CE_Engineering_Management_Pricing_Matrix_24_Jul_15.xlsx

XLSX spreadsheet 51 KB Posted

Attached to
CE Engineering Management Services Federal contract opportunity
Solicitation number
FA8101-15-R-0006
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

CE Engineering Management Pricing Matrix 24 Jul 15

View the file

Other files for this federal contract opportunity

Other files attached to CE Engineering Management Services, newest first.
File Type Posted
PWS_Engineering_Management_Rev_3 _12_Jan_16.pdf PDF
FA8101-15-R-0006-0006_21_Jan_16.pdf PDF
CE_Engineering_Management_Pricing_Matrix_12_Jan_16.xlsx XLSX spreadsheet
PWS_Engineering_Management_Rev_2 _1_Dec_15.pdf PDF
CE_Engineering_Management_Pricing_Matrix_2_Dec_15.xlsx XLSX spreadsheet
FA8101-15-R-0006-0005.pdf PDF
CE_Engineering_Questions_and_Answers_29_Oct_15.pdf PDF
4_5_3a_Design_Project_Workload _Updated_20_Oct_2015.xls XLS spreadsheet
Premium_Display.pdf PDF
Office_Desktop.pdf PDF
FA8101-15-R-0006-0004.pdf PDF
52.212-1_CE_Engineering_Rev_A_19_Oct_15.pdf PDF
23_Oct_2015_CE_Engineering_Q A.pdf PDF
Performance_Desktop.pdf PDF
Office_Display.pdf PDF
52.212-2_CE_Engineering_Rev_A_19_Oct_15.pdf PDF
Laptop.pdf PDF
FA8101-15-R-0006-0003.pdf PDF
20_Aug_2015_CE_Engineering_Q A.pdf PDF
ppi_tool.accdb —
14_Aug_2015_CE_Engineering_Q A.pdf PDF
14_Aug_2015_CE_Engineering_Q A.xlsx XLSX spreadsheet
7_Aug_2015_Engineering_Mgmt_Q A.pdf PDF
7_Aug_2015_Engineering_OPS_Q A.xlsx XLSX spreadsheet
FA8101-15-R-0006-0002.pdf PDF
Q_ _A_Engineering_Management_3_Aug_2015.pdf PDF
PWS_Engineering_Management_Rev_1 _24_Jul_15.pdf PDF
FA8101-15-R-0006-0001.pdf PDF
4.6.3_Government_Provided_Furnishings_-_17_Jul_15.xlsx XLSX spreadsheet
4.6.4_Government_Provided_Tools_and_Equipment_-_17_Jul_15.xlsx XLSX spreadsheet
4.6.1_Government_Furnished_Property_PDF_-_24_Jul_15.pdf PDF
ppi_tool.accdb —
Appendix_4.6.4_Tools_and_Equipment_Inventory_(CB).xls XLS spreadsheet
Appendix_4.6.3_Furniture_Inventory_(CB).xls XLS spreadsheet
Appendix_4.5_Workload_Data.zip ZIP file
Appendix_4.6_Government_Furnished_Property.zip ZIP file
PWS _1_Jul_2015.pdf PDF
RFP_Engineering_Flow_Charts.pdf PDF
Addendum_to_52.212-1_CE_Engineering_7_Jul_15.pdf PDF
DD254_Redacted.pdf PDF
Addendum_to_52.212-2_CE_Engineering_7_Jul_15.pdf PDF
APPENDIX_C_15-004_Civil_Engineering_Services.pdf PDF
CE_Engineering_Management_Pricing_Matrix_7_Jul_15.xlsx XLSX spreadsheet
Appendix_4.2_Applicable_Publications_and_Forms.zip ZIP file
Appendix_4.7_Deliverables.zip ZIP file
FA8101-15-R-0006.pdf PDF
Appendix_4.3_Environmental_Requirements.zip ZIP file
Appendix_4.1_Acronyms.zip ZIP file
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEP Total

Tinker AFB Civil Engineer Services- Engineering Management Contract
Pricing Matrix-Overall Total Evaluated Price
Base Period$ - 0
Option 1$ - 0
Option 2$ - 0
Option 3$ - 0
Option 4$ - 0
6-Month Extension$ - 0
Total Evaluated Price$ - 0

