4_5_3a_Design_Project_Workload _Updated_20_Oct_2015.xls
XLS spreadsheet 143 KB Posted
- Attached to
- CE Engineering Management Services Federal contract opportunity
- Solicitation number
- FA8101-15-R-0006
About this file
Revised Attachment 4.5.3a Design Project Workload
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100% Design
| 100% Design (2008-2015) | |||
| Project Description | Design Type | Amount in the Delivery Order | Funding Type |
| Replace 15KV Voltage Regulator at Substation #4 | 100% | $484,500 | SRM |
| Sustain Runway 17 Sequence Lights | 100% | $135,000 | SRM |
| Repair Rack Sprinkler System B477 | 100% | $250,000 | SRM |
| Sustain Twining Drive Bridge Deck | 100% | $600,000 | SRM |
| Study & Design Service for Dorm Security Barrier | 100% | $200,000 | SRM |
| Repair HVAC Units, Add Reheat Bldg 3 | 100% | $1,500,000 | SRM |
| Sustain Repair 5 Business Suites - Phase II B5605 | 100% | $1,800,000 | SRM |
| Repair RAC Structural Failure B3 | 100% | $715,000 | SRM |
| Repair RAC Fire Pond to Control Water Within Flood Plain | 100% | $484,500 | SRM |
| Repair Entry Control Point @ Vance Gate | 100% | $1,400,000 | SRM |
| Repair Entry Control Point @ Hope Gate | 100% | $1,200,000 | SRM |
| Repair Entry Control Point @ Lancer Gate | 100% | $1,250,000 | SRM |
| Repair Entry Control Point @ Liberator Gate | 100% | $1,400,000 | SRM |
| Repair Entry Control Point, Tinker Gate | 100% | $1,250,000 | SRM |
| Repair/Renovate for Move of B460 Activities to B1 | 100% | $4,900,000 | SRM |
| Construct Compressed air system controller ECIP | 100% | $148,100 | SRM |
| SUSTAINMENT REPAIR, DORM 5904 | 100% | $978,900 | SRM |
| REPAIR FIRE ALARMS & SMOKE DETECTORS, DORM 5903 | 100% | $19,900 | SRM |
| REPAIR FIRE ALARMS & SMOKE DETECTORS, DORM 5909 | 100% | $19,900 | SRM |
| REPAIR FIRE ALARMS & SMOKE DETECTORS, DORM 5908 | 100% | $19,900 | SRM |
| CONSTRUCT HOME STATION MEDICAL RESPONSE WAREHOUSE | 100% | $606,000 | SRM |
| Design New Comm Facility South Fourty | 100% | $575,000 | SRM |
| Total | 22 | $906,214 | Average |
| Repair by Replacement, Roof, B214 | 100% | $2,210,000 | DMAG |
| REPAIR NORTH LAB APPROX 7 FT B3001 | 100% | $350,000 | DMAG |
| REPAIR ADMIN AREA, MEZZ #1, B9001 | 100% | $1,564,062 | DMAG |
| Repair Boiler Area Columns & Slab, B9301 | 100% | $133,567 | DMAG |
| Install Pedestrian Turnstile Gates South of 3907 | 100% | $380,000 | DMAG |
| Repair Plumbing in Basement, B214 | 100% | $325,000 | DMAG |
| Repair Emergency Lighting, Bldg. 3001 | 100% | $1,500,000 | DMAG |
| RENOVATE MADPPC SPACE IN B3703 | 100% | $347,250 | DMAG |
| EXPAND NORTH LAB APPROX 7 FT | 100% | $350,000 | DMAG |
| Renovate restrooms Bldg. 2122 | 100% | $195,200 | DMAG |
| Bring AX and Annex into compliance in Bldg. 3705 Repair FSD B3705) | 100% | $375,000 | DMAG |
| REPAIR REPLACE BRIDGE CRANE C-2 IN HIGH BAY B3001 | 100% | $795,000 | DMAG |
| REPAIR REPLACE BRIDGE CRANE C-6 IN HIGH BAY B3001 | 100% | $795,000 | DMAG |
| REPAIR REPLACE BRIDGE CRANE C-3 IN HIGH BAY B3001 | 100% | $795,000 | DMAG |
| REPAIR & CLEAN OBSERVATION WINDOWS B3234 | 100% | $150,000 | DMAG |
| REPLACE LIGHTING IN BACKSHOP METAL HALIDE LIGHTING B3001 | 100% | $1,900,000 | DMAG |
| Repair water leaks/damage rooms B2280 | 100% | $145,000 | DMAG |
| Rplc 13 Heating Coils Chilled Water B2136 | 100% | $570,000 | DMAG |
| Replace Heavy Metal Basin Facility | 100% | $420,000 | DMAG |
| Repair/Replace Steam Condensate Piping B3001 | 100% | $200,000 | DMAG |
| Repair By Replacement Chilled Water Piping B3001 | 100% | $625,000 | DMAG |
| Repair By Replacement Electric Distribution Panel Col C99, B3001 | 100% | $310,000 | DMAG |
| Rpr/Reno Admin Area & Breakroom 1st Floor | 100% | $446,800 | DMAG |
| Total | 23 | $647,038 | Average |
| Notes: | |||
| Emergency designs constitutes 1% of all project designs. | |||
| Urgent designs constitute 10% of all project designs. |
A&E Design
| A&E Design (2008-2015) | |||||
| Project Description | Year | DO # | Design Type | Amount in the Delivery Order | Funding Type |
| Repair Cooking Hoods, Misc Facilities | 2008 | 148 | A&E | $300,000.00 | SRM |
| Construct Mask Training Chamber | 2010 | 278-798 | A&E | $265,000.00 | SRM |
| STUDY TAFB FIRE SUPPRESSION SYSTEM | 2011 | 989 | A&E | $500,000.00 | SRM |
| Study TAFB Fire supression System | 2011 | 1069 | A&E | $500,000.00 | SRM |
| SUSTAIN ELECTRICAL MAIN DISTRIBUTION AWACS HANGER B230 | 2011 | 1103 | A&E | $3,757,000.00 | SRM |
| Evaluate Facility 5801 for Reuse | 2011 | 1295 | A&E | $75,000.00 | SRM |
| Sustain Repair HVAC/Utilities B230 Ph 4 | 2012 | 1369 | A&E | $2,359,800.00 | SRM |
| Sustain Repair HVAC/Utilities, B230, Ph 2 | 2012 | 1371 | A&E | $1,930,100.00 | SRM |
| EVALUATE AIRFIELD LIGHTING SYSTEM | 2015 | A&E | $150,000.00 | SRM | |
| REPAIR SURFACE GRADE AT CDC EAST, B3904 | 2015 | A&E | $1,355,200.00 | SRM | |
| Total | 10 | $1,119,210.00 | Average | ||
| REPAIR/RENOVATE RESTROOMS PH 4 B3001 | 2008 | 14 | A&E | $1,200,000.00 | DMAG |
| REPAIR FIRE ALARM SYSTEM B3001 | 2008 | 16 | A&E | $1,000,000.00 | DMAG |
| Engineering Study TAC Industrial Facility | 2008 | 75 | A&E | $274,370.00 | DMAG |
| Roof Study B9001 | 2008 | 254 | A&E | $400,000.00 | DMAG |
| Rpr/Rplc 2 Low Pressure Chillers B3902 | 2009 | 611 | A&E | $1,320,000.00 | DMAG |
| REPAIR/REPLACE AIRCRAFT HANGAR DOOR CONTROLS B2280 | 2009 | 622 | A&E | $1,830,000.00 | DMAG |
| Repair Ventillation System B3102 | 2009 | 623 | A&E | $3,050,000.00 | DMAG |
| Evaluate Subsurface Voids. B9001 | 2009 | 629 | A&E | $50,000.00 | DMAG |
| Redundancy in Exhaust Stream of B2280, B3225 | 2010 | 686 | A&E | $200,000.00 | DMAG |
| Rpr/Renovate Floor Below Mezz 3, B9001 | 2010 | 747 | A&E | $3,800,000.00 | DMAG |
| Repair/Renovate Mezz 3 Area,B9001 | 2010 | 755 | A&E | $3,285,000.00 | DMAG |
| Repair by Replacement Hangar Door B3102 | 2010 | 751 | A&E | $2,609,156.56 | DMAG |
| Fuel Study 3234, 3703 | 2010 | 813 | A&E | $275,000.00 | DMAG |
| Study Fire Protection for DLA Rack System, B9001 | 2010 | 955 | A&E | $45,000.00 | DMAG |
| REPAIR/RENOVATE MEZZ 3 AREA, B9001 (WO # 49466,49467, 49468, 49469. 49470) | 2011 | 1032 | A&E | $2,875,728.00 | DMAG |
| STUDY WASTE TREATMENT SYSTEMS, TAC IWTP | 2011 | 1033 | A&E | $200,000.00 | DMAG |
| REPLACE NW HANGAR DOOR B3102 | 2011 | 1055 | A&E | $2,687,435.00 | DMAG |
| REPAIR RENOVATE BREATHING AIR SYSTEM B3225 | 2011 | 1124 | A&E | $2,159,845.00 | DMAG |
| Repair Personnel Gates at the East ALC Ramp, Fac No 11500, near buildings | 2011 | 1148 | A&E | $1,860,000.00 | DMAG |
| Repair/Renovate Ventilation in SW & Center Docks, B2122 | 2011 | 1158 | A&E | $6,000,000.00 | DMAG |
| Repair/Renovate South Admin Area B9001 | 2012 | 1087 | A&E | $4,217,591.69 | DMAG |
| REPAIR BOILER AREA COLUMNS & SLAB, B9301 | 2012 | A&E | $119,900.00 | DMAG | |
| REPAIR RENOVATE FOR CHEMICAL STORAGE, EE51, B9001 | 2012 | A&E | $1,564,000.00 | DMAG | |
| REPAIR AIRCRAFT DOCK VENTILATION SYSTEM B3105 | 2013 | A&E | $1,074,800.00 | DMAG | |
| REPAIR PLUMBING IN BASEMENT, B214 | 2013 | A&E | $325,000.00 | DMAG | |
| REPAIR HUMIDIFICATION SYSTEM, B2280 | 2013 | A&E | $2,500,000.00 | DMAG | |
| REPAIR BY REPLACEMENT HVAC B2280 | 2015 | A&E | $1,926,400.00 | DMAG | |
| RENOVATE NORTHWEST AREA OF BLDG 3220 | 2015 | A&E | $3,500,000.00 | DMAG | |
