SERD_CDRL_Atch_A1_-_SERD_LPD_Summary_Work_Worksheet.pdf
PDF 14 KB Posted
- Attached to
- T56 Component Improvement Program (CIP) Federal contract opportunity
- Solicitation number
- FA8124-14-R-0001
About this file
SERD CDRL Attach A1 - SERD LPD Summary Work Worksheet
View the file
Other files for this federal contract opportunity
Show all 50
T56 Component Improvement Program (CIP) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment to DD 1423 (DI-SESS-81759/T SERD _ Handtools)
LOGISTICS PRODUCT DATA (LPD) SUMMARY WORKSHEET (SERD)
DI-SESS-81759/T
15 Sep 2013
1. SUMMARY TITLE: SUPPORT AND TEST EQUIPMENT
1.1. Summary Sub-title: SUPPORT EQUIPMENT RECOMMENDATION DATA (SERD)
2. SPECIFIC INSTRUCTIONS: Identify all equipment (mobile or fixed) required to support the operation and maintenance of an end article/system. SERD required for each item of equipment (both contractor furnished and government furnished) identified as a solution to each functional requirement.
2.1. SERD shall provide full:
2.1.1. Narrative descriptions of the SE requirement.
2.1.2. Administrative/identification data about the SE and the article(s) requiring support.
2.1.3. SE supersedure/deletion/distribution data.
2.1.4. Design data requirements.
2.1.5. Integrated Product Support (IPS) data requirements (formerly ILS elements).
2.1.6. SE parametric and Unit Under Test (UUT) related information.
2.1.7. A sketch or line art drawing to clarify descriptive narrative of the SE item. All contractor furnished equipment (CFE)/nonstocklisted items will include a sketch.
2.2. Unless specified otherwise by the PPA, SERD shall not be prepared for items or classes of equipment as follows:
2.2.1. Common nonpowered hand tools.
2.2.2. Housekeeping items.
2.2.3. Office furniture and equipment.
2.2.4. Common production tools and tooling such as lathes, drill presses, plating equipment, induction heaters, and powered hand tools.
2.2.5. Facility installation equipment.
2.2.6. Manufacturer’s equipment such as items listed above and items which are used only by the contractor.
3. DATA IN LPD SPECIFICATION: Logistics Product Data Selection Worksheet for SE attached.
4. DATA NOT IN LPD SPECIFICATION: To be discussed at Provisioning Guidance Conference.
5. SUMMARY LAYOUT: Contractor Provided. The layout should be in a logical flow.
File details come from the government source that posted it. Updated .