Base Period

Tinker AFB Civil Engineer Services- Engineering Management Contract
Pricing Matrix- Base Period
Section B Pricing (must be identical)
Offerors shall insert only unit prices---all other prices will autopopulate accordinglyFor Government Use IAW Clause H-1
CLIN #DescriptionQtyUnitProposed Unit PriceProposed Extended PriceAdjusted Unit Price (92%)Adjusted Extended Price (92%)Quality Performance Indicator (8%)

CLIN 0015

0001Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0002Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0003Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0004INFORMATION ONLY: Project Management & Preliminary Contract ManagementINFORMATION ONLY
0004AAProject Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0004ABProject Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0005Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0006Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0007INFORMATION ONLY: Design (Non-Core Design Work)INFORMATION ONLY
0007AA100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.8Each$ - 0$ - 0$ - 0$ - 0$ - 0
0007AB100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.8Each$ - 0$ - 0$ - 0$ - 0$ - 0
0007AC100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.6Each$ - 0$ - 0$ - 0$ - 0$ - 0
0007AD100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.4Each$ - 0$ - 0$ - 0$ - 0$ - 0
0007AE100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.2Each$ - 0$ - 0$ - 0$ - 0$ - 0
0007AFA&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17.2Each$ - 0$ - 0$ - 0$ - 0$ - 0
0007AGPreliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17.40Each$ - 0$ - 0$ - 0$ - 0$ - 0
0007AHIDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.20Each$ - 0$ - 0$ - 0$ - 0$ - 0
0007AJIDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
0007AKConcept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17.20Each$ - 0$ - 0$ - 0$ - 0$ - 0
0008INFORMATION ONLY: Construction Management (DMAG)INFORMATION ONLY
0008AAFull Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15.$36,969,966Percent*0.00%$ - 0N/A**N/A**N/A**
0008ABLiaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16.$38,483,830Percent*0.00%$ - 0N/A**N/A**N/A**
0009Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0010INFORMATION ONLY: Operation Engineering ManagementINFORMATION ONLY
0010AAOperation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0010ABOperation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0010ACOperation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0011Equipment Information System Database PWS Reference 1.1.7.4.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0012Pavement Condition Inspection PWS Reference 1.1.7.5.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0013Bridge Inspection (once every two year requirement) PWS Reference 1.1.8.1Lot$ - 0$ - 0$ - 0$ - 0$ - 0
0014Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5.22Months$ - 0$ - 0$ - 0$ - 0$ - 0
0016Contract Transition-IN2Months$ - 0$ - 0$ - 0$ - 0$ - 0
Total Evaluated Price (Base Period):$ - 0
* Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA).
** Note 2: QPI will be derived from each task order.

Opt 1

Tinker AFB Civil Engineer Services- Engineering Management Contract
Pricing Matrix- Option 1
Section B Pricing (must be identical)
Offerors shall insert only unit prices---all other prices will autopopulate accordinglyFor Government Use IAW Clause H-1
CLIN #DescriptionQtyUnitProposed Unit PriceProposed Extended PriceAdjusted Unit Price (92%)Adjusted Extended Price (92%)Quality Performance Indicator (8%)

CLIN 1015

1001Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1002Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1003Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1004INFORMATION ONLY: Project Management & Preliminary Contract ManagementINFORMATION ONLY
1004AAProject Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1004ABProject Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1005Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1006Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1007INFORMATION ONLY: Design (Non-Core Design Work)INFORMATION ONLY
1007AA100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.4Each$ - 0$ - 0$ - 0$ - 0$ - 0
1007AB100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.4Each$ - 0$ - 0$ - 0$ - 0$ - 0
1007AC100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.3Each$ - 0$ - 0$ - 0$ - 0$ - 0
1007AD100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.2Each$ - 0$ - 0$ - 0$ - 0$ - 0
1007AE100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
1007AFA&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
1007AGPreliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17.20Each$ - 0$ - 0$ - 0$ - 0$ - 0
1007AHIDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
1007AJIDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.5Each$ - 0$ - 0$ - 0$ - 0$ - 0
1007AKConcept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
1008INFORMATION ONLY: Construction Management (DMAG)INFORMATION ONLY
1008AAFull Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15.$20,165,436Percent*0.00%$ - 0N/A**N/A**N/A**
1008ABLiaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16.$20,991,180Percent*0.00%$ - 0N/A**N/A**N/A**
1009Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1010INFORMATION ONLY: Operation Engineering ManagementINFORMATION ONLY
1010AAOperation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1010ABOperation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1010ACOperation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1011Equipment Information System Database PWS Reference 1.1.7.4.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1012Pavement Condition Inspection PWS Reference 1.1.7.5.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
1013Bridge Inspection (once every two year requirement) PWS Reference 1.1.8.1Lot$ - 0$ - 0$ - 0$ - 0$ - 0
1014Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
Total Evaluated Price (Opt 1):$ - 0
* Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA).
** Note 2: QPI will be derived from each task order