| REPAIR STEAM & CONDENSATE LINES, 3001 TO 3105 TO 3102 | 2015 | A&E | $1,700,000.00 | DMAG | |
| COMPRESSED AIR FEASIBILITY STUDY, 3234 & 3703 | 2015 | A&E | $35,700.00 | DMAG | |
| REPAIR OLD CMM AREA 9001 FOR QVC/PMEL | 2015 | A&E | $2,000,000.00 | DMAG | |
| REPAIR HANGAR DOOR SAFETY FEATURES | 2015 | A&E | $900,000.00 | DMAG | |
| Total | 32 | $1,718,278.95 | Average | ||
| Notes: | |||||
| Emergency designs constitutes 1% of all project designs. | |||||
| Urgent designs constitute 10% of all project designs. |
IDIQ (Roof & Pavement) Design
| IDIQ Design (2008-2015) | ||||
| Project Description | Year | TYPE OF Delivery | Amount in the Delivery Order | Funding |
| Design/Repair 20 Slabs at Navy Ramp at entry from Taxiway E | 2008 | IDIQ Design | $500,000 | SRM |
| Maintain Overrun & Non-Keel Asphalt Portions of Runway | 2008 | IDIQ Design | $1,636,598 | SRM |
| Repair By Replacement aa Delta Pop Up Bollards at Gott Gate | 2008 | IDIQ Design | $42,884 | SRM |
| Repair By Replacement aa Delta Pop Up Bollards at Vance Gate | 2008 | IDIQ Design | $39,340 | SRM |
| Repair Concrete Drain North Side of Echo Ramp | 2008 | IDIQ Design | $315,000 | SRM |
| Repair Entry Control Point, Lancer Gate B33610 | 2008 | IDIQ Design | $650,000 | SRM |
| Repair Exterior Roof /Wall Insulation & Replace Metal Siding | 2008 | IDIQ Design | $125,000 | SRM |
| Repair Parking lot B1017 | 2008 | IDIQ Design | $40,000 | SRM |
| Repair Pavement East Drive from Turbine Drive to ALC Ramp | 2008 | IDIQ Design | $792,330 | SRM |
| Repair Reconfigure Intersection Arnold & H | 2008 | IDIQ Design | $850,000 | SRM |
| Repair Roof & Guttering Section 1& 4 CE OPS B412 | 2008 | IDIQ Design | $1,890,000 | SRM |
| Repair Roof Command Post B1066 | 2008 | IDIQ Design | $100,800 | SRM |
| Repair Roof Section 1 B1093 | 2008 | IDIQ Design | $73,500 | SRM |
| Repair Taxiway Golf Between E & F | 2008 | IDIQ Design | $4,900,000 | SRM |
| Repair/Replace Bollards at Eaker Gate | 2008 | IDIQ Design | $49,610 | SRM |
| Repair/Replace Joint Seam, RunWay 17/35 | 2008 | IDIQ Design | $350,000 | SRM |
| Sustain Munitions Road from Alert Road to 59th Street | 2008 | IDIQ Design | $2,215,500 | SRM |
| Sustain Parking Lot A2 South of B9001 | 2008 | IDIQ Design | $209,100 | SRM |
| Sustain Parking Lot A5 South of B9001 | 2008 | IDIQ Design | $273,000 | SRM |
| Sustain Repair Roof Corrosion Control B2122 | 2008 | IDIQ Design | $3,168,900 | SRM |
| Sustain Replace Roof on B284 | 2008 | IDIQ Design | $238,350 | SRM |
| Sustain Replace Warehouse Roof on B801 | 2008 | IDIQ Design | $1,701,000 | SRM |
| Sustain Reserve Road From Air Depot to RAPCON | 2008 | IDIQ Design | $670,000 | SRM |
| Construct Additional Parking Near B1017 | 2009 | IDIQ Design | $45,000 | SRM |
| Construct Widen Lanes Along Arnold | 2009 | IDIQ Design | $650,000 | SRM |
| Demo Dorm B5916 | 2009 | IDIQ Design | $481,800 | SRM |
| Demo Dorm B5920 | 2009 | IDIQ Design | $461,800 | SRM |
| Demolish Maintenance Shop B27 | 2009 | IDIQ Design | $172,000 | SRM |
| Design Priliminary Temp Repair/Emergency Repr TAC Roof Bldg 9001 | 2009 | IDIQ Design | $300,000 | SRM |
| Design Repair Storm Damage Preliminary Repair B3102 | 2009 | IDIQ Design | $43,589 | SRM |
| Dsgn & Contract Mgmt Preliminary Repair Emergency Storm Damage B9001 | 2009 | IDIQ Design | $201,000 | SRM |
| Emergency Roof Repair Main Lobby B3001 | 2009 | IDIQ Design | $25,000 | SRM |
| Interim Roof Repair B9001 TEMPORARY REPAIR/EMERGENCY TAC ROOF ON B9001 | 2009 | IDIQ Design | $201,000 | SRM |
| Interim Storm Damage Roof Repair B2121 | 2009 | IDIQ Design | $35,000 | SRM |
| Maintain Restripe Parking Areas IDIQ Design | 2009 | IDIQ Design | $40,000 | SRM |
| Maintain Street Striping: Various Locs Basewide | 2009 | IDIQ Design | $75,000 | SRM |
| Maintain/Repaint Parking Lot Striping | 2009 | IDIQ Design | $85,000 | SRM |
| Perm Repair Storm Damaged Roof B2121 | 2009 | IDIQ Design | $3,300,000 | SRM |
| Preliminary Repair Storm Damaged Roof B1058 | 2009 | IDIQ Design | $30,000 | SRM |
| Preliminary Repair Storm Damaged Roof B9001 | 2009 | IDIQ Design | $8,000,000 | SRM |
| Repair ATFP Protection B3001G | 2009 | IDIQ Design | $515,267 | SRM |
| Repair Pavement: Arnold Ave Between Air Depot & Ave A | 2009 | IDIQ Design | $800,000 | SRM |
| Repair RAC-1 Roof Substrate B416 Emergency IDIQ | 2009 | IDIQ Design | $1,030,000 | SRM |
| Repair Roof Comp Engine Mgmt Fac B4008 | 2009 | IDIQ Design | $220,000 | SRM |
| Repair Storm Damage Intrim Roof B2121 | 2009 | IDIQ Design | $33,287 | SRM |
| Repair Storm Damage Intrim Roof B3102 | 2009 | IDIQ Design | $45,000 | SRM |
| Repair Storm Damage Permanent Roof B3102 | 2009 | IDIQ Design | $310,000 | SRM |
| Replace Mulitiple Spill Containment Pond Liners | 2009 | IDIQ Design | $160,000 | SRM |
| Rpr/Construct Final Denial Barrier System Midwest Bldvd Gate | 2009 | IDIQ Design | $1,300,000 | SRM |
| Sustain Parking Lot A1 South of B9001 | 2009 | IDIQ Design | $285,600 | SRM |
| Sustain Roof at Base of Trapezoidal Sections B230 | 2009 | IDIQ Design | $1,530,000 | SRM |
| Construct Services Road East of Building B1083 | 2010 | IDIQ Design | $100,000 | SRM |
| Repair Bak 12 Runway 12/30 | 2010 | IDIQ Design | $500,000 | SRM |
| REPAIR ISOLATED AREAS OF TYPE-D TRAFFIC AREAS OF RWY 12/30 | 2010 | IDIQ Design | $120,000 | SRM |
| Repair Parking Lot Front B3001 | 2010 | IDIQ Design | $5,500,000 | SRM |
| Repair Rof to Lean- to #10 | 2010 | IDIQ Design | $154,287 | SRM |
| Repair Roof & Guttering Section 2 & 3 DLA Warehouse B412 | 2010 | IDIQ Design | $2,010,068 | SRM |
| Repair Roof B1068 Design | 2010 | IDIQ Design | $561,000 | SRM |
| Repair Roof B1070 Design | 2010 | IDIQ Design | $212,700 | SRM |
| Repair Roof E4 Systems Integration Lab B1017 | 2010 | IDIQ Design | $200,000 | SRM |
| REPAIR ROOF ON SQUADRON OPERATIONS, B240 | 2010 | IDIQ Design | $234,000 | SRM |
| Replace Rof on Main Hangar B1030 | 2010 | IDIQ Design | $654,000 | SRM |
| RPR BY RPL TAXIWAY TO COMPASS ROSE FAC | 2010 | IDIQ Design | $140,000 | SRM |
| Rpr/ Construct Final Denail Barrier System (Turnbull Gate) | 2010 | IDIQ Design | $1,300,000 | SRM |
| Suatain Non-Keel Portion of Runway 12-30 | 2010 | IDIQ Design | $900,000 | SRM |
| Sustain Parkng Lot/ Drive Multiple Bldgs | 2010 | IDIQ Design | $960,000 | SRM |
| Sustain Roof Admin/Shop B230 | 2010 | IDIQ Design | $3,500,000 | SRM |
| Sustain Roof Sections 3,4 7 6 ABW HQ B460 | 2010 | IDIQ Design | $50,000 | SRM |
| Maintian /Rpr Roof Sections 300-304 B9001 | 2011 | IDIQ Design | $1,500,000 | SRM |
| REPAIR CENTER 50; KEEL SECTION, TWY 12/30 HORN TO TXY G | 2011 | IDIQ Design | $6,500,000 | SRM |
| REPAIR RAPCON RD RESERVE RD TO PATROL RD | 2011 | IDIQ Design | $905,000 | SRM |
| Repair Roof on Fuel sys Maint dock B976 | 2011 | IDIQ Design | $1,100,000 | SRM |
| Repair Roof Section 1-4, B3703 | 2011 | IDIQ Design | $505,000 | SRM |
| Repair Roof Sections 1 & 2, B825 | 2011 | IDIQ Design | $50,000 | SRM |
| Repair Roof Sections 6,7,8 & 14, B820 | 2011 | IDIQ Design | $180,000 | SRM |
| REPAIR ROOF SECTIONS 6,7,8, & 14, B820 | 2011 | IDIQ Design | $165,000 | SRM |
| sustain Gypsum Roof, AWAC Squa Ops B282 | 2011 | IDIQ Design | $1,210,000 | SRM |
| Sustain Turbine Rd @ E Dr and Resurface Warehouse to Staff. | 2011 | IDIQ Design | $852,000 | SRM |
| CONSTRUCT ACCESS ROAD TO B801 | 2012 | IDIQ Design | $344,300 | SRM |
| REPAIR ASPHALT SHOULDER OF NAVY RAMP | 2012 | IDIQ Design | $745,000 | SRM |
| REPAIR BARREL ROOF AT AWAC HANGAR B230 | 2012 | IDIQ Design | $3,512,800 | SRM |
| REPAIR ROOF, GUTTERS, DOWNSPOUTS, DORM 5904 | 2012 | IDIQ Design | $273,100 | SRM |
| REPAIR YOUTH CENTER ROOF - B5520 | 2012 | IDIQ Design | $278,300 | SRM |
| REPAIR/WIDEN KEEL PORTION OF RWY 12/30, HORN TO NW END | 2012 | IDIQ Design | $3,184,900 | SRM |
| SUSTAIN NON KEEL PORTIONS OF RWY 12/30, HORN TO SE END | 2012 | IDIQ Design | $3,738,800 | SRM |
| SUSTAIN NON-KEEL PORTIONS OF RUNWAY 12/30, NORTHWEST END | 2012 | IDIQ Design | $4,431,300 | SRM |
| SUSTAIN REPAIR ROOF B5931, DORMITORY | 2012 | IDIQ Design | $640,700 | SRM |
| SUSTAIN ROOF NAVY COMBINED BACHELOR HOUSING, B5930 | 2012 | IDIQ Design | $307,500 | SRM |
| SUSTAIN WAREHOUSE RD TURBINE DR TO SE 59TH ST | 2012 | IDIQ Design | $1,302,100 | SRM |
| EMERGENCY REPAIR ROOF FIRE DAMAGE, BLDG 412 | 2013 | IDIQ Design | $127,800 | SRM |
| REPAIR ROOF BLDG 4028 | 2013 | IDIQ Design | $24,100 | SRM |
| STORM DAMAGE - REPAIR ROOF AND STACKS, BLDG 9201 | 2013 | IDIQ Design | $241,400 | SRM |
| STORM DAMAGE - REPAIR ROOF BLDG 201 | 2013 | IDIQ Design | $74,200 | SRM |
| STORM DAMAGE - REPAIR ROOF BLDG 240 | 2013 | IDIQ Design | $132,900 | SRM |
| STORM DAMAGE - REPAIR ROOF BLDG 9301 | 2013 | IDIQ Design | $461,500 | SRM |
| REPAIR AIRFIELD APRON, AWACS APRON, P1 | 2014 | IDIQ Design | $14,817,400 | SRM |
| REPAIR AIRFIELD APRON, AWACS APRON, P2 | 2014 | IDIQ Design | $22,216,100 | SRM |
| Repair Apron West of Depot MX Hangar 3102 | 2014 | IDIQ Design | $14,497,600 | SRM |
| REPAIR EAST ALC MAINTENANCE APRON, P1 | 2014 | IDIQ Design | $7,995,000 | SRM |
| REPAIR ROOF BLDG 830 | 2014 | IDIQ Design | $2,491,900 | SRM |
| REPAIR ROOF CHILD DEVELOPMENT CENTER EAST, B3904 | 2014 | IDIQ Design | $268,900 | SRM |
| REPAIR ROOF NAVY HANGAR, B820 | 2014 | IDIQ Design | $5,610,000 | SRM |
| REPAIR ROOF SECTIONS, DISA and 966 AACS SQUAD OPS, B201 | 2014 | IDIQ Design | $1,680,400 | SRM |
| REPAIR ROOF SECURITY FORCES OPS, B7003 | 2014 | IDIQ Design | $674,400 | SRM |
| REPAIR ROOF WING HEADQUARTERS, B1002 | 2014 | IDIQ Design | $267,400 | SRM |
| REPAIR ROOF, BLDG 825 | 2014 | IDIQ Design | $1,325,000 | SRM |
| REPAIR TAXIWAY D | 2014 | IDIQ Design | $3,784,300 | SRM |
| REPAIR TAXIWAY J | 2014 | IDIQ Design | $2,028,000 | SRM |
| REPAIR WEST ALC MAINTENANCE APRON, P1 | 2014 | IDIQ Design | $9,061,000 | SRM |
| REPAIR WEST ALC MAINTENANCE APRON, P2 | 2014 | IDIQ Design | $6,672,000 | SRM |
| MAINTAIN SOUTH DORM PARKING LOT | 2015 | IDIQ Design | $200,000 | SRM |
| REPAIR AIR DEPOT RESERVE TO GOTT GATE | 2015 | IDIQ Design | $2,500,000 | SRM |
| REPAIR AIRFIELD APRON, AWACS APRON, P3 | 2015 | IDIQ Design | $22,322,000 | SRM |
| REPAIR EAST ALC MAINTENANCE APRON, P2 | 2015 | IDIQ Design | $6,650,000 | SRM |
| REPAIR PAVEMENT EAST DR. FROM BRADLEY TO TURBINE DR. | 2015 | IDIQ Design | $950,000 | SRM |
| REPAIR PRIMARY RUNWAY 18/36 | 2015 | IDIQ Design | $29,200 | SRM |
| REPAIR SHOULDERS; SOUTH HAMMERHEAD | 2015 | IDIQ Design | $5,800,000 | SRM |
| REPAIR SOUTH ROOF SECTIONS 104, 105, 106 & 109, B3001 | 2015 | IDIQ Design | $200,000 | SRM |
| REPAIR TRANSIENT CARGO APRON, P1 | 2015 | IDIQ Design | $11,914,000 | SRM |
| SUS REPAIR ROOF BASE MOBILITY FACILITY, B260 | 2015 | IDIQ Design | $5,112,500 | SRM |
| SUSTAIN ARNOLD FROM 'A' AVE TO 'F' AVE | 2015 | IDIQ Design | $5,397,200 | SRM |
| SUSTAIN REPAIR ROOF, BLDG 4057 | 2015 | IDIQ Design | $205,500 | SRM |
| Total | 122 | $2,014,425 | Average | |
| MAINTENANCE - RECOAT FLOOR STOCKROOM AREPAIR STOCKROOM B3705 | 2008 | IDIQ Design | $230,000 | DMAG |
| MAINTAIN/REPLACE ROOF B3234 TEST CELL | 2008 | IDIQ Design | $790,000 | DMAG |
| Repair Equipment Yard North of B2211 (EMERGENCY PROJECT) | 2008 | IDIQ Design | $500,000 | DMAG |
| REPAIR RAMP & Install Lighting Protection NEAR B3102 | 2008 | IDIQ Design | $2,400,000 | DMAG |
| Repair trenches/pits (J, K, L) in B9001 | 2008 | IDIQ Design | $540,000 | DMAG |
| REPLACE CONCRETE AT K-6 RAMP | 2008 | IDIQ Design | $1,900,000 | DMAG |
| REPLACE ROOF SECTIONS 5,7,8,9,10 B3001 | 2008 | IDIQ Design | $1,463,100 | DMAG |
| Fill Trenches from B55-56 to N55-65, B9001 | 2009 | IDIQ Design | $275,000 | DMAG |
| Repair trench/pit approximately post A44-G44 B9001 | 2009 | IDIQ Design | $47,650 | DMAG |
| Repair trenches/pits (B,D,E) in B9001 | 2009 | IDIQ Design | $590,000 | DMAG |
| Replace Asphalt With Concrete ALC East Ramp Near B2122 | 2009 | IDIQ Design | $740,000 | DMAG |
| Study Fire Damage Post EE57-U47 B9001 | 2009 | IDIQ Design | $30,000 | DMAG |
| Sustain repair center roof B2121 | 2009 | IDIQ Design | $1,700,000 | DMAG |
| CONSTRUCT AIRCRAFT PARKING SPOT J3 | 2010 | IDIQ Design | $630,000 | DMAG |
| CONSTRUCT PREP AREA FOR GSE DEAD LINE STORAGE EAST OF B3705 | 2010 | IDIQ Design | $740,000 | DMAG |
| Install Fuel Valve Pit and Cover B2112 | 2010 | IDIQ Design | $50,000 | DMAG |
| Maint Roof Sections 29, 32, 34, 37, & 360 B9001 | 2010 | IDIQ Design | $3,999,388 | DMAG |
| REPAIR AIRCRAFT PARKING SPOT J3 | 2010 | IDIQ Design | $690,000 | DMAG |
| REPAIR FILL TRENCHES, E52-G55, B9001 | 2010 | IDIQ Design | $60,000 | DMAG |
| REPAIR/REPLACE SOUTH HANGAR ROOF B2121 | 2010 | IDIQ Design | $1,850,000 | DMAG |
| REPLACE ROOF SECTIONS 25 & 30, B3001 | 2010 | IDIQ Design | $850,000 | DMAG |
| Construct Outdoor PMXG Engine Can Area NE of B9001 | 2011 | IDIQ Design | $750,000 | DMAG |
| CONSTRUCT STORAGE AREA BY B2122 | 2011 | IDIQ Design | $749,942 | DMAG |
| Maintain Roof section 380, B9001 | 2011 | IDIQ Design | $950,000 | DMAG |
| REMOVED RAISED TRACKS AND FILL TRENCHES, B9001 | 2011 | IDIQ Design | $1,000,000 | DMAG |
| Repair Center 50' Keel Section, Rwy 12/30 Horn to Txy G | 2011 | IDIQ Design | $6,499,700 | DMAG |
| Repair Concrete Pavement B3228 | 2011 | IDIQ Design | $61,800 | DMAG |
| Repair West Dogleg Composite Area Pits B9001 | 2011 | IDIQ Design | $270,000 | DMAG |
| REPAIR/REPLACE CONCRETE AT RAMP K-11 FACILITY | 2011 | IDIQ Design | $1,950,000 | DMAG |
| Repari Roof B3220 | 2011 | IDIQ Design | $165,000 | DMAG |
| RESURFACE AREA WITH CONCRETE IN AND AROUND B3507 (41012) | 2011 | IDIQ Design | $150,000 | DMAG |
| REPAIR RAMP AREA NEAR B2121, 2122 and 2136 | 2012 | IDIQ Design | $1,929,700 | DMAG |
| REPAIR ROOF SECTION 5, B9001 | 2012 | IDIQ Design | $2,507,900 | DMAG |
| REPAIR ROOF SECTIONS 3 AND 152, B9001 | 2012 | IDIQ Design | $1,441,500 | DMAG |
| REPAIR WEST DOGLEG COMPOSITE AREA PITS B9001 | 2012 | IDIQ Design | $280,000 | DMAG |
| REPLACE ROOF SECTIONS 1,2 & 3, B2280 | 2012 | IDIQ Design | $1,203,200 | DMAG |
| CONSTRUCT BLAST DEFLECTOR AT A/C PRKG SPOT W-1 | 2013 | IDIQ Design | $251,700 | DMAG |
| REPAIR METAL STANDING SEAM ROOF, DEPOT MAINT HANGAR 2136 | 2013 | IDIQ Design | $4,620,800 | DMAG |
| SUSTAIN REPAIR ROOF, CORROSION CONTROL, PH2 B2122 | 2013 | IDIQ Design | $3,666,300 | DMAG |
| CONSTRUCT BLAST DEFLECTOR AT W-3 & W-4 | 2014 | IDIQ Design | $510,000 | DMAG |
| CONSTRUCT FENCE AROUND B9400 | 2014 | IDIQ Design | $139,200 | DMAG |
| CONSTRUCT GSE PAD & BLAST FENCE, KC-135 BLOCK 45 MOD | 2014 | IDIQ Design | $734,000 | DMAG |
| REPAIR ROOF SECTION 25, BLDG 9001 | 2014 | IDIQ Design | $3,415,300 | DMAG |
