Attach 5 Schedule of Materials.xlsx

XLSX spreadsheet 157 KB Posted

Attached to
ADD Non-Potable Water Distribution Lines to Irrigation Areas, Multi
Solicitation number
FA557526B0003
Issued by

About this file

This is a Schedule of Material Submittals form for federal construction projects, specifically Project QUUG 19-1000 (ADD Non-Potable Water Distribution Lines to Irrigation Areas, Multi) and related projects. The document serves as a template and tracking mechanism for contractor submissions of materials, equipment specifications, test reports, and documentation throughout the project lifecycle.

The schedule requires contractors to submit 55 line items of materials and supporting documentation across multiple construction sections, including general conditions, demolition, cast-in-place concrete, earthwork, water utility distribution piping, and related infrastructure. Required submittals include warranty letters, construction schedules, shop drawings, quality control plans, concrete mix designs, compressive strength tests, geotechnical investigation reports, utility crossing plans, pipe and fitting specifications (HDPE), valve specifications, water meter documentation, and hydrostatic pressure test results. Submission deadlines are keyed to project milestones such as Contract Award + 7 days for construction schedules, Contract Award + 15 days for quality control plans, and Final Inspection minus specified days for as-built drawings and other closing documentation. The form tracks receipt dates, engineering review dates, return suspense dates, approval/disapproval notifications, and resubmittal requirements, with columns for remarks and contractor notifications. The document is provided in both English and Spanish versions, reflecting requirements for work performed in Spain under the U.S.-Spain Defense and Cooperation Agreement.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedul

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 19-1000PROJECT TITLE

ADD NON-POTABLE WATER

DIST LINES TO IRRIGATION AREAS, MULTI SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATE OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTS
APPROVED

: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DISAPPROVED

: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

SECTION 01 11 01

GENERAL CONDITIONS

01Warranty letter1Acceptance+15
02Construction Schedule1Contract Award+7
03Progress Schedule1Contract Award+10
04Work Plan1Contract Award+7
05DD Form 13541Final Inspection-10
06As-Built drawings1Final Inspection-5
07Mobility Plan1Contract Award+15
08Project Sign1Contract Award+15
09Quality Control Plan1Final Inspection-15
10Waste & construction debris management1Final Inspection
11Key Staff1Final Inspection-15
12Environmental Protection Plan1As-Built Drawings+10
13Spatial Data1Final Inspection-5
14Health and safety Plan1Contract Award+15
SECTION 01 11 02

SPECIAL CONDITIONS

15GPR report1CWC + 15
16Existing conditions1CWC + 16
SECTION 02 41 00

DEMOLITION

17Demolition Plan1CWC + 15
18Authorized dump or treatment and recovery plant1
19Delivery and disposal certificate1
SECTION 03 30 00

CAST IN PLACE CONCRETE

20Polyethylene sheet catalog data1
21Precast concrete cabinet1
22Quality Control Program1
23Concrete Mix design1
24Slump Tests1
25Compressive Strength Tests1
26Inspection certificate of the concrete batch plant1
27Reinforcing Bars1
SECTION 07 92 00

JOINT SEALANTS

28Sealants, Primers and Bond Brakers1
SECTION 09 90 00

PAINTING AND COATING

29Coatings11
30Deliverty Tickets1
SECTION 31 00 00

EARTHWORK

31Geotechnical investigation report1
32Shoring design report1
33Topographical study of the trenches1
34Utility Crossings Plan and Report1
35Compaction Plan1
36Dewatering Method Statement and Drawings1
37As-built Records of Encountered Utilities1
38Nuclear gauge calibration report1
39Proposed materials test reports for Backfill1
40Proposed materials for reused topsoil and soil1
41Field Density and Moisture1
42Plate Load Test and Footprint1
43Saturation Lines / Isosaturation Curves Laboratory Report1
SECTION 31 05 19

GEOTEXTILE

44Geotextile1
SECTION 32 92 19

SEEDING

45Seed11
46Fertilizer1
47Topsoil1
SECTION 33 11 00

WATER UTILITY DISTRIBUTION PIPING

48Pipe, Fittings, Joints, Couplings and electrowelded joining for HDPE1
49Valves and valve box1
50Hose bibb and Hose connection vacuum breaker.1
51Water meter1
52Irrigation Timer (Programer)1
53Handhole and covers1
54Combined Hydrostatic Pressure and Leakage Test1
55SCADA system11

&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 23-1012TÍTULO DE PROYECTO:
EDI: ADD MUNITIONS PERIMETER ROAD, F2010SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNNUMBER OF COPIES REQUIREDFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
CERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPO
APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

SECCIÓN 01 11 01

CONDICIONES GENERALES

01Carta de garantía1Acceptance+15
02Programa de obra1Contract Award+7
03Programa de avance de obra1Contract Award+10
04Plan de obra1Contract Award+7
05DD Form 13541Final Inspection-10
06Planos As-Built1Final Inspection-5
07Plan de movilización1Contract Award+15
08Proyecto firmado1Contract Award+15
09Plan de control de calidad1Final Inspection+15
10Certificado de gestión de residuos y escombros1Final Inspection
11Personal clave1Final Inspection+15
12Plan de protección medioambiental1As-Built Drawings+10
13Datos especiales1Final Inspection-5
14Plan de salud y seguridad1Contract Award+15
SECCIÓN 03 30 00

HORMIGÓN VERTIDO IN SITU

15Certificado de la inspección de la central de fabricación1
16Programa de ensayo de control de hormigón1
17Resultado de los ensayos de control de hormigón1
18Catálogo de la lámina de polietileno1
19Programa de control de calidad1
SECCIÓN 31 00 00

MOVIMIENTO DE TIERRA

20Excavación o pozos1
21Rellenos y terraplenes1
22Material para relleno1
23Material para explanada1
SECCIÓN 31 05 19

GEOTEXTIL

24Geotextile11
25Control de ejecución1
SECCIÓN 32 03 30

TERRAPLENES

26Identificación de suelo tolerable1
27Control de procedencia de suelo seleccionado1
28Tramo de prueba del suelo tolerable1
29Tramo de prueba del suelo seleccionado1
30Plantas1
31Control de recepción de suelo tolerable1
32Control de recepción de suelo seleccionado1
SECCIÓN 32 05 10

ZAHORRA

33Control de procedencia de los áridos11
34Fórmula de trabajo1
35Tramo de prueba1
36Control de recepción1
SECCIÓN 32 05 30

RIEGO DE IMPRIMACIÓN

37Superficies existentes1
38Control de procedencia del riego de imprimación11
39Control de procedencia del árido de cobertura11
40Dotación del riego de imprimación a aplicar1
41Dotación del árido de cobertura a extender1
42Control de ejecución1
SECCIÓN 32 05 31

RIEGO DE ADHERENCIA

43Control de procedencia del riego de adherencia11
44Dotación del riego de adherencia a aplicar1
45Control de ejecución1
46Control de recepción tras la colocación de la siguiente capa1
SECCIÓN 32 05 32

RIEGO DE CURADO

47Control de procedencia del riego de curado11
48Control de procedencia del árido de cobertura11
49Doptación del riego de curado a aplicar1
50Dotación del árido de cobertura a extender1
51Control de ejecución1
SECCIÓN 32 05 42

MEXCLAS BITUNIMOSAS TIPO HORMIGÓN BITUMINOSO

52Control de procedencia del betún11
53Control de procedencia de los áridos11
54Control de procedencia del polvo mineral11
55Central de fabricación1
56Fórmula de trabajo1
57Tramo de prueba1
58Plan de pavimento1
59Control de fabricación11
60Control de extensión y compactación1
61Control de recepción1
SECCIÓN 32 07 00

MARCAS VIALES

62Marcado CE de pintura1
63Marcado CE de microesferas de vidrio1
64Sistema de señalización durante la pintura1
65Ensayos de comprobación1
SECCIÓN 32 07 01

SEÑALES Y CARTELES VERTICALES DE CIRCULACIÓN RETRORREFLECTANTES

66Marcado CE de la señal1
67Systema de señalización durante la instalación1
68Dimensionado de la cimentación1
SECCIÓN 32 31 13.53

VALLAS Y PUERTAS DE ALTA SEGURIDAD

69Malla metálica11
70Cable de rechazo de vehículos1
71Postes1
72Tirantes y Rieles1
73Barras de camilla1
74Alambres de atar1
75Alambre de tensión1
76Alambre de espino1
77Soportes para alambre de espino1
SECCIÓN 33 40 00

INSTALACIONES DE DRENAJE DE PLUVIALES

78Marcos1
79Sellantes1
80Marcos rectangulares11
81Pasatubos1
82Accesorios1
83Materiales de unión1
SECCIÓN 33 71 01

TRANSMISIÓN Y DISTRIBUCIÓN AÉREA

84Conductores, conectores y empalmes1
85Aisladores1
86Postes de hormigón1
87Postes de hormigón1
88Crucetas de acero galvanizado1
89Pruebas de resistencia a tierra1
90Control de calidad de campo1
91Comprobaciones y pruebas de aceptación1
SECCIÓN 33 71 02

DISTRIBUCIÓN ELÉCTRICA ENTERRADA

92Arquetas eléctricas y de telecomunicaciones1
93Trazado de líneas subterráneas1
94Cable de baja tensión1
95Cable de alta tensión1
96Kit de terminación de caucho de silicona1
97Picas de tierra1
98Cables de tierra1
99Soldadura Exotérmica Cadweld1
100Cinta de advertencia e identificación enterrada1
101Arquetas1
102Conductos (ambos tipos)1
103Informes de prueba1

&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

File details come from the government source that posted it. Updated .