4_5_3a_Design_Project_Workload _Updated_20_Oct_2015.xls

XLS spreadsheet 143 KB Posted

Attached to
CE Engineering Management Services Federal contract opportunity
Solicitation number
FA8101-15-R-0006
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Revised Attachment 4.5.3a Design Project Workload

View the file

Other files for this federal contract opportunity

Other files attached to CE Engineering Management Services, newest first.
File Type Posted
PWS_Engineering_Management_Rev_3 _12_Jan_16.pdf PDF
CE_Engineering_Management_Pricing_Matrix_12_Jan_16.xlsx XLSX spreadsheet
FA8101-15-R-0006-0006_21_Jan_16.pdf PDF
CE_Engineering_Management_Pricing_Matrix_2_Dec_15.xlsx XLSX spreadsheet
PWS_Engineering_Management_Rev_2 _1_Dec_15.pdf PDF
FA8101-15-R-0006-0005.pdf PDF
CE_Engineering_Questions_and_Answers_29_Oct_15.pdf PDF
Premium_Display.pdf PDF
Office_Desktop.pdf PDF
FA8101-15-R-0006-0004.pdf PDF
Office_Display.pdf PDF
52.212-2_CE_Engineering_Rev_A_19_Oct_15.pdf PDF
52.212-1_CE_Engineering_Rev_A_19_Oct_15.pdf PDF
23_Oct_2015_CE_Engineering_Q A.pdf PDF
Performance_Desktop.pdf PDF
Laptop.pdf PDF
FA8101-15-R-0006-0003.pdf PDF
20_Aug_2015_CE_Engineering_Q A.pdf PDF
ppi_tool.accdb —
14_Aug_2015_CE_Engineering_Q A.pdf PDF
14_Aug_2015_CE_Engineering_Q A.xlsx XLSX spreadsheet
7_Aug_2015_Engineering_Mgmt_Q A.pdf PDF
7_Aug_2015_Engineering_OPS_Q A.xlsx XLSX spreadsheet
FA8101-15-R-0006-0002.pdf PDF
Q_ _A_Engineering_Management_3_Aug_2015.pdf PDF
PWS_Engineering_Management_Rev_1 _24_Jul_15.pdf PDF
FA8101-15-R-0006-0001.pdf PDF
4.6.3_Government_Provided_Furnishings_-_17_Jul_15.xlsx XLSX spreadsheet
CE_Engineering_Management_Pricing_Matrix_24_Jul_15.xlsx XLSX spreadsheet
4.6.4_Government_Provided_Tools_and_Equipment_-_17_Jul_15.xlsx XLSX spreadsheet
4.6.1_Government_Furnished_Property_PDF_-_24_Jul_15.pdf PDF
ppi_tool.accdb —
Appendix_4.6.4_Tools_and_Equipment_Inventory_(CB).xls XLS spreadsheet
Appendix_4.6.3_Furniture_Inventory_(CB).xls XLS spreadsheet
Appendix_4.5_Workload_Data.zip ZIP file
RFP_Engineering_Flow_Charts.pdf PDF
Addendum_to_52.212-1_CE_Engineering_7_Jul_15.pdf PDF
DD254_Redacted.pdf PDF
Addendum_to_52.212-2_CE_Engineering_7_Jul_15.pdf PDF
APPENDIX_C_15-004_Civil_Engineering_Services.pdf PDF
CE_Engineering_Management_Pricing_Matrix_7_Jul_15.xlsx XLSX spreadsheet
Appendix_4.2_Applicable_Publications_and_Forms.zip ZIP file
Appendix_4.7_Deliverables.zip ZIP file
Appendix_4.6_Government_Furnished_Property.zip ZIP file
PWS _1_Jul_2015.pdf PDF
FA8101-15-R-0006.pdf PDF
Appendix_4.3_Environmental_Requirements.zip ZIP file
Appendix_4.1_Acronyms.zip ZIP file
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100% Design

100% Design (2008-2015)
Project DescriptionDesign TypeAmount in the Delivery OrderFunding Type
Replace 15KV Voltage Regulator at Substation #4100%$484,500SRM
Sustain Runway 17 Sequence Lights100%$135,000SRM
Repair Rack Sprinkler System B477100%$250,000SRM
Sustain Twining Drive Bridge Deck100%$600,000SRM
Study & Design Service for Dorm Security Barrier100%$200,000SRM
Repair HVAC Units, Add Reheat Bldg 3100%$1,500,000SRM
Sustain Repair 5 Business Suites - Phase II B5605100%$1,800,000SRM
Repair RAC Structural Failure B3100%$715,000SRM
Repair RAC Fire Pond to Control Water Within Flood Plain100%$484,500SRM
Repair Entry Control Point @ Vance Gate100%$1,400,000SRM
Repair Entry Control Point @ Hope Gate100%$1,200,000SRM
Repair Entry Control Point @ Lancer Gate100%$1,250,000SRM
Repair Entry Control Point @ Liberator Gate100%$1,400,000SRM
Repair Entry Control Point, Tinker Gate100%$1,250,000SRM
Repair/Renovate for Move of B460 Activities to B1100%$4,900,000SRM
Construct Compressed air system controller ECIP100%$148,100SRM
SUSTAINMENT REPAIR, DORM 5904100%$978,900SRM
REPAIR FIRE ALARMS & SMOKE DETECTORS, DORM 5903100%$19,900SRM
REPAIR FIRE ALARMS & SMOKE DETECTORS, DORM 5909100%$19,900SRM
REPAIR FIRE ALARMS & SMOKE DETECTORS, DORM 5908100%$19,900SRM
CONSTRUCT HOME STATION MEDICAL RESPONSE WAREHOUSE100%$606,000SRM
Design New Comm Facility South Fourty100%$575,000SRM
Total22$906,214Average
Repair by Replacement, Roof, B214100%$2,210,000DMAG
REPAIR NORTH LAB APPROX 7 FT B3001100%$350,000DMAG
REPAIR ADMIN AREA, MEZZ #1, B9001100%$1,564,062DMAG
Repair Boiler Area Columns & Slab, B9301100%$133,567DMAG
Install Pedestrian Turnstile Gates South of 3907100%$380,000DMAG
Repair Plumbing in Basement, B214100%$325,000DMAG
Repair Emergency Lighting, Bldg. 3001100%$1,500,000DMAG
RENOVATE MADPPC SPACE IN B3703100%$347,250DMAG
EXPAND NORTH LAB APPROX 7 FT100%$350,000DMAG
Renovate restrooms Bldg. 2122100%$195,200DMAG
Bring AX and Annex into compliance in Bldg. 3705 Repair FSD B3705)100%$375,000DMAG
REPAIR REPLACE BRIDGE CRANE C-2 IN HIGH BAY B3001100%$795,000DMAG
REPAIR REPLACE BRIDGE CRANE C-6 IN HIGH BAY B3001100%$795,000DMAG
REPAIR REPLACE BRIDGE CRANE C-3 IN HIGH BAY B3001100%$795,000DMAG
REPAIR & CLEAN OBSERVATION WINDOWS B3234100%$150,000DMAG
REPLACE LIGHTING IN BACKSHOP METAL HALIDE LIGHTING B3001100%$1,900,000DMAG
Repair water leaks/damage rooms B2280100%$145,000DMAG
Rplc 13 Heating Coils Chilled Water B2136100%$570,000DMAG
Replace Heavy Metal Basin Facility100%$420,000DMAG
Repair/Replace Steam Condensate Piping B3001100%$200,000DMAG
Repair By Replacement Chilled Water Piping B3001100%$625,000DMAG
Repair By Replacement Electric Distribution Panel Col C99, B3001100%$310,000DMAG
Rpr/Reno Admin Area & Breakroom 1st Floor100%$446,800DMAG
Total23$647,038Average
Notes:
Emergency designs constitutes 1% of all project designs.
Urgent designs constitute 10% of all project designs.

