BUILDING

PROJECT NUMBER:XQPZ 10-0105CREAL PROPERTY
PROJECT TITLE:Cadet Gym Modernization - PH 3
BUILDING NO.:2170APPROVED:
BUILDING NAME:Cadet Gym
DESIGN MANAGER:Bryan L. SuhlerReal Estate Manager
CONSTR. MANAGER:10CES/CECR
DATE COMPLETED:(Construction Completion Date)
This form should be filled out completely for every contract project including replacement or repair. Both the QUANTITY and TOTAL COST for each line needs be annotated whether it is a Unit of Measure change (TN, SF, EA, etc.) or if no change, insert N/A. This checklist consists of 6 pages. Please do not separate pages or remove from project folder.
GENERAL DATA
ESTIMATED PROJECT COST$N/A
ACTUAL CONSTRUCTION COST$N/A
TOTAL FLOOR SPACE new buildingN/ASF
TOTAL FLOOR SPACE additionN/ASF
TOTAL FLOOR SPACE rehab existingN/ASF
NUMBER OF FLOORSN/ANO
O&M Manuals - Delivered to Maintenance EngineeringN/AYES or NO
Material Types (list predominant type)
foundationN/A
wallN/A
roofN/A
flooringN/A
Utilities Entering BuildingSIZE
waterN/A
sewerN/A
gasN/A
electricityN/A
telephoneN/A
fiberN/A
BUILDING SYSTEMSTOTAL
QUANUNITCOST
Fire Protection
880-211closed head auto sprinklers/SF/HDN/A
880-212open head Delug system/SF/HDN/A
880-216preaction sprinkler system/SF/HDN/A
880-217aff preaction sprinkler system/SF/HDN/A
880-218high expansion foam systemEAN/A
880-221auto fire detection system/SF/EAN/A
880-222manual fire alarm system, interiorEAN/A
880-231carbon dioxide fire systemEAN/A
880-232foam fire systemsEAN/A
880-233other fire systemEAN/A
880-234halon fire systemEAN/A
880-235dry chemical systemEAN/A
Security
872-841security alarm systemEAN/A
Mechanical/Electrical
890-126a/c units window units/SF/TNN/A
890-125a/c units <5TN/SF/TNN/A
890-121a/c unit 5-25TNTNN/A
Air Handling UnitN/A
Evap CoolingN/A
823-111Heat Gas Source/SF/MBN/A
821-115Heating PlantMBN/A
821-155Steam plant industrialMBN/A
TransformerKVAN/A
890-134air compressorHPN/A
890-144compressed air dist systemLFN/A
811-147emer electric power generator pltkWN/A
emer lightingEAN/A
Misc
ElevatorsEAN/A
HoistEAN/A
890-158Loading/Unloading PlatformSFN/A
AppliancesEAN/A
Rear Projection ScreensEAN/A
Postal Lock BoxesEAN/A
Attached SeatingEAN/A
Satellite AntennasEAN/A
Lockers(permanent)EAN/A
890-161Misc Support StructureEAN/A
.

&C&"Times New Roman,Bold"&16REAL PROPERTY 1354 CHECKLIST &"Times New Roman,Regular"&12Section 1 Building &L&"Times New Roman,Regular"&8&F&C&"Times New Roman,Regular"&7PAGE&P&R&"Times New Roman,Regular"&7Current as of Sep 04

