FA7000-10-R-0008-0002.pdf

PDF 35 KB Posted

Attached to
Cadet Gym Modernization Phase 3, United States Air Force Academy, CO
Solicitation number
FA7000-10-R-0008
Issued by

About this file

Amendment 0002 to the Solicitation. As with Amendment 0001 to the Solicitation please note Box 11.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F4BQ000050A001 XQPZ 10-0105C

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment to to amend the Specif ications.

A. Specif ication Section 09 31 00, Part 1, Section 1.09, Paragraph A, 2, shall read, "Warranty Period: Lifetime w arranty is preferred.

How ever, a f ive-year w arranty is acceptable." See Attachment 18

B. Specif ication Section 08 70 00, Part 1, Section 1.02, Paragraph D is amended to read, "D. Products furnished and installed under the

Section include:" See Attachment 19.

C. Specif ication Amendment 001, Delete Item #15. See Attachment 20.

D. Specif ication Amendment 001, Delete Item #27. See Attachment 20.

E. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Apr-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA7000-10-R-0008

X 9B. DATED (SEE ITEM 11)

03-Mar-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Apr-2010

CODE

10 CONS - FA7000

ATTN: AARON VOLLBRACHT

8110 INDUSTRIAL DRIVE, STE 200

USAF ACADEMY CO 80840

FA7000 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA7000-10-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Attch 1 - Specifications 1205 06-MAR-2009

Attachment 02 Attch 2 - Schedule of

Drawings

8 06-MAR-2009

Attachment 03 Attch 3 - Drawings 315 06-MAR-2009

Attachment 04 Attch 4 - Amendment 001 21 12-JAN-2010

Attachment 05 Attch 5 - Amendment 002 33 12-JAN-2010

Attachment 06 Attch 6 - Appendix B, D, E, W

4 23-NOV-2009

Attachment 07 Attch 7 - Limited

Asbestos/HAZMAT

Survey

45 23-FEB-2006

Attachment 08 Attach 8 - Appendix III A 2 23-FEB-2006

Attachment 09 Attch 9 - Appendix III B 78 23-FEB-2006

Attachment 10 Attch 10 - Appendix III C 20 23-FEB-2006

Attachment 11 Attch 11 - Phase 3

Figures

13 23-FEB-2006

Attachment 12 Attch 12 - Phase 3 Tables 11 23-FEB-2006

Attachment 13 Attch 13 - 1354 Checklist 6 28-OCT-2009

Attachment 14 Attach 14 - Davis Bacon dated 3-12-2010

12-MAR-2010

Attachment 15 Attch 15 - Past

Performance

Questionnaire

10 02-FEB-2010

Attachment 16 Attach 16 - Spec Section

01 14 00 Work

Restrictions

8 29-MAR-2010

Attachment 17 Attch 17 - Drawing AD-

1 16-MAR-2010

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Attch 1 - Specifications 1205 06-MAR-2009

Attachment 02 Attch 2 - Schedule of

Drawings

8 06-MAR-2009

Attachment 03 Attch 3 - Drawings 315 06-MAR-2009

Attachment 04 Attch 4 - Amendment 001 21 12-JAN-2010

Attachment 05 Attch 5 - Amendment 002 33 12-JAN-2010

Attachment 06 Attch 6 - Appendix B, D, 4 23-NOV-2009

FA7000-10-R-0008

E, W

Attachment 07 Attch 7 - Limited

Asbestos/HAZMAT

Survey

45 23-FEB-2006

Attachment 08 Attach 8 - Appendix III A 2 23-FEB-2006

Attachment 09 Attch 9 - Appendix III B 78 23-FEB-2006

Attachment 10 Attch 10 - Appendix III C 20 23-FEB-2006

Attachment 11 Attch 11 - Phase 3

Figures

13 23-FEB-2006

Attachment 12 Attch 12 - Phase 3 Tables 11 23-FEB-2006

Attachment 13 Attch 13 - 1354 Checklist 6 28-OCT-2009

Attachment 14 Attach 14 - Davis Bacon dated 3-12-2010

12-MAR-2010

Attachment 15 Attch 15 - Past

Performance

Questionnaire

10 02-FEB-2010

Attachment 16 Attach 16 - Spec Section

01 14 00 Work

Restrictions

8 29-MAR-2010

Attachment 17 Attch 17 - Drawing AD-

1 16-MAR-2010

Attachment 18 Attch 18 - Specification

09 31 00 Revised

12 08-APR-2010

Attachment 19 Attch 19 - Specification

08 71 00 Revised

18 08-APR-2010

Attachment 20 Attch 20 - Specification

Amendment 001 Revised

6 08-APR-2010

(End of Summary of Changes)

File details come from the government source that posted it. Updated .