Attach 4 Cost Estimat REV.xlsx

XLSX spreadsheet 133 KB Posted

Attached to
ADD Non-Potable Water Distribution Lines to Irrigation Areas, Multi
Solicitation number
FA557526B0003
Issued by

About this file

This is a Cost Estimate Breakdown document for a federal construction contract at Morón Air Base, Spain. The project (QUUG 19-1000) involves adding non-potable water distribution lines to irrigation areas with a contract value between $500,000 and $1,000,000 and a 570-day performance period. The cost estimate is prepared by ESTUDIO GH as of June 2026, using a EUR to USD exchange rate of 0.9303, and covers seven contract line items (CLINs): CLIN #1 (Base Bid) and CLINs #2 through #7 (Options 1-6).

CLIN #1 (Base Bid) encompasses modifications to the non-potable water system at the potable water treatment facility, installation of programmers in existing sprinkler irrigation systems with solar-powered cabinets, and distribution infrastructure for Area #1, including polyethylene HDPE pipes (DN200, DN160, DN110, DN63), solenoid valves, water meters, cabinet-type control systems, gate valves, road crossings, and site restoration. CLINs #2-#5 cover Areas #2-#5 respectively with similar components scaled to each area's requirements. CLIN #6 addresses unexpected obstructions with contingency materials and labor, while CLIN #7 includes Ground Penetrating Radar (GPR) and GPS surveying plus targeted construction for Areas #3 and #4 serving buildings 106, 110, 119, 192, and 203. Each CLIN line item details unit measurements, quantities, material costs, labor costs (in man-hours or man-days with average rates), and other direct costs, with subtotals for materials, labor, overhead, and profit calculations applied uniformly across all modifications.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOV-SUMMARY

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTISUMMARY$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1CLIN #1 BASE BID
CLIN #1 BASE BID
2CLIN #2 OPTION #1
CLIN #2 OPCIÓN #1
3CLIN #3 OPTION #2
CLIN #3 OPCIÓN #2
4CLIN #4 OPTION #3
CLIN #4 OPCIÓN #3
5CLIN #5 OPTION #4
CLIN #5 OPCIÓN #4
6CLIN #6 OPTION #5
CLIN #6 OPCIÓN #5
7CLIN #7 OPTION #6
CLIN #7 OPCIÓN #6
TOTAL
TOTAL

DATE: June 2026 FIRM NAME: ESTUDIO GH RATE $1: 0.9303 €

TITLE: A&E Director PREPARED BY: Cayetano Gómez

These costs and overhead and profit will be applied in any possible future modifications

Page &P

GOV-CLIN #1-BASE BID

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #1 BASE BID$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #1 BASE BID
CLIN #1 BASE BID
WORKS RELATED TO MODIFICATION OF NON-POTABLE WATER SYSTEM AT POTABLE WATER TREATMENT FACILITY
TRABAJOS RELACIONADOS CON LA MODIFICACIÓN DEL SISTEMA DE AGUA NO POTABLE EN LA INSTALACIÓN DE TRATAMIENTO DE AGUA POTABLE
1Polyethylene pipe HDPE PN16 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN16 DN200, accesorios de conexión y excavación y relleno de zanjaLm
2Solenoid Valve Ø200mm and accessories
Válvulas solenoide Ø200mm y accesoriosEa
3Solenoid valves and accessories (on the water inlet line for the water treatment plant)
Válvulas solenoide y accesorios (en la línea de entrada de agua para la planta potabilizadora)Ea
4Install water meter BMETERS. WDE-K50 Ø200mm compatible with existing SCADA system
Instalar contador de agua BMETERS. WDE-K50 Ø200mm compatible con el sistema SCADA existenteEa
TOTAL WORKS
TOTAL TRABAJO
WORKS RELATED TO INSTALLATION OF PROGRAMMERS IN EXISTING SPRINKLER IRRIGATION SYSTEM
TRABAJOS RELACIONADOS CON INTALACIÓN DE PROGRAMADORES EN SISTEMAS DE RIEGO POR ASPERSIÓN EXISTENTE
5Cabinet type C2: precast concrete cabinet with reinforced concrete slab(15cm/Ø6mm) including hose bibb, hose connection vacuum breaker 3/4", water meter Ø110mm, pressure gauge, solenoid valve Ø110mm, programmer with solar panel and accessories
Armario tipo C2: armario prefabricado de hormigón con losa de hormigón armado (15 cm/Ø6 mm) que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4", contador de agua de Ø110 mm, manómetro, válvula solenoide de Ø110 mm, programador con panel solar y accesorios.Ea
6Cabinet type C3: precast concrete cabinet with reinforced concrete slab(15cm/Ø6mm) including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge, solenoid valve Ø63mm, programmer with solar panel and accessories
Armario tipo C3: armario prefabricado de hormigón con losa de hormigón armado (15 cm/Ø6 mm) que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4", contador de agua de Ø63 mm, manómetro, válvula solenoide de Ø63 mm, programador con panel solar y accesorios.Ea
7Cabinet type C4: precast concrete cabinet with reinforced concrete slab(15cm/Ø6mm) including hose bibb, hose connection vacuum breaker 3/4", water meter Ø40mm, pressure gauge, solenoid valve Ø40mm, programmer with solar panel and accessories
Armario tipo C4: armario prefabricado de hormigón con losa de hormigón armado (15 cm/Ø6 mm) que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4", contador de agua de Ø40 mm, manómetro, válvula solenoide de Ø40 mm, programador con panel solar y accesorios.Ea
TOTAL WORKS
TOTAL TRABAJO
AREA #1
ZONA #1
8Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
9GPS Survey
Estudio GPSm2
10Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
11Polyethylene pipe HDPE PN10 DN160, connection fittings, excavation and filling of trench
Tubo de polietileno HDPE PN10 DN160, accesorios de conexión, excavación y relleno de zanjaLm
12Polyethylene pipe HDPE PN10 DN110, connection fittings, excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión, excavación y relleno de zanjaLm
13Polyethylene pipe HDPE PN10 DN63, connection fittings, excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión, excavación y relleno de zanjaLm
14Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge and accessories
Armario tipo C1: Armario prefabricado de hormigón con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm, manómetro y accesoriosEa
15Gate Valve Ø160mm and accessories (valve box)
Válvulas de compuerta Ø160mm y accesorios (caja de válvulas)Ea
16Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
17Road crossing (drilled) RC-01 for pipe Ø160mm
Cruce carretera (con topo) RC-01 para tubería Ø160mmLm
18Road crossing (drilled) RC-02 for pipe Ø110mm
Cruce carretera (con topo) RC-02 para tubería Ø110mmLm
19Road crossing (drilled) RC-03 for pipe Ø110mm
Cruce carretera (con topo) RC-03 para tubería Ø110mmLm
20Road crossing (drilled) RC-04 for pipe Ø110mm
Cruce carretera (con topo) RC-04 para tubería Ø110mmLm
21Road crossing (drilled) RC-05 for pipe Ø110mm
Cruce carretera (con topo) RC-05 para tubería Ø110mmLm
22Top soil and seeding
Tierra vegetal y sembradom2
23Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #1
Total Zona #1
TOTAL
TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL PROJECT EUROS
RATE $10.9303€
TOTAL PROJECT US $

DATE: June 2026 FIRM NAME: ESTUDIO GH

TITLE: A&E Director PREPARED BY: Cayetano Gómez

These costs and overhead and profit will be applied in any possible future modifications

GOV-CLIN #2-OPTION 1

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #2-OPTION 1$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #2 OPTION #1
CLIN #2 OPCIÓN #1
AREA #2
ZONA #2
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
2GPS Survey
Estudio GPSm2
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
5Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
6Cabinet type C5: precast concrete cabinet including hose bibb, hose connection vacuum breaker, 3/4" water meter Ø63mm and pressure gauge.
Armario tipo C5: armario prefabricado de hormigón que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4" ,contador de agua de Ø63 mm y manómetroEa
7Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker, 3/4" water meter Ø63mm , pressure gauge and accessories
Armario tipo C1: Armario prefabricado de hormigón con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm , manómetro y accesoriosEa
8Handhole with blind flange
Arqueta con brida ciegaEa
9Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvula)Ea
10Gate Valve Ø63mm and accessories (valve box)
Válvulas de compuerta Ø63mm y accesorios (caja válvulas)Ea
11Road crossing (drilled) RC-06 for pipe Ø63mm
Cruce carretera (con topo) RC-06 para tubería Ø63mmLm
12Top soil and seeding
Tierra vegetal y sembradom2
13Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #2
Total Zona #2
TOTAL
TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL
DATE: June 2026FIRM NAME: ESTUDIO GH
PROFIT%
TITLE: A&E DirectorPREPARED BY:Cayetano GómezTOTAL PROJECT EUROS
RATE $10.9303€
TOTAL PROJECT US $

These costs and overhead and profit will be applied in any possible future modifications

GOV-CLIN #3-OPTION 2

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #3-OPTION 2$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #3 OPTION #2
CLIN #3 OPCIÓN #2
AREA #3
ZONA #3
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
2GPS Survey
Estudio GPSm2
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
5Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm , pressure gauge and accessories
Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera Ø63mm , disyuntor de vacío de 3/4", contador de agua, manómetro y accesoriosEa
6Gate Valve Ø63mm and accessories (valve box)
Válvulas de compuerta Ø63mm y accesorios (caja válvulas)Ea
7Road crossing (drilled) RC-07 for pipe Ø63mm
Cruce carretera (con topo) RC-07 para tubería Ø63mmLm
8Road crossing (drilled) RC-08 for pipe Ø63mm
Cruce carretera (con topo) RC-08 para tubería Ø63mmLm
9Top soil and seeding
Tierra vegetal y sembradom2
10Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #3
Total Zona #3
TOTAL
TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL PROJECT EUROS
RATE $10.9303€
TOTAL PROJECT US $

DATE: June 2026 FIRM NAME: ESTUDIO GH

TITLE: A&E Director PREPARED BY: Cayetano Gómez

These costs and overhead and profit will be applied in any possible future modifications

GOV-CLIN #4-OPTION 3

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #4-OPTION 3$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #4 OPTION #3
CLIN #4 OPCIÓN #3
AREA #4
ZONA #4
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
2GPS Survey
Estudio GPSm2
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
5Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
6Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge and accessories
Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm, manómetro y accesoriosEa
7Handhole with blind flange
Arqueta con brida ciegaEa
8Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
9Road crossing (drilled) RC-19 for pipe Ø110mm
Cruce carretera (con topo) RC-19 para tubería Ø110mmLm
10Top soil and seeding
Tierra vegetal y sembradom2
11Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #4
Total Zona #4
TOTAL
TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL
DATE: June 2026FIRM NAME: ESTUDIO GH
PROFIT%
TITLE: A&E DirectorPREPARED BY:Cayetano GómezTOTAL PROJECT EUROS
RATE $10.9303€
TOTAL PROJECT US $
These costs and overhead and profit will be applied in any possible future modifications

GOV-CLIN #5-OPTION 4

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #5-OPTION 4$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #5 OPTION #4
CLIN #5 OPCIÓN #4
AREA #5
ZONA #5
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
2GPS Survey
Estudio GPSm2
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
5Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
6Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge and accessories
Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm, manómetro y accesoriosEa
7Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja válvulas)Ea
8Gate Valve Ø63mm and accessories (valve box)
Válvulas de compuerta Ø63mm y accesorios (caja válvulas)Ea
9Road crossing (drilled) RC-09 for pipe Ø63mm
Cruce carretera (con topo) RC-09 para tubería Ø63mmLm
10Road crossing (drilled) RC-10 for pipe Ø63mm
Cruce carretera (con topo) RC-10 para tubería Ø63mmLm
11Road crossing (drilled) RC-11 for pipe Ø110mm
Cruce carretera (con topo) RC-11 para tubería Ø110mmLm
12Road crossing (drilled) RC-12 for pipe Ø110mm
Cruce carretera (con topo) RC-12 para tubería Ø110mmLm
13Road crossing (drilled) RC-13 for pipe Ø63mm
Cruce carretera (con topo) RC-13 para tubería Ø63mmLm
14Road crossing (drilled) RC-14 for pipe Ø63mm
Cruce carretera (con topo) RC-14 para tubería Ø63mmLm
15Road crossing (drilled) RC-15 for pipe Ø63mm
Cruce carretera (con topo) RC-15 para tubería Ø63mmLm
16Road crossing (drilled) RC-16 for pipe Ø63mm
Cruce carretera (con topo) RC-16 para tubería Ø63mmLm
17Road crossing (drilled) RC-17 for pipe Ø63mm
Cruce carretera (con topo) RC-17 para tubería Ø63mmLm
18Top soil and seeding
Tierra vegetal y sembradom2
19Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #5
Total Zona #5
TOTAL
TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL PROJECT EUROS
RATE $10.9303€
TOTAL PROJECT US $

DATE: June 2026 FIRM NAME: ESTUDIO GH

TITLE: A&E Director PREPARED BY: Cayetano Gómez

These costs and overhead and profit will be applied in any possible future modifications

GOV-CLIN#6-OPTION 5

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #6-OPTION 5$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #6 OPTION #5
CLIN #6 OPCIÓN #5
WORKS RELATED TO UNEXPECTED OBSTRUCTIONS
TRABAJOS RELACIONADOS CON OBSTRUCCIONES NO DETECTADAS
1Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
2Polyethylene pipe HDPE PN10 DN160, connection fittings, excavation and filling of trench
Tubo de polietileno HDPE PN10 DN160, accesorios de conexión, excavación y relleno de zanjaLm
3Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
5Gate Valve Ø160mm and accessories (valve box)
Válvulas de compuerta Ø160mm y accesorios (caja de válvulas)Ea
6Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
7Gate Valve Ø63mm and accessories (valve box)
Válvulas de compuerta Ø63mm y accesorios (caja de válvulas)Ea
8Road crossing (drilled) for pipe Ø160mm
Cruce carretera (con topo) para tubería Ø160mmLm
9Road crossing (drilled) for pipe Ø110mm
Cruce carretera (con topo) para tubería Ø110mmLm
10Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge and accessories
Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm, manómetro y accesoriosEa
TOTAL
TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL PROJECT EUROS
RATE $10.9303€
TOTAL PROJECT US $
DATE: June 2026FIRM NAME: ESTUDIO GH

TITLE: A&E Director PREPARED BY: Cayetano Gómez

These costs and overhead and profit will be applied in any possible future modifications

GOV-CLIN#7-OPTION 6

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTICLIN #7-OPTION 6$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #7 OPTION #6
CLIN #7 OPCIÓN #6
GROUND PENETRATING RADAR (GPR) Y GPS
GEO-RADAR Y GPS
1Ground Penetrating Radar GPR survey
Estudio Geo-Radar (GPR)m2
2GPS Survey
Estudio GPSm2
TOTAL GPR AND GPS WORKS
TOTAL TRABAJO DE GPR Y GPS
AREA #3 (Blg. #106, #110, #119)
ZONA #3 (Blg. #106, #110, #119)
3Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanjaLm
4Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
5Handhole with blind flange
Arqueta con brida ciegaEa
6Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
7Road crossing (drilled) RC-20 for pipe Ø110mm
Cruce carretera (con topo) RC-20 para tubería Ø110mmLm
8Road crossing (drilled) RC-18 for pipe Ø110mm
Cruce carretera (con topo) RC-18 para tubería Ø110mmLm
9Top soil and seeding
Tierra vegetal y sembradom2
10Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #3
Total Zona #3
AREA #4 (Blg #192, #203)
ZONA #4 (Edif. #192, #203)
11Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanjaLm
12Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench
Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanjaLm
13Handhole with blind flange
Arqueta con brida ciegaEa
14Connection to existing handhole (bldg 192)Ea
Conexión con arqueta existente (Bldg 192)
15Gate Valve Ø110mm and accessories (valve box)
Válvulas de compuerta Ø110mm y accesorios (caja de válvulas)Ea
16Top soil and seeding
Tierra vegetal y sembradom2
17Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJob
Total, Area #4
Total Zona #4
TOTAL WORKS
TOTAL TRABAJO CONSTRUCCIÓN
TOTAL
TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL PROJECT EUROS
RATE $10.9303€
TOTAL PROJECT US $

DATE: June 2026 FIRM NAME: ESTUDIO GH

TITLE: A&E Director PREPARED BY: Cayetano Gómez

These costs and overhead and profit will be applied in any possible future modifications image1.png image2.png

File details come from the government source that posted it. Updated .