Attach 4 Cost Estimat REV.xlsx
XLSX spreadsheet 133 KB Posted
- Solicitation number
- FA557526B0003
About this file
This is a Cost Estimate Breakdown document for a federal construction contract at Morón Air Base, Spain. The project (QUUG 19-1000) involves adding non-potable water distribution lines to irrigation areas with a contract value between $500,000 and $1,000,000 and a 570-day performance period. The cost estimate is prepared by ESTUDIO GH as of June 2026, using a EUR to USD exchange rate of 0.9303, and covers seven contract line items (CLINs): CLIN #1 (Base Bid) and CLINs #2 through #7 (Options 1-6).
CLIN #1 (Base Bid) encompasses modifications to the non-potable water system at the potable water treatment facility, installation of programmers in existing sprinkler irrigation systems with solar-powered cabinets, and distribution infrastructure for Area #1, including polyethylene HDPE pipes (DN200, DN160, DN110, DN63), solenoid valves, water meters, cabinet-type control systems, gate valves, road crossings, and site restoration. CLINs #2-#5 cover Areas #2-#5 respectively with similar components scaled to each area's requirements. CLIN #6 addresses unexpected obstructions with contingency materials and labor, while CLIN #7 includes Ground Penetrating Radar (GPR) and GPS surveying plus targeted construction for Areas #3 and #4 serving buildings 106, 110, 119, 192, and 203. Each CLIN line item details unit measurements, quantities, material costs, labor costs (in man-hours or man-days with average rates), and other direct costs, with subtotals for materials, labor, overhead, and profit calculations applied uniformly across all modifications.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOV-SUMMARY
| COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTI | SUMMARY | $ | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1000 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| 1 | CLIN #1 BASE BID |
| CLIN #1 BASE BID | |
| 2 | CLIN #2 OPTION #1 |
| CLIN #2 OPCIÓN #1 | |
| 3 | CLIN #3 OPTION #2 |
| CLIN #3 OPCIÓN #2 | |
| 4 | CLIN #4 OPTION #3 |
| CLIN #4 OPCIÓN #3 | |
| 5 | CLIN #5 OPTION #4 |
| CLIN #5 OPCIÓN #4 | |
| 6 | CLIN #6 OPTION #5 |
| CLIN #6 OPCIÓN #5 | |
| 7 | CLIN #7 OPTION #6 |
| CLIN #7 OPCIÓN #6 | |
| TOTAL | |
| TOTAL |
DATE: June 2026 FIRM NAME: ESTUDIO GH RATE $1: 0.9303 €
TITLE: A&E Director PREPARED BY: Cayetano Gómez
These costs and overhead and profit will be applied in any possible future modifications
Page &P
GOV-CLIN #1-BASE BID
| COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTI | CLIN #1 BASE BID | $ | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1000 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| CLIN #1 BASE BID | ||||||||||
| CLIN #1 BASE BID | ||||||||||
| WORKS RELATED TO MODIFICATION OF NON-POTABLE WATER SYSTEM AT POTABLE WATER TREATMENT FACILITY | ||||||||||
| TRABAJOS RELACIONADOS CON LA MODIFICACIÓN DEL SISTEMA DE AGUA NO POTABLE EN LA INSTALACIÓN DE TRATAMIENTO DE AGUA POTABLE | ||||||||||
| 1 | Polyethylene pipe HDPE PN16 DN200, connection fittings and excavation and filling of trench | |||||||||
| Tubo de polietileno HDPE PN16 DN200, accesorios de conexión y excavación y relleno de zanja | Lm | |||||||||
| 2 | Solenoid Valve Ø200mm and accessories | |||||||||
| Válvulas solenoide Ø200mm y accesorios | Ea | |||||||||
| 3 | Solenoid valves and accessories (on the water inlet line for the water treatment plant) | |||||||||
| Válvulas solenoide y accesorios (en la línea de entrada de agua para la planta potabilizadora) | Ea | |||||||||
| 4 | Install water meter BMETERS. WDE-K50 Ø200mm compatible with existing SCADA system | |||||||||
| Instalar contador de agua BMETERS. WDE-K50 Ø200mm compatible con el sistema SCADA existente | Ea | |||||||||
| TOTAL WORKS | ||||||||||
| TOTAL TRABAJO |
| WORKS RELATED TO INSTALLATION OF PROGRAMMERS IN EXISTING SPRINKLER IRRIGATION SYSTEM | ||
| TRABAJOS RELACIONADOS CON INTALACIÓN DE PROGRAMADORES EN SISTEMAS DE RIEGO POR ASPERSIÓN EXISTENTE | ||
| 5 | Cabinet type C2: precast concrete cabinet with reinforced concrete slab(15cm/Ø6mm) including hose bibb, hose connection vacuum breaker 3/4", water meter Ø110mm, pressure gauge, solenoid valve Ø110mm, programmer with solar panel and accessories | |