Opt 2

Tinker AFB Civil Engineer Services- Engineering Management Contract
Pricing Matrix- Option 2
Section B Pricing (must be identical)
Offerors shall insert only unit prices---all other prices will autopopulate accordinglyFor Government Use IAW Clause H-1
CLIN #DescriptionQtyUnitProposed Unit PriceProposed Extended PriceAdjusted Unit Price (92%)Adjusted Extended Price (92%)Quality Performance Indicator (8%)

CLIN 2015

2001Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2002Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2003Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2004INFORMATION ONLY: Project Management & Preliminary Contract ManagementINFORMATION ONLY
2004AAProject Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2004ABProject Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2005Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2006Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2007INFORMATION ONLY: Design (Non-Core Design Work)INFORMATION ONLY
2007AA100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.4Each$ - 0$ - 0$ - 0$ - 0$ - 0
2007AB100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.4Each$ - 0$ - 0$ - 0$ - 0$ - 0
2007AC100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.3Each$ - 0$ - 0$ - 0$ - 0$ - 0
2007AD100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.2Each$ - 0$ - 0$ - 0$ - 0$ - 0
2007AE100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
2007AFA&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
2007AGPreliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17.20Each$ - 0$ - 0$ - 0$ - 0$ - 0
2007AHIDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
2007AJIDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.5Each$ - 0$ - 0$ - 0$ - 0$ - 0
2007AKConcept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
2008INFORMATION ONLY: Construction Management (DMAG)INFORMATION ONLY
2008AAFull Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15.$20,165,436Percent*0.00%$ - 0N/A**N/A**N/A**
2008ABLiaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16.$20,991,180Percent*0.00%$ - 0N/A**N/A**N/A**
2009Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2010INFORMATION ONLY: Operation Engineering ManagementINFORMATION ONLY
2010AAOperation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2010ABOperation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2010ACOperation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2011Equipment Information System Database PWS Reference 1.1.7.4.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2012Pavement Condition Inspection PWS Reference 1.1.7.5.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
2013Bridge Inspection (once every two year requirement) PWS Reference 1.1.8.1Lot$ - 0$ - 0$ - 0$ - 0$ - 0
2014Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
Total Evaluated Price (Opt 2):$ - 0
* Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA).
** Note 2: QPI will be derived from each task order

Opt 3

Tinker AFB Civil Engineer Services- Engineering Management Contract
Pricing Matrix- Option 3
Section B Pricing (must be identical)
Offerors shall insert only unit prices---all other prices will autopopulate accordinglyFor Government Use IAW Clause H-1
CLIN #DescriptionQtyUnitProposed Unit PriceProposed Extended PriceAdjusted Unit Price (92%)Adjusted Extended Price (92%)Quality Performance Indicator (8%)

