This solicitation is for the remanufacture of inertial navigation elements over a 14-year period. The Air Force Materiel Command Nuclear Weapons Center is seeking these services on a sole source basis from Northrop Grumman Services Corporation. The contractor will restore navigation elements to their original life expectancy through remanufacturing and related services. The contract consists of one 3-year ordering period followed by four 2-year periods and one final 3-year period. Pricing will be determined using firm fixed price and firm fixed price incentive terms across contract line items for remanufacturing, over and above work, and items found to be beyond economical repair. The minimum order quantity is 40 units and maximum is 550 units over the life of the contract.

View the file

Other files

File Type Posted
CDRL_Report_INE.pdf PDF
DI_ADMN_81250B.pdf PDF
Packaging.pdf PDF
DI_MISC_80508B.pdf PDF
DI_ADMN_81249B.pdf PDF
DI_MGMT_80259.pdf PDF
DI_MGMT_81605.pdf PDF
DI_MGMT_81634C.pdf PDF
GFP_Attachment_INE.pdf PDF
INE_Production_SOW_Nov_13_2019.pdf PDF
DI_QCIC_80798C.pdf PDF
AFMC_Form_158.pdf PDF
FA812820R0002.pdf PDF
SPI_F01_163_8424.pdf PDF
DI_NDTI_80603A.pdf PDF
DI_MGMT_80227.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Test Plan

Number: DI-NDTI-80566A Approval Date: 14 Nov 2006 AMSC Number: 7639 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship: The Test Plan outlines the plans and performance objectives at every level of testing on systems or equipment. It provides the procuring activity with the test concept, objectives and requirements to be satisfied, test methods, elements, responsible activities associated with the testing, measures required and recording procedures to be used.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is applicable to system and equipment tests that include design evaluation tests, engineering tests, preliminary qualification tests, formal qualification tests, human factors tests, operational tests and acceptance tests.

This DID supersede DI-NDTI-80566.

Requirements:

1. Reference documents. None.

2. General. The test plan shall document in detail the contractor’s plan for conducting tests and analyzing the test results to show how the system, when fielded, will satisfy the requirements of the applicable design specification.

3. Format: The plan shall be in contractor’s format.

4. Contents. The plan shall contain the following:

4.1 Title page. The title page shall include the following:

a. Title of the test to be conducted.

b. Identification of system being tested.

c. Contractor’s name.

d. Contractor number.

Downloaded from http://www.everyspec.com

DI-NDTI-80566A

e. Security classification.

f. Distribution statement.

4.2 Introduction. Consists of an overview of the objectives of the test plan, including flow diagrams, milestones, personnel participation, locations, schedules, and security measures to be observed. The plan shall include the following:

4.3 Flow diagrams. The flow diagrams will reflect a functional description of the test program using a block diagram portrayal of the functions that must be met to satisfy the total test program. Functions shall be numbered 1.0, 2.0, 3.0, etc.

4.4 Milestones. Identifies the start and expected completion dates of each test to be performed.

4.5 Participation. Identifies the government and contractor participation roles and responsibilties.

4.6 Location. Identifies the facilities where the testing will be performed.

4.7 Schedule. States when testing will be performed, whether testing is on schedule, and if not, what procedures will be taken to meet the schedule.

4.8 Security. Identify and state briefly any security measures of guidelines to be observed.

4.9 Master test list. Lists all tests to be accomplished in the order they are to be performed. A separate listing for each location shall be provided. Each listing shall include the following:

4.9.1 Test description. Name and brief description of test to be performed.

4.9.2 Applicable specification (s). The specifications shall be identified as follows:

a. Title and identification number.

b. Paragraph number associated with the tests.

c. Title of test.

d. Functional category of test.

4.9.3 Parameters. The number of cycles the test will be performed and selected parameters to be observed.

4.9.4 Special tests. Provides a list of special or unusual tests and examination necessary to verify satisfactory equipment performance to specifications.

DI-NDTI-80566A

4.9.5 Test classification category. State the functional area of each test performed.

4.9.6 Test objectives. Describes the objectives of each test performed, including the criteria, baseline, duration, and number of times each test should be performed.

a. Success/failure criteria.

b. Baseline.

c. Duration.

d. Quantity of test.

4.9.7 Test equipment. List all equipment to be used in the test and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

4.9.8 Support equipment. List all support equipment that will be used to perform the tests and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

d. Calibration constants.

e. Calibration procedures.

f. Operating instructions.

4.9.9 Special test equipment. List all special test equipment required to be designed or fabricated for use on the program as follows:

a. Description.

b. Nomenclature.

c. Data required.

4.9.10 Approach. Describe the steps used to perform each test.

4.9.11 Instrumentation. Indicates the type and recording devices that will be used and the number and types of parameters to be recorded.

4.9.12 Data reduction and analysis. Describes data to be recorded and the data reduction and analysis techniques that will be used to interpret the data.

4.9.13 Government test facilities. Identifies applicable facility and includes a reference to the appropriate facility requirements documents.

Validation procedure. An overview of the procedures that the contractor will use to validate the test results.

5. END OF DI-NDTI-80566A