| Armario tipo C2: armario prefabricado de hormigón con losa de hormigón armado (15 cm/Ø6 mm) que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4", contador de agua de Ø110 mm, manómetro, válvula solenoide de Ø110 mm, programador con panel solar y accesorios. | Ea | |
| 6 | Cabinet type C3: precast concrete cabinet with reinforced concrete slab(15cm/Ø6mm) including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge, solenoid valve Ø63mm, programmer with solar panel and accessories | |
| Armario tipo C3: armario prefabricado de hormigón con losa de hormigón armado (15 cm/Ø6 mm) que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4", contador de agua de Ø63 mm, manómetro, válvula solenoide de Ø63 mm, programador con panel solar y accesorios. | Ea | |
| 7 | Cabinet type C4: precast concrete cabinet with reinforced concrete slab(15cm/Ø6mm) including hose bibb, hose connection vacuum breaker 3/4", water meter Ø40mm, pressure gauge, solenoid valve Ø40mm, programmer with solar panel and accessories | |
| Armario tipo C4: armario prefabricado de hormigón con losa de hormigón armado (15 cm/Ø6 mm) que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4", contador de agua de Ø40 mm, manómetro, válvula solenoide de Ø40 mm, programador con panel solar y accesorios. | Ea |
| TOTAL WORKS |
| TOTAL TRABAJO |
| AREA #1 | ||
| ZONA #1 | ||
| 8 | Ground Penetrating Radar GPR survey | |
| Estudio Geo-Radar (GPR) | m2 | |
| 9 | GPS Survey | |
| Estudio GPS | m2 | |
| 10 | Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 11 | Polyethylene pipe HDPE PN10 DN160, connection fittings, excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN160, accesorios de conexión, excavación y relleno de zanja | Lm | |
| 12 | Polyethylene pipe HDPE PN10 DN110, connection fittings, excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN110, accesorios de conexión, excavación y relleno de zanja | Lm | |
| 13 | Polyethylene pipe HDPE PN10 DN63, connection fittings, excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN63, accesorios de conexión, excavación y relleno de zanja | Lm | |
| 14 | Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge and accessories | |
| Armario tipo C1: Armario prefabricado de hormigón con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm, manómetro y accesorios | Ea | |
| 15 | Gate Valve Ø160mm and accessories (valve box) | |
| Válvulas de compuerta Ø160mm y accesorios (caja de válvulas) | Ea | |
| 16 | Gate Valve Ø110mm and accessories (valve box) | |
| Válvulas de compuerta Ø110mm y accesorios (caja de válvulas) | Ea | |
| 17 | Road crossing (drilled) RC-01 for pipe Ø160mm | |
| Cruce carretera (con topo) RC-01 para tubería Ø160mm | Lm | |
| 18 | Road crossing (drilled) RC-02 for pipe Ø110mm | |
| Cruce carretera (con topo) RC-02 para tubería Ø110mm | Lm | |
| 19 | Road crossing (drilled) RC-03 for pipe Ø110mm | |
| Cruce carretera (con topo) RC-03 para tubería Ø110mm | Lm | |
| 20 | Road crossing (drilled) RC-04 for pipe Ø110mm | |
| Cruce carretera (con topo) RC-04 para tubería Ø110mm | Lm | |
| 21 | Road crossing (drilled) RC-05 for pipe Ø110mm | |
| Cruce carretera (con topo) RC-05 para tubería Ø110mm | Lm | |
| 22 | Top soil and seeding | |
| Tierra vegetal y sembrado | m2 | |
| 23 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | Job | |
| Total, Area #1 | ||
| Total Zona #1 |
| TOTAL |
| TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
| TOTAL PROJECT EUROS | ||
| RATE $1 | 0.9303 | € |
| TOTAL PROJECT US $ |
DATE: June 2026 FIRM NAME: ESTUDIO GH
TITLE: A&E Director PREPARED BY: Cayetano Gómez
These costs and overhead and profit will be applied in any possible future modifications
GOV-CLIN #2-OPTION 1
| COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTI | CLIN #2-OPTION 1 | $ | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1000 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN #2 OPTION #1 |
| CLIN #2 OPCIÓN #1 |
| AREA #2 | ||
| ZONA #2 | ||
| 1 | Ground Penetrating Radar GPR survey | |
| Estudio Geo-Radar (GPR) | m2 | |
| 2 | GPS Survey | |
