Attach 5 Schedule of Materials REV.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
ADD Non-Potable Water Distribution Lines to Irrigation Areas, Multi
Solicitation number
FA557526B0003
Issued by

About this file

This is a Schedule of Materials attachment for a solicitation to add non-potable water distribution lines to irrigation areas at a military installation in Spain. The document provides a detailed inventory of materials required for the project, organized by category and specification. Materials include various types and sizes of pipes, fittings, valves, pumps, and associated hardware necessary for constructing the water distribution system. Each line item specifies the material type, dimensions, quantity required, and unit of measure to enable contractors to accurately price and procure the necessary components.

The schedule supports the overall project QUUG 19-1000, which carries a contract value between $500,000 and $1,000,000 with a 570-day period of performance. Contractors must be authorized to perform government works in Spain under Spanish law per the Defense and Cooperation Agreement between Spain and the United States. The bid deadline is 0930 hours local time on 13 July 2026, with all bids remaining valid through 31 December 2026. Questions must be submitted by 19 June 2026 at 1200 hours, and a pre-proposal conference and site visit are scheduled for 12 June 2026 at 1300 hours at Moron Air Base.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedul

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 19-1000PROJECT TITLE

ADD NON-POTABLE WATER

DIST LINES TO IRRIGATION AREAS, MULTI SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATE OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTS
APPROVED

None: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DISAPPROVED

None: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

SECTION 01 11 01

GENERAL CONDITIONS

01Warranty letter1Acceptance+15
02Construction Schedule1Contract Award+7
03Progress Schedule1Contract Award+10
04Work Plan1Contract Award+7
05DD Form 13541Final Inspection-10
06As-Built drawings1Final Inspection-5
07Mobility Plan1Contract Award+15
08Project Sign1Contract Award+15
09Quality Control Plan1Final Inspection-15
10Waste & construction debris management1Final Inspection
11Key Staff1Final Inspection-15
12Environmental Protection Plan1As-Built Drawings+10
13Spatial Data1Final Inspection-5
14Health and safety Plan1Contract Award+15
SECTION 01 11 02

SPECIAL CONDITIONS

15GPR report1CWC + 15
16Existing conditions1CWC + 16
SECTION 02 41 00

DEMOLITION

17Demolition Plan1CWC + 15
18Authorized dump or treatment and recovery plant1
19Delivery and disposal certificate1
SECTION 03 30 00

CAST IN PLACE CONCRETE

20Polyethylene sheet catalog data1
21Precast concrete cabinet1
22Quality Control Program1
23Concrete Mix design1
24Slump Tests1
25Compressive Strength Tests1
26Inspection certificate of the concrete batch plant1
27Reinforcing Bars1
SECTION 07 92 00

JOINT SEALANTS

28Sealants, Primers and Bond Brakers1
SECTION 09 90 00

PAINTING AND COATING

29Coatings111
30Deliverty Tickets1
SECTION 31 00 00

EARTHWORK

31Geotechnical investigation report1
32Shoring design report1
33Topographical study of the trenches1
34Utility Crossings Plan and Report1
35Compaction Plan1
36Dewatering Method Statement and Drawings1
37As-built Records of Encountered Utilities1
38Nuclear gauge calibration report1
39Proposed materials test reports for Backfill1
40Proposed materials for reused topsoil and soil1
41Field Density and Moisture1
42Plate Load Test and Footprint1
43Saturation Lines / Isosaturation Curves Laboratory Report1
SECTION 31 05 19

GEOTEXTILE

44Geotextile1
SECTION 32 92 19

SEEDING

45Seed11
46Fertilizer1
47Topsoil1
SECTION 33 11 00

WATER UTILITY DISTRIBUTION PIPING

48Pipe, Fittings, Joints, Couplings and electrowelded joining for HDPE1
49Valves and valve box1
50Hose bibb and Hose connection vacuum breaker.1
51Water meter1
52Irrigation Timer (Programer)1
53Handhole and covers1
54Combined Hydrostatic Pressure and Leakage Test1
55SCADA system11
56Stainless steel pipe, fittings, flanges and fabricated assemblies1
57Welding consumables1
58Passivation products and procedures1
59Irrigation Timer (Programmer): Solar Power Supply System (Photovoltaic Panels, MPPT Solar Charge Controller, Battery Storage System, exterior IP66 cabinet)11
60Hydrostatic test reports for fabricated stainless steel assemblies1
61Liquid Penetrant Examination (PT) reports1
62Fabricated stainless steel assemblies - shop drawings1
63Welding Procedure Specifications (WPS)1
64Procedure Qualification Records (PQR)1
65Welder Qualification Records1