| REPAIR ROOF SECTION 32, BLDG 9001 | 2014 | IDIQ Design | $3,411,400 | DMAG |
| REPAIR ROOF SECTION 33, BLDG 9001 | 2014 | IDIQ Design | $3,446,300 | DMAG |
| REPAIR ROOF SECTION 360, BLDG 9001 | 2014 | IDIQ Design | $4,748,000 | DMAG |
| REPLACE CONCRETE AT K-7 RAMP | 2014 | IDIQ Design | $2,136,900 | DMAG |
| REPAIR ROOF SECTION 230 & 234, BLDG 9001 | 2015 | IDIQ Design | $3,287,000 | DMAG |
| REPAIR ROOF SECTION 62, B3001 | 2015 | IDIQ Design | $360,000 | DMAG |
| REPAIR/CONSTRUCT APRON PAVEMENTS, KC-135 RAMP, W-2 | 2015 | IDIQ Design | $893,400 | DMAG |
| REPAIR/CONSTRUCT BLAST DEFLECTOR AT W-2 | 2015 | IDIQ Design | $338,000 | DMAG |
| REPLACE BUR, CANTED ROOF & EIFS OVERHANG, 3707 | 2015 | IDIQ Design | $2,012,500 | DMAG |
| REPLACE ROOF SECTION 8, BUILDING 2121 | 2015 | IDIQ Design | $1,042,200 | DMAG |
| RESTRIPE EAST ALC RAMP | 2015 | IDIQ Design | $125,000 | DMAG |
| Total | 54 | $1,391,146 | Average | |
| Notes | ||||
| Emergency designs constitutes 1% of all project designs. | ||||
| Urgent designs constitute 10% of all project designs. |
35% Design
| 35% Design (2008 -2015) | ||||
| Project Description | TYPE OF Delivery | Amount in the Delivery Order | Funding Type | |
| Mod and Renovation, B400 | 35% Design For MACC Minimal Design Build | $250,000 | SRM | |
| Repair/renovate Mens Locker Rooms B830 | 35% Design For MACC Minimal Design Build | $250,000 | SRM | |
| Repair B9002 for DRMO | 35% Design For MACC Minimal Design Build | $150,000 | SRM | |
| CONSTRUCT TRUCK SCALES AND LOAD RAMP BY B9002 | 35% Design For MACC Minimal Design Build | $200,000 | SRM | |
| Renovate Office and Install 3 Rollup Doors B801 | 35% Design For MACC Minimal Design Build | $150,000 | SRM | |
| Repair Racquetball Courts, B216 | 35% Design For MACC Minimal Design Build | $379,717 | SRM | |
| REPAIR BY REPLACEMENT ADVANCED METERING | 35% Design For MACC Minimal Design Build | $250,000 | SRM | |
| REPAIR RENOVATE CAFETERIA AREA, SOUTH ADMIN, | ||||
| B9001 | 35% Design For MACC Minimal Design Build | $500,000 | SRM | |
| REPAIR REPLACE FIRE WATER MAIN NEAR MAINT | ||||
| DEPO B3105 & B3001 | 35% Design For MACC Minimal Design Build | $900,000 | SRM | |
| REPAIR HVAC CONTROLS, MULTIPLE FACILITIES (215,412,469,506,510,801,820,989,1030,1130,3102,3105,3220,3900) (214,801,1055,2121,3102,3105,3220,3234) | 35% Design For MACC Minimal Design Build | $508,971 | SRM | |
| REPAIR HVAC IN 18-BUILDINGS BY | ||||
| RECOMMISSIONING/BALANCING | 35% Design For MACC Minimal Design Build | $1,100,000 | SRM | |
| REPAIR AC AND CHILLERS, MULTIPLE FACILITIES (214, 215, 412,460, 510, 1030, 1055, 1130, 2121, 3102, 3220) | 35% Design For MACC Minimal Design Build | $1,830,419 | SRM | |
| REPAIR/MAINTAIN MULTIPLE BLDGS TO REDUCE | ||||
| ENERGY LEAKAGE | 35% Design For MACC Minimal Design Build | $2,305,229 | SRM | |
| REPAIR LIGHTING SYSTEMS, MULTIPLE FACILITIES | 35% Design For MACC Minimal Design Build | $2,111,838 | SRM | |
| REPAIR RENOVATE WATER HEATING WITH SOLAR | 35% Design For MACC Minimal Design Build | $461,238 | SRM | |
| Repair HVAC By Rebalancing Mulitple Facilities 215,412,469,506,820,1030,3900 | 35% Design For MACC Minimal Design Build | $65,905 | SRM | |
| Repair HVAC by Rebalancing Multiple Facilites 260, 2121, 3102, 3105, 3220 | 35% Design For MACC Minimal Design Build | $32,552 | SRM | |
| Replace Fire water Main near Main Hanger B3102 | 35% Design For MACC Minimal Design Build | $500,000 | SRM | |
| SUSTAIN ELECTRIC MOTORS ON HANGAR DOORS, | ||||
| AWAC HANGAR B230 | 35% Design For MACC Minimal Design Build | $2,750,000 | SRM | |
| RENOVATE CLS AREA, BLDG 825 | 35% Design For MACC Minimal Design Build | $150,000 | SRM | |
| Repair Storm Damaged Fan Decks, AHU Coils, B3001 | 35% Design For MACC Minimal Design Build | $1,400,000 | SRM | |
| Repair Replace Storm Damaged AHU Coils, B3221. | 35% Design For MACC Minimal Design Build | $1,200,000 | SRM | |
| Repair Replace Storm Damaged AHU Coils, B2280 | 35% Design For MACC Minimal Design Build | $600,000 | SRM | |
| REPAIR REPLACE STORM DAMAGED AHU COILS, B3225 | 35% Design For MACC Minimal Design Build | $800,000 | SRM | |
| REPAIR MULTIPLE 38 CEG FACILITIES FOR SIPRNET | 35% Design For MACC Minimal Design Build | $713,010 | SRM | |
| DEMOLISH AFMC MAINTENANCE FACILITY - B1001 | 35% Design For MACC Minimal Design Build | $72,600 | SRM | |
| DEMOLISH AFMC MAINTENANCE FACILITY - B7005 | 35% Design For MACC Minimal Design Build | $37,700 | SRM | |
| DEMO B/2128 | 35% Design For MACC Minimal Design Build | $3,200 | SRM | |
| DEMOLISH B46501, STEAM HEAT MAINS | 35% Design For MACC Minimal Design Build | $250,000 | SRM | |
| DEMOLISH B6604, SAN LATRINE | 35% Design For MACC Minimal Design Build | $3,500 | SRM | |
| Repair Dorm B5904 | 35% Design For MACC Minimal Design Build | $875,108 | SRM | |
| REPLACE HVAC IN POWER PRO & HVAC OFFICES | 35% Design For MACC Minimal Design Build | $80,000 | SRM | |
| Sustainment Repair Exterior Stairs, Dorm 5930 | ||||
| Sustainment Repair Exterior Stairs, Dorm 5931 | 35% Design For MACC Minimal Design Build | $164,000 | SRM | |
| Repair By Replacement Lights With Ceiling Fans B5931 | 35% Design For MACC Minimal Design Build | $325,000 | SRM | |
| DEMOLISH MAINTENANCE FACILITY - B1001 | 35% Design For MACC Minimal Design Build | $72,600 | SRM | |
| DEMOLISH MAINTENANCE FACILITY - B7005 | 35% Design For MACC Minimal Design Build | $37,700 | SRM | |
| REMOVE AIRFIELD HAZARDS B51156 | 35% Design For MACC Minimal Design Build | $97,500 | SRM | |
| DEMOLISH BRIDGE ON OLD AIR DEPOT RD N OF B1130 | 35% Design For MACC Minimal Design Build | $95,100 | SRM | |
| DEMO DAM #2 AT NORTH END OF WASTE WATER FACILITY | 35% Design For MACC Minimal Design Build | $211,500 | SRM | |
| SUSTAIN RAC-3 BRICK WORK & ADD CANOPIES AT 7 | ||||
| ENTRANCES IN B3001 | 35% Design For MACC Minimal Design Build | $577,500 | SRM | |
| SUSTAINMENT REPAIR EXTERIOR STAIRS, DORM 5930 | 35% Design For MACC Minimal Design Build | $52,800 | SRM | |
| REPAIR BY REPLACEMENT HVAC SYSTEM, B202 | 35% Design For MACC Minimal Design Build | $657,500 | SRM | |
| REPAIR ATHLETIC FIELD SURFACE | 35% Design For MACC Minimal Design Build | $766,400 | SRM | |
| SUSTAIN HVAC OPS SUPPORT SQDN, WEST SIDE, B283 | 35% Design For MACC Minimal Design Build | $400,900 | SRM | |
| REPAIR SERVICES HEADQUARTERS FOR SERVICES TRANSFORMATION | 35% Design For MACC Minimal Design Build | $810,600 | SRM | |
| REPAIR SERVICES HEADQUARTERS FOR TRANSFORMATION, NAF | 35% Design For MACC Minimal Design Build | $340,000 | SRM | |
| CONSTRUCT RESTROOM TO MEET ADA REQUIREMENTS B1105 | 35% Design For MACC Minimal Design Build | $119,000 | SRM | |
| REPAIR NATURAL GAS VALVES BASEWIDE | 35% Design For MACC Minimal Design Build | $499,200 | SRM | |
| Add Tracer System to 3 AHUs, B/5801 | SABER Design | $50,080 | SRM | |
| Repair HVAC Diffuser & Lights | SABER Design | $200,000 | SRM | |
| Repair Restrooms Post 1ABI 107-2AB 107 B3001 | SABER Design | $700,000 | SRM | |
| Repair lighting for area bounded by Q22-G39 in B9001 | SABER Design | $900,000 | SRM | |
| Repair Lighting for area bounded by S31 - X36 in B9001 | SABER Design | $180,000 | SRM | |
| Repair by Replacement Engine for Fire Pump B4006 | SABER Design | $125,000 | SRM | |
| Repair AWACS Supply Facility For Admin B296 | SABER Design | $1,750,000 | SRM | |
| Repair for AWACS Supply Facility - Relocate Supply Equipment B296 | SABER Design | $600,000 | SRM | |
| Demolish B24 Maintenance Shop | SABER Design | $185,000 | SRM | |
| Replace Exterior Doors B3703 | SABER Design | $40,548 | SRM | |
| Replace Exterior Doors B3224 | SABER Design | $30,930 | SRM | |
| REPAIR ATFP PROTECTION FOR WELL HOUSES #24, 25, 26, 33, 35 | SABER Design | $197,000 | SRM | |
| Repair Spill Containment B290 | SABER Design | $219,000 | SRM | |
| Sustain Roof, Renovate Interior & Bathroom B234 | SABER Design | $50,000 | SRM | |
| Repair Exterior Stairs B5903, 5904, 5908, & 5909 | SABER Design | $325,000 | SRM | |
| Repair FSD Cooking Hoods B473 | SABER Design | $38,943 | SRM | |
| Replace Alarm Panel B820 | SABER Design | $84,800 | SRM | |
| Upgrade Air Handler B7001 | SABER Design | $6,731 | SRM | |
| Repair Restroom AF Audit Agency B510 | SABER Design | $250,000 | SRM | |
| Sustain HVAC System B282 | SABER Design | $1,836,000 | SRM | |
| Construct Showers & HVAC Mens Lavatory B7001 | SABER Design | $108,000 | SRM | |
| Repair/Construct PIC facility B469 | SABER Design | $2,500,000 | SRM | |
| Repair Dorm Bollards/Planters | SABER Design | $185,000 | SRM | |
| Alter Bldg 260 for MOBAG Storage | SABER Design | $2,800,000 | SRM | |
| Repair Storm Damaged Vehicle Access Door | SABER Design | $101,000 | SRM | |
| Repair Storm Damage on Mechanical System B3705 | SABER Design | $490,000 | SRM | |
| Repair Storm Damage Control Tower Window B935 | SABER Design | $10,000 | SRM | |
| Repair Renovate Housing Office SPC Bldg5913 | SABER Design | $640,000 | SRM | |
| Renovate/Repair B282 | SABER Design | $210,000 | SRM | |
| Install Emergency Generator/UPS Annex B3001 | SABER Design | $441,000 | SRM | |
| Install Comm Emergency BU Power B3705 | SABER Design | $50,000 | SRM | |
| Demo Connecting Structure B1 | SABER Design | $1,019,600 | SRM | |
| Repair Short Term Storm Damage Roof Sect B1118 | SABER Design | $175,000 | SRM | |
| Repair Short Term Storm Damage Roof Sect B1119 | SABER Design | $175,000 | SRM | |
| Repair Cathodic Protection System | SABER Design | $250,000 | SRM | |
| Repair Ventilation System B3102 | SABER Design | $3,050,000 | SRM | |
| Repair Aircraft Maint. Hangar tDoor Controls B2280 | SABER Design | $1,860,000 | SRM | |
| Repair Hanger Door B3102 | SABER Design | $2,430,000 | SRM | |
| SABER/MACC Desgn, Rpr/Constr B9001Access | SABER Design | $837,000 | SRM | |
| Construct Compress Air System Controller | SABER Design | $148,100 | SRM | |
| Repair Bay Lighting | SABER Design | $61,000 | SRM | |
| Sustain Sewer Line, Network Learning Ctr B7005 | SABER Design | $138,000 | SRM | |
| Sustain Repair Truck Dock for DDOO Dep Whs B506 | SABER Design | $450,000 | SRM | |
| Rpr/Rpl Emerg Generator, Airfield Lighting Vault | SABER Design | $210,000 | SRM | |
| Maintenance Airfield Markings and Signage | SABER Design | $330,000 | SRM | |
| Construct Heat & Air Vents for Dorm 5913 (3 Floors) | SABER Design | $290,000 | SRM | |
| Sustain RAC-3 Brick Work & Add Canopy B3001 | SABER Design | $500,000 | SRM | |
| Repair Bay Lighting Set #2 SRMC | SABER Design | $303,167 | SRM | |
| Repair/Construct B9001 access | SABER Design | $837,000 | SRM | |
| RAC-1 Brick Work at SE Corner B3001 | SABER Design | $79,000 | SRM | |
| REPAIR BAY LIGHTING W/ ENERGY EFF LIGHTING, FACILITY SET 3 | SABER Design | $987,780 | SRM | |
| Repair Bay Lighting SABER Design | SABER Design | $922,297 | SRM | |
| Repair Bay Lighting with Energy Efficient T-5HO Lights (SABER Design) | SABER Design | $752,868 | SRM | |
| REPAIR REPLACE GENERATOR & ATS B3202 | SABER Design | $136,743 | SRM | |
| REPAIR HEATING PLANTS AND SYSTEMS, MULTIPLE FACILITIES | SABER Design | $744,524 | SRM | |
| REPAIR WEST DOGLEG COMPOSITE AREA PITS B9001 | SABER Design | $830,000 | SRM | |
| REPAIR RENOVATE AREA FOR SOURCE SELECTION FAC, B3 | SABER Design | $189,000 | SRM | |
| Repair Storm Damage B2110 | SABER Design | $220,000 | SRM | |
| Roof Repair B4012 Storm Damage | SABER Design | $365,000 | SRM | |
| REPAIR STORM DAMAGE, ROOF 4012 | SABER Design | $378,000 | SRM | |
| REPAIR STORM DAMAGE, REFUELER MAINT FAC 2110 | SABER Design | $96,400 | SRM | |
| REPAIR CENTRAL BOILER PLANT CATWALK , B3001 (RAC 1) | SABER Design | $208,200 | SRM | |
| DEMOLISH AIRCRAFT ARRESTING BARRIERS | SABER Design | $600,000 | SRM | |
| CONSTRUCT STORM SHELTERS, NAVY DORM AREA | SABER Design | $384,391 | SRM | |
| REPAIR RENOVATE WOMEN'S RESTROOM, B8400 | SABER Design | $84,000 | SRM | |
| ADD EXTERNAL STORM SHELTERS, SE DORM AREA | SABER Design | $513,000 | SRM | |
| ADD EXTERNAL STORM SHELTERS, SW DORM AREA | SABER Design | $517,300 | SRM | |
| ADD EXTERNAL STORM SHELTERS NEAR YOUTH CENTER | SABER Design | $530,400 | SRM | |
| REPAIR CONF RM, B-1 & B-2 DIV, 2ND FL, B3001 | SABER Design | $50,000 | SRM | |
| REPAIR/RENOVATE DIV OFFICES, B-1 & B-2, 2ND FL, B3001 | SABER Design | $525,000 | SRM | |
| Total | 118 | $538,899 | Average | |
| REPAIR CONCRETE PIERS IN CHEMICAL CLEANING SHOP, B3001 | 35% Design For MACC Minimal Design Build | $130,000 | DMAG | |
| Replace Chilled Water Coils and Outside Air Dampers B2280 | 35% Design For MACC Minimal Design Build | $1,400,000 | DMAG | |
| Repair/Replace IWTP Pump Sys to Temporary Storage B9311 | 35% Design For MACC Minimal Design Build | $813,470 | DMAG | |
| Repair Power and Air Distribution for 76 CMXG, B9001 | 35% Design For MACC Minimal Design Build | $400,000 | DMAG | |
| CONSTRUCT AWNING WESTSIDE B2280 | 35% Design For MACC Minimal Design Build | $112,000 | DMAG | |
| REPAIR REPLACE SIDING B240 | 35% Design For MACC Minimal Design Build | $327,200 | DMAG | |
| REPLACE HUMIDIFICATION SYSTEM B2280 | 35% Design For MACC Minimal Design Build | $1,800,000 | DMAG | |
| REPAIR AIR CRAFT DOCK VENTILATION SYSTEM B3105 | 35% Design For MACC Minimal Design Build | $1,800,000 | DMAG | |
| Repair Replace Air Compressor and Dryer B9301 | 35% Design For MACC Minimal Design Build | $1,000,000 | DMAG | |
| RPR FOR TRASH COMPACTOR PLACEMENT B9001 | 35% Design For MACC Minimal Design Build | $125,000 | DMAG | |
| Replace Heating and Cooling Coils B3225 | 35% Design For MACC Minimal Design Build | $1,500,000 | DMAG | |
| Repair Transformer for South Admin, B9001 | 35% Design For MACC Minimal Design Build | $1,100,000 | DMAG | |
| Repair/Replace 15 KV Switchgear, Buss & Main-Tie, B9309 | 35% Design For MACC Minimal Design Build | $2,680,801 | DMAG | |
| Repair/Renovate Break Rooms in NW Corner, B9001 | 35% Design For MACC Minimal Design Build | $170,000 | DMAG | |
| Repair Rooms 141, 143 & 144, B3220 | 35% Design For MACC Minimal Design Build | $383,523 | DMAG | |
| Repair Office Area @ 2P65, B3001 | 35% Design For MACC Minimal Design Build | $322,655 | DMAG | |
| Repair Fire Alarm Notification System, B9001 | 35% Design For MACC Minimal Design Build | $208,000 | DMAG | |
| Repair Fire Notification System B3001 | 35% Design For MACC Minimal Design Build | $223,900 | DMAG | |
| Repair Utilities for Shops, B9001 | 35% Design For MACC Minimal Design Build | $248,000 | DMAG | |
| Install Additional 1600 Amp Buss Duct, G-H Aisle, B9001 | 35% Design For MACC Minimal Design Build | $766,000 | DMAG | |
| North Dock Prep | 35% Design For MACC Minimal Design Build | $2,925,000 | DMAG | |
