25._Construction_Task_Breakdown.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Repair Underground Feeder #1 Federal contract opportunity
- Solicitation number
- FA5575-16-R-0002
About this file
Construction Task Breakdown
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ktor
| CONSTRUCTION TASK BREAKDOWN (INFORMATION ONLY) | |||||||
| CONTRACTOR | ADDRESS | ||||||
| MORÓN AIR BASE, SPAIN | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||
| RPR UNDERGROUND FEEDER #1 | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||
| QUUG 11-1016 | MORÓN AIR BASE, SPAIN | ||||||
| UNIT | MATERIAL | LABOR | |||||
| LIN | ITEM | OF | |||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | ||
| (1) | (2) | (3) | (4) | (5) | (6) | ||
| DESIGN SERVICES | |||||||
| SERVICIOS DE REDACCIÓN DE PROYECTO | |||||||
| 1 | 35% Design Submission | ||||||
| Presentación del Diseño al 35% | Ea | ||||||
| 2 | 65% Design Submission | ||||||
| Presentación del Diseño al 65% | Ea | ||||||
| 3 | 95% Design Submission | ||||||
| Presentación del Diseño al 95% | Ea | ||||||
| 4 | 100% Design Submission | ||||||
| Presentación del Diseño al 100% | Ea | ||||||
| DESIGN SERVICES TOTAL | |||||||
| TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO |
| CONSTRUCTION WORKS | ||
| TRABAJOS DE CONSTRUCCIÓN | ||
| 5 | Remove & dispose existing cable, switches, insulators,etc. | |
| Demoler y tratar cable, seccionadores, aisladores, etc. exist. | Job | |
| 6 | New SF6-insulated switches (3 Ph, 1 Ph) | |
| Nuevos seccionadores aislados en SF6 (mono-, tri-fásicos) | Ea | |
| 7 | New 1x35 mm2 RHZ1 copper cable | |
| Nuevo cable de cobre 1x35 mm2 RHZ1 | Lm | |
| 8 | Insulators, supports, rack arms, and other hardware | |
| Aisladores, soportes, racks, y otro herraje | Job | |
| 9 | Grounding system | |
| Sistema de puesta a tierra | Job | |
| 10 | Sludge sump pumps and related installation | |
| Bombas sumindero de lodos e instalación accesoria | Ea | |
| 11 | Vault transformers modifications | |
| Modificaciones en transformadores en arquetas | Job | |
| 12 | Manhole cleaning, de-contamination, repairs, new covers, ground grading, etc | |
| Limpieza,descontaminacin, reparación,nuevas tapas,renivelado,etc. arquetas | Job | |
| CONSTRUCTION WORKS TOTAL | ||
| TOTAL TRABAJOS DE CONSTRUCCIÓN |
| WORK SUMMARY |
| RESUMEN TRABAJOS |
| Design Services |
| Servicios de Redacción de Proyecto |
| Construction Works |
| Trabajos de Construcción |
Site Superintendent
QC Manager
QC Manager Assistant
Safety Manager
English Speaking Representative
| ` | |
| DATE: | FIRM NAME: |
TITLE: BY: