FA5575-16-R-0002-0002_Extend_Tech_Pages.pdf
PDF 376 KB Posted
- Attached to
- Repair Underground Feeder #1 Federal contract opportunity
- Solicitation number
- FA5575-16-R-0002
About this file
SF 30 Amendment
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUUG 11-1016
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The porpuse of this amendment is the extend the numbers of pages for the technical proposal from 10 pages to 20 pages. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5575-16-R-0002
X 9B. DATED (SEE ITEM 11)
19-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Sep-2016
CODE
496 ABS/LGC (FA5575)
APARTADO 221
41530 MORON
SEVILLA
FA5575 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5575-16-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
SECTION L PROPOSAL PREPARATION INSTRUCTIONS
All proposal packages must be either delivered via courier mail service (ex. SEUR, MRW, DHL, FEDEX) or hand carried in accordance with the following information. Faxed proposals will NOT be accepted.
The proposal package must be completed and returned to the address in Block 7 of the SF 1442 or if being sent via commercial courier mail service to the following address:
UNITED STATES AIR FORCE
496 ABS/LGTTC
BASE AEREA DE MORON – TMO
CRTA. SEVILLA – MORON KM48
MORON DE LA FRONTERA, 41530 SEVILLA, SPAIN
ATTENTION: ELIA PORTZ 496 ABS/LGC
A. Format for proposal Parts I, II and III shall be as follows:
1. All proposal packages must be received by this office prior to the receipt of proposals date/time for both courier mail service and hand carried proposals (See Block 13A of the SF 1442).
2. HAND-CARRIED PROPOSALS NOTICE: Offerors are cautioned that Morón Air Base has stringent visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass and be cleared by the Government point of contact prior to entrance. Please contact the POC’s listed at least 3 days prior to the Solicitation closing date to coordinate delivery of hand carried proposals. All Third Country
Nationals must be approved through ODC Madrid prior to requesting base access and this process may take up to three weeks.
3. The proposals will be on A4 paper, white or ivory stock. Charts, tables or diagrams may not exceed 11” x 17”.
4. A page is defined as one face of a sheet of paper containing information. This includes all appendices, charts, graphs, diagrams, tables, photographs, etc., unless placed on 11” x 17” sheets, in which case they will be counted as two pages. Covers for factors, tables of contents, appendixes, title pages, cross and section dividers/tables will not be included in the page count if they are inserted solely to provide ease to the reader in locating factors/sections of the proposal. They will be counted if they contain any other information, (e.g.
diagrams, extraneous data, etc.). Pages marked “This page intentionally left blank” will not be counted.
5. Type face shall be approximately 12 font, with approximately 1” margins on all sides. Smaller, legible font size, approximately 6 point, may be used for charts and tables.
6. Elaborate formats, bindings or color presentations are not desired or required. Company Name and solicitation number shall be included in the header of each page. Each volume will be labeled with the following format:
FA5575-16-R-0002, COMPANY NAME,
7. Submit one original and two (2) hard copies for each part.
8. Submit two (2) electronic copies in CD form to include all three parts each.
PART I – CONTRACT DOCUMENTATION AND PRICE PROPOSAL -
SF 1442: Complete applicable blanks. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through J. Acknowledge all amendments issued to the solicitation (see Block 19 of the SF 1442)
A. Section B: Insert the proposed price for CLIN 0001 and CLIN 0002 and the TOTAL AMOUNT to provide a complete and usable end product in accordance with the terms and conditions stated in this solicitation. Offerors’ proposals not conforming to this RFP may be considered ineligible for award. The prices shall be valid through the proposal acceptance period (SF 1442 Block 13 D).
B. Section C through J: Complete applicable blanks, the offeror shall submit only those pages that require a fill-in.
C. Section K: Complete the representations, certifications, and acknowledgments. Section K shall be returned in its entirety. The holder of the certificate must perform the work for that classification.
D. Construction Task Breakdown: The Construction Task Breakdown (attachment 25) will be used to perform proposal analysis.
PART II -TECHNICAL PROPOSAL – Limited to no more than 20 pages.
Offerors shall meet the minimum standards of each Technical Factor and subfactor in order for their technical proposal to be determined “technically acceptable.” The standards are defined in Section M of the RFP.