| Estudio GPS | m2 | |
| 3 | Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 4 | Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 5 | Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 6 | Cabinet type C5: precast concrete cabinet including hose bibb, hose connection vacuum breaker, 3/4" water meter Ø63mm and pressure gauge. | |
| Armario tipo C5: armario prefabricado de hormigón que incluye grifo para manguera, conexión para manguera, válvula de vacío de 3/4" ,contador de agua de Ø63 mm y manómetro | Ea | |
| 7 | Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker, 3/4" water meter Ø63mm , pressure gauge and accessories | |
| Armario tipo C1: Armario prefabricado de hormigón con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm , manómetro y accesorios | Ea | |
| 8 | Handhole with blind flange | |
| Arqueta con brida ciega | Ea | |
| 9 | Gate Valve Ø110mm and accessories (valve box) | |
| Válvulas de compuerta Ø110mm y accesorios (caja de válvula) | Ea | |
| 10 | Gate Valve Ø63mm and accessories (valve box) | |
| Válvulas de compuerta Ø63mm y accesorios (caja válvulas) | Ea | |
| 11 | Road crossing (drilled) RC-06 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-06 para tubería Ø63mm | Lm | |
| 12 | Top soil and seeding | |
| Tierra vegetal y sembrado | m2 | |
| 13 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | Job | |
| Total, Area #2 | ||
| Total Zona #2 | ||
| TOTAL | ||
| TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
| SUBTOTAL | |||
| DATE: June 2026 | FIRM NAME: ESTUDIO GH | ||
| PROFIT | % |
| TITLE: A&E Director | PREPARED BY: | Cayetano Gómez | TOTAL PROJECT EUROS | ||
| RATE $1 | 0.9303 | € | |||
| TOTAL PROJECT US $ |
These costs and overhead and profit will be applied in any possible future modifications
GOV-CLIN #3-OPTION 2
| COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTI | CLIN #3-OPTION 2 | $ | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1000 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN #3 OPTION #2 |
| CLIN #3 OPCIÓN #2 |
| AREA #3 | ||
| ZONA #3 | ||
| 1 | Ground Penetrating Radar GPR survey | |
| Estudio Geo-Radar (GPR) | m2 | |
| 2 | GPS Survey | |
| Estudio GPS | m2 | |
| 3 | Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 4 | Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 5 | Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm , pressure gauge and accessories | |
| Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera Ø63mm , disyuntor de vacío de 3/4", contador de agua, manómetro y accesorios | Ea | |
| 6 | Gate Valve Ø63mm and accessories (valve box) | |
| Válvulas de compuerta Ø63mm y accesorios (caja válvulas) | Ea | |
| 7 | Road crossing (drilled) RC-07 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-07 para tubería Ø63mm | Lm | |
| 8 | Road crossing (drilled) RC-08 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-08 para tubería Ø63mm | Lm | |
| 9 | Top soil and seeding | |
| Tierra vegetal y sembrado | m2 | |
| 10 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | Job | |
| Total, Area #3 | ||
| Total Zona #3 |
| TOTAL |
| TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
| TOTAL PROJECT EUROS | ||
| RATE $1 | 0.9303 | € |
| TOTAL PROJECT US $ |
DATE: June 2026 FIRM NAME: ESTUDIO GH
TITLE: A&E Director PREPARED BY: Cayetano Gómez
These costs and overhead and profit will be applied in any possible future modifications
GOV-CLIN #4-OPTION 3
| COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTI | CLIN #4-OPTION 3 | $ | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1000 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN #4 OPTION #3 |
| CLIN #4 OPCIÓN #3 |
| AREA #4 | ||
| ZONA #4 | ||
| 1 | Ground Penetrating Radar GPR survey | |
| Estudio Geo-Radar (GPR) | m2 | |
| 2 | GPS Survey | |
| Estudio GPS | m2 | |
| 3 | Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 4 | Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 5 | Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 6 | Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge and accessories | |
| Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm, manómetro y accesorios | Ea | |
| 7 | Handhole with blind flange | |
