FBO_Post_Final_-_Attachment_L-5_Price_Model_with_Options_29_Jul_14.xls

XLS spreadsheet 114 KB Posted

Attached to
AFICA Air Force Contract Augmentation Program (AFCAP) IV
Solicitation number
FA8051-14-R-0001
Issued by

About this file

Attachment L-5 post Q A

View the file

Other files

File Type Posted
Q A_14_Aug_2014.pdf PDF
RFP_Follow-On_Questions-12_Aug_14.docx DOCX document
Q A_supplement.pdf PDF
Attachment_L-1_revised_appendix_B3.pdf PDF
Attachment_L-1_revised_appendix_B2.pdf PDF
Amendment_05_SF30.pdf PDF
Attachment_L-3_Construction_Sample_Task_SOW-Revision_1_3_August_2014.pdf PDF
Conformed_Doc_Post_Amendment_05.pdf PDF
Sample_Task_Q A_as_of_5_August_2014.pdf PDF
Attachment_L-1_Sample_BOS_Task_Order_PWS-Revision_1_6_August_2014.pdf PDF
FBO_Post_Final_-_Attachment_L-6_PMO_Pricing_29_Jul_14.xls XLS spreadsheet
Attachment_L-2_Commodity_Sample_Task_SOW-Revision_1_dated_31_Jul_14.pdf PDF
Revised_Section_H.pdf PDF
Revised_Section_M.pdf PDF
FBO_Post_Final_-_Attachment_L-6_PMO_Pricing_22_Jul_14.xls XLS spreadsheet
FBO_Post_Final_-_Attachment_L-5_Price_Model_with_Options_23_Jul_14.xls XLS spreadsheet
Amendment_04_SF_30.pdf PDF
RFP_Questions_as_of_29_July_2014.pdf PDF
Attachment_L-2_Commodity_Sample_Task_SOW-27_Feb_14.doc DOC document
Attachment_L-3_Construction_Sample_Task_SOW_-_5_March_2014.doc DOC document
Attachment_L-1_Sample_BOS_Task_Order_PWS_-_25_February_2014.doc DOC document
Amend_03.pdf PDF
AFCAP_IV_QA1.docx DOCX document
Amend_02.pdf PDF
Amend_01.pdf PDF
Amend_01_conformed.pdf PDF
AFCAP4_10jul14.pdf PDF
FBO_Post_Final_-_Attachment_L-6_PMO_Pricing_10_Jul_14.xls XLS spreadsheet
FBO_Post_Final_-_Attachment_L-4_Past_Performance_Questionnaire_10_Jul_14.docx DOCX document
FBO_Post_Final_-_Attachment_L-5_Price_Model_with_Options_10_Jul_14.xls XLS spreadsheet
FBO_Post_Final_-_Attachment_L-7_DD_Form_254_10_Jul_14.pdf PDF
Attachment_L-5_Price_Model.xls XLS spreadsheet
Attachment_L-4_Past_Performance_Questionnaire.docx DOCX document
Solicitation_18_mar_14_1050hrs.pdf PDF
Attachment_L-6_Corporate_Pricing.xls XLS spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FFP SAMPLE TASKS

TOTAL AFCAP IV EVALUATED PRICE*
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR0.000.00$0.00$ - 0
PRODUCTIVE OVERTIME0.000.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR0.000.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL SAMPLE TASK ESTIMATED PRICE$ - 0$ - 0
ATTACHMENT L-1 Sample Task Order PWS 1 BOS Support
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 00.00%$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 1$ - 0$ - 0
ATTACHMENT L-2 Commodity SOW Sample Task
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 00.00%$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 2$ - 0$ - 0
ATTACHMENT L-3 Construction Sample Task
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 3$ - 0$ - 0
*Provide cell comments to define cell content.$ - 0

&L &F

&A&CAFCAP IV SAMPLE TASK

PRICE MODEL

&R&D &T

&L CONTRACTOR NAME

&CSOURCE SELECTION INFORMTION

SEE FAR 2.101 AND 3.104

&RPG &P OF &N

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

FFP SAMPLE TASK BY

AFCAP IV BASE YEAR EVALUATED PRICE
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR0.000.00$0.00$ - 0
PRODUCTIVE OVERTIME0.000.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR0.000.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
BASE YEAR SAMPLE TASK EVALUATED PRICE$ - 0
ATTACHMENT L-1 Sample Task Order PWS 1 BOS Support
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 1$ - 0
ATTACHMENT L-2 Commodity SOW Sample Task
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 2$ - 0
ATTACHMENT L-3 Construction Sample Task
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 3$ - 0
*Provide cell comments to define cell content when necessary.