A&E Design

A&E Design (2008-2015)
Project DescriptionYearDO #Design TypeAmount in the Delivery OrderFunding Type
Repair Cooking Hoods, Misc Facilities2008148A&E$300,000.00SRM
Construct Mask Training Chamber2010278-798A&E$265,000.00SRM
STUDY TAFB FIRE SUPPRESSION SYSTEM2011989A&E$500,000.00SRM
Study TAFB Fire supression System20111069A&E$500,000.00SRM
SUSTAIN ELECTRICAL MAIN DISTRIBUTION AWACS HANGER B23020111103A&E$3,757,000.00SRM
Evaluate Facility 5801 for Reuse20111295A&E$75,000.00SRM
Sustain Repair HVAC/Utilities B230 Ph 420121369A&E$2,359,800.00SRM
Sustain Repair HVAC/Utilities, B230, Ph 220121371A&E$1,930,100.00SRM
EVALUATE AIRFIELD LIGHTING SYSTEM2015A&E$150,000.00SRM
REPAIR SURFACE GRADE AT CDC EAST, B39042015A&E$1,355,200.00SRM
Total10$1,119,210.00Average
REPAIR/RENOVATE RESTROOMS PH 4 B3001200814A&E$1,200,000.00DMAG
REPAIR FIRE ALARM SYSTEM B3001200816A&E$1,000,000.00DMAG
Engineering Study TAC Industrial Facility200875A&E$274,370.00DMAG
Roof Study B90012008254A&E$400,000.00DMAG
Rpr/Rplc 2 Low Pressure Chillers B39022009611A&E$1,320,000.00DMAG
REPAIR/REPLACE AIRCRAFT HANGAR DOOR CONTROLS B22802009622A&E$1,830,000.00DMAG
Repair Ventillation System B31022009623A&E$3,050,000.00DMAG
Evaluate Subsurface Voids. B90012009629A&E$50,000.00DMAG
Redundancy in Exhaust Stream of B2280, B32252010686A&E$200,000.00DMAG
Rpr/Renovate Floor Below Mezz 3, B90012010747A&E$3,800,000.00DMAG
Repair/Renovate Mezz 3 Area,B90012010755A&E$3,285,000.00DMAG
Repair by Replacement Hangar Door B31022010751A&E$2,609,156.56DMAG
Fuel Study 3234, 37032010813A&E$275,000.00DMAG
Study Fire Protection for DLA Rack System, B90012010955A&E$45,000.00DMAG
REPAIR/RENOVATE MEZZ 3 AREA, B9001 (WO # 49466,49467, 49468, 49469. 49470)20111032A&E$2,875,728.00DMAG
STUDY WASTE TREATMENT SYSTEMS, TAC IWTP20111033A&E$200,000.00DMAG
REPLACE NW HANGAR DOOR B310220111055A&E$2,687,435.00DMAG
REPAIR RENOVATE BREATHING AIR SYSTEM B322520111124A&E$2,159,845.00DMAG
Repair Personnel Gates at the East ALC Ramp, Fac No 11500, near buildings20111148A&E$1,860,000.00DMAG
Repair/Renovate Ventilation in SW & Center Docks, B212220111158A&E$6,000,000.00DMAG
Repair/Renovate South Admin Area B900120121087A&E$4,217,591.69DMAG
REPAIR BOILER AREA COLUMNS & SLAB, B93012012A&E$119,900.00DMAG
REPAIR RENOVATE FOR CHEMICAL STORAGE, EE51, B90012012A&E$1,564,000.00DMAG
REPAIR AIRCRAFT DOCK VENTILATION SYSTEM B31052013A&E$1,074,800.00DMAG
REPAIR PLUMBING IN BASEMENT, B2142013A&E$325,000.00DMAG
REPAIR HUMIDIFICATION SYSTEM, B22802013A&E$2,500,000.00DMAG
REPAIR BY REPLACEMENT HVAC B22802015A&E$1,926,400.00DMAG
RENOVATE NORTHWEST AREA OF BLDG 32202015A&E$3,500,000.00DMAG
REPAIR STEAM & CONDENSATE LINES, 3001 TO 3105 TO 31022015A&E$1,700,000.00DMAG
COMPRESSED AIR FEASIBILITY STUDY, 3234 & 37032015A&E$35,700.00DMAG
REPAIR OLD CMM AREA 9001 FOR QVC/PMEL2015A&E$2,000,000.00DMAG
REPAIR HANGAR DOOR SAFETY FEATURES2015A&E$900,000.00DMAG
Total32$1,718,278.95Average
Notes:
Emergency designs constitutes 1% of all project designs.
Urgent designs constitute 10% of all project designs.

