This is a blank cost estimate template for a federal construction project at Morón Air Base, Spain. The template is designed for contractors to submit pricing for Project QUUG 19-1000, which involves adding non-potable water distribution lines to irrigation areas at the facility. The cost estimate form accommodates a base bid (CLIN #1) plus six optional line items (CLINs #2-7), allowing contractors to propose costs for different project phases or areas.

The template requires contractors to break down costs across multiple categories including materials, labor (measured in man-hours/man-days with average rates), and other direct costs, with provision for overhead and profit calculations. The work items span several functional areas: modification of non-potable water systems at the potable water treatment facility, installation of programmers in existing sprinkler irrigation systems, and distribution line installation across five designated areas (Areas #1-5) plus obstruction-related work and geophysical survey work. Specific line items include polyethylene pipe (HDPE) in various diameters (DN40-DN200), solenoid valves, water meters, concrete cabinets, gate valves, road crossings, ground penetrating radar surveys, GPS surveys, and site restoration work such as topsoil and seeding. All cost totals on this blank template currently show 0.00, as it is an unfilled template awaiting contractor pricing input. The form includes signature blocks for firm name, preparer title, and preparer identification.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTISUMMARY
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1CLIN #1 BASE BID
CLIN #1 BASE BID
2CLIN #2 OPTION #1
CLIN #2 OPCIÓN #1
3CLIN #3 OPTION #2
CLIN #3 OPCIÓN #2
4CLIN #4 OPTION #3
CLIN #4 OPCIÓN #3
5CLIN #5 OPTION #4
CLIN #5 OPCIÓN #4
6CLIN #6 OPTION #5
CLIN #6 OPCIÓN #5
6CLIN #7 OPTION #6
CLIN #7 OPCIÓN #6
TOTAL
TOTAL

DATE: FIRM NAME:

TITLE:

These costs and overhead and profit will be applied in any possible future modifications

