Text version

Appendix B - Solid Waste Report

Project Title: Cadet Gym Modernization - Phase 3 Construction Manager:

Project #: XQPZ 10-0105C CE Project Manager

Category Total Weight Recycled

Total Weight Disposed

Landfill used Recycling company used

Land Clearing Debris Concrete Concrete masonry units (CMU) Asphalt Metals from banding, stud trim, ductwork, piping, rebar, roof decking and metal roofing, other trim, steel, iron, galvanized sheet steel, stainless steel, aluminum, copper, zinc, lead brass and bronze

Gypsum wall board Paint Carpet Insulation Glass Cast Stone Plastic Lumber Wood Materials

Please attach copies of disposal or diversion records.

Construction and Demolition Waste is waste generated as a result of a construction, demolition, or renovation project and includes building materials, packaging, trash, debris, and rubble resulting from construction, remodeling repair, and demolition operations.

Construction Manager:

Type of Waste Generated Quantity (weight/v olume)

Frequency Recyling or Disposal Method

ApproximateEconomic Benefit (Disposal Cost savings/recycling cost savings)

Is cost of waste management & disposal included in the Contract (check)

Accepted by CEV

Contractor must identify all materials that are discarded as a result of this project. This includes all chemical waste, universal wastes (light bulbs, aerosol cans, batteries, electronic equipment, and ?) and solid waste such as recycable materials and refuse.

Anticipated Project Start Date: Anticipated Project Competion Date:

Waste Identification Form- Appendix D

Project #:XQPZ 10-0105C CE Project Manager:

Project Title : Cadet Gym Modernization - Phase3

APPENDIX E

GREEN PROCUREMENT PROGRAM

CONTRACTOR/ PROJECT MANAGER

REQUIREMENTS

Project Title: Cadet Gym Modernization – Phase 3 Project #: XQPZ 10-0105C Project Manager: _____________________

The contractor or project manager /contractor shall:

(1) Execute the following requirement promulgated by the Resource Conservation and Recovery Act of 1976 (42 U.S.C. 6962(i)(2)(C)), and identified in the Statement of Work or delivery order.

I, _______________ (name of contractor representative) am responsible for the performance of this contract and hereby state that the following materials used met the Design Affirmative Procurement requirements, or met the EPA’s guidance Comprehensive Procurement Guidelines found on the following web site (http://www.epa.gov/cpg/products.htm)

I, _______________ (name of contractor representative), am responsible for the performance of this contract and hereby state that an evaluation of the project indicates that recycled content materials identified on the EPA’s guidance document is not practicable due to one of the following reasons:

1. Items are not available competitively,

2. Items are not available within a reasonable time frame,

3. Items are only available at an unreasonable price.

[Signature of the Officer or Employee] [Typed Name of the Officer or Employee]

Item/Material Minimum Qty To Be Recycled

Recycling Method Actual Quantity Recycled (weight in tons or lbs)

Recycling Cost ($ paid to recycle)

Recycling Reimbursed ($ obtained from recyclable)

Total Cost (Net) (-)or (+)

Recycling company used

Actual Quantity Disposed (weight in tons or lbs)

Cost of Disposal Landfill used Completed by Environmental Division Recycling Information Disposal information

Solid Waste Determination- Appendix W Project Title: Cadet Gym Modernization - Phase 3 Construction Manager:

Project #: XQPZ 10-0105C Academy Technical Representative:

Anticipated Project Start Date: Anticipated Project Completion Date: