25._Const_Tsk_Brkdwn_Rev.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Repair Underground Feeder #1 Federal contract opportunity
- Solicitation number
- FA5575-16-R-0002
About this file
Construction Task Breakdown (Updated)
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ktor
| CONSTRUCTION TASK BREAKDOWN (INFORMATION ONLY) | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| RPR UNDERGROUND FEEDER #1 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| QUUG 11-1016 | MORÓN AIR BASE, SPAIN | ||||||||
| UNIT | MATERIAL | LABOR | TOTAL EXTENDED PRICE | ||||||
| LIN | ITEM | OF | UNIT PRICE | TOTAL PRICE | UNIT PRICE | TOTAL PRICE | |||
| NO. | MEAS. | QUANTI. | MH/MD | ||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| DESIGN SERVICES | |||||||||
| SERVICIOS DE REDACCIÓN DE PROYECTO | |||||||||
| 1 | 35% Design Submission | ||||||||
| Presentación del Diseño al 35% | Ea | ||||||||
| 2 | 65% Design Submission | ||||||||
| Presentación del Diseño al 65% | Ea | ||||||||
| 3 | 95% Design Submission | ||||||||
| Presentación del Diseño al 95% | Ea | ||||||||
| 4 | 100% Design Submission | ||||||||
| Presentación del Diseño al 100% | Ea | ||||||||
| DESIGN SERVICES TOTAL | |||||||||
| TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO | |||||||||
| CONSTRUCTION WORKS | |||||||||
| TRABAJOS DE CONSTRUCCIÓN | |||||||||
| 5 | Remove & dispose existing cable, switches, insulators,etc. | ||||||||
| Demoler y tratar cable, seccionadores, aisladores, etc. exist. | Job | ||||||||
| 6 | New SF6-insulated switches (3 Ph, 1 Ph) | ||||||||
| Nuevos seccionadores aislados en SF6 (mono-, tri-fásicos) | Ea | ||||||||
| 7 | New 1x35 mm2 RHZ1 copper cable | ||||||||
| Nuevo cable de cobre 1x35 mm2 RHZ1 | Lm | ||||||||
| 8 | Insulators, supports, rack arms, and other hardware | ||||||||
| Aisladores, soportes, racks, y otro herraje | Job | ||||||||
| 9 | Grounding system | ||||||||
| Sistema de puesta a tierra | Job | ||||||||
| 10 | Sludge sump pumps and related installation | ||||||||
| Bombas sumindero de lodos e instalación accesoria | Ea | ||||||||
| 11 | Vault transformers modifications | ||||||||
| Modificaciones en transformadores en arquetas | Job | ||||||||
| 12 | Manhole cleaning, de-contamination, repairs, new covers, ground grading, etc | ||||||||
| Limpieza,descontaminacin, reparación,nuevas tapas,renivelado,etc. arquetas | Job | ||||||||
| CONSTRUCTION WORKS TOTAL | |||||||||
| TOTAL TRABAJOS DE CONSTRUCCIÓN | |||||||||
| TOTAL CONTRACT PRICE | |||||||||
| PRECIO TOTAL DEL CONTRATO | |||||||||
| ` | |||||||||