| Repair Handicap entrances at B9001 | 35% Design For MACC Minimal Design Build | $450,518 | DMAG | |
| Replace/Abate Insulation, Steam Lines, B3001 COL Y71 | 35% Design For MACC Minimal Design Build | $834,605 | DMAG | |
| Install Level II Entry Gate, B3907 | 35% Design For MACC Minimal Design Build | $202,000 | DMAG | |
| MAINTAIN ELECTRICAL EQUIP, XFMR RMS 5,6 7 & AB, BLDG 9001 | 35% Design For MACC Minimal Design Build | $78,500 | DMAG | |
| REPAIR 15 KV SWTCHGEAR,BUSS & MAIN-TIE,ROOF & SIDING,B93099 | 35% Design For MACC Minimal Design Build | $2,339,000 | DMAG | |
| REPAIR/RELOCATE TUBE AND CABLE SHOP, B9001 | 35% Design For MACC Minimal Design Build | $354,200 | DMAG | |
| REPAIR RENOVATE BREAK ROOMS IN NW CORNER, B9001 | 35% Design For MACC Minimal Design Build | $181,600 | DMAG | |
| REPAIR ELECTRIC TRANSFORMER FOR SOUTH ADMIN, B9001 | 35% Design For MACC Minimal Design Build | $713,200 | DMAG | |
| REPAIR FIRE ALARM NOTIFICATION SYSTEM, B9001 | 35% Design For MACC Minimal Design Build | $232,300 | DMAG | |
| REPLACE STEAM-DRIVEN CHILLERS, B9301 | 35% Design For MACC Minimal Design Build | $2,187,900 | DMAG | |
| REPAIR OFFICE AREA AT 2P65, B3001 | 35% Design For MACC Minimal Design Build | $359,000 | DMAG | |
| REPAIR BUSSDUCT AT G-H AISLE, B9001 | 35% Design For MACC Minimal Design Build | $315,200 | DMAG | |
| REPAIR LIGHTNING PROTECTION, B3225 | 35% Design For MACC Minimal Design Build | $53,100 | DMAG | |
| RENOVATE DEPOT AIRCRAFT MAINT DOCK, BLDG 3105 | 35% Design For MACC Minimal Design Build | $3,055,400 | DMAG | |
| REPLACE INSULATION, STEAM & CONDENSATE RETURN LINES, B3001 | 35% Design For MACC Minimal Design Build | $3,286,800 | DMAG | |
| REPAIR EQUIPMENT PLATFORM ACCESS, BLDG 200 | 35% Design For MACC Minimal Design Build | $131,700 | DMAG | |
| REPAIR BY REPLACEMENT HANGAR DOOR B3102 | 35% Design For MACC Minimal Design Build | $1,737,100 | DMAG | |
| REPAIR/RENOVATE ADMIN AREA & BREAKROOM 1ST FLOOR B3113 | 35% Design For MACC Minimal Design Build | $688,400 | DMAG | |
| REPAIR ROOM HVAC, B214 | 35% Design For MACC Minimal Design Build | $601,200 | DMAG | |
| INSTALL LEVEL II ENTRY GATE, 3907 | 35% Design For MACC Minimal Design Build | $196,400 | DMAG | |
| INSTALL PEDESTRIAN TURNSTILE GATES, S OF 3907 | 35% Design For MACC Minimal Design Build | $251,300 | DMAG | |
| CONSTRUCT ADDITION TO KC-135 POST DOCK RAMP | 35% Design For MACC Minimal Design Build | $711,700 | DMAG | |
| REPLACE COILS/CONTROLS BLDG3001 FAN DECKS 14, 15, 18 & 20 | 35% Design For MACC Minimal Design Build | $2,399,000 | DMAG | |
| REPAIR/REPLACE NE COOLING TOWER, BLDG 3221 | 35% Design For MACC Minimal Design Build | $836,414 | DMAG | |
| REPAIR SECURE STORAGE FACILITY, BLDG 2136 | 35% Design For MACC Minimal Design Build | $1,140,000 | DMAG | |
| REPAIR FIRE WATER MAIN, B2136 | 35% Design For MACC Minimal Design Build | $424,000 | DMAG | |
| REPLACE AHU SERVING PLATING LAB, B3001 | 35% Design For MACC Minimal Design Build | $322,600 | DMAG | |
| REPAIR ROOF TRUSS MEMBERS, BLDG 2122 | 35% Design For MACC Minimal Design Build | $26,400 | DMAG | |
| REPLACE STEAM PRE-HEAT COILS AHUs, BLDG 2280 | 35% Design For MACC Minimal Design Build | $1,829,500 | DMAG | |
| INSTALL HVAC TO COMPUTER ROOM, BLDG 3234 | 35% Design For MACC Minimal Design Build | $163,000 | DMAG | |
| DEMO AND REPLACE CHILLED WATER PIPING, B3001 | 35% Design For MACC Minimal Design Build | $168,000 | DMAG | |
| REMOVE DETERIORATED ROOF INSULATION, 3001 | 35% Design For MACC Minimal Design Build | $185,100 | DMAG | |
| REPLACE SENSORS & CONTROLLERS, B3001 | 35% Design For MACC Minimal Design Build | $562,430 | DMAG | |
| MAINTAIN/REPAIR ROOF, BLDG 3225 | 35% Design For MACC Minimal Design Build | $499,700 | DMAG | |
| REPAIR INSULATION AROUND DUCTWORK B2280 | 35% Design For MACC Minimal Design Build | $1,628,000 | DMAG | |
| REPAIR INDUSTRIAL WASTE LIFT STATION, FAC3228 | 35% Design For MACC Minimal Design Build | $131,500 | DMAG | |
| REPAIR BOILERS & BOILER ROOM, BLDG 3907 | 35% Design For MACC Minimal Design Build | $1,964,000 | DMAG | |
| REPLACE EIFS, REPAIR WATER DAMAGE, BLDG 2211 | 35% Design For MACC Minimal Design Build | $738,200 | DMAG | |
| PMEL Dark Room B3113 | SABER Design | $50,000 | DMAG | |
| REPAIR HVAC DATA & TELEPHONE EQUIP RM IN B3001 Post Y-79 | SABER Design | $319,000 | DMAG | |
| REPAIR BREAKROOM COL B95 B3001 | SABER Design | $258,000 | DMAG | |
| Repair humidification system, Bldg. 3708 | SABER Design | $330,000 | DMAG | |
| Repair/Replace outside personnel doors, Bldg. 3703 | SABER Design | $42,980 | DMAG | |
| Repair/Replace outside personnel doors Bldg. 3234 | SABER Design | $32,786 | DMAG | |
| RENOVATE LIGHTING TIRE MACHINE SHOP B2210 | SABER Design | $176,000 | DMAG | |
| REPAIR ADD MEZZANINE B3001 | SABER Design | $127,100 | DMAG | |
| RENOVATE PARKING LOT AND AREA LIGHTING SOUTH OF B2121 | SABER Design | $24,500 | DMAG | |
| REPAIR MEZZANINE B200 | SABER Design | $120,800 | DMAG | |
| Repair Electrical Switches in Bldg 3108 | SABER Design | $250,000 | DMAG | |
| Ensure restroom at N31 in B9001 meets ADA requirements | SABER Design | $75,000 | DMAG | |
| Ensure restroom at P59 in B9001 meets ADA requirements | SABER Design | $89,000 | DMAG | |
| Ensure restroom at W33 in B9001 meets ADA requirements | SABER Design | $55,000 | DMAG | |
| Ensure restroom at N43 meets ADA requirements B9001 (WO45324) | SABER Design | $155,000 | DMAG | |
| Ensure restroom at K22 meets ADA requirements B9001 | SABER Design | $80,000 | DMAG | |
| Repair elevator B9001 | SABER Design | $50,000 | DMAG | |
| Ensure restroom at 2W43 meets ADA requirements B9001 | SABER Design | $95,300 | DMAG | |
| Install utilities for five break rooms in B9001 | SABER Design | $150,000 | DMAG | |
| Install utilities for two break rooms in B9001 | SABER Design | $60,000 | DMAG | |
| Repair basement for safety, post signage and fence off B9001 | SABER Design | $83,000 | DMAG | |
| Ensure restroom at B62 (portable) meets ADA requirements B9001 | SABER Design | $204,000 | DMAG | |
| Ensure restroom at B69 meets ADA requirements B9001 | SABER Design | $204,000 | DMAG | |
| Ensure restroom at A70 meets ADA requirements B9001 | SABER Design | $204,000 | DMAG | |
| Repair two sets of north double and south double doors and one north and south 14’ overhead door B9001 | SABER Design | $281,820 | DMAG | |
| Repair Center Elevator @ W43 (Mezzanine 2) | SABER Design | $60,000 | DMAG | |
| Repair emergency exit egress signs/lights B9001 | SABER Design | $452,550 | DMAG | |
| Repair Center Mezzanine 2 to Ensure Stairwell meets Fire Protection Codes | SABER Design | $800,000 | DMAG | |
| Repair Utilities For Break Areas B9001 | SABER Design | $60,000 | DMAG | |
| Repair Freight Elevator B9001 | SABER Design | $117,000 | DMAG | |
| Replace HVAC Controls B9001 | SABER Design | $321,600 | DMAG | |
| Replace Roof B904 | SABER Design | $39,850 | DMAG | |
| Repair Exterior Stairs B5903, 5904, 5908, & 5909 | SABER Design | $325,000 | DMAG | |
| Replace Roof on B902 | SABER Design | $39,850 | DMAG | |
| Replace Roof B903 | SABER Design | $39,850 | DMAG | |
| Replace Roof on B905 | SABER Design | $39,850 | DMAG | |
| Construct New Restroom CC34 | SABER Design | $400,000 | DMAG | |
| Install Breakrooms CC36 & Y33 (F110) | SABER Design | $158,000 | DMAG | |