| Arqueta con brida ciega | Ea | |
| 8 | Gate Valve Ø110mm and accessories (valve box) | |
| Válvulas de compuerta Ø110mm y accesorios (caja de válvulas) | Ea | |
| 9 | Road crossing (drilled) RC-19 for pipe Ø110mm | |
| Cruce carretera (con topo) RC-19 para tubería Ø110mm | Lm | |
| 10 | Top soil and seeding | |
| Tierra vegetal y sembrado | m2 | |
| 11 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | Job | |
| Total, Area #4 | ||
| Total Zona #4 |
| TOTAL |
| TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
| SUBTOTAL | |||
| DATE: June 2026 | FIRM NAME: ESTUDIO GH | ||
| PROFIT | % |
| TITLE: A&E Director | PREPARED BY: | Cayetano Gómez | TOTAL PROJECT EUROS | ||
| RATE $1 | 0.9303 | € | |||
| TOTAL PROJECT US $ | |||||
| These costs and overhead and profit will be applied in any possible future modifications |
GOV-CLIN #5-OPTION 4
| COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTI | CLIN #5-OPTION 4 | $ | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1000 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN #5 OPTION #4 |
| CLIN #5 OPCIÓN #4 |
| AREA #5 | ||
| ZONA #5 | ||
| 1 | Ground Penetrating Radar GPR survey | |
| Estudio Geo-Radar (GPR) | m2 | |
| 2 | GPS Survey | |
| Estudio GPS | m2 | |
| 3 | Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 4 | Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 5 | Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 6 | Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge and accessories | |
| Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm, manómetro y accesorios | Ea | |
| 7 | Gate Valve Ø110mm and accessories (valve box) | |
| Válvulas de compuerta Ø110mm y accesorios (caja válvulas) | Ea | |
| 8 | Gate Valve Ø63mm and accessories (valve box) | |
| Válvulas de compuerta Ø63mm y accesorios (caja válvulas) | Ea | |
| 9 | Road crossing (drilled) RC-09 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-09 para tubería Ø63mm | Lm | |
| 10 | Road crossing (drilled) RC-10 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-10 para tubería Ø63mm | Lm | |
| 11 | Road crossing (drilled) RC-11 for pipe Ø110mm | |
| Cruce carretera (con topo) RC-11 para tubería Ø110mm | Lm | |
| 12 | Road crossing (drilled) RC-12 for pipe Ø110mm | |
| Cruce carretera (con topo) RC-12 para tubería Ø110mm | Lm | |
| 13 | Road crossing (drilled) RC-13 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-13 para tubería Ø63mm | Lm | |
| 14 | Road crossing (drilled) RC-14 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-14 para tubería Ø63mm | Lm | |
| 15 | Road crossing (drilled) RC-15 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-15 para tubería Ø63mm | Lm | |
| 16 | Road crossing (drilled) RC-16 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-16 para tubería Ø63mm | Lm | |
| 17 | Road crossing (drilled) RC-17 for pipe Ø63mm | |
| Cruce carretera (con topo) RC-17 para tubería Ø63mm | Lm | |
| 18 | Top soil and seeding | |
| Tierra vegetal y sembrado | m2 | |
| 19 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | Job | |
| Total, Area #5 | ||
| Total Zona #5 |
| TOTAL |
| TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
| TOTAL PROJECT EUROS | ||
| RATE $1 | 0.9303 | € |
| TOTAL PROJECT US $ |
DATE: June 2026 FIRM NAME: ESTUDIO GH
TITLE: A&E Director PREPARED BY: Cayetano Gómez
These costs and overhead and profit will be applied in any possible future modifications
GOV-CLIN#6-OPTION 5
| COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTI | CLIN #6-OPTION 5 | $ | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1000 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN #6 OPTION #5 | ||
| CLIN #6 OPCIÓN #5 | ||
| WORKS RELATED TO UNEXPECTED OBSTRUCTIONS | ||
| TRABAJOS RELACIONADOS CON OBSTRUCCIONES NO DETECTADAS | ||
| 1 | Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 2 | Polyethylene pipe HDPE PN10 DN160, connection fittings, excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN160, accesorios de conexión, excavación y relleno de zanja | Lm | |
| 3 | Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 4 | Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 5 | Gate Valve Ø160mm and accessories (valve box) | |