IDIQ (Roof & Pavement) Design

IDIQ Design (2008-2015)
Project DescriptionYearTYPE OF DeliveryAmount in the Delivery OrderFunding
Design/Repair 20 Slabs at Navy Ramp at entry from Taxiway E2008IDIQ Design$500,000SRM
Maintain Overrun & Non-Keel Asphalt Portions of Runway2008IDIQ Design$1,636,598SRM
Repair By Replacement aa Delta Pop Up Bollards at Gott Gate2008IDIQ Design$42,884SRM
Repair By Replacement aa Delta Pop Up Bollards at Vance Gate2008IDIQ Design$39,340SRM
Repair Concrete Drain North Side of Echo Ramp2008IDIQ Design$315,000SRM
Repair Entry Control Point, Lancer Gate B336102008IDIQ Design$650,000SRM
Repair Exterior Roof /Wall Insulation & Replace Metal Siding2008IDIQ Design$125,000SRM
Repair Parking lot B10172008IDIQ Design$40,000SRM
Repair Pavement East Drive from Turbine Drive to ALC Ramp2008IDIQ Design$792,330SRM
Repair Reconfigure Intersection Arnold & H2008IDIQ Design$850,000SRM
Repair Roof & Guttering Section 1& 4 CE OPS B4122008IDIQ Design$1,890,000SRM
Repair Roof Command Post B10662008IDIQ Design$100,800SRM
Repair Roof Section 1 B10932008IDIQ Design$73,500SRM
Repair Taxiway Golf Between E & F2008IDIQ Design$4,900,000SRM
Repair/Replace Bollards at Eaker Gate2008IDIQ Design$49,610SRM
Repair/Replace Joint Seam, RunWay 17/352008IDIQ Design$350,000SRM
Sustain Munitions Road from Alert Road to 59th Street2008IDIQ Design$2,215,500SRM
Sustain Parking Lot A2 South of B90012008IDIQ Design$209,100SRM
Sustain Parking Lot A5 South of B90012008IDIQ Design$273,000SRM
Sustain Repair Roof Corrosion Control B21222008IDIQ Design$3,168,900SRM
Sustain Replace Roof on B2842008IDIQ Design$238,350SRM
Sustain Replace Warehouse Roof on B8012008IDIQ Design$1,701,000SRM
Sustain Reserve Road From Air Depot to RAPCON2008IDIQ Design$670,000SRM
Construct Additional Parking Near B10172009IDIQ Design$45,000SRM
Construct Widen Lanes Along Arnold2009IDIQ Design$650,000SRM
Demo Dorm B59162009IDIQ Design$481,800SRM
Demo Dorm B59202009IDIQ Design$461,800SRM
Demolish Maintenance Shop B272009IDIQ Design$172,000SRM
Design Priliminary Temp Repair/Emergency Repr TAC Roof Bldg 90012009IDIQ Design$300,000SRM
Design Repair Storm Damage Preliminary Repair B31022009IDIQ Design$43,589SRM
Dsgn & Contract Mgmt Preliminary Repair Emergency Storm Damage B90012009IDIQ Design$201,000SRM
Emergency Roof Repair Main Lobby B30012009IDIQ Design$25,000SRM
Interim Roof Repair B9001 TEMPORARY REPAIR/EMERGENCY TAC ROOF ON B90012009IDIQ Design$201,000SRM
Interim Storm Damage Roof Repair B21212009IDIQ Design$35,000SRM
Maintain Restripe Parking Areas IDIQ Design2009IDIQ Design$40,000SRM
Maintain Street Striping: Various Locs Basewide2009IDIQ Design$75,000SRM
Maintain/Repaint Parking Lot Striping2009IDIQ Design$85,000SRM
Perm Repair Storm Damaged Roof B21212009IDIQ Design$3,300,000SRM
Preliminary Repair Storm Damaged Roof B10582009IDIQ Design$30,000SRM
Preliminary Repair Storm Damaged Roof B90012009IDIQ Design$8,000,000SRM
Repair ATFP Protection B3001G2009IDIQ Design$515,267SRM
Repair Pavement: Arnold Ave Between Air Depot & Ave A2009IDIQ Design$800,000SRM
Repair RAC-1 Roof Substrate B416 Emergency IDIQ2009IDIQ Design$1,030,000SRM
Repair Roof Comp Engine Mgmt Fac B40082009IDIQ Design$220,000SRM
Repair Storm Damage Intrim Roof B21212009IDIQ Design$33,287SRM
Repair Storm Damage Intrim Roof B31022009IDIQ Design$45,000SRM
Repair Storm Damage Permanent Roof B31022009IDIQ Design$310,000SRM
Replace Mulitiple Spill Containment Pond Liners2009IDIQ Design$160,000SRM
Rpr/Construct Final Denial Barrier System Midwest Bldvd Gate2009IDIQ Design$1,300,000SRM
Sustain Parking Lot A1 South of B90012009IDIQ Design$285,600SRM
Sustain Roof at Base of Trapezoidal Sections B2302009IDIQ Design$1,530,000SRM
Construct Services Road East of Building B10832010IDIQ Design$100,000SRM
Repair Bak 12 Runway 12/302010IDIQ Design$500,000SRM
REPAIR ISOLATED AREAS OF TYPE-D TRAFFIC AREAS OF RWY 12/302010IDIQ Design$120,000SRM
Repair Parking Lot Front B30012010IDIQ Design$5,500,000SRM
Repair Rof to Lean- to #102010IDIQ Design$154,287SRM
Repair Roof & Guttering Section 2 & 3 DLA Warehouse B4122010IDIQ Design$2,010,068SRM
Repair Roof B1068 Design2010IDIQ Design$561,000SRM
Repair Roof B1070 Design2010IDIQ Design$212,700SRM
Repair Roof E4 Systems Integration Lab B10172010IDIQ Design$200,000SRM
REPAIR ROOF ON SQUADRON OPERATIONS, B2402010IDIQ Design$234,000SRM
Replace Rof on Main Hangar B10302010IDIQ Design$654,000SRM
RPR BY RPL TAXIWAY TO COMPASS ROSE FAC2010IDIQ Design$140,000SRM
Rpr/ Construct Final Denail Barrier System (Turnbull Gate)2010IDIQ Design$1,300,000SRM
Suatain Non-Keel Portion of Runway 12-302010IDIQ Design$900,000SRM
Sustain Parkng Lot/ Drive Multiple Bldgs2010IDIQ Design$960,000SRM
Sustain Roof Admin/Shop B2302010IDIQ Design$3,500,000SRM
Sustain Roof Sections 3,4 7 6 ABW HQ B4602010IDIQ Design$50,000SRM
Maintian /Rpr Roof Sections 300-304 B90012011IDIQ Design$1,500,000SRM
REPAIR CENTER 50; KEEL SECTION, TWY 12/30 HORN TO TXY G2011IDIQ Design$6,500,000SRM
REPAIR RAPCON RD RESERVE RD TO PATROL RD2011IDIQ Design$905,000SRM
Repair Roof on Fuel sys Maint dock B9762011IDIQ Design$1,100,000SRM
Repair Roof Section 1-4, B37032011IDIQ Design$505,000SRM
Repair Roof Sections 1 & 2, B8252011IDIQ Design$50,000SRM
Repair Roof Sections 6,7,8 & 14, B8202011IDIQ Design$180,000SRM
REPAIR ROOF SECTIONS 6,7,8, & 14, B8202011IDIQ Design$165,000SRM
sustain Gypsum Roof, AWAC Squa Ops B2822011IDIQ Design$1,210,000SRM
Sustain Turbine Rd @ E Dr and Resurface Warehouse to Staff.2011IDIQ Design$852,000SRM
CONSTRUCT ACCESS ROAD TO B8012012IDIQ Design$344,300SRM
REPAIR ASPHALT SHOULDER OF NAVY RAMP2012IDIQ Design$745,000SRM
REPAIR BARREL ROOF AT AWAC HANGAR B2302012IDIQ Design$3,512,800SRM
REPAIR ROOF, GUTTERS, DOWNSPOUTS, DORM 59042012IDIQ Design$273,100SRM
REPAIR YOUTH CENTER ROOF - B55202012IDIQ Design$278,300SRM
REPAIR/WIDEN KEEL PORTION OF RWY 12/30, HORN TO NW END2012IDIQ Design$3,184,900SRM
SUSTAIN NON KEEL PORTIONS OF RWY 12/30, HORN TO SE END2012IDIQ Design$3,738,800SRM
SUSTAIN NON-KEEL PORTIONS OF RUNWAY 12/30, NORTHWEST END2012IDIQ Design$4,431,300SRM
SUSTAIN REPAIR ROOF B5931, DORMITORY2012IDIQ Design$640,700SRM
SUSTAIN ROOF NAVY COMBINED BACHELOR HOUSING, B59302012IDIQ Design$307,500SRM
SUSTAIN WAREHOUSE RD TURBINE DR TO SE 59TH ST2012IDIQ Design$1,302,100SRM
EMERGENCY REPAIR ROOF FIRE DAMAGE, BLDG 4122013IDIQ Design$127,800SRM
REPAIR ROOF BLDG 40282013IDIQ Design$24,100SRM
STORM DAMAGE - REPAIR ROOF AND STACKS, BLDG 92012013IDIQ Design$241,400SRM
STORM DAMAGE - REPAIR ROOF BLDG 2012013IDIQ Design$74,200SRM
STORM DAMAGE - REPAIR ROOF BLDG 2402013IDIQ Design$132,900SRM
STORM DAMAGE - REPAIR ROOF BLDG 93012013IDIQ Design$461,500SRM
REPAIR AIRFIELD APRON, AWACS APRON, P12014IDIQ Design$14,817,400SRM
REPAIR AIRFIELD APRON, AWACS APRON, P22014IDIQ Design$22,216,100SRM
Repair Apron West of Depot MX Hangar 31022014IDIQ Design$14,497,600SRM
REPAIR EAST ALC MAINTENANCE APRON, P12014IDIQ Design$7,995,000SRM
REPAIR ROOF BLDG 8302014IDIQ Design$2,491,900SRM
REPAIR ROOF CHILD DEVELOPMENT CENTER EAST, B39042014IDIQ Design$268,900SRM
REPAIR ROOF NAVY HANGAR, B8202014IDIQ Design$5,610,000SRM
REPAIR ROOF SECTIONS, DISA and 966 AACS SQUAD OPS, B2012014IDIQ Design$1,680,400SRM
REPAIR ROOF SECURITY FORCES OPS, B70032014IDIQ Design$674,400SRM
REPAIR ROOF WING HEADQUARTERS, B10022014IDIQ Design$267,400SRM
REPAIR ROOF, BLDG 8252014IDIQ Design$1,325,000SRM
REPAIR TAXIWAY D2014IDIQ Design$3,784,300SRM
REPAIR TAXIWAY J2014IDIQ Design$2,028,000SRM
REPAIR WEST ALC MAINTENANCE APRON, P12014IDIQ Design$9,061,000SRM
REPAIR WEST ALC MAINTENANCE APRON, P22014IDIQ Design$6,672,000SRM
MAINTAIN SOUTH DORM PARKING LOT2015IDIQ Design$200,000SRM
REPAIR AIR DEPOT RESERVE TO GOTT GATE2015IDIQ Design$2,500,000SRM
REPAIR AIRFIELD APRON, AWACS APRON, P32015IDIQ Design$22,322,000SRM
REPAIR EAST ALC MAINTENANCE APRON, P22015IDIQ Design$6,650,000SRM
REPAIR PAVEMENT EAST DR. FROM BRADLEY TO TURBINE DR.2015IDIQ Design$950,000SRM
REPAIR PRIMARY RUNWAY 18/362015IDIQ Design$29,200SRM
REPAIR SHOULDERS; SOUTH HAMMERHEAD2015IDIQ Design$5,800,000SRM
REPAIR SOUTH ROOF SECTIONS 104, 105, 106 & 109, B30012015IDIQ Design$200,000SRM
REPAIR TRANSIENT CARGO APRON, P12015IDIQ Design$11,914,000SRM
SUS REPAIR ROOF BASE MOBILITY FACILITY, B2602015IDIQ Design$5,112,500SRM
SUSTAIN ARNOLD FROM 'A' AVE TO 'F' AVE2015IDIQ Design$5,397,200SRM
SUSTAIN REPAIR ROOF, BLDG 40572015IDIQ Design$205,500SRM
Total122$2,014,425Average
MAINTENANCE - RECOAT FLOOR STOCKROOM AREPAIR STOCKROOM B37052008IDIQ Design$230,000DMAG
MAINTAIN/REPLACE ROOF B3234 TEST CELL2008IDIQ Design$790,000DMAG
Repair Equipment Yard North of B2211 (EMERGENCY PROJECT)2008IDIQ Design$500,000DMAG
REPAIR RAMP & Install Lighting Protection NEAR B31022008IDIQ Design$2,400,000DMAG
Repair trenches/pits (J, K, L) in B90012008IDIQ Design$540,000DMAG
REPLACE CONCRETE AT K-6 RAMP2008IDIQ Design$1,900,000DMAG
REPLACE ROOF SECTIONS 5,7,8,9,10 B30012008IDIQ Design$1,463,100DMAG
Fill Trenches from B55-56 to N55-65, B90012009IDIQ Design$275,000DMAG
Repair trench/pit approximately post A44-G44 B90012009IDIQ Design$47,650DMAG
Repair trenches/pits (B,D,E) in B90012009IDIQ Design$590,000DMAG
Replace Asphalt With Concrete ALC East Ramp Near B21222009IDIQ Design$740,000DMAG
Study Fire Damage Post EE57-U47 B90012009IDIQ Design$30,000DMAG
Sustain repair center roof B21212009IDIQ Design$1,700,000DMAG
CONSTRUCT AIRCRAFT PARKING SPOT J32010IDIQ Design$630,000DMAG
CONSTRUCT PREP AREA FOR GSE DEAD LINE STORAGE EAST OF B37052010IDIQ Design$740,000DMAG
Install Fuel Valve Pit and Cover B21122010IDIQ Design$50,000DMAG
Maint Roof Sections 29, 32, 34, 37, & 360 B90012010IDIQ Design$3,999,388DMAG
REPAIR AIRCRAFT PARKING SPOT J32010IDIQ Design$690,000DMAG
REPAIR FILL TRENCHES, E52-G55, B90012010IDIQ Design$60,000DMAG
REPAIR/REPLACE SOUTH HANGAR ROOF B21212010IDIQ Design$1,850,000DMAG
REPLACE ROOF SECTIONS 25 & 30, B30012010IDIQ Design$850,000DMAG
Construct Outdoor PMXG Engine Can Area NE of B90012011IDIQ Design$750,000DMAG
CONSTRUCT STORAGE AREA BY B21222011IDIQ Design$749,942DMAG
Maintain Roof section 380, B90012011IDIQ Design$950,000DMAG
REMOVED RAISED TRACKS AND FILL TRENCHES, B90012011IDIQ Design$1,000,000DMAG
Repair Center 50' Keel Section, Rwy 12/30 Horn to Txy G2011IDIQ Design$6,499,700DMAG
Repair Concrete Pavement B32282011IDIQ Design$61,800DMAG
Repair West Dogleg Composite Area Pits B90012011IDIQ Design$270,000DMAG
REPAIR/REPLACE CONCRETE AT RAMP K-11 FACILITY2011IDIQ Design$1,950,000DMAG
Repari Roof B32202011IDIQ Design$165,000DMAG
RESURFACE AREA WITH CONCRETE IN AND AROUND B3507 (41012)2011IDIQ Design$150,000DMAG
REPAIR RAMP AREA NEAR B2121, 2122 and 21362012IDIQ Design$1,929,700DMAG
REPAIR ROOF SECTION 5, B90012012IDIQ Design$2,507,900DMAG
REPAIR ROOF SECTIONS 3 AND 152, B90012012IDIQ Design$1,441,500DMAG
REPAIR WEST DOGLEG COMPOSITE AREA PITS B90012012IDIQ Design$280,000DMAG
REPLACE ROOF SECTIONS 1,2 & 3, B22802012IDIQ Design$1,203,200DMAG
CONSTRUCT BLAST DEFLECTOR AT A/C PRKG SPOT W-12013IDIQ Design$251,700DMAG
REPAIR METAL STANDING SEAM ROOF, DEPOT MAINT HANGAR 21362013IDIQ Design$4,620,800DMAG
SUSTAIN REPAIR ROOF, CORROSION CONTROL, PH2 B21222013IDIQ Design$3,666,300DMAG
CONSTRUCT BLAST DEFLECTOR AT W-3 & W-42014IDIQ Design$510,000DMAG
CONSTRUCT FENCE AROUND B94002014IDIQ Design$139,200DMAG
CONSTRUCT GSE PAD & BLAST FENCE, KC-135 BLOCK 45 MOD2014IDIQ Design$734,000DMAG
REPAIR ROOF SECTION 25, BLDG 90012014IDIQ Design$3,415,300DMAG
REPAIR ROOF SECTION 32, BLDG 90012014IDIQ Design$3,411,400DMAG
REPAIR ROOF SECTION 33, BLDG 90012014IDIQ Design$3,446,300DMAG
REPAIR ROOF SECTION 360, BLDG 90012014IDIQ Design$4,748,000DMAG
REPLACE CONCRETE AT K-7 RAMP2014IDIQ Design$2,136,900DMAG
REPAIR ROOF SECTION 230 & 234, BLDG 90012015IDIQ Design$3,287,000DMAG
REPAIR ROOF SECTION 62, B30012015IDIQ Design$360,000DMAG
REPAIR/CONSTRUCT APRON PAVEMENTS, KC-135 RAMP, W-22015IDIQ Design$893,400DMAG
REPAIR/CONSTRUCT BLAST DEFLECTOR AT W-22015IDIQ Design$338,000DMAG
REPLACE BUR, CANTED ROOF & EIFS OVERHANG, 37072015IDIQ Design$2,012,500DMAG
REPLACE ROOF SECTION 8, BUILDING 21212015IDIQ Design$1,042,200DMAG
RESTRIPE EAST ALC RAMP2015IDIQ Design$125,000DMAG
Total54$1,391,146Average
Notes
Emergency designs constitutes 1% of all project designs.
Urgent designs constitute 10% of all project designs.