| Install Breakrooms X34, B9001 | SABER Design | $158,000 | DMAG | |
| Restroom Renovation W33 B3001 | SABER Design | $150,000 | DMAG | |
| Restroom Renovation D10 B9001 | SABER Design | $110,000 | DMAG | |
| Restroom Renovation G39 B9001 | SABER Design | $110,000 | DMAG | |
| Repair by Renovation 1st Floor East B282 | SABER Design | $235,000 | DMAG | |
| Repair/Renovate 2nd Floor B282 | SABER Design | $385,000 | DMAG | |
| Emergency Repair Center Section B2121 | SABER Design | $265,000 | DMAG | |
| Alter Bldg 260 for MOBAG Storage | SABER Design | $2,800,000 | DMAG | |
| Install Additional Lighting PMEL Lab B3113 | SABER Design | $41,000 | DMAG | |
| Fill Trenches from B55-56 to N55-65, B9001 | SABER Design | $275,000 | DMAG | |
| REPAIR RESTROOMS @ B62 TO ADA COMPLIANCE, B9001 | SABER Design | $140,000 | DMAG | |
| Repair/CONSTRUCT NEW MASONRY RESTROOMS @ X31, B9001 | SABER Design | $155,000 | DMAG | |
| REPAIR BREAKROOM @ X37, B9001 | SABER Design | $153,000 | DMAG | |
| REPAIR RENOVATE 4-BREAK RMS, B9001 | SABER Design | $612,000 | DMAG | |
| Repair Foundry Shop Area for CMXG B9001 | SABER Design | $123,411 | DMAG | |
| Repair water leaks/damage rooms B2280 | SABER Design | $300,000 | DMAG | |
| Repair By Replacement Electric Distribution Panel Col C99, B3001 | SABER Design | $300,000 | DMAG | |
| Repair By Replacement Chilled Water Piping B3001 | SABER Design | $625,000 | DMAG | |
| Repair/Replace Steam Condensate Piping B3001 | SABER Design | $200,000 | DMAG | |
| Repair Test Static Grounding System B2121 | SABER Design | $360,000 | DMAG | |
| Repair resroom at J59 to ADA Compliance | SABER Design | $58,000 | DMAG | |
| Repair Entrance West of Door 4 B3001 | SABER Design | $85,000 | DMAG | |
| INSTALL NEW HIGH BAY FIXTURES B3001 | SABER Design | $20,500 | DMAG | |
| Soundproofing on Walls B3234 | SABER Design | $88,000 | DMAG | |
| Rpr Breakroom @ S38-X44 B9001 | SABER Design | $150,000 | DMAG | |
| REPAIR HEAVY METAL BASIN FACILIT | SABER Design | $420,000 | DMAG | |
| Renovate First Floor B2122 | SABER Design | $115,000 | DMAG | |
| Repair Break Area Col 2093 B3001 | SABER Design | $260,000 | DMAG | |
| Repairs 76 AMXG Group office B3001 | SABER Design | $172,000 | DMAG | |
| Rpr Docks 11/12 w/Utility Trenches B3001 | SABER Design | $75,500 | DMAG | |
| Repair Advance Electrical Metering In DMAG buildings 3, 10, 200, 210, 214, 229, 230, 240, 260, 477, 1055, 2121, 2122, 2136, 2210, 2211, 2280, 3001, 3102, 3105, 3113, 3123, 3220, 3221, 3225, 3228, 3234, 3333, 3507, 3703, 3705, 3706, 3707, 3708, 3761, 3772, 3902, 9001, 9201, & 9301 WO # 49896 | SABER Design | $1,440,000 | DMAG | |
| Repair doors to make ADA compliant at B3221 | SABER Design | $70,000 | DMAG | |
| RENOVATE ROOMS 210, 210B & 210C, B3220 | SABER Design | $125,000 | DMAG | |
| RENOVATE ROOMS 219-A1, A2, B1, B2, B3220 | SABER Design | $107,000 | DMAG | |
| Repair Bay Lighting SABER Design (SRM) | SABER Design | $297,209 | DMAG | |
| REPAIR RESTROOMS @ E30 TO ADA COMPLIANCE, B9001 | SABER Design | $380,000 | DMAG | |
| REPAIR RESTROOMS @ W22 TO ADA COMPLIANCE, B9001 | SABER Design | $140,000 | DMAG | |
| REPAIR RESTROOMS @ P53 TO ADA COMPLIANCE, B9001 | SABER Design | $140,000 | DMAG | |
| REPAIR RESTROOMS @ V45 TO ADA COMPLIANCE, B9001 | SABER Design | $260,000 | DMAG | |
| REPAIR RENOVATE BREAK AREA @ B67, B9001 | SABER Design | $160,000 | DMAG | |
| RPR/RPL LIFT STATION DISCHARGE LINE | SABER Design | $315,000 | DMAG | |
| Repair Renovate Break Area @ D10, B9001 | SABER Design | $165,000 | DMAG | |
| REPAIR BY REPLACEMENT LIGHTING FOR B3221 CHEMICAL CLEAN SHOP | SABER Design | $106,000 | DMAG | |
| Repair/Paint Aisle B2121 | SABER Design | $175,000 | DMAG | |
| RPR/RNVT RESTROOMS 103,104,109,118 B3234 | SABER Design | $432,000 | DMAG | |
| Repair/Refinish Test Cell Floor B3234 | SABER Design | $294,000 | DMAG | |
| RPR/RPLC CONTROL VALVES COOLER | ||||
| TOWER B3225 | SABER Design | $106,000 | DMAG | |
| REPAIR BREAK AREA COL C81 B3001 | SABER Design | $226,000 | DMAG | |
| Rpr Restroom @D10 TP ADA COM B9001 | SABER Design | $140,000 | DMAG | |
| RENOVATE RESTROOMS, COL A87, B3001 | SABER Design | $172,000 | DMAG | |
| REPAIR RESTROOM @ DD25 TO ADA COMPLIANCE, B9001 | SABER Design | $260,000 | DMAG | |
| Replace Steam Condensate Return Line | SABER Design | $450,000 | DMAG | |
| REPAIR FOUNDATION PITS, (U53-W55 & 57T-59W), B3001 | SABER Design | $315,000 | DMAG | |
| Repair Enclosure in Tank and Cooler Area, B9001, G7 | SABER Design | $245,000 | DMAG | |
| REPAIR BLDG 1 AT DOOR 9 FOR ELECTRICAL/SOLDER TRAINING AREA | SABER Design | $322,000 | DMAG | |
| REPAIR RENOVATE FOR CHEMICAL SOTRAGE, EE51, B9001 | SABER Design | $690,000 | DMAG | |
| REPAIR, PURCHASE, AND INSTALL BREAKROOMS @ V23 & T22 B9001 D20, X26, BB23, & DD25 | SABER Design | $1,006,000 | DMAG | |
| Repair Restrooms at C70 to ADA Compliance, B9001 | SABER Design | $180,000 | DMAG | |
| Repair Restrooms at D20 to ADA Compliance, B9001 | SABER Design | $275,000 | DMAG | |
| CNST BACK-UP GENERATOR FOR TELCO RM, B9001 | SABER Design | $155,422 | DMAG | |
| Repair/Upgrade Fire Alarm System, NW Corner B9001 | SABER Design | $264,000 | DMAG | |
| REPAIR FIRE ALARM SYSTEM (Phase 2), B3001 | SABER Design | $858,925 | DMAG | |
| REPAIR FIRE ALARM SYSTEM, BLDG 3001 | SABER Design | $745,100 | DMAG | |
| REPAIR MECHANICAL SUPPORT ROOMS, BLDG 3907 | SABER Design | $77,000 | DMAG | |
| REPAIR SECURE LAB AREA ROOM 144, BLDG 3220 | SABER Design | $135,000 | DMAG | |
| REPAIR HVAC CONTROLS AHU-1 & AHU-2, B2136 | SABER Design | $1,836,200 | DMAG | |
| REPAIR EXTERIOR BRICK, BUILDING 3105 | SABER Design | $2,623,500 | DMAG | |
| REPAIR CALIBRATION FLUID SYSTEM, BLDG 3907 | SABER Design | $179,400 | DMAG | |
| REPAIR VENTILATION SYSTEM REMOTE TEST STATIONS, B3102 | SABER Design | $265,000 | DMAG | |
| DEMOLISH/PURGE HYDRANT FUEL SYSTEM, TANKS 2114, 2115, 2117 | SABER Design | $420,000 | DMAG | |
| REPLACE AIR COMPRESSOR IN ZONE C, B3001 | SABER Design | $711,700 | DMAG | |
| REPAIR AIR HANDLING UNIT, POST 2M41, B3001 | SABER Design | $314,300 | DMAG | |
| CONSTRUCT FINAL PREP VENTILATION & ROOF RUNOFF SYSTEM, B3703 | SABER Design | $336,100 | DMAG | |
| REPAIR STEAM COILS, B3221 C-11 | SABER Design | $200,000 | DMAG | |
| REPLACE HVAC AT BATTERY SHOP, B3123 | SABER Design | $300,000 | DMAG | |
| CONSTRUCT EMERGENCY SHOWER STATIONS AT FUEL YARD, B9400 | SABER Design | $250,000 | DMAG | |
| REPAIR WATER LEAK B3001, COL X99 | SABER Design | $500,000 | DMAG | |
| Total | 174 | $487,883 | Average | |
| Notes: | ||||
| Emergency designs constitutes 1% of all project designs. | ||||
| Urgent designs constitute 10% of all project designs. |
Concept Design
| Concept Design (2008-2015) | ||||
| Project Description | TYPE OF Delivery | Amount in the Delivery Order | Funding Type | |
| Repair Replace Roof Drains in Hangar B230 | Concept (SOW) Design Mgmt | $1,000,000 | SRM | |
| Suatain/Repair North Administration Area Roof - Sections 30 and 31 Building 3001 | Concept (SOW) Design Mgmt | $1,676,597 | SRM | |
| Repair Ricwell Steam Piping to Zone A from Bldg 208 | Concept (SOW) Design Mgmt | $3,015,029 | SRM | |
| Construct Power, Air, Utilities for Woodshop B3 | Concept (SOW) Design Mgmt | $635,000 | SRM | |