CLIN 3015

3001Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3002Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3003Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3004INFORMATION ONLY: Project Management & Preliminary Contract ManagementINFORMATION ONLY
3004AAProject Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3004ABProject Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3005Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3006Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3007INFORMATION ONLY: Design (Non-Core Design Work)INFORMATION ONLY
3007AA100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.4Each$ - 0$ - 0$ - 0$ - 0$ - 0
3007AB100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.4Each$ - 0$ - 0$ - 0$ - 0$ - 0
3007AC100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.3Each$ - 0$ - 0$ - 0$ - 0$ - 0
3007AD100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.2Each$ - 0$ - 0$ - 0$ - 0$ - 0
3007AE100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
3007AFA&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
3007AGPreliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17.20Each$ - 0$ - 0$ - 0$ - 0$ - 0
3007AHIDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
3007AJIDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.5Each$ - 0$ - 0$ - 0$ - 0$ - 0
3007AKConcept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
3008INFORMATION ONLY: Construction Management (DMAG)INFORMATION ONLY
3008AAFull Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15.$20,165,436Percent*0.00%$ - 0$ - 0$ - 0$ - 0
3008ABLiaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16.$20,991,180Percent*0.00%$ - 0$ - 0$ - 0$ - 0
3009Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3010INFORMATION ONLY: Operation Engineering ManagementINFORMATION ONLY
3010AAOperation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3010ABOperation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3010ACOperation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3011Equipment Information System Database PWS Reference 1.1.7.4.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3012Pavement Condition Inspection PWS Reference 1.1.7.5.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
3013Bridge Inspection (once every two year requirement) PWS Reference 1.1.8.1Lot$ - 0$ - 0$ - 0$ - 0$ - 0
3014Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
Total Evaluated Price (Opt 3):$ - 0
* Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA).
** Note 2: QPI will be derived from each task order

Opt 4

Tinker AFB Civil Engineer Services- Engineering Management Contract
Pricing Matrix- Option 4
Section B Pricing (must be identical)
Offerors shall insert only unit prices---all other prices will autopopulate accordinglyFor Government Use IAW Clause H-1
CLIN #DescriptionQtyUnitProposed Unit PriceProposed Extended PriceAdjusted Unit Price (92%)Adjusted Extended Price (92%)Quality Performance Indicator (8%)

CLIN 4015

4001Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4002Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4003Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4004INFORMATION ONLY: Project Management & Preliminary Contract ManagementINFORMATION ONLY
4004AAProject Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4004ABProject Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4005Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4006Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4007INFORMATION ONLY: Design (Non-Core Design Work)INFORMATION ONLY
4007AA100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.4Each$ - 0$ - 0$ - 0$ - 0$ - 0
4007AB100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.4Each$ - 0$ - 0$ - 0$ - 0$ - 0
4007AC100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.3Each$ - 0$ - 0$ - 0$ - 0$ - 0
4007AD100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.2Each$ - 0$ - 0$ - 0$ - 0$ - 0
4007AE100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
4007AFA&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
4007AGPreliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17.20Each$ - 0$ - 0$ - 0$ - 0$ - 0
4007AHIDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
4007AJIDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.5Each$ - 0$ - 0$ - 0$ - 0$ - 0
4007AKConcept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
4008INFORMATION ONLY: Construction Management (DMAG)INFORMATION ONLY
4008AAFull Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15.$20,165,436Percent*0.00%$ - 0N/A**N/A**N/A**
4008ABLiaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16.$20,991,180Percent*0.00%$ - 0N/A**N/A**N/A**
4009Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4010INFORMATION ONLY: Operation Engineering ManagementINFORMATION ONLY
4010AAOperation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4010ABOperation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4010ACOperation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3.12Months$ - 0$ - 0$ - 0$ - 0
4011Equipment Information System Database PWS Reference 1.1.7.4.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4012Pavement Condition Inspection PWS Reference 1.1.7.5.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
4013Bridge Inspection (once every two year requirement) PWS Reference 1.1.8.1Lot$ - 0$ - 0$ - 0$ - 0$ - 0
4014Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5.12Months$ - 0$ - 0$ - 0$ - 0$ - 0
Total Evaluated Price (Opt 4):$ - 0
* Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA).
** Note 2: QPI will be derived from each task order

6-Mo Ext

Tinker AFB Civil Engineer Services- Engineering Management Contract
Pricing Matrix- 6 Month Extension Calculation (no input required)
For Government Use IAW Clause H-1
CLIN #DescriptionQtyUnitProposed Unit PriceProposed Extended PriceAdjusted Unit Price (92%)Adjusted Extended Price (92%)Quality Performance Indicator (8%)

