25._Const_Tsk_Brkdwn_Rev.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Repair Underground Feeder #1 Federal contract opportunity
Solicitation number
FA5575-16-R-0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Construction Task Breakdown (Updated)

View the file

Other files for this federal contract opportunity

Other files attached to Repair Underground Feeder #1, newest first.
File Type Posted
FA5575-16-R-0002-0002_Extend_Tech_Pages.pdf PDF
FA5575-16-R-0002-0001_Section_K_Revisions.pdf PDF
6._Basic_Electrical_Material_and_Methods.pdf PDF
2._PPQ.doc DOC document
7._Excavation_and_Fill.pdf PDF
1._CPPS.doc DOC document
23._As-Built_Dwgs.pdf PDF
13._Materiales_y_mtodos_elctricos_bsicos.pdf PDF
15._Transmisin_y_Distribucin_Enterradas.pdf PDF
8._Underground_Electrical_Transmission_and_Distribution.pdf PDF
9._Medium-Voltage_Gas_Switch.pdf PDF
24._Fotografias.pdf PDF
5._Cast-in-place_Concrete.pdf PDF
19._Photographs.pdf PDF
22._Moron_AB_INRMP.PDF PDF
16._Interruptor_con_Aislamiento_de_Gas.pdf PDF
20._AF66_Schedule_of_Material_Submittals.pdf PDF
18._USAFEI32-1007_(Oct'12)_Airfield_and_Heliport_Planning_and_Design.pdf PDF
11._Demoliciones.pdf PDF
14._Excavacin_y_Relleno.pdf PDF
12._Hormigon_vertido_in_situ.pdf PDF
4._Demolitions.pdf PDF
3._SoW_17_May_2016.pdf PDF
FA5575-16-R-0002 _UG_Feeder_.pdf PDF
25._Construction_Task_Breakdown.xlsx XLSX spreadsheet
21._List_of_Specific_Design_Criteria.pdf PDF
10._Specifications_(Spanish)_17_May_2016.pdf PDF
17._Concept_Drawings.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ktor

CONSTRUCTION TASK BREAKDOWN (INFORMATION ONLY)
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR UNDERGROUND FEEDER #1
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 11-1016MORÓN AIR BASE, SPAIN
UNITMATERIALLABORTOTAL EXTENDED PRICE
LINITEMOFUNIT PRICETOTAL PRICEUNIT PRICETOTAL PRICE
NO.MEAS.QUANTI.MH/MD
(1)(2)(3)(4)(5)(6)(7)(8)(9)
DESIGN SERVICES
SERVICIOS DE REDACCIÓN DE PROYECTO
135% Design Submission
Presentación del Diseño al 35%Ea
265% Design Submission
Presentación del Diseño al 65%Ea
395% Design Submission
Presentación del Diseño al 95%Ea
4100% Design Submission
Presentación del Diseño al 100%Ea
DESIGN SERVICES TOTAL
TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO
CONSTRUCTION WORKS
TRABAJOS DE CONSTRUCCIÓN
5Remove & dispose existing cable, switches, insulators,etc.
Demoler y tratar cable, seccionadores, aisladores, etc. exist.Job
6New SF6-insulated switches (3 Ph, 1 Ph)
Nuevos seccionadores aislados en SF6 (mono-, tri-fásicos)Ea
7New 1x35 mm2 RHZ1 copper cable
Nuevo cable de cobre 1x35 mm2 RHZ1Lm
8Insulators, supports, rack arms, and other hardware
Aisladores, soportes, racks, y otro herrajeJob
9Grounding system
Sistema de puesta a tierraJob
10Sludge sump pumps and related installation
Bombas sumindero de lodos e instalación accesoriaEa
11Vault transformers modifications
Modificaciones en transformadores en arquetasJob
12Manhole cleaning, de-contamination, repairs, new covers, ground grading, etc
Limpieza,descontaminacin, reparación,nuevas tapas,renivelado,etc. arquetasJob
CONSTRUCTION WORKS TOTAL
TOTAL TRABAJOS DE CONSTRUCCIÓN
TOTAL CONTRACT PRICE
PRECIO TOTAL DEL CONTRATO
`
DATE:FIRM NAME:

TITLE: BY:

File details come from the government source that posted it. Updated .