| Válvulas de compuerta Ø160mm y accesorios (caja de válvulas) | Ea | |
| 6 | Gate Valve Ø110mm and accessories (valve box) | |
| Válvulas de compuerta Ø110mm y accesorios (caja de válvulas) | Ea | |
| 7 | Gate Valve Ø63mm and accessories (valve box) | |
| Válvulas de compuerta Ø63mm y accesorios (caja de válvulas) | Ea | |
| 8 | Road crossing (drilled) for pipe Ø160mm | |
| Cruce carretera (con topo) para tubería Ø160mm | Lm | |
| 9 | Road crossing (drilled) for pipe Ø110mm | |
| Cruce carretera (con topo) para tubería Ø110mm | Lm | |
| 10 | Cabinet type C1: Precast concrete cabinet including hose bibb, hose connection vacuum breaker 3/4", water meter Ø63mm, pressure gauge and accessories | |
| Armario tipo C1: Armario prefabricado de hormigón (tipo 1) con grifo de manguera, conexión de manguera, disyuntor de vacío de 3/4", contador de agua Ø63mm, manómetro y accesorios | Ea |
| TOTAL |
| TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
| TOTAL PROJECT EUROS | ||||
| RATE $1 | 0.9303 | € | ||
| TOTAL PROJECT US $ | ||||
| DATE: June 2026 | FIRM NAME: ESTUDIO GH |
TITLE: A&E Director PREPARED BY: Cayetano Gómez
These costs and overhead and profit will be applied in any possible future modifications
GOV-CLIN#7-OPTION 6
| COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ADD NON-POTABLE WATER DIST LINES TO IRRIGATION AREAS, MULTI | CLIN #7-OPTION 6 | $ | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1000 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN #7 OPTION #6 | ||
| CLIN #7 OPCIÓN #6 | ||
| GROUND PENETRATING RADAR (GPR) Y GPS | ||
| GEO-RADAR Y GPS | ||
| 1 | Ground Penetrating Radar GPR survey | |
| Estudio Geo-Radar (GPR) | m2 | |
| 2 | GPS Survey | |
| Estudio GPS | m2 | |
| TOTAL GPR AND GPS WORKS | ||
| TOTAL TRABAJO DE GPR Y GPS |
| AREA #3 (Blg. #106, #110, #119) | ||
| ZONA #3 (Blg. #106, #110, #119) | ||
| 3 | Polyethylene pipe HDPE PN10 DN200, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN200, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 4 | Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 5 | Handhole with blind flange | |
| Arqueta con brida ciega | Ea | |
| 6 | Gate Valve Ø110mm and accessories (valve box) | |
| Válvulas de compuerta Ø110mm y accesorios (caja de válvulas) | Ea | |
| 7 | Road crossing (drilled) RC-20 for pipe Ø110mm | |
| Cruce carretera (con topo) RC-20 para tubería Ø110mm | Lm | |
| 8 | Road crossing (drilled) RC-18 for pipe Ø110mm | |
| Cruce carretera (con topo) RC-18 para tubería Ø110mm | Lm | |
| 9 | Top soil and seeding | |
| Tierra vegetal y sembrado | m2 | |
| 10 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | Job | |
| Total, Area #3 | ||
| Total Zona #3 | ||
| AREA #4 (Blg #192, #203) | ||
| ZONA #4 (Edif. #192, #203) | ||
| 11 | Polyethylene pipe HDPE PN10 DN110, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN110, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 12 | Polyethylene pipe HDPE PN10 DN63, connection fittings and excavation and filling of trench | |
| Tubo de polietileno HDPE PN10 DN63, accesorios de conexión y excavación y relleno de zanja | Lm | |
| 13 | Handhole with blind flange | |
| Arqueta con brida ciega | Ea | |
| 14 | Connection to existing handhole (bldg 192) | Ea |
| Conexión con arqueta existente (Bldg 192) | ||
| 15 | Gate Valve Ø110mm and accessories (valve box) | |
| Válvulas de compuerta Ø110mm y accesorios (caja de válvulas) | Ea | |
| 16 | Top soil and seeding | |
| Tierra vegetal y sembrado | m2 | |
| 17 | Repair elements affected by the execution of the project | |
| Reparar elementos afectados por la ejecución del proyecto | Job | |
| Total, Area #4 | ||
| Total Zona #4 | ||
| TOTAL WORKS | ||
| TOTAL TRABAJO CONSTRUCCIÓN |
| TOTAL |
| TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
| TOTAL PROJECT EUROS | ||
| RATE $1 | 0.9303 | € |
| TOTAL PROJECT US $ |
DATE: June 2026 FIRM NAME: ESTUDIO GH
TITLE: A&E Director PREPARED BY: Cayetano Gómez
These costs and overhead and profit will be applied in any possible future modifications image1.png image2.png
File details come from the government source that posted it. Updated .