Note: Offerors are responsible for ensuring their proposal meets the minimum requirements of the Statement of
Work. See Section M – Other – Conformance to Specification Requirements.
A. Subfactor 1 – Staffing Plan/Key Personnel: Provide an organizational chart that identifies all required personnel including all required qualifications, certifications and years of experience in accordance with the General
Conditions of the Statement of Work (attachment 3)(Pgs. 31-34, para. 23). In the organizational chart also show the prime and subcontractor relationships lines of authority.
B. Subfactor 2 - Technical Approach: The offeror shall prepare in narrative format the following key elements giving an explanation on the procedures that will be used during contract execution providing confidence that the offeror has a complete understanding of the Design/Build process.
i. Offeror’s proposed A/E Design Firm capabilities specific to High Voltage Electrical design
ii. Construction team involvement during the design phase
iii. Design team involvement during the construction phase
iv. How each key team member will be incorporated into contract performance including all site visits, site performance and meetings; and also explain why each subcontractor has been added to the team.
v. Explain how the offeror’s Safety Program for the project will be implemented.
vi. Explain how the offeror's quality control and quality assurance plan will be implemented during the entire project.
C. Subfactor 3 – Schedule/Phasing Plan: The offeror shall submit the scheduling/phasing plan in the form of Gantt chart, showing the relationship between activities, the critical path and any floats placed in the schedule. This plan shall include at a minimum:
i. Design Schedule including site visits, site surveys, all meetings, and submittals
ii. Demolition schedule including site visits, site surveys, all meetings, and submittals
iii. Construction schedule including site visits, site surveys, all meetings, and submittals
PART III – PAST PERFORMANCE PROPOSAL - Limited to no more than 10 pages.
The Contracting Officer shall seek past performance information on offerors based on the past efforts provided by the offeror and/or data independently obtained from other Government and commercial sources.
If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past/present performance information on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past and present relevant contracts in accordance with the instructions herein.
Recency: To be considered recent, contracts must have been performed within five (5) years of the issuance of this solicitation (see Standard Form 1442, Solicitation, Offer, and Award, Block 3). If any part of the performance falls within the above timeframe, the contract in its entirety may be evaluated for past performance.
Relevancy: To be considered relevant, contracts must be of similar scope (high voltage electrical and airfield concrete/cement work), complexity (Design/Build construction) and magnitude (greater than $500,000) as contained herein. Include rationale supporting your assertion of relevance.
A. Contractor Past Performance Submittal: Submit Attachment 1 – Contractor Past Performance Submittal for a maximum of two (2) contracts performed in the last five (5) years that is considered by the offeror to be the most recent and relevant demonstrating their ability to perform the proposed effort. Also include information for a maximum of two (2) contracts performed in the last five (5) years by each of the offeror’s teaming partners/joint ventures and significant subcontractors that is considered the most recent and relevant demonstrating their ability to perform the proposed effort. Include with the PPQ a list of all Points of Contact that will be used as evaluators.
B. Past Performance Questionnaire: The government will use information submitted on the completed Past
Performance questionnaire (PPQ)(See Attachment 2) to assess performance. The PPQ will be completed and submitted by the evaluators as submitted by the Offeror (Contractor Past Performance Submittal). The evaluators will submit their completed PPQ’s directly to the Rory Bryant at rory.bryant@us.af.mil and Elia Portz at elia.portz.3.es@us.af.mil.
PART IV – OTHER: Conformance to Specification Requirements: In addition to the instructions to offerors stated in this RFP, the offeror must submit the following:
i. The offeror shall provide Letter of Agreement (LOA) for all teaming partnerships, joint ventures, A/E Firm partnerships or significant subcontractors that will be performing as part of this contract. Changes will not be permitted after contract award without a valid justification and approval from the Contracting Officer.
ii. Submit all required certifications as specified in the Statement of Work (attachment 3) and in Section
K of this RFP.
The above general outline in no way limits or reduces the responsibility of the Contractor to perform all work as required by the Statement of Work (attachment 3) and project drawings in order to provide a complete and operable high voltage electrical system.
(End of Summary of Changes)