EXTERIOR UTILIES

PROJECT NUMBER:XQPZ 10-0105CRP INITAIL
PROJECT TITLE:Cadet Gym Modernization - PH 3
This form should be filled out completely for every contract project including replacement or repair. Both the QUANTITY and TOTAL COST for each line needs be annotated whether it is a Unit of Measure change (TN, SF, EA, etc.) or if no change, insert N/A. This checklist consists of 6 pages. Please do not seperate pages or remove from project folder.
UTILITIESTOTAL
QUANUNITCOST
ELECTRIC
Electric Distribution System
812-223Primary Distro Line OverheadLFN/A
812-224Secondary Distro Line OvhdLFN/A
812-225Underground Prim Distr LineLFN/A
812-226UG Secondary Prim Dist LineLFN/A
Substations and Switching Stations
813-228Elect Switching Station/SF/EAN/A
813-231Elect SubstationkWN/A
Elec Use Facilities
812-926Exterior Area LightedEAN/A
812-928Traffic LightsEAN/A
HEAT
Heat, Gas - Transmission
821-115Heat plantMBN/A
823-244Gas StorageCFN/A
824-464Gas Mains (list sizes)LFN/A
824-468Gas Valve FacilitySFN/A
AIR CONDITIONING
826-122Air Conditioning 25-100 tonsTNN/A
826-123Air Conditioning >100 tonsTNN/A
CHILLED WATER (Air Conditioning) EXTERIOR
827-111Chilled Water Exterior Distriburtion LinesLFN/A
SEWAGE WASTE, TREATMENT, AND DISPOSAL
Wastewater
831-165Sewage Treatment & Disposal SysKGN/A
831-168Waste Treatment Facility BldgSFN/A
831-169Sewage Septic TankKGN/A
832-266Sanitary Sewer Main (list sizes)LFN/A
832-267Sanitary Sewage Pump StationSFN/A
WATER
Water Supply and Storage
841-161Water Supply MainLFN/A
841-165Water Supply TreatmentKGN/A
841-166Water WellKGN/A
841-169Water Supply BuildingSFN/A
841-425Water Storage ReservoirKGN/A
841-427Water Tank StorageKGN/A
Water Distribution System
842-245Water Distro Mains (list all sizes)LFN/A
842-246Water HydrantsEAN/A
842-249Water Pumping StationsSFN/A
Fire Protection
843-314FP Water MainsLFN/A
843-315Fire HydrantsEAN/A
843-319FP Water StorageKGN/A
Non-Pot Water Storage
844-367Non-Pot Water StorageKGN/A
844-368Non-Pot Water Supply SystemKGN/A
845-362Non-Pot Water Supply BldgSFN/A
845-363Non-Pot Water Supply MainsLFN/A
PAVEMENTS
Roads
851-142Roadway BridgesLFN/A
851-143Curb and GutterLFN/A
851-145DrivewaysSYN/A
851-147Roads/SY/LFN/A
852-261Vehicle Parking, operationsSYN/A
852-262Vehile Parking, non-organizationSYN/A
852-289SidewalkSYN/A
852-287Covered WalkwaySYN/A
AIRFIELD
113-321ApronsSYN/A
111-111RunwaySYN/A
112-211TaxiwaysSYN/A
DRAINAGE
871-183Storm Drainage (list sizes,feature)LFN/A
pipeN/A
channelN/A
catch basinN/A
culvertN/A
manholeN/A
inletN/A
871-185Storm Drainage Pump StationSFN/A
MISC UTILITIES
871-187Retaining WallSY/LFN/A
872-245Fence, BoundaryLFN/A
872-247Fence, SecurityLFN/A
872-248Fence, InteriorLFN/A
890-181Utility Line Conduit/DuctLFN/A
890-185Utility DoorLFN/A
890-187Ultility VaultSFN/A
Utility ManholeLFN/A
Comm ManholeEAN/A
135-583Duct FacilityLFN/A
135-586Pole Facility (Telephone Poles)LFN/A
890-171Tank, Miscellaneous StorageBLN/A
890-269Cathodic Protection SystemsEAN/A
Oil Water SeparaterEAN/A
HTHW Lines (list sizes)LFN/A
MTHW LinesLFN/A
841-161Water Supply MainLFN/A
EMCS
890-271EMCS Central StationEAN/A
890-272EMCS Field EquipmentEAN/A
890-273EMCS Data LinksLFN/A

&C&"Times New Roman,Bold"&16REAL PROPERTY 1354 CHECKLIST &"Times New Roman,Regular"&12Section 2 Utilities &L&"Times New Roman,Regular"&7&F&R&"Times New Roman,Regular"&7PAGE &P Current as of Sep 04

RPIE

PROJECT NUMBER:XQPZ 10-0105CRP INITAIL
PROJECT TITLE:Cadet Gym Modernization - PH 3
This form should be filled out completely for every contract project including replacement or repair. Both the QUANTITY and TOTAL COST for each line needs be annotated whether it is a Unit of Measure change (TN, SF, EA, etc.) or if no change, insert N/A. This checklist consists of 6 pages. Please do not seperate pages or remove from project folder.
MISC RPIE
RPIE DEFINITION: Those items of government owned or leased accessary equipment apparatus and fixtures that are essential to the function of the real property and are permanently attached to, integral into, or on government-owned or leased property. POC is Ms Karen Leikam building 8120, ex 3-8407.
TOTAL
DESCRIPTIONQUANUNITCOST
Appliances (list each MFH Only)EAN/A
Air Dryers/CompressorsEAN/A
Auditorium CurtainsEAN/A
Central Vac SysEAN/A
ChalkboardsEAN/A
Chapel Equip
pewsLFN/A
altarsEAN/A
pulpitsEAN/A
baptistryEAN/A
ChlorinatorsEAN/A
DehumidifiersEAN/A
Electronic Air CleanerEAN/A
ElevatorsEAN/A
Fire ShuttersEAN/A
Room divider curtainEAN/A
Latrine Equipment
lavatoriesEAN/A
commodesEAN/A
urinalsEAN/A
Playground Equip (list)EAN/A
Projection screensEAN/A
SaunasEAN/A
ScoreboardsEAN/A
Spray Paint BoothEAN/A
Stadium SeatsEAN/A
Theater ChairsEAN/A
Wardrobes/LockersEAN/A
Window A/C unitEAN/A
ADDITIONAL PROJECT INFORMATION

&C&"Times New Roman,Bold"&16REAL PROPERTY 1354 CHECKLIST &"Times New Roman,Regular"&12Section 3 Misc. RPIE &L&"Times New Roman,Regular"&7&F&R&"Times New Roman,Regular"&7PAGE &P Current as of Sep 04