Page &P

CLIN #1-BASE BID

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #1 BASE BID0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #1 BASE BID
CLIN #1 BASE BID
WORKS RELATED TO MODIFICATION OF NON-POTABLE WATER SYSTEM AT POTABLE WATER TREATMENT FACILITY
TRABAJOS RELACIONADOS CON LA MODIFICACIÓN DEL SISTEMA DE AGUA NO POTABLE EN LA INSTALACIÓN DE TRATAMIENTO DE AGUA POTABLE
1Polyethylene pipe HDPE PN16 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN16 DN200, accesorios de conexión y excavación y relleno de zanjaLm
2Solenoid Valve Ø200mm and accessories
Válvulas solenoide Ø200mm y accesoriosEa
3Solenoid valves and accessories (on the water inlet line for the water treatment plant)
Válvulas solenoide y accesorios (en la línea de entrada de agua para la planta potabilizadora)Ea
4Install water meter BMETERS. WDE-K50 Ø200mm compatible with existing SCADA system
Instalar contador de agua BMETERS. WDE-K50 Ø200mm compatible con el sistema SCADA existenteEa
TOTAL WORKS
TOTAL TRABAJO
WORKS RELATED TO INSTALLATION OF PROGRAMMERS IN EXISTING SPRINKLER IRRIGATION SYSTEM
TRABAJOS RELACIONADOS CON INTALACIÓN DE PROGRAMADORES EN SISTEMAS DE RIEGO POR ASPERSIÓN EXISTENTE
5Cabinet type C2:precast concrete cabinet with reinforce concrete slab(15cm/Ø6mm) including hose bibb, hose connection vacuum breaker 3/4" water meter Ø110mm, pressure gauge solenoid valve Ø110mm, programmer with solar panel and accesories
Armario tipo C2: armario prefabricado de hormigón con losa de hormigón armado (15 cm/Ø6 mm) que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4", contador de agua de Ø110 mm, manómetro, válvula solenoide de Ø110 mm, programador con panel solar y accesorios.Ea
6Cabinet type C3:precast concrete cabinet with reinforce concrete slab(15cm/Ø6mm) including hose bibb, hose connection vacuum breaker 3/4" water meter Ø63mm, pressure gauge solenoid valve Ø63mm, programmer with solar panel and accesories
Armario tipo C3: armario prefabricado de hormigón con losa de hormigón armado (15 cm/Ø6 mm) que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4", contador de agua de Ø63 mm, manómetro, válvula solenoide de Ø63 mm, programador con panel solar y accesorios.Ea
7Cabinet type C4:precast concrete cabinet with reinforce concrete slab(15cm/Ø6mm) including hose bibb, hose connection vacuum breaker 3/4" water meter Ø40mm, pressure gauge solenoid valve Ø40mm, programmer with solar panel and accesories
Armario tipo C4: armario prefabricado de hormigón con losa de hormigón armado (15 cm/Ø6 mm) que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4", contador de agua de Ø40 mm, manómetro, válvula solenoide de Ø40 mm, programador con panel solar y accesorios.Ea
TOTAL WORKS
TOTAL TRABAJO
AREA #1
ZONA #1
8Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
9GPS Survey
Estudio GPSm2
10Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
11Polyethylene pipe HDPE PN10 DN160, connection fittings, excavation and filling of trench
Tubo de polietileno HDPE PN10 DN160, accesorios de conexión, excavación y relleno de zanjaLm
12Polyethylene pipe HDPE PN10 DN110, connection fittings, excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión, excavación y relleno de zanjaLm
13Polyethylene pipe HDPE PN10 DN63, connection fittings, excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión, excavación y relleno de zanjaLm
14Cabinet type C1:Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4" water meter Ø63mm, pressure gauge and accesories
Armario tipo C1:Armario prefabricado de hormigón con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm , manómetro y accesoriosEa
15Gate Valve Ø160mm and accessories (valve box)
Válvulas de compuerta Ø160mm y accesorios (caja de válvulas)Ea
16Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
17Road crossing (drilled) RC-01 for pipe Ø160mm
Cruce carretera (con topo) RC-01 para tubería Ø160mmLm
18Road crossing (drilled) RC-02 for pipe Ø110mm
Cruce carretera (con topo) RC-02 para tubería Ø110mmLm
19Road crossing (drilled) RC-03 for pipe Ø110mm
Cruce carretera (con topo) RC-03 para tubería Ø110mmLm
20Road crossing (drilled) RC-04 for pipe Ø110mm
Cruce carretera (con topo) RC-04 para tubería Ø110mmLm
21Road crossing (drilled) RC-05 for pipe Ø110mm
Cruce carretera (con topo) RC-05 para tubería Ø110mmLm
22Top soil and seeding
Tierra vegetal y sembradom2
23Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #1
Total Zona #1
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL 0.00

PROFIT % 0.00

TOTAL PROJECT EUROS 0.00

DATE: FIRM NAME:

TITLE: PREPARED BY:

These costs and overhead and profit will be applied in any possible future modifications

CLIN #2-OPTION 1

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #2-OPTION 10.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #2 OPTION #1
CLIN #2 OPCIÓN #1
AREA #2
ZONA #2
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
2GPS Survey
Estudio GPSm2
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN6200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
5Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
6Cabinet type C5:precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4" water meter Ø63mm and pressure gauge.
Armario tipo C5: armario prefabricado de hormigón que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4" ,contador de agua de Ø63 mm y manómetroEa
7Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4" water meter Ø63mm , pressure gauge and accesories
Armario tipo C1:Armario prefabricado de hormigón con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm , manómetro y accesoriosEa
8Handhole with blind flange
Arqueta con brida ciegaEa
9Gate Valve Ø110mm" and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvula)Ea
10Gate Valve Ø63mm and accessories
Válvulas de compuerta Ø63mm y accesoriosEa
11Road crossing (drilled) RC-06 for pipe Ø63mm
Cruce carretera (con topo) RC-06 para tubería Ø63mmLm
12Top soil and seeding
Tierra vegetal y sembradom2
13Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #2
Total Zona #2
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL0.00
DATE:FIRM NAME:
PROFIT%0.00