| REPAIR REMODEL OFFICE AREA FOR CFT IN B3001 | Concept (SOW) Design Mgmt | $199,500 | SRM | |
| Repair by Replacement HVAC Diffusers and Lights for KC 135 | Concept (SOW) Design Mgmt | $253,282 | SRM | |
| Repair Aircraft Maint. Hangar to meet Fire Code B230 | Concept (SOW) Design Mgmt | $1,500,000 | SRM | |
| Demolish Dorm B5902 | Concept (SOW) Design Mgmt | $626,548 | SRM | |
| Demolish Dormitory B5910 | Concept (SOW) Design Mgmt | $568,431 | SRM | |
| Repair Collapsed Duct Bank Taxiway H to Reserve Ramp | Concept (SOW) Design Mgmt | $297,637 | SRM | |
| Repair Exterior Walls for ATFP, B5931 | Concept (SOW) Design Mgmt | $603,750 | SRM | |
| Repair Dorm Bollards/Planters | Concept (SOW) Design Mgmt | $200,000 | SRM | |
| Repair Power Check Pad | Concept (SOW) Design Mgmt | $2,152,500 | SRM | |
| Repairs Walls for ATFP B5942 | Concept (SOW) Design Mgmt | $603,750 | SRM | |
| Repair Walls for ATFP B5930 | Concept (SOW) Design Mgmt | $603,750 | SRM | |
| Sustain 8" Gas Main from A Ave to E Ave along Arnold | Concept (SOW) Design Mgmt | $1,205,000 | SRM | |
| B1 Door 1 & Door 5 Alteration | Concept (SOW) Design Mgmt | $150,972 | SRM | |
| Repair HVAC & Utilities Infrastructure in Maint Hangar B230 | Concept (SOW) Design Mgmt | $4,700,000 | SRM | |
| Demo Bldg 4025 | Concept (SOW) Design Mgmt | $112,800 | SRM | |
| Demo Bldg 4024 | Concept (SOW) Design Mgmt | $112,800 | SRM | |
| East CDC Addition Design | Concept (SOW) Design Mgmt | $2,000,000 | SRM | |
| Demolish B27 | Concept (SOW) Design Mgmt | $4,000 | SRM | |
| Sustain Roof at Base of Trapezoidal Sections B230 | Concept (SOW) Design Mgmt | $1,849,616 | SRM | |
| B1 Door Alterations | Concept (SOW) Design Mgmt | $161,567 | SRM | |
| Demolish B4025 | Concept (SOW) Design Mgmt | $150,001 | SRM | |
| Sustain HVAC System B282 BMC Design | Concept (SOW) Design Mgmt | $1,800,000 | SRM | |
| Demolish Dorm 5920 Constr Mgt | Concept (SOW) Design Mgmt | $21,314 | SRM | |
| Demo Connecting Structure B1 Constr Mgt | Concept (SOW) Design Mgmt | $698,060 | SRM | |
| Demolish Dorm 5916 | Concept (SOW) Design Mgmt | $215,416 | SRM | |
| Demo Bldg. 773 | Concept (SOW) Design Mgmt | $542,970 | SRM | |
| REPAIR FACILITY FOR BREAK AREA & ADMIN (DLA), B9001 | Concept (SOW) Design Mgmt | $707,152 | SRM | |
| Demolish Golf Maintenance & Euipment B6020 | Concept (SOW) Design Mgmt | $25,000 | SRM | |
| Demolish B2101 General Purpose Shop | Concept (SOW) Design Mgmt | $3,300,000 | SRM | |
| DEMOLISH ABOVE GROUND STORAGE TANK 349 | Concept (SOW) Design Mgmt | $250,000 | SRM | |
| Demolish Maintenance Shop B4041 | Concept (SOW) Design Mgmt | $55,000 | SRM | |
| DEMOLISH B2102, STEAM PLANT | Concept (SOW) Design Mgmt | $85,000 | SRM | |
| Construct Road & Demo EIG Fitness Center | Concept (SOW) Design Mgmt | $76,000 | SRM | |
| Construct West Loading Dock B1083 | Concept (SOW) Design Mgmt | $360,000 | SRM | |
| Rpr Aircraft Maint Hangar B230 Ph2 | Concept (SOW) Design Mgmt | $2,525,000 | SRM | |
| Repair RAC-1 Roof DLA warehouse B416 | Concept (SOW) Design Mgmt | $12,971,800 | SRM | |
| MOVE HOUSING OFFICE TO B5913 & DEMO | ||||
| B5927 | Concept (SOW) Design Mgmt | $378,760 | SRM | |
| DEMOLISH AIRCRAFT MAINTENANCE SHOP B3215 | Concept (SOW) Design Mgmt | $436,000 | SRM | |
| CONSOLIDATE MOVE COMM TO B3 AND DEMO B803 | Concept (SOW) Design Mgmt | $1,123,200 | SRM | |
| DEMOLISH AIRCRAFT MAINTENANCE SHOP, B3212 | Concept (SOW) Design Mgmt | $102,400 | SRM | |
| SUSTAIN REPLACE HVAC 552ND ALERT FAC B989 | Concept (SOW) Design Mgmt | $1,600,000 | SRM | |
| REPAIR HVAC, EXHAUST EXTRACTION & INTERIOR, B1070 | Concept (SOW) Design Mgmt | $167,800 | SRM | |
| REPAIR HVAC & FIRE SPRINKLER SYSTEM, B260 | Concept (SOW) Design Mgmt | $110,900 | SRM | |
| REPAIR EXTERIOR DRAINAGE SYSTEM AT COMMAND POST FAC | ||||
| B1066 | Concept (SOW) Design Mgmt | $120,000 | SRM | |
| CONSTRUCT DASH 21 STORAGE FACILITY B1071 | Concept (SOW) Design Mgmt | $641,100 | SRM | |
| Sustain Air Conditioning System Base Communications Hub, B3001G | Concept (SOW) Design Mgmt | $360,000 | SRM | |
| Repair/Replace Fire Water Maiin B3105 & B3001 | Concept (SOW) Design Mgmt | $900,000 | SRM | |
| Sustain/Repair 12.5 KVA Swiitch Gear BLA WHS B1 | Concept (SOW) Design Mgmt | $760,000 | SRM | |
| Repair/Replace Generator &ATS, B-3202 | Concept (SOW) Design Mgmt | $136,743 | SRM | |
| Sstn/Rpr RAC-3 Fire Supression Tanks B2119, 3203, 2120 | Concept (SOW) Design Mgmt | $1,550,000 | SRM | |
| CONSOLIDATION REPAIR GLSC & MANPOWER, BLDG 1 | Concept (SOW) Design Mgmt | $2,203,000 | SRM | |
| RENOVATE TWADDLE CENTER | Concept (SOW) Design Mgmt | $3,106,930 | SRM | |
| Repair/Construct Final Denial Barrier System Midwest Blvd | Concept (SOW) Design Mgmt | $1,192,211 | SRM | |
| REPAIR SOURCE SELECTION ADMIN, BLDG 10 | Concept (SOW) Design Mgmt | $28,750 | SRM | |
| Construct entry control facility | Concept (SOW) Design Mgmt | $749,000 | SRM | |
| RPR E-3 PL-2 AREA BOUNDRY, NORTH AWAC RAMP | Concept (SOW) Design Mgmt | $1,858,600 | SRM | |
| CONSTRUCT FINAL DENIAL BARRIER SYS MIDWEST BLVD GATE | Concept (SOW) Design Mgmt | $1,192,200 | SRM | |
| REPAIR CONSOLIDATE AFLCMC, TWADDLE CENTER 8400 | Concept (SOW) Design Mgmt | $10,256,700 | SRM | |
| REPAIR BUILDING 1 ADMIN AREA FOR SWING SPACE | Concept (SOW) Design Mgmt | $2,798,200 | SRM | |
| CONSTRUCT ENTRY CONTROL FACILITY TO AWAC RESTRICTED AREA | Concept (SOW) Design Mgmt | $554,700 | SRM | |
| RPR FIRE/POTABLE WATER CROSS CONNECTION B240 | Concept Design For MACC Full Design Build | $3,500,000 | SRM | |
| CONSTRUCT STORM WATER DETENTION SYSTEM, | ||||
| PRAIRIELAND | Concept Design For MACC Full Design Build | $150,000 | SRM | |
| REPAIR 8" GAS MAIN ALONG A AVE | Concept Design For MACC Full Design Build | $800,000 | SRM | |
| SUSTAIN REPAIR RAC-3 FIRE SUPRESSION TANKS | ||||
| B2119, 3203, 2120 | Concept Design For MACC Full Design Build | $1,550,000 | SRM | |
| SUSTAIN SIM MAINT AREA HVAC 552ND TRAINING FACILITY B284 | Concept Design For MACC Full Design Build | $1,300,000 | SRM | |
| Repair B9301 W/ Free Cooling Heat Exchangers | Concept Design For MACC Full Design Build | $780,000 | SRM | |
| Repair B3001 W/ Free Cooling Heat Exchange | Concept Design For MACC Full Design Build | $760,000 | SRM | |
| Repair Renovate Barrel Washing Facility B3125 | Concept Design For MACC Full Design Build | $1,400,000 | SRM | |
| Construct Storm Water Detention System , Prarieland | Concept Design For MACC Full Design Build | $150,000 | SRM | |
| Sustain HVAC, AWACS HQ, B280 | Concept Design For MACC Full Design Build | $1,000,000 | SRM | |
| Replace Cooling Tower, B1 | Concept Design For MACC Full Design Build | $350,000 | SRM | |
| Replace 600 Ft of Sewer Line near B1048 | Concept Design For MACC Full Design Build | $425,000 | SRM | |
| Rpr/Replace standby Generator for B284 | Concept Design For MACC Full Design Build | $160,000 | SRM | |
| REPAIR BY RENOVATION SQUAD OPS 1ST FL EAST FOR INTEL B282 | Concept Design For MACC Full Design Build | $255,000 | SRM | |
| SUSTAIN HVAC IN SIM 1 AND FIT 552ND TRAINING FAC B284 | Concept Design For MACC Full Design Build | $2,760,900 | SRM | |
| REPAIR SECURE AREA, OSK, B282 | Concept Design For MACC Full Design Build | $385,000 | SRM | |
| DEMOLISH BLDG 3108 AS PART OF 20/20 DEMOLITION PLAN | Concept Design For MACC Full Design Build | $2,110,250 | SRM |