CLIN X015

X001Architectural-Engineering Consulting, Investigations, and Evaluations PWS Reference 1.1. thru 1.1.1.24.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X002Drafting, Surveying, Mapping and Engineering Technical Services PWS Reference 1.1.2. thru 1.1.2.8.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X003Maintain GeoBase PWS Reference 1.1.2.9. thru 1.1.2.12.11.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X004INFORMATION ONLY: Project Management & Preliminary Contract ManagementINFORMATION ONLY
X004AAProject Management & Preliminary Contract Management (Non-DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X004ABProject Management & Preliminary Contract Management (DMAG Funded Program) PWS Reference 1.1.3. and 1.1.4. thru 1.1.4.1.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X005Core Design Workload (Non-DMAG) PWS Reference 1.1.3. through 1.1.2.17. & Table 1.1.3. CDRLs A008 and A0096Months$ - 0$ - 0$ - 0$ - 0$ - 0
X006Construction Management (Non-DMAG) PWS Reference 1.1.5. thru 1.1.5.16. CDRLs A009 and A0106Months$ - 0$ - 0$ - 0$ - 0$ - 0
X007INFORMATION ONLY: Design (Non-Core Design Work)INFORMATION ONLY
X007AA100% Design < $500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.2Each$ - 0$ - 0$ - 0$ - 0$ - 0
X007AB100% Design $500,001 through $1,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.2Each$ - 0$ - 0$ - 0$ - 0$ - 0
X007AC100% Design $1,000,001 through $1,500,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
X007AD100% Design $1,500,001 through $2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
X007AE100% Design >$2,000,000 PWS Reference 1.1.3.2.1. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
X007AFA&E Design Requirements and Design Management PWS Reference 1.1.3.2.2. and 1.1.3.3. thru 1.1.3.17.1Each$ - 0$ - 0$ - 0$ - 0$ - 0
X007AGPreliminary 35% Design (SABER or MACC) PWS Reference 1.1.3.3. thru 1.1.3.17.10Each$ - 0$ - 0$ - 0$ - 0$ - 0
X007AHIDIQ Design (Roofing or Paving) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.5Each$ - 0$ - 0$ - 0$ - 0$ - 0
X007AJIDIQ Design (Protective Coating) PWS Reference 1.1.3.2.5. and 1.1.3.3. thru 1.1.3.17.2Each$ - 0$ - 0$ - 0$ - 0$ - 0
X007AKConcept (SOW) Design PWS Reference 1.1.3.2.6. and 1.1.3.3. thru 1.1.3.17.5Each$ - 0$ - 0$ - 0$ - 0$ - 0
X008INFORMATION ONLY: Construction Management (DMAG)INFORMATION ONLY
X008AAFull Contract & Construction Management (Non-MILCON) PWS Reference 1.1.5. thru 1.1.5.15.$10,082,718Percent*0.00%$ - 0$ - 0$ - 0$ - 0
X008ABLiaison Contract & Construction (Non-MILCON) PWS Reference 1.1.5.16.$10,495,590Percent*0.00%$ - 0$ - 0$ - 0$ - 0
X009Work Order by Contract PWS Reference 1.1.6. thru 1.1.6.3.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X010INFORMATION ONLY: Operation Engineering ManagementINFORMATION ONLY
X010AAOperation Engineering Management (DMAG Facilities) PWS Reference 1.1.7. and 1.1.7.3.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X010ABOperation Engineering Management (NAVY Facilities) PWS Reference 1.1.7. and 1.1.7.3.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X010ACOperation Engineering Management (DLA Facilities) PWS Reference 1.1.7. and 1.1.7.3.6Months$ - 0$ - 0$ - 0$ - 0
X011Equipment Information System Database PWS Reference 1.1.7.4.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X012Pavement Condition Inspection PWS Reference 1.1.7.5.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
X013Bridge Inspection (once every two year requirement) PWS Reference 1.1.8.1Lot$ - 0$ - 0$ - 0$ - 0$ - 0
X014Required General Service & Quality Control PWS Reference 1.2. thru 1.2.10. and 1.4. thru 1.4.1.5.6Months$ - 0$ - 0$ - 0$ - 0$ - 0
Total Evaluated Price (6 Mo Ext):$ - 0
* Note 1: Insert only your proposed percentage in the proposed unit price of SubCLIN X008AA/X008AB in Section B and the pricing matrix. The percentages will be applied to historical workload data for TEP purposes only. After contract award, the price of each task order under these SubCLINs will be determined by multiplying the percent proposed with the project amount (PA).
** Note 2: QPI will be derived from each task order

File details come from the government source that posted it. Updated .