TITLE: PREPARED BY: TOTAL PROJECT EUROS 0.00

These costs and overhead and profit will be applied in any possible future modifications

CLIN #3-OPTION 2

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #3-OPTION 20.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #3 OPTION #2
CLIN #3 OPCIÓN #2
AREA #3
ZONA #3
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
2GPS Survey
Estudio GPSm2
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
5Cabinet tipe C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4" water meter Ø63mm , pressure gauge and accesories
Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera Ø63mm , disyuntor de vacío de 3/4", contador de agua, manómetro y accesoriosEa
6Gate Valve Ø63mm and accessories
Válvulas de compuerta Ø63mm y accesoriosEa
7Road crossing (drilled) RC-07 for pipe Ø63mm
Cruce carretera (con topo) RC-07 para tubería Ø63mmEa
8Road crossing (drilled) RC-08 for pipe Ø63mm
Cruce carretera (con topo) RC-08 para tubería Ø63mmEa
9Top soil and seeding
Tierra vegetal y sembradom2
10Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #3
Total Zona #3
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL 0.00

PROFIT % 0.00

TOTAL PROJECT EUROS 0.00

DATE: FIRM NAME:

TITLE: PREPARED BY:

These costs and overhead and profit will be applied in any possible future modifications

CLIN #4-OPTION 3

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #4-OPTION 30.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #4 OPTION #3
CLIN #4 OPCIÓN #3
AREA #4
ZONA #4
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
2GPS Survey
Estudio GPSm2
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
5Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
6Cabinet typo C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm ,pressure gauge and accesories
Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm, manómetro y accesoriosEa
7Handhole with blind flange
Arqueta con brida ciegaEa
8Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
9Road crossing (drilled) RC-19 for pipe Ø110mm
Cruce carretera (con topo) RC-19 para tubería Ø110mmEa
10Top soil and seeding
Tierra vegetal y sembradom2
11Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #4
Total Zona #4
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL0.00
DATE:FIRM NAME:
PROFIT%0.00

TITLE: PREPARED BY: TOTAL PROJECT EUROS 0.00

These costs and overhead and profit will be applied in any possible future modifications

CLIN #5-OPTION 4

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #5-OPTION 40.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #5 OPTION #4
CLIN #5 OPCIÓN #4
AREA #5
ZONA #5
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
2GPS Survey
Estudio GPSm2
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
5Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
6Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4",water meter Ø63mm and accesories
Armario tipo C1: Armario prefabricado de hormigón con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm y accesoriosEa
7Gate Valve Ø110mm and accessories
Válvulas de compuerta Ø110mm y accesoriosEa
8Gate Valve Ø63mm and accessories
Válvulas de compuerta Ø63mm y accesoriosEa
7Road crossing (drilled) RC-09 for pipe Ø63mm
Cruce carretera (con topo) RC-09 para tubería Ø63mmEa
8Road crossing (drilled) RC-10 pipe Ø63mm
Cruce carretera (con topo) RC-10 para tubería Ø63mmEa
9Road crossing (drilled) RC-11for pipe Ø110mm
Cruce carretera (con topo) RC-11para tubería Ø110mmEa
10Road crossing (drilled) RC-12 pipe Ø110mm
Cruce carretera (con topo) RC-12 para tubería Ø110mmEa
11Road crossing (drilled) RC-13 para tubería Ø63mm
Cruce carretera (con topo) RC-13 para tubería Ø63mmEa
12Road crossing (drilled) RC-14 for pipe Ø63mm
Cruce carretera (con topo) RC-14 para tubería Ø63mmEa
13Road crossing (drilled) RC-15 for pipe Ø63mm
Cruce carretera (con topo) RC-15 para tubería Ø63mmEa
14Road crossing (drilled) RC-16 for pipe Ø63mm
Cruce carretera (con topo) RC-16 para tubería Ø63mmEa
15Road crossing (drilled) RC-17 for pipe Ø63mm
Cruce carretera (con topo) RC-17 para tubería Ø63mmEa
16Top soil and seeding
Tierra vegetal y sembradom2
17Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #5
Total Zona #5
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL 0.00

