CE_Engineering_Management_Pricing_Matrix_7_Jul_15.xlsx
XLSX spreadsheet 51 KB Posted
- Attached to
- CE Engineering Management Services Federal contract opportunity
- Solicitation number
- FA8101-15-R-0006
About this file
CE_Engineering_Management_Pricing_Matrix_7_Jul_15
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEP Total
| Tinker AFB Civil Engineer Services- Engineering Management Contract | |
| Pricing Matrix-Overall Total Evaluated Price | |
| Base Period | $ - 0 |
| Option 1 | $ - 0 |
| Option 2 | $ - 0 |
| Option 3 | $ - 0 |
| Option 4 | $ - 0 |
| 6-Month Extension | $ 24.00 |
| Total Evaluated Price | $ 24.00 |
Base Period
| Tinker AFB Civil Engineer Services- Engineering Management Contract | |||||||||
| Pricing Matrix- Base Period | |||||||||
| Section B Pricing (must be identical) | |||||||||
| Offerors shall insert only unit prices---all other prices will autopopulate accordingly | For Government Use IAW Clause H-1 | ||||||||
| CLIN # | Description | Qty | Unit | Proposed Unit Price | Proposed Extended Price | Adjusted Unit Price (92%) | Adjusted Extended Price (92%) | Quality Performance Indicator (8%) |
CLIN 0015
| 0001 | Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002 | Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003 | Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0004 | INFORMATION ONLY: Project Management & Preliminary Contract Management | INFORMATION ONLY | ||||||
| 0004AA | Project Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0004AB | Project Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0005 | Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0006 | Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007 | INFORMATION ONLY: Design (Non-Core Design Work) | INFORMATION ONLY | ||||||
| 0007AA | 100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 8 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007AB | 100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 8 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007AC | 100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 6 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007AD | 100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 4 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007AE | 100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 2 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007AF | A&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17. | 2 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007AG | Preliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17. | 40 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007AH | IDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 20 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007AJ | IDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007AK | Concept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17. | 20 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0008 | INFORMATION ONLY: Construction Management (DMAG) | INFORMATION ONLY | ||||||
| 0008AA | Full Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15. | $36,969,966 | Percent* | 0.00% | $ - 0 | N/A** | N/A** | N/A** |
| 0008AB | Liaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16. | $38,483,830 | Percent* | 0.00% | $ - 0 | N/A** | N/A** | N/A** |
| 0009 | Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0010 | INFORMATION ONLY: Operation Engineering Management | INFORMATION ONLY | ||||||
| 0010AA | Operation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0010AB | Operation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0010AC | Operation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0011 | Equipment Information System Database PWS Reference 1.1.7.4. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0012 | Pavement Condition Inspection PWS Reference 1.1.7.5. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0013 | Bridge Inspection (once every two year requirement) PWS Reference 1.1.8. | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0014 | Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5. | 22 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0016 | Contract Transition-IN | 2 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Evaluated Price (Base Period): | $ - 0 |
| * Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA). |
| ** Note 2: QPI will be derived from each task order. |
Opt 1
| Tinker AFB Civil Engineer Services- Engineering Management Contract | |||||||||
| Pricing Matrix- Option 1 | |||||||||
| Section B Pricing (must be identical) | |||||||||
| Offerors shall insert only unit prices---all other prices will autopopulate accordingly | For Government Use IAW Clause H-1 | ||||||||
| CLIN # | Description | Qty | Unit | Proposed Unit Price | Proposed Extended Price | Adjusted Unit Price (92%) | Adjusted Extended Price (92%) | Quality Performance Indicator (8%) |
CLIN 1015
| 1001 | Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1002 | Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1003 | Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1004 | INFORMATION ONLY: Project Management & Preliminary Contract Management | INFORMATION ONLY | ||||||
| 1004AA | Project Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1004AB | Project Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1005 | Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1006 | Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007 | INFORMATION ONLY: Design (Non-Core Design Work) | INFORMATION ONLY | ||||||
| 1007AA | 100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 4 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007AB | 100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 4 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007AC | 100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 3 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007AD | 100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 2 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007AE | 100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007AF | A&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007AG | Preliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17. | 20 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007AH | IDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007AJ | IDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 5 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1007AK | Concept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1008 | INFORMATION ONLY: Construction Management (DMAG) | INFORMATION ONLY | ||||||
| 1008AA | Full Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15. | $20,165,436 | Percent* | 0.00% | $ - 0 | N/A** | N/A** | N/A** |
| 1008AB | Liaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16. | $20,991,180 | Percent* | 0.00% | $ - 0 | N/A** | N/A** | N/A** |
| 1009 | Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1010 | INFORMATION ONLY: Operation Engineering Management | INFORMATION ONLY | ||||||
