This document is a Data Item Description (DID) for a Test Plan, DI-NDTI-80566A. The Test Plan outlines the plans and performance objectives for testing systems or equipment, and provides the procuring activity with the test concept, objectives, requirements, methods, elements, responsible activities, and recording procedures to be used.

The related federal contract opportunity is for a Flight Simulator Curved Screen, solicitation number FA813924Q0036. The requirement is for 1 lot of a Flight Simulator Curved Screen in accordance with the Performance Work Statement (PWS). The delivery period is not to exceed 26 weeks after receipt of order. Offerors must be registered in SAM, have a passing NIST SP 800-171 assessment, and submit quotations conforming to the solicitation requirements. The contract will be awarded to the responsible offeror providing the best value quotation.

View the file

Other files

File Type Posted
Combined Synopsis Solicitation Amendment FA813924Q00360001 SF 30.pdf PDF
QandA_CSS FA813924Q0036 Questions and Answers_10 Oct 2024.pdf PDF
QandA_CSS FA813924Q0036 Questions and Answers_8 Oct 2024.pdf PDF
QandA_CSS FA813924Q0036 Questions and Answers_7 Oct 2024.pdf PDF
12139 CDRL A004 - StatementCertificate of Volatility - signed_Redacted.pdf PDF
12139 CDRL A005 - Instruction Blending Warping - DID DI-TMSS-81675.pdf PDF
QPL - Qulified Parts List_Flight Simulator Curved Screen_Redacted.pdf PDF
12139 CDRL A003 - CAD Computer Aided Design - DID DI-MISC-81489.pdf PDF
GAT - Government Acceptance Test Procedures_Flight Simulator Curved Screen.pdf PDF
12139 CDRL A001 - BOM Bill of Materials - DID DI-PSSS-81656.pdf PDF
12139 CDRL A005 - Instructions for Blending and Warping - signed_Redacted.pdf PDF
12139 CDRL A006 - Contractors Personnel Roster - DID DI-MGMT-81834.pdf PDF
12139 CDRL A002 - IMS Integrated Master Schedule - DID DI-IPSC-82297.pdf PDF
12139 CDRL A007 - Acceptance Test Procedures (ATP) - signed_Redacted.pdf PDF
12139 CDRL A006 - Contractors Personnel Roster - signed_Redacted.pdf PDF
12139 CDRL A002 - IMS Integrated Master Schedule - signed_Redacted.pdf PDF
12139 CDRL A004 - StatementCertificate of Volatility - DID DI-MISC-80508.pdf PDF
GFP - Government Furnished Property_flight Simulator Curved Screed_GFPFA813924Q0036_4.pdf PDF
12139 CDRL A003 - CAD Computer Aided Design - signed_Redacted.pdf PDF
12139 Brand Name Justification_signed 28 Aug 2024_Redacted.pdf PDF
12139 CDRL A001 - BOM Bill of Materials - signed_Redacted.pdf PDF
Service Contract Act WD 2015-5315 - Rev 24_22 Jul 2024.pdf PDF
CSS-Combined Synopsis-Solicitation_FA813924Q0036.pdf PDF
PWS - Performance Work Statement_Flight Simulator Curved Screen_23 Apr 2024.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Test Plan

Number: DI-NDTI-80566A Approval Date: 14 Nov 2006 AMSC Number: 7639 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship: The Test Plan outlines the plans and performance objectives at every level of testing on systems or equipment. It provides the procuring activity with the test concept, objectives and requirements to be satisfied, test methods, elements, responsible activities associated with the testing, measures required and recording procedures to be used.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is applicable to system and equipment tests that include design evaluation tests, engineering tests, preliminary qualification tests, formal qualification tests, human factors tests, operational tests and acceptance tests.

This DID supersede DI-NDTI-80566.

Requirements:

1. Reference documents. None.

2. General. The test plan shall document in detail the contractor’s plan for conducting tests and analyzing the test results to show how the system, when fielded, will satisfy the requirements of the applicable design specification.

3. Format: The plan shall be in contractor’s format.

4. Contents. The plan shall contain the following:

4.1 Title page. The title page shall include the following:

a. Title of the test to be conducted.

b. Identification of system being tested.

c. Contractor’s name.

d. Contractor number.

Source: http://assist.dla.mil -- Downloaded: 2024-07-12T16:00Z

Check the source to verify that this is the current version before use.

DI-NDTI-80566A

e. Security classification.

f. Distribution statement.

4.2 Introduction. Consists of an overview of the objectives of the test plan, including flow diagrams, milestones, personnel participation, locations, schedules, and security measures to be observed. The plan shall include the following:

4.3 Flow diagrams. The flow diagrams will reflect a functional description of the test program using a block diagram portrayal of the functions that must be met to satisfy the total test program. Functions shall be numbered 1.0, 2.0, 3.0, etc.

4.4 Milestones. Identifies the start and expected completion dates of each test to be performed.

4.5 Participation. Identifies the government and contractor participation roles and responsibilties.

4.6 Location. Identifies the facilities where the testing will be performed.

4.7 Schedule. States when testing will be performed, whether testing is on schedule, and if not, what procedures will be taken to meet the schedule.

4.8 Security. Identify and state briefly any security measures of guidelines to be observed.

4.9 Master test list. Lists all tests to be accomplished in the order they are to be performed. A separate listing for each location shall be provided. Each listing shall include the following:

4.9.1 Test description. Name and brief description of test to be performed.

4.9.2 Applicable specification (s). The specifications shall be identified as follows:

a. Title and identification number.

b. Paragraph number associated with the tests.

c. Title of test.

d. Functional category of test.

4.9.3 Parameters. The number of cycles the test will be performed and selected parameters to be observed.

4.9.4 Special tests. Provides a list of special or unusual tests and examination necessary to verify satisfactory equipment performance to specifications.

DI-NDTI-80566A

4.9.5 Test classification category. State the functional area of each test performed.

4.9.6 Test objectives. Describes the objectives of each test performed, including the criteria, baseline, duration, and number of times each test should be performed.

a. Success/failure criteria.

b. Baseline.

c. Duration.

d. Quantity of test.

4.9.7 Test equipment. List all equipment to be used in the test and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

4.9.8 Support equipment. List all support equipment that will be used to perform the tests and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

d. Calibration constants.

e. Calibration procedures.

f. Operating instructions.

4.9.9 Special test equipment. List all special test equipment required to be designed or fabricated for use on the program as follows:

a. Description.

b. Nomenclature.

c. Data required.

4.9.10 Approach. Describe the steps used to perform each test.

4.9.11 Instrumentation. Indicates the type and recording devices that will be used and the number and types of parameters to be recorded.

4.9.12 Data reduction and analysis. Describes data to be recorded and the data reduction and analysis techniques that will be used to interpret the data.

4.9.13 Government test facilities. Identifies applicable facility and includes a reference to the appropriate facility requirements documents.

Validation procedure. An overview of the procedures that the contractor will use to validate the test results.

5. END OF DI-NDTI-80566A