PROFIT % 0.00

TOTAL PROJECT EUROS 0.00

DATE: FIRM NAME:

TITLE: PREPARED BY:

These costs and overhead and profit will be applied in any possible future modifications

CLIN#6-OPTION 5

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #6-OPTION 50.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #6 OPTION #5
CLIN #6 OPCIÓN #5
WORKS RELATED TO OBSTRUCTIONS
TRABAJOS RELACIONADOS CON OBSTRUCCIONES
1Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
2Polyethylene pipe HDPE PN10 DN160, connection fittings, excavation and filling of trench
Tubo de polietileno HDPE PN10 DN160, accesorios de conexión, excavación y relleno de zanjaLm
3Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
3Gate Valve Ø160mm and accessories (valve box)
Válvulas de compuerta Ø160mm y accesorios (caja de válvulas)Ea
4Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
5Road crossing (drilled) RC-01 for pipe Ø160mm
Cruce carretera (con topo) RC-01 para tubería Ø160mmLm
6Road crossing (drilled) RC-02 for pipe Ø110mm
Cruce carretera (con topo) RC-02 para tubería Ø110mmLm
7Cabinet type 1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4",water meter Ø63mm and accesories
Armario tipo 1:Armario prefabricado de hormigón con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm y accesoriosEa
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL 0.00

PROFIT % 0.00

TOTAL PROJECT EUROS 0.00

DATE: FIRM NAME:

TITLE: PREPARED BY:

These costs and overhead and profit will be applied in any possible future modifications

CLIN#7-OPTION 6

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #7-OPTION 60.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #7 OPTION #6
CLIN #7 OPCIÓN #6
GROUND PENETRATING RADAR (GPR) Y GPS
GEO-RADAR Y GPS
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)Lm
2GPS Survey
Estudio GPSLm
TOTAL GPR AND GPS WORKS
TOTAL TRABAJO DE GPR Y GPS
AREA #3 (Blg. #106, #110, #119)
ZONA #3 (Blg. #106, #110, #119)
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
5Handhole with blind flange
Arqueta con brida ciegaEa
6Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
7Road crossing (drilled) RC-20 for pipe Ø110mm
Cruce carretera (con topo) RC-20 para tubería Ø110mmEa
8Road crossing (drilled) RC-18 for pipe Ø110mm
Cruce carretera (con topo) RC-18 para tubería Ø110mmEa
9Top soil and seeding
Tierra vegetal y sembradom2
10Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #3
Total Zona #3
AREA #4 (Blg #192, #203)
ZONA #4 (Edif. #192, #203)
11Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
12Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
13Handhole with blind flange
Arqueta con brida ciegaEa
14Gate Valve Ø200mm and accessories (valve box)
Válvulas de compuerta Ø200mm y accesorios (caja de válvulas)Ea
15Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
16Road crossing (drilled) RC-20 for pipe Ø110mm
Cruce carretera (con topo) RC-20 para tubería Ø110mmEa
17Top soil and seeding
Tierra vegetal y sembradom2
18Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #4
Total Zona #4
TOTAL WORKS
TOTAL TRABAJO CONSTRUCCIÓN
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL 0.00

PROFIT % 0.00

TOTAL PROJECT EUROS 0.00

DATE: FIRM NAME:

TITLE: PREPARED BY:

These costs and overhead and profit will be applied in any possible future modifications image1.png