| 1010AA | Operation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1010AB | Operation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1010AC | Operation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1011 | Equipment Information System Database PWS Reference 1.1.7.4. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1012 | Pavement Condition Inspection PWS Reference 1.1.7.5. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1013 | Bridge Inspection (once every two year requirement) PWS Reference 1.1.8. | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1014 | Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Evaluated Price (Opt 1): | $ - 0 | |||||||
| * Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA). | ||||||||
| ** Note 2: QPI will be derived from each task order |
Opt 2
| Tinker AFB Civil Engineer Services- Engineering Management Contract | |||||||||
| Pricing Matrix- Option 2 | |||||||||
| Section B Pricing (must be identical) | |||||||||
| Offerors shall insert only unit prices---all other prices will autopopulate accordingly | For Government Use IAW Clause H-1 | ||||||||
| CLIN # | Description | Qty | Unit | Proposed Unit Price | Proposed Extended Price | Adjusted Unit Price (92%) | Adjusted Extended Price (92%) | Quality Performance Indicator (8%) |
CLIN 2015
| 2001 | Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2002 | Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2003 | Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2004 | INFORMATION ONLY: Project Management & Preliminary Contract Management | INFORMATION ONLY | ||||||
| 2004AA | Project Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2004AB | Project Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2005 | Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2006 | Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007 | INFORMATION ONLY: Design (Non-Core Design Work) | INFORMATION ONLY | ||||||
| 2007AA | 100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 4 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007AB | 100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 4 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007AC | 100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 3 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007AD | 100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 2 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007AE | 100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007AF | A&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007AG | Preliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17. | 20 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007AH | IDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007AJ | IDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 5 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2007AK | Concept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2008 | INFORMATION ONLY: Construction Management (DMAG) | INFORMATION ONLY | ||||||
| 2008AA | Full Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15. | $20,165,436 | Percent* | 0.00% | $ - 0 | N/A** | N/A** | N/A** |
| 2008AB | Liaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16. | $20,991,180 | Percent* | 0.00% | $ - 0 | N/A** | N/A** | N/A** |
| 2009 | Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2010 | INFORMATION ONLY: Operation Engineering Management | INFORMATION ONLY | ||||||
| 2010AA | Operation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2010AB | Operation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2010AC | Operation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2011 | Equipment Information System Database PWS Reference 1.1.7.4. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2012 | Pavement Condition Inspection PWS Reference 1.1.7.5. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2013 | Bridge Inspection (once every two year requirement) PWS Reference 1.1.8. | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2014 | Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Evaluated Price (Opt 2): | $ - 0 | |||||||
| * Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA). | ||||||||
| ** Note 2: QPI will be derived from each task order |
Opt 3
| Tinker AFB Civil Engineer Services- Engineering Management Contract | |||||||||
| Pricing Matrix- Option 3 | |||||||||
| Section B Pricing (must be identical) | |||||||||
| Offerors shall insert only unit prices---all other prices will autopopulate accordingly | For Government Use IAW Clause H-1 | ||||||||
| CLIN # | Description | Qty | Unit | Proposed Unit Price | Proposed Extended Price | Adjusted Unit Price (92%) | Adjusted Extended Price (92%) | Quality Performance Indicator (8%) |
CLIN 3015
| 3001 | Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3002 | Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3003 | Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3004 | INFORMATION ONLY: Project Management & Preliminary Contract Management | INFORMATION ONLY | ||||||
| 3004AA | Project Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3004AB | Project Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3005 | Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3006 | Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007 | INFORMATION ONLY: Design (Non-Core Design Work) | INFORMATION ONLY | ||||||
| 3007AA | 100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 4 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007AB | 100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 4 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007AC | 100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 3 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007AD | 100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 2 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007AE | 100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007AF | A&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007AG | Preliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17. | 20 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007AH | IDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007AJ | IDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 5 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3007AK | Concept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3008 | INFORMATION ONLY: Construction Management (DMAG) | INFORMATION ONLY | ||||||
| 3008AA | Full Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15. | $20,165,436 | Percent* | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3008AB | Liaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16. | $20,991,180 | Percent* | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3009 | Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3010 | INFORMATION ONLY: Operation Engineering Management | INFORMATION ONLY | ||||||
| 3010AA | Operation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3010AB | Operation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3010AC | Operation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3011 | Equipment Information System Database PWS Reference 1.1.7.4. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3012 | Pavement Condition Inspection PWS Reference 1.1.7.5. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3013 | Bridge Inspection (once every two year requirement) PWS Reference 1.1.8. | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3014 | Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Evaluated Price (Opt 3): | $ - 0 | |||||||
| * Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA). | ||||||||
| ** Note 2: QPI will be derived from each task order |
Opt 4
| Tinker AFB Civil Engineer Services- Engineering Management Contract | |||||||||
| Pricing Matrix- Option 4 | |||||||||
| Section B Pricing (must be identical) | |||||||||
| Offerors shall insert only unit prices---all other prices will autopopulate accordingly | For Government Use IAW Clause H-1 | ||||||||
| CLIN # | Description | Qty | Unit | Proposed Unit Price | Proposed Extended Price | Adjusted Unit Price (92%) | Adjusted Extended Price (92%) | Quality Performance Indicator (8%) |
CLIN 4015
| 4001 | Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4002 | Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4003 | Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4004 | INFORMATION ONLY: Project Management & Preliminary Contract Management | INFORMATION ONLY | ||||||
| 4004AA | Project Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4004AB | Project Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4005 | Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4006 | Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007 | INFORMATION ONLY: Design (Non-Core Design Work) | INFORMATION ONLY | ||||||
| 4007AA | 100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 4 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007AB | 100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 4 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007AC | 100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 3 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007AD | 100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 2 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007AE | 100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007AF | A&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007AG | Preliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17. | 20 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007AH | IDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007AJ | IDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 5 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4007AK | Concept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4008 | INFORMATION ONLY: Construction Management (DMAG) | INFORMATION ONLY | ||||||
| 4008AA | Full Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15. | $20,165,436 | Percent* | 0.00% | $ - 0 | N/A** | N/A** | N/A** |
| 4008AB | Liaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16. | $20,991,180 | Percent* | 0.00% | $ - 0 | N/A** | N/A** | N/A** |
| 4009 | Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4010 | INFORMATION ONLY: Operation Engineering Management | INFORMATION ONLY | ||||||
| 4010AA | Operation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4010AB | Operation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4010AC | Operation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 4011 | Equipment Information System Database PWS Reference 1.1.7.4. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4012 | Pavement Condition Inspection PWS Reference 1.1.7.5. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4013 | Bridge Inspection (once every two year requirement) PWS Reference 1.1.8. | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4014 | Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5. | 12 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Evaluated Price (Opt 4): | $ - 0 | |||||||
| * Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA). | ||||||||
| ** Note 2: QPI will be derived from each task order |
6-Mo Ext
| Tinker AFB Civil Engineer Services- Engineering Management Contract | ||||||||
| Pricing Matrix- 6 Month Extension Calculation (no input required) | ||||||||
| For Government Use IAW Clause H-1 | ||||||||
| CLIN # | Description | Qty | Unit | Proposed Unit Price | Proposed Extended Price | Adjusted Unit Price (92%) | Adjusted Extended Price (92%) | Quality Performance Indicator (8%) |
CLIN X015
| X001 | Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X002 | Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X003 | Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X004 | INFORMATION ONLY: Project Management & Preliminary Contract Management | INFORMATION ONLY | ||||||
| X004AA | Project Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X004AB | Project Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X005 | Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3. CDRLs A008 and A009 | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X006 | Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16. CDRLs A009 and A010 | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007 | INFORMATION ONLY: Design (Non-Core Design Work) | INFORMATION ONLY | ||||||
| X007AA | 100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 2 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007AB | 100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 2 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007AC | 100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007AD | 100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007AE | 100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007AF | A&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17. | 1 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007AG | Preliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17. | 10 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007AH | IDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 5 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007AJ | IDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17. | 2 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X007AK | Concept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17. | 5 | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X008 | INFORMATION ONLY: Construction Management (DMAG) | INFORMATION ONLY | ||||||
| X008AA | Full Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15. | $10,082,718 | Percent* | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X008AB | Liaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16. | $10,495,590 | Percent* | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X009 | Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X010 | INFORMATION ONLY: Operation Engineering Management | INFORMATION ONLY | ||||||
| X010AA | Operation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X010AB | Operation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 6 | Months | $ 4.00 | $ 24.00 | $ 3.68 | $ 22.08 | $ 1.92 |
| X010AC | Operation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| X011 | Equipment Information System Database PWS Reference 1.1.7.4. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X012 | Pavement Condition Inspection PWS Reference 1.1.7.5. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X013 | Bridge Inspection (once every two year requirement) PWS Reference 1.1.8. | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| X014 | Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5. | 6 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Evaluated Price (6 Mo Ext): | $ 24.00 |
| * Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA). |
| ** Note 2: QPI will be derived from each task order |
File details come from the government source that posted it. Updated .