35% Design

35% Design (2008 -2015)
Project DescriptionTYPE OF DeliveryAmount in the Delivery OrderFunding Type
Mod and Renovation, B40035% Design For MACC Minimal Design Build$250,000SRM
Repair/renovate Mens Locker Rooms B83035% Design For MACC Minimal Design Build$250,000SRM
Repair B9002 for DRMO35% Design For MACC Minimal Design Build$150,000SRM
CONSTRUCT TRUCK SCALES AND LOAD RAMP BY B900235% Design For MACC Minimal Design Build$200,000SRM
Renovate Office and Install 3 Rollup Doors B80135% Design For MACC Minimal Design Build$150,000SRM
Repair Racquetball Courts, B21635% Design For MACC Minimal Design Build$379,717SRM
REPAIR BY REPLACEMENT ADVANCED METERING35% Design For MACC Minimal Design Build$250,000SRM
REPAIR RENOVATE CAFETERIA AREA, SOUTH ADMIN,
B900135% Design For MACC Minimal Design Build$500,000SRM
REPAIR REPLACE FIRE WATER MAIN NEAR MAINT
DEPO B3105 & B300135% Design For MACC Minimal Design Build$900,000SRM
REPAIR HVAC CONTROLS, MULTIPLE FACILITIES (215,412,469,506,510,801,820,989,1030,1130,3102,3105,3220,3900) (214,801,1055,2121,3102,3105,3220,3234)35% Design For MACC Minimal Design Build$508,971SRM
REPAIR HVAC IN 18-BUILDINGS BY
RECOMMISSIONING/BALANCING35% Design For MACC Minimal Design Build$1,100,000SRM
REPAIR AC AND CHILLERS, MULTIPLE FACILITIES (214, 215, 412,460, 510, 1030, 1055, 1130, 2121, 3102, 3220)35% Design For MACC Minimal Design Build$1,830,419SRM
REPAIR/MAINTAIN MULTIPLE BLDGS TO REDUCE
ENERGY LEAKAGE35% Design For MACC Minimal Design Build$2,305,229SRM
REPAIR LIGHTING SYSTEMS, MULTIPLE FACILITIES35% Design For MACC Minimal Design Build$2,111,838SRM
REPAIR RENOVATE WATER HEATING WITH SOLAR35% Design For MACC Minimal Design Build$461,238SRM
Repair HVAC By Rebalancing Mulitple Facilities 215,412,469,506,820,1030,390035% Design For MACC Minimal Design Build$65,905SRM
Repair HVAC by Rebalancing Multiple Facilites 260, 2121, 3102, 3105, 322035% Design For MACC Minimal Design Build$32,552SRM
Replace Fire water Main near Main Hanger B310235% Design For MACC Minimal Design Build$500,000SRM
SUSTAIN ELECTRIC MOTORS ON HANGAR DOORS,
AWAC HANGAR B23035% Design For MACC Minimal Design Build$2,750,000SRM
RENOVATE CLS AREA, BLDG 82535% Design For MACC Minimal Design Build$150,000SRM
Repair Storm Damaged Fan Decks, AHU Coils, B300135% Design For MACC Minimal Design Build$1,400,000SRM
Repair Replace Storm Damaged AHU Coils, B3221.35% Design For MACC Minimal Design Build$1,200,000SRM
Repair Replace Storm Damaged AHU Coils, B228035% Design For MACC Minimal Design Build$600,000SRM
REPAIR REPLACE STORM DAMAGED AHU COILS, B322535% Design For MACC Minimal Design Build$800,000SRM
REPAIR MULTIPLE 38 CEG FACILITIES FOR SIPRNET35% Design For MACC Minimal Design Build$713,010SRM
DEMOLISH AFMC MAINTENANCE FACILITY - B100135% Design For MACC Minimal Design Build$72,600SRM
DEMOLISH AFMC MAINTENANCE FACILITY - B700535% Design For MACC Minimal Design Build$37,700SRM
DEMO B/212835% Design For MACC Minimal Design Build$3,200SRM
DEMOLISH B46501, STEAM HEAT MAINS35% Design For MACC Minimal Design Build$250,000SRM
DEMOLISH B6604, SAN LATRINE35% Design For MACC Minimal Design Build$3,500SRM
Repair Dorm B590435% Design For MACC Minimal Design Build$875,108SRM
REPLACE HVAC IN POWER PRO & HVAC OFFICES35% Design For MACC Minimal Design Build$80,000SRM
Sustainment Repair Exterior Stairs, Dorm 5930
Sustainment Repair Exterior Stairs, Dorm 593135% Design For MACC Minimal Design Build$164,000SRM
Repair By Replacement Lights With Ceiling Fans B593135% Design For MACC Minimal Design Build$325,000SRM
DEMOLISH MAINTENANCE FACILITY - B100135% Design For MACC Minimal Design Build$72,600SRM
DEMOLISH MAINTENANCE FACILITY - B700535% Design For MACC Minimal Design Build$37,700SRM
REMOVE AIRFIELD HAZARDS B5115635% Design For MACC Minimal Design Build$97,500SRM
DEMOLISH BRIDGE ON OLD AIR DEPOT RD N OF B113035% Design For MACC Minimal Design Build$95,100SRM
DEMO DAM #2 AT NORTH END OF WASTE WATER FACILITY35% Design For MACC Minimal Design Build$211,500SRM
SUSTAIN RAC-3 BRICK WORK & ADD CANOPIES AT 7
ENTRANCES IN B300135% Design For MACC Minimal Design Build$577,500SRM
SUSTAINMENT REPAIR EXTERIOR STAIRS, DORM 593035% Design For MACC Minimal Design Build$52,800SRM
REPAIR BY REPLACEMENT HVAC SYSTEM, B20235% Design For MACC Minimal Design Build$657,500SRM
REPAIR ATHLETIC FIELD SURFACE35% Design For MACC Minimal Design Build$766,400SRM
SUSTAIN HVAC OPS SUPPORT SQDN, WEST SIDE, B28335% Design For MACC Minimal Design Build$400,900SRM
REPAIR SERVICES HEADQUARTERS FOR SERVICES TRANSFORMATION35% Design For MACC Minimal Design Build$810,600SRM
REPAIR SERVICES HEADQUARTERS FOR TRANSFORMATION, NAF35% Design For MACC Minimal Design Build$340,000SRM
CONSTRUCT RESTROOM TO MEET ADA REQUIREMENTS B110535% Design For MACC Minimal Design Build$119,000SRM
REPAIR NATURAL GAS VALVES BASEWIDE35% Design For MACC Minimal Design Build$499,200SRM
Add Tracer System to 3 AHUs, B/5801SABER Design$50,080SRM
Repair HVAC Diffuser & LightsSABER Design$200,000SRM
Repair Restrooms Post 1ABI 107-2AB 107 B3001SABER Design$700,000SRM
Repair lighting for area bounded by Q22-G39 in B9001SABER Design$900,000SRM
Repair Lighting for area bounded by S31 - X36 in B9001SABER Design$180,000SRM
Repair by Replacement Engine for Fire Pump B4006SABER Design$125,000SRM
Repair AWACS Supply Facility For Admin B296SABER Design$1,750,000SRM
Repair for AWACS Supply Facility - Relocate Supply Equipment B296SABER Design$600,000SRM
Demolish B24 Maintenance ShopSABER Design$185,000SRM
Replace Exterior Doors B3703SABER Design$40,548SRM
Replace Exterior Doors B3224SABER Design$30,930SRM
REPAIR ATFP PROTECTION FOR WELL HOUSES #24, 25, 26, 33, 35SABER Design$197,000SRM
Repair Spill Containment B290SABER Design$219,000SRM
Sustain Roof, Renovate Interior & Bathroom B234SABER Design$50,000SRM
Repair Exterior Stairs B5903, 5904, 5908, & 5909SABER Design$325,000SRM
Repair FSD Cooking Hoods B473SABER Design$38,943SRM
Replace Alarm Panel B820SABER Design$84,800SRM
Upgrade Air Handler B7001SABER Design$6,731SRM
Repair Restroom AF Audit Agency B510SABER Design$250,000SRM
Sustain HVAC System B282SABER Design$1,836,000SRM
Construct Showers & HVAC Mens Lavatory B7001SABER Design$108,000SRM
Repair/Construct PIC facility B469SABER Design$2,500,000SRM
Repair Dorm Bollards/PlantersSABER Design$185,000SRM
Alter Bldg 260 for MOBAG StorageSABER Design$2,800,000SRM
Repair Storm Damaged Vehicle Access DoorSABER Design$101,000SRM
Repair Storm Damage on Mechanical System B3705SABER Design$490,000SRM
Repair Storm Damage Control Tower Window B935SABER Design$10,000SRM
Repair Renovate Housing Office SPC Bldg5913SABER Design$640,000SRM
Renovate/Repair B282SABER Design$210,000SRM
Install Emergency Generator/UPS Annex B3001SABER Design$441,000SRM
Install Comm Emergency BU Power B3705SABER Design$50,000SRM
Demo Connecting Structure B1SABER Design$1,019,600SRM
Repair Short Term Storm Damage Roof Sect B1118SABER Design$175,000SRM
Repair Short Term Storm Damage Roof Sect B1119SABER Design$175,000SRM
Repair Cathodic Protection SystemSABER Design$250,000SRM
Repair Ventilation System B3102SABER Design$3,050,000SRM
Repair Aircraft Maint. Hangar tDoor Controls B2280SABER Design$1,860,000SRM
Repair Hanger Door B3102SABER Design$2,430,000SRM
SABER/MACC Desgn, Rpr/Constr B9001AccessSABER Design$837,000SRM
Construct Compress Air System ControllerSABER Design$148,100SRM
Repair Bay LightingSABER Design$61,000SRM
Sustain Sewer Line, Network Learning Ctr B7005SABER Design$138,000SRM
Sustain Repair Truck Dock for DDOO Dep Whs B506SABER Design$450,000SRM
Rpr/Rpl Emerg Generator, Airfield Lighting VaultSABER Design$210,000SRM
Maintenance Airfield Markings and SignageSABER Design$330,000SRM
Construct Heat & Air Vents for Dorm 5913 (3 Floors)SABER Design$290,000SRM
Sustain RAC-3 Brick Work & Add Canopy B3001SABER Design$500,000SRM
Repair Bay Lighting Set #2 SRMCSABER Design$303,167SRM
Repair/Construct B9001 accessSABER Design$837,000SRM
RAC-1 Brick Work at SE Corner B3001SABER Design$79,000SRM
REPAIR BAY LIGHTING W/ ENERGY EFF LIGHTING, FACILITY SET 3SABER Design$987,780SRM
Repair Bay Lighting SABER DesignSABER Design$922,297SRM
Repair Bay Lighting with Energy Efficient T-5HO Lights (SABER Design)SABER Design$752,868SRM
REPAIR REPLACE GENERATOR & ATS B3202SABER Design$136,743SRM
REPAIR HEATING PLANTS AND SYSTEMS, MULTIPLE FACILITIESSABER Design$744,524SRM
REPAIR WEST DOGLEG COMPOSITE AREA PITS B9001SABER Design$830,000SRM
REPAIR RENOVATE AREA FOR SOURCE SELECTION FAC, B3SABER Design$189,000SRM
Repair Storm Damage B2110SABER Design$220,000SRM
Roof Repair B4012 Storm DamageSABER Design$365,000SRM
REPAIR STORM DAMAGE, ROOF 4012SABER Design$378,000SRM
REPAIR STORM DAMAGE, REFUELER MAINT FAC 2110SABER Design$96,400SRM
REPAIR CENTRAL BOILER PLANT CATWALK , B3001 (RAC 1)SABER Design$208,200SRM
DEMOLISH AIRCRAFT ARRESTING BARRIERSSABER Design$600,000SRM
CONSTRUCT STORM SHELTERS, NAVY DORM AREASABER Design$384,391SRM
REPAIR RENOVATE WOMEN'S RESTROOM, B8400SABER Design$84,000SRM
ADD EXTERNAL STORM SHELTERS, SE DORM AREASABER Design$513,000SRM
ADD EXTERNAL STORM SHELTERS, SW DORM AREASABER Design$517,300SRM
ADD EXTERNAL STORM SHELTERS NEAR YOUTH CENTERSABER Design$530,400SRM
REPAIR CONF RM, B-1 & B-2 DIV, 2ND FL, B3001SABER Design$50,000SRM
REPAIR/RENOVATE DIV OFFICES, B-1 & B-2, 2ND FL, B3001SABER Design$525,000SRM
Total118$538,899Average
REPAIR CONCRETE PIERS IN CHEMICAL CLEANING SHOP, B300135% Design For MACC Minimal Design Build$130,000DMAG
Replace Chilled Water Coils and Outside Air Dampers B228035% Design For MACC Minimal Design Build$1,400,000DMAG
Repair/Replace IWTP Pump Sys to Temporary Storage B931135% Design For MACC Minimal Design Build$813,470DMAG
Repair Power and Air Distribution for 76 CMXG, B900135% Design For MACC Minimal Design Build$400,000DMAG
CONSTRUCT AWNING WESTSIDE B228035% Design For MACC Minimal Design Build$112,000DMAG
REPAIR REPLACE SIDING B24035% Design For MACC Minimal Design Build$327,200DMAG
REPLACE HUMIDIFICATION SYSTEM B228035% Design For MACC Minimal Design Build$1,800,000DMAG
REPAIR AIR CRAFT DOCK VENTILATION SYSTEM B310535% Design For MACC Minimal Design Build$1,800,000DMAG
Repair Replace Air Compressor and Dryer B930135% Design For MACC Minimal Design Build$1,000,000DMAG
RPR FOR TRASH COMPACTOR PLACEMENT B900135% Design For MACC Minimal Design Build$125,000DMAG
Replace Heating and Cooling Coils B322535% Design For MACC Minimal Design Build$1,500,000DMAG
Repair Transformer for South Admin, B900135% Design For MACC Minimal Design Build$1,100,000DMAG
Repair/Replace 15 KV Switchgear, Buss & Main-Tie, B930935% Design For MACC Minimal Design Build$2,680,801DMAG
Repair/Renovate Break Rooms in NW Corner, B900135% Design For MACC Minimal Design Build$170,000DMAG
Repair Rooms 141, 143 & 144, B322035% Design For MACC Minimal Design Build$383,523DMAG
Repair Office Area @ 2P65, B300135% Design For MACC Minimal Design Build$322,655DMAG
Repair Fire Alarm Notification System, B900135% Design For MACC Minimal Design Build$208,000DMAG
Repair Fire Notification System B300135% Design For MACC Minimal Design Build$223,900DMAG
Repair Utilities for Shops, B900135% Design For MACC Minimal Design Build$248,000DMAG
Install Additional 1600 Amp Buss Duct, G-H Aisle, B900135% Design For MACC Minimal Design Build$766,000DMAG
North Dock Prep35% Design For MACC Minimal Design Build$2,925,000DMAG
Repair Handicap entrances at B900135% Design For MACC Minimal Design Build$450,518DMAG
Replace/Abate Insulation, Steam Lines, B3001 COL Y7135% Design For MACC Minimal Design Build$834,605DMAG
Install Level II Entry Gate, B390735% Design For MACC Minimal Design Build$202,000DMAG
MAINTAIN ELECTRICAL EQUIP, XFMR RMS 5,6 7 & AB, BLDG 900135% Design For MACC Minimal Design Build$78,500DMAG
REPAIR 15 KV SWTCHGEAR,BUSS & MAIN-TIE,ROOF & SIDING,B9309935% Design For MACC Minimal Design Build$2,339,000DMAG
REPAIR/RELOCATE TUBE AND CABLE SHOP, B900135% Design For MACC Minimal Design Build$354,200DMAG
REPAIR RENOVATE BREAK ROOMS IN NW CORNER, B900135% Design For MACC Minimal Design Build$181,600DMAG
REPAIR ELECTRIC TRANSFORMER FOR SOUTH ADMIN, B900135% Design For MACC Minimal Design Build$713,200DMAG
REPAIR FIRE ALARM NOTIFICATION SYSTEM, B900135% Design For MACC Minimal Design Build$232,300DMAG
REPLACE STEAM-DRIVEN CHILLERS, B930135% Design For MACC Minimal Design Build$2,187,900DMAG
REPAIR OFFICE AREA AT 2P65, B300135% Design For MACC Minimal Design Build$359,000DMAG
REPAIR BUSSDUCT AT G-H AISLE, B900135% Design For MACC Minimal Design Build$315,200DMAG
REPAIR LIGHTNING PROTECTION, B322535% Design For MACC Minimal Design Build$53,100DMAG
RENOVATE DEPOT AIRCRAFT MAINT DOCK, BLDG 310535% Design For MACC Minimal Design Build$3,055,400DMAG
REPLACE INSULATION, STEAM & CONDENSATE RETURN LINES, B300135% Design For MACC Minimal Design Build$3,286,800DMAG
REPAIR EQUIPMENT PLATFORM ACCESS, BLDG 20035% Design For MACC Minimal Design Build$131,700DMAG
REPAIR BY REPLACEMENT HANGAR DOOR B310235% Design For MACC Minimal Design Build$1,737,100DMAG
REPAIR/RENOVATE ADMIN AREA & BREAKROOM 1ST FLOOR B311335% Design For MACC Minimal Design Build$688,400DMAG
REPAIR ROOM HVAC, B21435% Design For MACC Minimal Design Build$601,200DMAG
INSTALL LEVEL II ENTRY GATE, 390735% Design For MACC Minimal Design Build$196,400DMAG
INSTALL PEDESTRIAN TURNSTILE GATES, S OF 390735% Design For MACC Minimal Design Build$251,300DMAG
CONSTRUCT ADDITION TO KC-135 POST DOCK RAMP35% Design For MACC Minimal Design Build$711,700DMAG
REPLACE COILS/CONTROLS BLDG3001 FAN DECKS 14, 15, 18 & 2035% Design For MACC Minimal Design Build$2,399,000DMAG
REPAIR/REPLACE NE COOLING TOWER, BLDG 322135% Design For MACC Minimal Design Build$836,414DMAG
REPAIR SECURE STORAGE FACILITY, BLDG 213635% Design For MACC Minimal Design Build$1,140,000DMAG
REPAIR FIRE WATER MAIN, B213635% Design For MACC Minimal Design Build$424,000DMAG
REPLACE AHU SERVING PLATING LAB, B300135% Design For MACC Minimal Design Build$322,600DMAG
REPAIR ROOF TRUSS MEMBERS, BLDG 212235% Design For MACC Minimal Design Build$26,400DMAG
REPLACE STEAM PRE-HEAT COILS AHUs, BLDG 228035% Design For MACC Minimal Design Build$1,829,500DMAG
INSTALL HVAC TO COMPUTER ROOM, BLDG 323435% Design For MACC Minimal Design Build$163,000DMAG
DEMO AND REPLACE CHILLED WATER PIPING, B300135% Design For MACC Minimal Design Build$168,000DMAG
REMOVE DETERIORATED ROOF INSULATION, 300135% Design For MACC Minimal Design Build$185,100DMAG
REPLACE SENSORS & CONTROLLERS, B300135% Design For MACC Minimal Design Build$562,430DMAG
MAINTAIN/REPAIR ROOF, BLDG 322535% Design For MACC Minimal Design Build$499,700DMAG
REPAIR INSULATION AROUND DUCTWORK B228035% Design For MACC Minimal Design Build$1,628,000DMAG
REPAIR INDUSTRIAL WASTE LIFT STATION, FAC322835% Design For MACC Minimal Design Build$131,500DMAG
REPAIR BOILERS & BOILER ROOM, BLDG 390735% Design For MACC Minimal Design Build$1,964,000DMAG
REPLACE EIFS, REPAIR WATER DAMAGE, BLDG 221135% Design For MACC Minimal Design Build$738,200DMAG
PMEL Dark Room B3113SABER Design$50,000DMAG
REPAIR HVAC DATA & TELEPHONE EQUIP RM IN B3001 Post Y-79SABER Design$319,000DMAG
REPAIR BREAKROOM COL B95 B3001SABER Design$258,000DMAG
Repair humidification system, Bldg. 3708SABER Design$330,000DMAG
Repair/Replace outside personnel doors, Bldg. 3703SABER Design$42,980DMAG
Repair/Replace outside personnel doors Bldg. 3234SABER Design$32,786DMAG