&L &F

&A&CAFCAP IV SAMPLE TASK

PRICE MODEL

&R&D &T

&L CONTRACTOR NAME

&CSOURCE SELECTION INFORMTION

SEE FAR 2.101 AND 3.104

&RPG &P OF &N

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

FFP SAMPLE TASK OY1

AFCAP IV OPTION 1 EVALUATED PRICE
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR0.000.00$0.00$ - 0
PRODUCTIVE OVERTIME0.000.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR0.000.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
OPTION 1 SAMPLE TASK EVALUATED PRICE$ - 0
ATTACHMENT L-1 Sample Task Order PWS 1 BOS Support
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 00.00%$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 1$ - 0
ATTACHMENT L-2 Commodity SOW Sample Task N/A IN OPTION YEARS
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR
PRODUCTIVE OVERTIME
TOTAL PRODUCTIVE LABOR
NON-PRODUCTIVE LABOR
LABOR BURDEN
HEALTH & WELFARE
PAYROLL TAXES
FICA
FUTA
SUTA
OTHER PAYROLL COSTS
OTHER LABOR BURDEN
TOTAL LABOR BURDEN
OTHER DIRECT COSTS (ODC)
MATERIALS
MATERIAL SHIPPING AND HANDLING
EQUIPMENT
EQUIPMENT SHIPPING AND HANDLING
VEHICLES
VEHICLES SHIPPING AND HANDLING
TRAVEL
SUBCONTRACTS
OTHER DIRECT COSTS
TOTAL OTHER DIRECT COSTS
TOTAL LABOR/BURDEN/ODC SUBTOTAL
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST
PROFIT
COST-OF-MONEY
TOTAL TASK 2
ATTACHMENT L-3 Construction Sample Task N/A IN OPTION YEARS
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR
PRODUCTIVE OVERTIME
TOTAL PRODUCTIVE LABOR
NON-PRODUCTIVE LABOR
LABOR BURDEN
HEALTH & WELFARE
PAYROLL TAXES
FICA
FUTA
SUTA
OTHER PAYROLL COSTS
OTHER LABOR BURDEN
TOTAL LABOR BURDEN
OTHER DIRECT COSTS (ODC)
MATERIALS
MATERIAL SHIPPING AND HANDLING
EQUIPMENT
EQUIPMENT SHIPPING AND HANDLING
VEHICLES
VEHICLES SHIPPING AND HANDLING
TRAVEL
SUBCONTRACTS
OTHER DIRECT COSTS
TOTAL OTHER DIRECT COSTS
TOTAL LABOR/BURDEN/ODC SUBTOTAL
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST
PROFIT
COST-OF-MONEY
TOTAL TASK 3
*Provide cell comments to define cell content when necessary.

&L &F

&A&CAFCAP IV SAMPLE TASK

PRICE MODEL

&R&D &T

&L CONTRACTOR NAME

&CSOURCE SELECTION INFORMTION

SEE FAR 2.101 AND 3.104

&RPG &P OF &N

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

FFP SAMPLE TASK OY2

AFCAP IV OPTION YEAR 2 EVALUATED PRICE
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR0.000.00$0.00$ - 0
PRODUCTIVE OVERTIME0.000.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR0.000.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
OPTION YEAR 2 SAMPLE TASK EVALUATED PRICE$ - 0
ATTACHMENT L-1 Sample Task Order PWS 1 BOS Support
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 00.00%$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 1$ - 0
ATTACHMENT L-2 Commodity SOW Sample Task N/A IN OPTION YEARS
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 2$ - 0
ATTACHMENT L-3 Construction Sample Task N/A IN OPTION YEARS
FFPFTEsHOURSAVG RATEAMOUNT
PRODUCTIVE LABOR00.00$0.00$ - 0
PRODUCTIVE OVERTIME00.00$0.00$ - 0
TOTAL PRODUCTIVE LABOR00.00$ - 0
NON-PRODUCTIVE LABOR0.00$0.00$ - 0
LABOR BURDENAMOUNT
HEALTH & WELFARE$ - 0
PAYROLL TAXES
FICA$ - 0
FUTA$ - 0
SUTA$ - 0
OTHER PAYROLL COSTS$ - 0
OTHER LABOR BURDEN$ - 0
TOTAL LABOR BURDEN$ - 0
OTHER DIRECT COSTS (ODC)
MATERIALS$ - 0
MATERIAL SHIPPING AND HANDLING$ - 0
EQUIPMENT$ - 0
EQUIPMENT SHIPPING AND HANDLING$ - 0
VEHICLES$ - 0
VEHICLES SHIPPING AND HANDLING$ - 0
TRAVEL$ - 0
SUBCONTRACTS$ - 0
OTHER DIRECT COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL LABOR/BURDEN/ODC SUBTOTAL$ - 0
BASERATE
INDIRECT COSTS
G & A$ - 0
OVERHEAD$ - 0
OTHER INDIRECT COSTS$ - 0
TOTAL INDIRECT COSTS$ - 0
ESTIMATED COST$ - 0
PROFIT$ - 00.00%$ - 0
COST-OF-MONEY$ - 00.00%$ - 0
TOTAL TASK 3$ - 0
*Provide cell comments to define cell content when necessary.

&L &F

&A&CAFCAP IV SAMPLE TASK

PRICE MODEL

&R&D &T

&L CONTRACTOR NAME

&CSOURCE SELECTION INFORMTION

SEE FAR 2.101 AND 3.104

&RPG &P OF &N

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

HOLIDAYS, VACATION,SICK, AND OTHER TIME

OTHER DIRECT COSTS NOT INCLUDED IN THE ABOVE COSTS

File details come from the government source that posted it. Updated .