RENOVATE LIGHTING TIRE MACHINE SHOP B2210SABER Design$176,000DMAG
REPAIR ADD MEZZANINE B3001SABER Design$127,100DMAG
RENOVATE PARKING LOT AND AREA LIGHTING SOUTH OF B2121SABER Design$24,500DMAG
REPAIR MEZZANINE B200SABER Design$120,800DMAG
Repair Electrical Switches in Bldg 3108SABER Design$250,000DMAG
Ensure restroom at N31 in B9001 meets ADA requirementsSABER Design$75,000DMAG
Ensure restroom at P59 in B9001 meets ADA requirementsSABER Design$89,000DMAG
Ensure restroom at W33 in B9001 meets ADA requirementsSABER Design$55,000DMAG
Ensure restroom at N43 meets ADA requirements B9001 (WO45324)SABER Design$155,000DMAG
Ensure restroom at K22 meets ADA requirements B9001SABER Design$80,000DMAG
Repair elevator B9001SABER Design$50,000DMAG
Ensure restroom at 2W43 meets ADA requirements B9001SABER Design$95,300DMAG
Install utilities for five break rooms in B9001SABER Design$150,000DMAG
Install utilities for two break rooms in B9001SABER Design$60,000DMAG
Repair basement for safety, post signage and fence off B9001SABER Design$83,000DMAG
Ensure restroom at B62 (portable) meets ADA requirements B9001SABER Design$204,000DMAG
Ensure restroom at B69 meets ADA requirements B9001SABER Design$204,000DMAG
Ensure restroom at A70 meets ADA requirements B9001SABER Design$204,000DMAG
Repair two sets of north double and south double doors and one north and south 14’ overhead door B9001SABER Design$281,820DMAG
Repair Center Elevator @ W43 (Mezzanine 2)SABER Design$60,000DMAG
Repair emergency exit egress signs/lights B9001SABER Design$452,550DMAG
Repair Center Mezzanine 2 to Ensure Stairwell meets Fire Protection CodesSABER Design$800,000DMAG
Repair Utilities For Break Areas B9001SABER Design$60,000DMAG
Repair Freight Elevator B9001SABER Design$117,000DMAG
Replace HVAC Controls B9001SABER Design$321,600DMAG
Replace Roof B904SABER Design$39,850DMAG
Repair Exterior Stairs B5903, 5904, 5908, & 5909SABER Design$325,000DMAG
Replace Roof on B902SABER Design$39,850DMAG
Replace Roof B903SABER Design$39,850DMAG
Replace Roof on B905SABER Design$39,850DMAG
Construct New Restroom CC34SABER Design$400,000DMAG
Install Breakrooms CC36 & Y33 (F110)SABER Design$158,000DMAG
Install Breakrooms X34, B9001SABER Design$158,000DMAG
Restroom Renovation W33 B3001SABER Design$150,000DMAG
Restroom Renovation D10 B9001SABER Design$110,000DMAG
Restroom Renovation G39 B9001SABER Design$110,000DMAG
Repair by Renovation 1st Floor East B282SABER Design$235,000DMAG
Repair/Renovate 2nd Floor B282SABER Design$385,000DMAG
Emergency Repair Center Section B2121SABER Design$265,000DMAG
Alter Bldg 260 for MOBAG StorageSABER Design$2,800,000DMAG
Install Additional Lighting PMEL Lab B3113SABER Design$41,000DMAG
Fill Trenches from B55-56 to N55-65, B9001SABER Design$275,000DMAG
REPAIR RESTROOMS @ B62 TO ADA COMPLIANCE, B9001SABER Design$140,000DMAG
Repair/CONSTRUCT NEW MASONRY RESTROOMS @ X31, B9001SABER Design$155,000DMAG
REPAIR BREAKROOM @ X37, B9001SABER Design$153,000DMAG
REPAIR RENOVATE 4-BREAK RMS, B9001SABER Design$612,000DMAG
Repair Foundry Shop Area for CMXG B9001SABER Design$123,411DMAG
Repair water leaks/damage rooms B2280SABER Design$300,000DMAG
Repair By Replacement Electric Distribution Panel Col C99, B3001SABER Design$300,000DMAG
Repair By Replacement Chilled Water Piping B3001SABER Design$625,000DMAG
Repair/Replace Steam Condensate Piping B3001SABER Design$200,000DMAG
Repair Test Static Grounding System B2121SABER Design$360,000DMAG
Repair resroom at J59 to ADA ComplianceSABER Design$58,000DMAG
Repair Entrance West of Door 4 B3001SABER Design$85,000DMAG
INSTALL NEW HIGH BAY FIXTURES B3001SABER Design$20,500DMAG
Soundproofing on Walls B3234SABER Design$88,000DMAG
Rpr Breakroom @ S38-X44 B9001SABER Design$150,000DMAG
REPAIR HEAVY METAL BASIN FACILITSABER Design$420,000DMAG
Renovate First Floor B2122SABER Design$115,000DMAG
Repair Break Area Col 2093 B3001SABER Design$260,000DMAG
Repairs 76 AMXG Group office B3001SABER Design$172,000DMAG
Rpr Docks 11/12 w/Utility Trenches B3001SABER Design$75,500DMAG
Repair Advance Electrical Metering In DMAG buildings 3, 10, 200, 210, 214, 229, 230, 240, 260, 477, 1055, 2121, 2122, 2136, 2210, 2211, 2280, 3001, 3102, 3105, 3113, 3123, 3220, 3221, 3225, 3228, 3234, 3333, 3507, 3703, 3705, 3706, 3707, 3708, 3761, 3772, 3902, 9001, 9201, & 9301 WO # 49896SABER Design$1,440,000DMAG
Repair doors to make ADA compliant at B3221SABER Design$70,000DMAG
RENOVATE ROOMS 210, 210B & 210C, B3220SABER Design$125,000DMAG
RENOVATE ROOMS 219-A1, A2, B1, B2, B3220SABER Design$107,000DMAG
Repair Bay Lighting SABER Design (SRM)SABER Design$297,209DMAG
REPAIR RESTROOMS @ E30 TO ADA COMPLIANCE, B9001SABER Design$380,000DMAG
REPAIR RESTROOMS @ W22 TO ADA COMPLIANCE, B9001SABER Design$140,000DMAG
REPAIR RESTROOMS @ P53 TO ADA COMPLIANCE, B9001SABER Design$140,000DMAG
REPAIR RESTROOMS @ V45 TO ADA COMPLIANCE, B9001SABER Design$260,000DMAG
REPAIR RENOVATE BREAK AREA @ B67, B9001SABER Design$160,000DMAG
RPR/RPL LIFT STATION DISCHARGE LINESABER Design$315,000DMAG
Repair Renovate Break Area @ D10, B9001SABER Design$165,000DMAG
REPAIR BY REPLACEMENT LIGHTING FOR B3221 CHEMICAL CLEAN SHOPSABER Design$106,000DMAG
Repair/Paint Aisle B2121SABER Design$175,000DMAG
RPR/RNVT RESTROOMS 103,104,109,118 B3234SABER Design$432,000DMAG
Repair/Refinish Test Cell Floor B3234SABER Design$294,000DMAG
RPR/RPLC CONTROL VALVES COOLER
TOWER B3225SABER Design$106,000DMAG
REPAIR BREAK AREA COL C81 B3001SABER Design$226,000DMAG
Rpr Restroom @D10 TP ADA COM B9001SABER Design$140,000DMAG
RENOVATE RESTROOMS, COL A87, B3001SABER Design$172,000DMAG
REPAIR RESTROOM @ DD25 TO ADA COMPLIANCE, B9001SABER Design$260,000DMAG
Replace Steam Condensate Return LineSABER Design$450,000DMAG
REPAIR FOUNDATION PITS, (U53-W55 & 57T-59W), B3001SABER Design$315,000DMAG
Repair Enclosure in Tank and Cooler Area, B9001, G7SABER Design$245,000DMAG
REPAIR BLDG 1 AT DOOR 9 FOR ELECTRICAL/SOLDER TRAINING AREASABER Design$322,000DMAG
REPAIR RENOVATE FOR CHEMICAL SOTRAGE, EE51, B9001SABER Design$690,000DMAG
REPAIR, PURCHASE, AND INSTALL BREAKROOMS @ V23 & T22 B9001 D20, X26, BB23, & DD25SABER Design$1,006,000DMAG
Repair Restrooms at C70 to ADA Compliance, B9001SABER Design$180,000DMAG
Repair Restrooms at D20 to ADA Compliance, B9001SABER Design$275,000DMAG
CNST BACK-UP GENERATOR FOR TELCO RM, B9001SABER Design$155,422DMAG
Repair/Upgrade Fire Alarm System, NW Corner B9001SABER Design$264,000DMAG
REPAIR FIRE ALARM SYSTEM (Phase 2), B3001SABER Design$858,925DMAG
REPAIR FIRE ALARM SYSTEM, BLDG 3001SABER Design$745,100DMAG
REPAIR MECHANICAL SUPPORT ROOMS, BLDG 3907SABER Design$77,000DMAG
REPAIR SECURE LAB AREA ROOM 144, BLDG 3220SABER Design$135,000DMAG
REPAIR HVAC CONTROLS AHU-1 & AHU-2, B2136SABER Design$1,836,200DMAG
REPAIR EXTERIOR BRICK, BUILDING 3105SABER Design$2,623,500DMAG
REPAIR CALIBRATION FLUID SYSTEM, BLDG 3907SABER Design$179,400DMAG
REPAIR VENTILATION SYSTEM REMOTE TEST STATIONS, B3102SABER Design$265,000DMAG
DEMOLISH/PURGE HYDRANT FUEL SYSTEM, TANKS 2114, 2115, 2117SABER Design$420,000DMAG
REPLACE AIR COMPRESSOR IN ZONE C, B3001SABER Design$711,700DMAG
REPAIR AIR HANDLING UNIT, POST 2M41, B3001SABER Design$314,300DMAG
CONSTRUCT FINAL PREP VENTILATION & ROOF RUNOFF SYSTEM, B3703SABER Design$336,100DMAG
REPAIR STEAM COILS, B3221 C-11SABER Design$200,000DMAG
REPLACE HVAC AT BATTERY SHOP, B3123SABER Design$300,000DMAG
CONSTRUCT EMERGENCY SHOWER STATIONS AT FUEL YARD, B9400SABER Design$250,000DMAG
REPAIR WATER LEAK B3001, COL X99SABER Design$500,000DMAG
Total174$487,883Average
Notes:
Emergency designs constitutes 1% of all project designs.
Urgent designs constitute 10% of all project designs.

Concept Design

Concept Design (2008-2015)
Project DescriptionTYPE OF DeliveryAmount in the Delivery OrderFunding Type
Repair Replace Roof Drains in Hangar B230Concept (SOW) Design Mgmt$1,000,000SRM
Suatain/Repair North Administration Area Roof - Sections 30 and 31 Building 3001Concept (SOW) Design Mgmt$1,676,597SRM
Repair Ricwell Steam Piping to Zone A from Bldg 208Concept (SOW) Design Mgmt$3,015,029SRM
Construct Power, Air, Utilities for Woodshop B3Concept (SOW) Design Mgmt$635,000SRM
REPAIR REMODEL OFFICE AREA FOR CFT IN B3001Concept (SOW) Design Mgmt$199,500SRM
Repair by Replacement HVAC Diffusers and Lights for KC 135Concept (SOW) Design Mgmt$253,282SRM
Repair Aircraft Maint. Hangar to meet Fire Code B230Concept (SOW) Design Mgmt$1,500,000SRM
Demolish Dorm B5902Concept (SOW) Design Mgmt$626,548SRM
Demolish Dormitory B5910Concept (SOW) Design Mgmt$568,431SRM
Repair Collapsed Duct Bank Taxiway H to Reserve RampConcept (SOW) Design Mgmt$297,637SRM
Repair Exterior Walls for ATFP, B5931Concept (SOW) Design Mgmt$603,750SRM
Repair Dorm Bollards/PlantersConcept (SOW) Design Mgmt$200,000SRM
Repair Power Check PadConcept (SOW) Design Mgmt$2,152,500SRM
Repairs Walls for ATFP B5942Concept (SOW) Design Mgmt$603,750SRM
Repair Walls for ATFP B5930Concept (SOW) Design Mgmt$603,750SRM
Sustain 8" Gas Main from A Ave to E Ave along ArnoldConcept (SOW) Design Mgmt$1,205,000SRM
B1 Door 1 & Door 5 AlterationConcept (SOW) Design Mgmt$150,972SRM
Repair HVAC & Utilities Infrastructure in Maint Hangar B230Concept (SOW) Design Mgmt$4,700,000SRM
Demo Bldg 4025Concept (SOW) Design Mgmt$112,800SRM
Demo Bldg 4024Concept (SOW) Design Mgmt$112,800SRM
East CDC Addition DesignConcept (SOW) Design Mgmt$2,000,000SRM
Demolish B27Concept (SOW) Design Mgmt$4,000SRM
Sustain Roof at Base of Trapezoidal Sections B230Concept (SOW) Design Mgmt$1,849,616SRM
B1 Door AlterationsConcept (SOW) Design Mgmt$161,567SRM
Demolish B4025Concept (SOW) Design Mgmt$150,001SRM
Sustain HVAC System B282 BMC DesignConcept (SOW) Design Mgmt$1,800,000SRM
Demolish Dorm 5920 Constr MgtConcept (SOW) Design Mgmt$21,314SRM
Demo Connecting Structure B1 Constr MgtConcept (SOW) Design Mgmt$698,060SRM
Demolish Dorm 5916Concept (SOW) Design Mgmt$215,416SRM
Demo Bldg. 773Concept (SOW) Design Mgmt$542,970SRM
REPAIR FACILITY FOR BREAK AREA & ADMIN (DLA), B9001Concept (SOW) Design Mgmt$707,152SRM
Demolish Golf Maintenance & Euipment B6020Concept (SOW) Design Mgmt$25,000SRM
Demolish B2101 General Purpose ShopConcept (SOW) Design Mgmt$3,300,000SRM
DEMOLISH ABOVE GROUND STORAGE TANK 349Concept (SOW) Design Mgmt$250,000SRM
Demolish Maintenance Shop B4041Concept (SOW) Design Mgmt$55,000SRM
DEMOLISH B2102, STEAM PLANTConcept (SOW) Design Mgmt$85,000SRM
Construct Road & Demo EIG Fitness CenterConcept (SOW) Design Mgmt$76,000SRM
Construct West Loading Dock B1083Concept (SOW) Design Mgmt$360,000SRM
Rpr Aircraft Maint Hangar B230 Ph2Concept (SOW) Design Mgmt$2,525,000SRM
Repair RAC-1 Roof DLA warehouse B416Concept (SOW) Design Mgmt$12,971,800SRM
MOVE HOUSING OFFICE TO B5913 & DEMO
B5927Concept (SOW) Design Mgmt$378,760SRM
DEMOLISH AIRCRAFT MAINTENANCE SHOP B3215Concept (SOW) Design Mgmt$436,000SRM
CONSOLIDATE MOVE COMM TO B3 AND DEMO B803Concept (SOW) Design Mgmt$1,123,200SRM
DEMOLISH AIRCRAFT MAINTENANCE SHOP, B3212Concept (SOW) Design Mgmt$102,400SRM
SUSTAIN REPLACE HVAC 552ND ALERT FAC B989Concept (SOW) Design Mgmt$1,600,000SRM
REPAIR HVAC, EXHAUST EXTRACTION & INTERIOR, B1070Concept (SOW) Design Mgmt$167,800SRM
REPAIR HVAC & FIRE SPRINKLER SYSTEM, B260Concept (SOW) Design Mgmt$110,900SRM
REPAIR EXTERIOR DRAINAGE SYSTEM AT COMMAND POST FAC
B1066Concept (SOW) Design Mgmt$120,000SRM
CONSTRUCT DASH 21 STORAGE FACILITY B1071Concept (SOW) Design Mgmt$641,100SRM
Sustain Air Conditioning System Base Communications Hub, B3001GConcept (SOW) Design Mgmt$360,000SRM
Repair/Replace Fire Water Maiin B3105 & B3001Concept (SOW) Design Mgmt$900,000SRM
Sustain/Repair 12.5 KVA Swiitch Gear BLA WHS B1Concept (SOW) Design Mgmt$760,000SRM
Repair/Replace Generator &ATS, B-3202Concept (SOW) Design Mgmt$136,743SRM
Sstn/Rpr RAC-3 Fire Supression Tanks B2119, 3203, 2120Concept (SOW) Design Mgmt$1,550,000SRM
CONSOLIDATION REPAIR GLSC & MANPOWER, BLDG 1Concept (SOW) Design Mgmt$2,203,000SRM
RENOVATE TWADDLE CENTERConcept (SOW) Design Mgmt$3,106,930SRM
Repair/Construct Final Denial Barrier System Midwest BlvdConcept (SOW) Design Mgmt$1,192,211SRM
REPAIR SOURCE SELECTION ADMIN, BLDG 10Concept (SOW) Design Mgmt$28,750SRM
Construct entry control facilityConcept (SOW) Design Mgmt$749,000SRM
RPR E-3 PL-2 AREA BOUNDRY, NORTH AWAC RAMPConcept (SOW) Design Mgmt$1,858,600SRM
CONSTRUCT FINAL DENIAL BARRIER SYS MIDWEST BLVD GATEConcept (SOW) Design Mgmt$1,192,200SRM
REPAIR CONSOLIDATE AFLCMC, TWADDLE CENTER 8400Concept (SOW) Design Mgmt$10,256,700SRM
REPAIR BUILDING 1 ADMIN AREA FOR SWING SPACEConcept (SOW) Design Mgmt$2,798,200SRM
CONSTRUCT ENTRY CONTROL FACILITY TO AWAC RESTRICTED AREAConcept (SOW) Design Mgmt$554,700SRM
RPR FIRE/POTABLE WATER CROSS CONNECTION B240Concept Design For MACC Full Design Build$3,500,000SRM
CONSTRUCT STORM WATER DETENTION SYSTEM,
PRAIRIELANDConcept Design For MACC Full Design Build$150,000SRM
REPAIR 8" GAS MAIN ALONG A AVEConcept Design For MACC Full Design Build$800,000SRM
SUSTAIN REPAIR RAC-3 FIRE SUPRESSION TANKS
B2119, 3203, 2120Concept Design For MACC Full Design Build$1,550,000SRM
SUSTAIN SIM MAINT AREA HVAC 552ND TRAINING FACILITY B284Concept Design For MACC Full Design Build$1,300,000SRM
Repair B9301 W/ Free Cooling Heat ExchangersConcept Design For MACC Full Design Build$780,000SRM
Repair B3001 W/ Free Cooling Heat ExchangeConcept Design For MACC Full Design Build$760,000SRM
Repair Renovate Barrel Washing Facility B3125Concept Design For MACC Full Design Build$1,400,000SRM
Construct Storm Water Detention System , PrarielandConcept Design For MACC Full Design Build$150,000SRM
Sustain HVAC, AWACS HQ, B280Concept Design For MACC Full Design Build$1,000,000SRM
Replace Cooling Tower, B1Concept Design For MACC Full Design Build$350,000SRM
Replace 600 Ft of Sewer Line near B1048Concept Design For MACC Full Design Build$425,000SRM
Rpr/Replace standby Generator for B284Concept Design For MACC Full Design Build$160,000SRM
REPAIR BY RENOVATION SQUAD OPS 1ST FL EAST FOR INTEL B282Concept Design For MACC Full Design Build$255,000SRM
SUSTAIN HVAC IN SIM 1 AND FIT 552ND TRAINING FAC B284Concept Design For MACC Full Design Build$2,760,900SRM
REPAIR SECURE AREA, OSK, B282Concept Design For MACC Full Design Build$385,000SRM
DEMOLISH BLDG 3108 AS PART OF 20/20 DEMOLITION PLANConcept Design For MACC Full Design Build$2,110,250SRM

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .