Section_J,_Attachment_18_Work_Breakdown_Structure_Amend_8_Aug_24_2017.xlsx

XLSX spreadsheet 158 KB Posted

Attached to
ISS2 FA5215-18-C-9003
Solicitation number
FA5215-17-R-9002
Issued by

About this file

This sources sought notice requests capability statements from interested parties to provide installation support services at Eareckson Air Station in Shemya, Alaska, Wake Island Airfield in Wake Island, and King Salmon Airport in King Salmon, Alaska.

The services include airport operations such as airfield management, weather observations, and aircraft ground servicing. Facility support services involve maintenance of infrastructure, utilities, vehicles, equipment, and real property. Additional requirements include security, fire protection, environmental management, snow removal, logistics support, dining services, and third party contractor support.

Interested parties must demonstrate experience with NAICS code 561210 for facilities support services and NAICS code 488119 for other airport operations. Capability statements are due by February 15, 2018 and should not exceed three pages plus one attachment. The incumbent contractor has provided these services since February 2012 and the current contract expires in September 2020. The government intends to determine the best acquisition approach and whether to conduct the forthcoming solicitation as a small business set-aside.

ISS2 Section J, Attachment 18, Work Breakdown Structure Amendment 3

View the file

Other files

File Type Posted
Attachment_24_MR32_FY16.pdf PDF
Attachment_23_MR32_FY15.pdf PDF
Questions_Answers_10_Aug_17.pdf PDF
FA521517R90020002_9_Aug_17.pdf PDF
Attachment_21_EAS_AGE_R14.pdf PDF
Attachment_1_ISS2_PWS_-_RFP.pdf PDF
Questions_Answers_FBO.pdf PDF
Attachment_22_WI_AGE_R14.pdf PDF
Questions_Answers_for_FBO.pdf PDF
Section_J,_Attachment_18_Work_Breakdown_Structure_Amend_2_July_24_2017.xlsx XLSX spreadsheet
Attachment_2_EAS_GFP.xlsx XLSX spreadsheet
FA521517R90020002_24_July_17.pdf PDF
Attachment_1_PWS_-_ISS2_-_RFP.pdf PDF
Attachment_3_WI_GFP.xlsx XLSX spreadsheet
Attachment_4_KS_GFP.xlsx XLSX spreadsheet
Attachment_20_CE_Data_Call.xlsx XLSX spreadsheet
FA521517R90020001_SF30.pdf PDF
Attachment_10_CBA_WD_EAS_IFF_2014-0795.pdf PDF
Attachment_7_SCA_WD_HI_05-2153.pdf PDF
Attachment_4_KS_GFP.pdf PDF
Attachment_2_EAS_GFP.pdf PDF
Attachment_3_WI_GFP.pdf PDF
Attachment_12_KS_CBA_2016-0184.pdf PDF
Attachment_19_Past_Performance_Questionnaire.pdf PDF
Exhibit_A_Deliverables.pdf PDF
Attachment_1_PWS_-_ISS2_-_RFP.pdf PDF
Attachment_6_SCA_WD_AK_05-2017.pdf PDF
Attachment_13_CBA_WD_WI_2015-0166.pdf PDF
Attachment_5_SCA_WD_WI_05-2147.pdf PDF
Attachment_11_CBA_WD_EAS_IBEW_2014-0784.pdf PDF
Questions_and_Answers_FBO_Ready.pdf PDF
Attachment_16_Section_L_Instructions_to_Offerors.pdf PDF
FA521517R90020001_30_Jun_2017.pdf PDF
Attachment_14_Performance_Incentive_Plan.pdf PDF
Attachment_17_Section_M_Evaluation_Criteria.pdf PDF
Attachment_15_Over_and_Above_Work.pdf PDF
Attachment_9_DBA_AK6.pdf PDF
Section_J,_Attachment_18_Work_Breakdown_Structure.xlsx XLSX spreadsheet
Attachment_8_DBA_AK1.pdf PDF
Section_J,_Exhibit_B_ELIN_Structure.xlsx XLSX spreadsheet
Questions_Answers_Round_1_FBO.pdf PDF
Section_J,_Exhibit_B_-_20_Apr_2017_-_1_Jun_2017.xlsx XLSX spreadsheet
Work_Breakdown_Schedule_(WBS)_Attachment_18.xlsx XLSX spreadsheet
FA521517R9002_1_Jun_2017.pdf PDF
Performance_Incentive_Plan.pdf PDF
Presolicitation_ISS2.pdf PDF
IndustryDayV3.pdf PDF
Industry_Day_Attendance_Roster.pdf PDF
ISS2_questions_(003).pdf PDF
ATTENDANCE_ROSTER_EAS.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WBS Roll Up Contractor:

Opt Yr 1 TotalsOpt Yr 1 Totals
EAS Labor$ - 0Company HQ Lbr$ - 0
Labor + Overhead %0%$ - 0Labor + Overhead %0%$ - 0
Labor w/OH + G&A %0%$ - 0Labor w/OH + G&A %0%$ - 0
Labor w/OH/G&A + Profit %0%$ - 0Labor w/OH/G&A + Profit %0%$ - 0
EAS Non Labor$ - 0CHQ Non Labor$ - 0
EAS Vehicles$ - 0Total + Overhead %0%$ - 0
Total + Overhead %0%$ - 0Total w/OH + G&A %0%$ - 0
Total w/OH + G&A %0%$ - 0Total w/OH/G&A + Profit %0%$ - 0
Total w/OH/G&A + Profit %0%$ - 0Company HQ Total$ - 0
EAS Total$ - 0Retention Plan$ - 0
KS Labor$ - 0
Labor + Overhead %0%$ - 0ItemPrice
Labor w/OH + G&A %0%$ - 0Phase In Labor$ - 0
Labor w/OH/G&A + Profit %0%$ - 0Labor + Overhead %0%$ - 0
KS Non Labor$ - 0Labor w/OH + G&A %0%$ - 0
KS Vehicles$ - 0Labor w/OH/G&A + Profit %0%$ - 0
Total + Overhead %0%$ - 0Phase In Non Labor$ - 0
Total w/OH + G&A %0%$ - 0Total + Overhead0%$ - 0
Total w/OH/G&A + Profit %0%$ - 0Total w/OH + G&A0%$ - 0
KS Total$ - 0Total /OH/G&A + Profit0%$ - 0
WI Labor$ - 0Total Phase In$ - 0
Labor + Overhead %0%$ - 0
Labor w/OH + G&A %0%$ - 0Totals
Labor w/OH/G&A + Profit %0%$ - 0Phase In$ - 0
WI Non Labor$ - 0Option Yr 1$ - 0
WI Vehicles$ - 0
Total + Overhead %0%$ - 0Totals for Phase In and Option Yr 1 must match the totals for Phase In and Option Yr 1 on the Roll Up Tab of Section J, Exhibit B CLIN/ELIN Tables.
Total w/OH + G&A %0%$ - 0
Total w/OH/G&A + Profit %0%$ - 0
WI Total$ - 0

ISS2

FA5215-17-R-9002 Section J, Attachment 13 Work Breakdown Structure (WBS) &P of &N

08/08/2017

Phase In Contractor: Phase In-FFP

PWSPWS Paragraph DescriptionLabor CategoryBase Labor With FringeTotal LaborTotal Non-LaborTotal
SECTION 1 - DESCRIPTION OF SERVICES$ - 0$ - 0$ - 0$ - 0
3.1.14Develop & Implement Phase-In Plan$ - 0$ - 0$ - 0$ - 0
aPrepare a phase-in plan$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Totals$ - 0$ - 0$ - 0$ - 0

FA5215-17-R-9002 Section J, Attachment 13 Work Breakdown Structure (WBS)

EAS

Contractor: EAS-WBS (FFP) Opt Yr 1

PWSPWS Paragraph DescriptionLabor CategoryHoursBase Labor With FringeTotal LaborNon-LaborTotal
3.2Provide project management for EAS$ - 0$ - 0$ - 0$ - 0
3.2.1Maintain and operate the airfield$ - 0$ - 0$ - 0$ - 0
aMaintain airfield pavements to IAW AFI 13-204V3$ - 0$ - 0$ - 0$ - 0
bEnsure foreign object debris (FOD) are removed from airfield pavements$ - 0$ - 0$ - 0$ - 0
cEnsure Aircraft are marshaled IAW AFI 11-218,$ - 0$ - 0$ - 0$ - 0
dEnsure vehicle operations on military ramps and taxiways comply with AFI 13-213$ - 0$ - 0$ - 0$ - 0
eConduct daily airfield inspections IAW AFI 13-204V3$ - 0$ - 0$ - 0$ - 0
3.2.1.1Provide monitoring for the airfield$ - 0$ - 0$ - 0$ - 0
aProvide airfield, weather and BASH information when requested by aircrews$ - 0$ - 0$ - 0$ - 0
3.2.1.2Restrict airfield when needed$ - 0$ - 0$ - 0$ - 0
Request PMO approval for all A/F restrictions and publish NOTAMS$ - 0$ - 0$ - 0$ - 0
aNotification to the Government will be performed by telephone and email$ - 0$ - 0$ - 0$ - 0
bEmail and telephonic notifications when the airfield restrictions are lifted$ - 0$ - 0$ - 0$ - 0
cRecord site-supported aircraft arrival and departure information and submit via CDRL A006$ - 0$ - 0$ - 0$ - 0
3.2.1.3Respond to aircraft$ - 0$ - 0$ - 0$ - 0
aProvide transient alert service IAW TO 00-25-172$ - 0$ - 0$ - 0$ - 0
bMaintain the capability to provide 30 minute response to divert and emergency aircraft 24/7/365$ - 0$ - 0$ - 0$ - 0
Provide crash response and follow-up support$ - 0$ - 0$ - 0$ - 0
3.2.1.4Implement Government provided BASH plan for airfield operations$ - 0$ - 0$ - 0$ - 0
aMaintain required Federal and State permits$ - 0$ - 0$ - 0$ - 0
bImplement and maintain Government BASH plan IAW AFPAM 91-212$ - 0$ - 0$ - 0$ - 0
cDesignate, train, and document BASH patrol members$ - 0$ - 0$ - 0$ - 0
dDetermine Bird Exclusion Zone (BEZ) IAW 11 AF Supplement 1 to AFI 91-202$ - 0$ - 0$ - 0$ - 0
eMaintain wildlife reduction actions log on site and provide to Government$ - 0$ - 0$ - 0$ - 0
fWithin an hour proceeding scheduled aircraft arrivals and departures$ - 0$ - 0$ - 0$ - 0
gProvide aircrews and/or maintenance prsnl with BASH information$ - 0$ - 0$ - 0$ - 0
3.2.2Provide weather operations services$ - 0$ - 0$ - 0$ - 0
aPerform Surface Weather Observations IAW AFMAN 15-111$ - 0$ - 0$ - 0$ - 0
bEnsure site information is current and correctly described in the FLIP$ - 0$ - 0$ - 0$ - 0
cSolicit and submit Pilot Reports (PIREP) IAW AFMAN 15-124$ - 0$ - 0$ - 0$ - 0
3.2.2.1Perform upper air observations$ - 0$ - 0$ - 0$ - 0
aPerform upper air soundings IAW AFMAN 15-111$ - 0$ - 0$ - 0$ - 0
bSounding releases shall be conducted and documented IAW FMH-3$ - 0$ - 0$ - 0$ - 0
cSounding times are 0000 UTC and 1200 UTC.$ - 0$ - 0$ - 0$ - 0
dSubmit and transmit sounding message into Air Force Weather Web Services$ - 0$ - 0$ - 0$ - 0
eDocument results and submit on AF Form 3811$ - 0$ - 0$ - 0$ - 0
3.2.2.2Provide surface weather observations$ - 0$ - 0$ - 0$ - 0
aDevelop and implement a surface weather observing quality control program$ - 0$ - 0$ - 0$ - 0
bDocument surface weather observations on AF Form 3803$ - 0$ - 0$ - 0$ - 0
cTransmit surface weather observations$ - 0$ - 0$ - 0$ - 0
dAugment the AWOS when mandatory supplementary weather conditions occur$ - 0$ - 0$ - 0$ - 0
eAugment the AWOS during normal airfield hours when any system sensors$ - 0$ - 0$ - 0$ - 0
fNotify the 17 OWS whenever AWOS is taken out of service$ - 0$ - 0$ - 0$ - 0
3.2.3Civil Engineering$ - 0$ - 0$ - 0$ - 0
3.2.3.1Maintain facilities$ - 0$ - 0$ - 0$ - 0
aMaintain and repair building system lifts$ - 0$ - 0$ - 0$ - 0
bMaintain and repair interior and exterior finishes$ - 0$ - 0$ - 0$ - 0
cRetain floor coverings/accessories/coating$ - 0$ - 0$ - 0$ - 0
dPerform corrosion control required as related to SM$ - 0$ - 0$ - 0$ - 0
eMaintain and repair electrical components and systems$ - 0$ - 0$ - 0$ - 0
fMaintain, repair and keep fully functional all plumbing components$ - 0$ - 0$ - 0$ - 0
3.2.3.2Operate, maintain, calibrate, and repair Heating, Ventilation, Air Conditioning/Refrigeration (HVAC/R)$ - 0$ - 0$ - 0$ - 0
aOp/maintain systems to provide temperature modifications as designed$ - 0$ - 0$ - 0$ - 0
bOp/maintain systems to ensure appliances are operable and available$ - 0$ - 0$ - 0$ - 0
cOp/maintain systems to ensure data collection and thermal devices are properly calibrated$ - 0$ - 0$ - 0$ - 0
dMaintain water treatment to control scale, algae, slime, and corrosion on HVAC/R systems.$ - 0$ - 0$ - 0$ - 0
eDocument and maintain on site a record of water analysis$ - 0$ - 0$ - 0$ - 0
fProvide inspection and cleaning of hoods and ducts in food preparation facilities$ - 0$ - 0$ - 0$ - 0
gEnsure boilers are prepared for annual inspection and certification. USAF boiler inspector$ - 0$ - 0$ - 0$ - 0
3.2.3.3Maintain and repair locks$ - 0$ - 0$ - 0$ - 0
aMaintain and repair locks to ensure they function to provide protection/secuirty as required$ - 0$ - 0$ - 0$ - 0
bEnsure positive control of issued keys, lock key pad codes and combinations$ - 0$ - 0$ - 0$ - 0
cRe-key/replace affected locks when keys lost at no cost to Gov$ - 0$ - 0$ - 0$ - 0
dChange lock key code pads and lock combinations as required$ - 0$ - 0$ - 0$ - 0
eMaintain/repair GSA safes/locks$ - 0$ - 0$ - 0$ - 0
3.2.3.4Maintain and repair alarms and fire suppression systems$ - 0$ - 0$ - 0$ - 0
aMaintain and repair fire detection, fire suppression, and intrusion alarm systems$ - 0$ - 0$ - 0$ - 0
bMaintain alarm and fire suppression records IAW Unified Facilities Criteria 3-601-02$ - 0$ - 0$ - 0$ - 0
3.2.3.5Maintain and repair roof systems$ - 0$ - 0$ - 0$ - 0
aMaintain and repair roof systems to ensure full life expectancy$ - 0$ - 0$ - 0$ - 0
bEnsure repairs are energy efficient$ - 0$ - 0$ - 0$ - 0
cRepair areas damaged by roof system failures to match existing materials and appearance$ - 0$ - 0$ - 0$ - 0
dEnsure emergency repairs mitigate further water intrusion and protect interior$ - 0$ - 0$ - 0$ - 0
eNotify the Government within 24 hours of any emergency roof repairs$ - 0$ - 0$ - 0$ - 0
3.2.3.6Maintain and repair Grounding, Lightning Protection and Cathodic Protection systems$ - 0$ - 0$ - 0$ - 0
aMaintain and repair systems so they function as designed$ - 0$ - 0$ - 0$ - 0
bMaintain and repair corrosion control systems and cathodic protection systems$ - 0$ - 0$ - 0$ - 0
cMaintain leak investigation log on site.$ - 0$ - 0$ - 0$ - 0
3.2.3.7Maintain, repair, and operate base utility infrastructure systems$ - 0$ - 0$ - 0$ - 0
aEnsure base utility and infrastructure systems are cost effective, safe, and reliable$ - 0$ - 0$ - 0$ - 0
3.2.3.8Maintain and repair roads surfaces, sidewalks, parking lots, and driveways$ - 0$ - 0$ - 0$ - 0
aDevelop and implement a road maintenance schedule driven by road usage$ - 0$ - 0$ - 0$ - 0
bMaintain and repair ditches, culvert storm drains, catch basins$ - 0$ - 0$ - 0$ - 0
cMaintain and repair guard rails to ensure they maintain structural integrity$ - 0$ - 0$ - 0$ - 0
dInspect, maintain and repair all base signs and markers and ensure that signage$ - 0$ - 0$ - 0$ - 0
eEnsure access lids for underground water facilities are securely kept in place$ - 0$ - 0$ - 0$ - 0
3.2.3.9Maintain secondary containment revetments to ensure no vegetation grows on or in secondary containment$ - 0$ - 0$ - 0$ - 0
aInspect, maintain and repair all fences and gates to function as designed$ - 0$ - 0$ - 0$ - 0
bCut grass within in 50 feet of fuel tanks and active facilities for improved grounds$ - 0$ - 0$ - 0$ - 0
cMowing is not required for semi-improved and un-improved grounds$ - 0$ - 0$ - 0$ - 0
3.2.3.10Remove snow and prevent ice formation on the airfield and road surfaces$ - 0$ - 0$ - 0$ - 0
aSnow removal plan must be approved by the Gov 2 weeks before 1st winter season CDRL A043$ - 0$ - 0$ - 0$ - 0
bRemove snow completely from full width of main roadways and sidewalks$ - 0$ - 0$ - 0$ - 0
cRemove snow and ice from the runway, taxiways and parking aprons$ - 0$ - 0$ - 0$ - 0
dEnsure sodium chloride, calcium chloride, or sand is not used within 300 feet$ - 0$ - 0$ - 0$ - 0
eEnsure snow, ice, and debris is removed to ensure operability of systems as designed$ - 0$ - 0$ - 0$ - 0
3.2.3.11Perform all refuse collection and landfill operations$ - 0$ - 0$ - 0$ - 0
aCollect and dispose of refuse generated by parties on site$ - 0$ - 0$ - 0$ - 0
bInspect, maintain and repair dumpsters to function as designed$ - 0$ - 0$ - 0$ - 0
cCompact and cover landfill refuse in compliance with current solid waste landfill permit$ - 0$ - 0$ - 0$ - 0
3.2.3.12Perform airfield ground maintenance$ - 0$ - 0$ - 0$ - 0
aRemove vegetation from growing in/on airfield pavements$ - 0$ - 0$ - 0$ - 0
bMaintain and apply airfield markings to meet standards in AFI 32-1042$ - 0$ - 0$ - 0$ - 0
3.2.3.13Maintain and repair seawall, barge dock, and the wharf$ - 0$ - 0$ - 0$ - 0
aInspect and assess seawall, barge dock, and the wharf$ - 0$ - 0$ - 0$ - 0
bMaintain the seawall to minimize erosion$ - 0$ - 0$ - 0$ - 0
cMaintain and repair barge dock/wharf surface, railings, bladders, moorings$ - 0$ - 0$ - 0$ - 0
3.2.3.14Perform pest control$ - 0$ - 0$ - 0$ - 0
aComply with current AFI 32-1053, Integrated Pest Management Program$ - 0$ - 0$ - 0$ - 0
bInput all data into Integrated Pest Management Information System (IPMIS)$ - 0$ - 0$ - 0$ - 0
cImplement the Integrated Pest Management (IPM) plan$ - 0$ - 0$ - 0$ - 0
dRestrict use of rodenticides in areas away from buildings or in communal areas$ - 0$ - 0$ - 0$ - 0
3.2.3.15Operate and maintain water systems$ - 0$ - 0$ - 0$ - 0
aOperate, maintain and repair potable water, reclaimed water, fire water supply$ - 0$ - 0$ - 0$ - 0
bOperate, maintain and repair water systems IAW UFC 3-230-02, Operations$ - 0$ - 0$ - 0$ - 0
cProvide the PMO, tenants and affected parties advanced notification$ - 0$ - 0$ - 0$ - 0
dMaintain visibly posted established operating system procedures and schematics$ - 0$ - 0$ - 0$ - 0
eAnnually exercise all main water valves and maintain an on-site log$ - 0$ - 0$ - 0$ - 0
fMaintain all in service water meters calibrated every two years and repair as required.$ - 0$ - 0$ - 0$ - 0
3.2.3.16Operate, maintain, and repair wastewater treatment plant$ - 0$ - 0$ - 0$ - 0
aAccomplish sampling and laboratory analysis IAW approved regulatory permits$ - 0$ - 0$ - 0$ - 0
bMaintain on-site records of all sampling and analyses$ - 0$ - 0$ - 0$ - 0
3.2.3.17Operate, maintain, and repair sanitary and waste water systems$ - 0$ - 0$ - 0$ - 0
aOperate, maintain, and repair IAW UFC 3-240-03N$ - 0$ - 0$ - 0$ - 0
bMaintain sanitary flow meter calibration records on site for Gov review$ - 0$ - 0$ - 0$ - 0
cMaintain on site records$ - 0$ - 0$ - 0$ - 0
dRespond to any noticeable changes in the waste stream$ - 0$ - 0$ - 0$ - 0
eEnsure sampling and testing is utilized$ - 0$ - 0$ - 0$ - 0
fMaintain laboratory records on site$ - 0$ - 0$ - 0$ - 0
3.2.3.18Provide solid waste disposal services to prevent overflow conditions at collection sites$ - 0$ - 0$ - 0$ - 0
aConduct the applicable test and analysis of waste products to ensure regulatory compliance$ - 0$ - 0$ - 0$ - 0
3.2.3.19Operate, maintain, and repair electrical systems$ - 0$ - 0$ - 0$ - 0
3.2.3.19.1Operate, maintain, and repair generators, associated switch gears, and components$ - 0$ - 0$ - 0$ - 0
aEnsure calibration of all meters is current$ - 0$ - 0$ - 0$ - 0
bEnsure power plant and stand-by generators are operationally capable$ - 0$ - 0$ - 0$ - 0
cOperate all power plant and stand-by generators IAW AFI 32-1062 and ETL 13-4 change 1$ - 0$ - 0$ - 0$ - 0
dWithin 15 minutes of power outages or brownouts, restore power$ - 0$ - 0$ - 0$ - 0
eEnsure power plant is maintained and operated per manufacturers recommendations$ - 0$ - 0$ - 0$ - 0
fDevelop a maintenance plan that defines the maintenance tasks$ - 0$ - 0$ - 0$ - 0
gPrepare list of required spare parts for repair and maintenance$ - 0$ - 0$ - 0$ - 0
hMaintain operational and maintenance logs on site per manufacturers$ - 0$ - 0$ - 0$ - 0
iProvide the PMO updates to HQ PACAF annual generator report$ - 0$ - 0$ - 0$ - 0
jMaintain on site a mechanical single line diagram$ - 0$ - 0$ - 0$ - 0
kMajor overhauls: Completed as part of the FFP to include all required parts and materials$ - 0$ - 0$ - 0$ - 0
3.2.3.19.2Operate, maintain, and repair all components of the electrical power distribution systems$ - 0$ - 0$ - 0$ - 0
aEnsure power transmission/distribution systems are capable of meeting electrical load requirements$ - 0$ - 0$ - 0$ - 0
bMaintain on site a one-line electrical diagram$ - 0$ - 0$ - 0$ - 0
3.2.3.19.3Operate and maintain airfield lighting systems$ - 0$ - 0$ - 0$ - 0
aOperate, maintain and repair the airfield lighting systems runway/ramp/taxiway lighting$ - 0$ - 0$ - 0$ - 0
3.2.3.19.4Operate and maintain the Aircraft Arresting Systems (AAS)$ - 0$ - 0$ - 0$ - 0
aIdentify by letter of designation a Lead Power Pro Tech and min two Barrier Techs$ - 0$ - 0$ - 0$ - 0
bInitial letter required at contract start date and within five duty days of changes$ - 0$ - 0$ - 0$ - 0
cEnsure all personnel involved in AAS activities are annually task trained$ - 0$ - 0$ - 0$ - 0
dMaintain records$ - 0$ - 0$ - 0$ - 0
3.2.3.20Manage, operate, inspect, and provide Fire Protection and Prevention Services$ - 0$ - 0$ - 0$ - 0
3.2.3.20.1Provide Fire Protection services$ - 0$ - 0$ - 0$ - 0
aEnsure a minimum of eight firefighters, in addition to either a Fire Chief or Assistant Fire Chief$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
bEnsure all fire response personnel meet the certification (training) requirements$ - 0$ - 0$ - 0$ - 0
cNotify the Gov within four hours of any change in the level of service, absences or delays$ - 0$ - 0$ - 0$ - 0
dProvide fire protection coverage$ - 0$ - 0$ - 0$ - 0
eEstablish and implement a medical evaluation process for all firefighters$ - 0$ - 0$ - 0$ - 0
3.2.3.20.2Inspect and maintain installed equipment/systems$ - 0$ - 0$ - 0$ - 0
aPerform and maintain periodic inspection and test reports on site$ - 0$ - 0$ - 0$ - 0
3.2.3.21Establish and implement Incident Command Structure for disaster response$ - 0$ - 0$ - 0$ - 0
aEnsure Incident Command Structure is IAW National Incident Command System$ - 0$ - 0$ - 0$ - 0
bEstablish and maintain Giant Voice disaster warning and notification system$ - 0$ - 0$ - 0$ - 0
cSupport Gov contingency response teams$ - 0$ - 0$ - 0$ - 0
dComply with the Gov-provided Electromagnetic Radiation Hazard Survey report$ - 0$ - 0$ - 0$ - 0
3.2.3.22Operate, maintain, and repair liquid fuels distribution storage systems$ - 0$ - 0$ - 0$ - 0
aMaintain IAW UFC 3-460-03, UFC 3-570-06, and UFC 3-460-03$ - 0$ - 0$ - 0$ - 0
3.2.3.23Participate in and implement Energy Awareness Campaigns$ - 0$ - 0$ - 0$ - 0
aSubmit all conservation actions for acceptance$ - 0$ - 0$ - 0$ - 0
3.2.4Environmental$ - 0$ - 0$ - 0$ - 0
aAll operations in compliance with ISO 14001$ - 0$ - 0$ - 0$ - 0
bProvide copies of all correspondence$ - 0$ - 0$ - 0$ - 0
3.2.4.1Ensure compliance with ESOHCAMP$ - 0$ - 0$ - 0$ - 0
aPerform Tier 1 and Tier 2 internal assessments$ - 0$ - 0$ - 0$ - 0
bNotify the Gov in writing of the ESOHCAMP inspection dates$ - 0$ - 0$ - 0$ - 0
cNotify the Gov in writing of the tier 2 results within 45 days of inspection completion$ - 0$ - 0$ - 0$ - 0
3.2.4.2Support and comply with implementation of the Integrated Natural Resources Management Plan (INRMP)$ - 0$ - 0$ - 0$ - 0
aMaintain a local electronic and hard copy of the current installation INRMP.$ - 0$ - 0$ - 0$ - 0
bEnforce the INRMP IAW AFI 32-7064$ - 0$ - 0$ - 0$ - 0
cNotify the Gov of any non-compliance concerns$ - 0$ - 0$ - 0$ - 0
dEnsure all third party contractors conducting work at the Installation are aware of requirements$ - 0$ - 0$ - 0$ - 0
3.2.4.3Comply with the Integrated Cultural Resources Management Plan (ICRMP)$ - 0$ - 0$ - 0$ - 0
aComply IAW AFI 32-7065, Cultural Resources Management Program$ - 0$ - 0$ - 0$ - 0
bEnsure all correspondence is coordinated through the Gov$ - 0$ - 0$ - 0$ - 0
cIncorporate the basic information on cultural resources into the orientation briefings$ - 0$ - 0$ - 0$ - 0
dMaintain an inventory (list) of artifacts currently in possession$ - 0$ - 0$ - 0$ - 0
eHalt all work in the immediate vicinity and notify CO immediately if human skeletal remains discovered$ - 0$ - 0$ - 0$ - 0
3.2.4.4Develop and implement Contractor's Hazardous Waste Management Plan$ - 0$ - 0$ - 0$ - 0
aComply with PRSC OI 32-1 and Waste Handling Handbook$ - 0$ - 0$ - 0$ - 0
bPerform TMO functions for generated hazardous and non-hazardous waste shipments$ - 0$ - 0$ - 0$ - 0
cSign as manifest manager for EPA uniform hazardous waste manifest$ - 0$ - 0$ - 0$ - 0
dCoordinate and obtain approval for all hazardous and non-hazardous waste$ - 0$ - 0$ - 0$ - 0
3.2.4.5Accept third party waste for the site only with approval of the PMO$ - 0$ - 0$ - 0$ - 0
aProcess all waste IAW 611 CES Waste Handling Handbook$ - 0$ - 0$ - 0$ - 0
bUtilize the government provided hazardous waste tracking database$ - 0$ - 0$ - 0$ - 0
cEnsure third party contractors depart with all items imported$ - 0$ - 0$ - 0$ - 0
3.2.4.6Respond to Petroleum, Oils and Lubricants spills$ - 0$ - 0$ - 0$ - 0
aTrain and respond IAW state and federal laws and regulations$ - 0$ - 0$ - 0$ - 0
bUpdate ODPCP and obtain State of Alaska approval of all ODPCP$ - 0$ - 0$ - 0$ - 0
3.2.4.7Remove toxic substances$ - 0$ - 0$ - 0$ - 0
aReport toxic substances to the Gov as required by state and federal agencies$ - 0$ - 0$ - 0$ - 0
bMaintain all asbestos regulated documents on site for the duration of this contract$ - 0$ - 0$ - 0$ - 0
cRemove asbestos and lead paint incidental to performing maintenance and repairs$ - 0$ - 0$ - 0$ - 0
dRepair any damaged asbestos to eliminate the possibility of the release of airborne asbestos fibers$ - 0$ - 0$ - 0$ - 0
eEnsure all regulated asbestos materials are disposed of in the asbestos landfill$ - 0$ - 0$ - 0$ - 0
fImmediately report with photographs all suspected hazardous debris$ - 0$ - 0$ - 0$ - 0
gProperly dispose of hazardous seaborne waste washed ashore$ - 0$ - 0$ - 0$ - 0
3.2.4.8Maintain and be responsible for permits$ - 0$ - 0$ - 0$ - 0
aProvide submittals and notices to regulatory agencies$ - 0$ - 0$ - 0$ - 0
bProvide copies of all correspondence$ - 0$ - 0$ - 0$ - 0
cPrepare and submit all permit applications and reports$ - 0$ - 0$ - 0$ - 0
dSubmit permit applications and reports through the CO$ - 0$ - 0$ - 0$ - 0
3.2.4.9Participate in quarterly teleconferences with 611 CES/CEI$ - 0$ - 0$ - 0$ - 0
aProvide status of ongoing corrective actions and upcoming regulatory changes$ - 0$ - 0$ - 0$ - 0
3.2.5Security$ - 0$ - 0$ - 0$ - 0
3.2.5.1Develop, implement, and manage a comprehensive security program$ - 0$ - 0$ - 0$ - 0
aInclude Installation, Physical, Information, Personnel, Industrial, Operations, and Antiterrorism disciplines$ - 0$ - 0$ - 0$ - 0
bSecurity shall be implemented in accordance with DD Form 254$ - 0$ - 0$ - 0$ - 0
cImplement Force Protection Condition (FPCON) measures as directed$ - 0$ - 0$ - 0$ - 0
dComply with AFI 31-113, Installation Perimeter Access Control$ - 0$ - 0$ - 0$ - 0
eComply with JBERI 31-113, Base Access Program$ - 0$ - 0$ - 0$ - 0
fIdentify a primary and alternate Facility Secuirty Officer$ - 0$ - 0$ - 0$ - 0
3.2.5.2Implement Integrated Defense/Physical Security$ - 0$ - 0$ - 0$ - 0
aImplement government provided plans, guidance, and general procedures$ - 0$ - 0$ - 0$ - 0
bEnsure personnel are knowledgeable of and understand their responsibility$ - 0$ - 0$ - 0$ - 0
cMaintain two (2) armed, weapons qualified guards per shift 24/7/365$ - 0$ - 0$ - 0$ - 0
dFollow Air Force requirements for Use of Force$ - 0$ - 0$ - 0$ - 0
3.2.5.3Install and maintain security signage$ - 0$ - 0$ - 0$ - 0
aSecurity signage shall be marked IAW AFI 31-101$ - 0$ - 0$ - 0$ - 0
bMust have at least one installation warning sign posted on the airfield and dock area$ - 0$ - 0$ - 0$ - 0
cProperly mark CA boundaries with sign and keep entrances to a minimum$ - 0$ - 0$ - 0$ - 0
dEnsure all signs are easily readable by pedestrians or motorists$ - 0$ - 0$ - 0$ - 0
eComply with visual aid standards$ - 0$ - 0$ - 0$ - 0
fMark the Restricted Area boundary IAW AFI 31-101$ - 0$ - 0$ - 0$ - 0
3.2.5.4Restrict access to restricted/controlled areas$ - 0$ - 0$ - 0$ - 0
aEnsure all personal that have access to RAs know and understand duress words$ - 0$ - 0$ - 0$ - 0
bRA warning signs must be applied at all entrances/exits to the facility or portion$ - 0$ - 0$ - 0$ - 0
cEntry to RAs will be via an approved Site Arrival Notice$ - 0$ - 0$ - 0$ - 0
dEnsure all escorted personnel visiting the RA are given an escort briefing$ - 0$ - 0$ - 0$ - 0
eIf photography or computer equipment is necessary, approval must be designated$ - 0$ - 0$ - 0$ - 0
3.2.5.5Monitor and respond to the Intrusion Detection System (IDS) and report intrusions$ - 0$ - 0$ - 0$ - 0
aMonitor alarms for Restricted Areas$ - 0$ - 0$ - 0$ - 0
bResponse times to unannounced alarm activations shall be immediate$ - 0$ - 0$ - 0$ - 0
cPrimary entrances to RAs will be secured using IDS and CCTV$ - 0$ - 0$ - 0$ - 0
3.2.5.6Provide physical security for controlled areas$ - 0$ - 0$ - 0$ - 0
aDesignate in writing a CA monitor$ - 0$ - 0$ - 0$ - 0
3.2.5.7Report security incidents$ - 0$ - 0$ - 0$ - 0
aRelay a verbal incident report to the RAOC$ - 0$ - 0$ - 0$ - 0
bContact the RAOC, MCC immediately$ - 0$ - 0$ - 0$ - 0
cImplement a COVERED WAGON$ - 0$ - 0$ - 0$ - 0
dReport simultaneous or near simultaneous maintenance alarm activations$ - 0$ - 0$ - 0$ - 0
eReport all security incidents involving classified material to 611 ASUS/SF$ - 0$ - 0$ - 0$ - 0
3.2.5.8Develop and implement a key and lock control program$ - 0$ - 0$ - 0$ - 0
aProvide key and lock control program records upon request$ - 0$ - 0$ - 0$ - 0
3.2.5.9Facilitate Industrial Security Reviews$ - 0$ - 0$ - 0$ - 0
aInspect the Contractors Home Office$ - 0$ - 0$ - 0$ - 0
3.2.5.10Develop and implement a security container program$ - 0$ - 0$ - 0$ - 0
aFollow standards outlined in AFI 16-1404$ - 0$ - 0$ - 0$ - 0
bMaintain a record for each container$ - 0$ - 0$ - 0$ - 0
cProtect all personally identifiable information$ - 0$ - 0$ - 0$ - 0
dUpon completion of part 2 of SF 700$ - 0$ - 0$ - 0$ - 0
eChange combinations to security containers$ - 0$ - 0$ - 0$ - 0
fPerform End of Day Security Checks daily$ - 0$ - 0$ - 0$ - 0
gUse SF 702 to record each opening/closing of the security container$ - 0$ - 0$ - 0$ - 0
3.2.5.11Develop, implement, and conduct information security training$ - 0$ - 0$ - 0$ - 0
aEnsure that security training is in accordance with AFI 16-1404$ - 0$ - 0$ - 0$ - 0
bEnsure employees are knowledgeable and understand their responsibility$ - 0$ - 0$ - 0$ - 0
cReport all security incidents/violations involving classified material$ - 0$ - 0$ - 0$ - 0
dEnsure FOUO information and PII is protected$ - 0$ - 0$ - 0$ - 0
eWhen sending personal information over Email within DoD, ensure$ - 0$ - 0$ - 0$ - 0
fEnsure Emails are encrypted when they contain FOUO$ - 0$ - 0$ - 0$ - 0
3.2.5.12Implement industrial security standards$ - 0$ - 0$ - 0$ - 0
aImplement Industrial Security standards as outlined in DD Form 254$ - 0$ - 0$ - 0$ - 0
3.2.5.13Develop and implement a personnel security program$ - 0$ - 0$ - 0$ - 0
aEnsure all employees meet personnel security requirements$ - 0$ - 0$ - 0$ - 0
bEnsure all contract personnel obtain/maintain a SECRET security clearance$ - 0$ - 0$ - 0$ - 0
cContinually evaluate the security eligibility for all personnel$ - 0$ - 0$ - 0$ - 0
dEnsure only authorized personnel arrive on site$ - 0$ - 0$ - 0$ - 0
eEnsure all other contract employees not requiring a SECRET security clearance require favorable NACI$ - 0$ - 0$ - 0$ - 0
3.2.5.14Develop and implement a Common Access Card (CAC) Program$ - 0$ - 0$ - 0$ - 0
aIssue identity credentials to all personnel who require long-term access$ - 0$ - 0$ - 0$ - 0
3.2.5.14.1Ensure Anti-Terrorism training is completed for all CAC holders$ - 0$ - 0$ - 0$ - 0
acomplete initial and annual Level I - AT Awareness Training$ - 0$ - 0$ - 0$ - 0
3.2.6Communications and Electronics$ - 0$ - 0$ - 0$ - 0
3.2.6.1Operate and maintain NAVAIDS$ - 0$ - 0$ - 0$ - 0
aOperate and maintain the AN/GRN-29 ILS$ - 0$ - 0$ - 0$ - 0
bOperate and maintain the AN/GRN-30$ - 0$ - 0$ - 0$ - 0
cOperate and maintain the AN/GRN-31$ - 0$ - 0$ - 0$ - 0
dOperate and maintain the AN/FRN-43 VORTAC$ - 0$ - 0$ - 0$ - 0
ePerform equipment out-of-service preventative maintenance inspections$ - 0$ - 0$ - 0$ - 0
fCoordinate deviations from published NAVAIDS PMI times$ - 0$ - 0$ - 0$ - 0
gMaintain a facility and system status record for each NAVAID$ - 0$ - 0$ - 0$ - 0
hRecord all NAVAIDS equipment Reference Data$ - 0$ - 0$ - 0$ - 0
iNotify PMO/CO when changes occur that could affect NAVAID flight safety$ - 0$ - 0$ - 0$ - 0
3.2.6.2Operate and maintain weather systems$ - 0$ - 0$ - 0$ - 0
aOperate and maintain the Vaisala MW-41 Sounding System$ - 0$ - 0$ - 0$ - 0
bOperate and maintain the AN/FMQ-23$ - 0$ - 0$ - 0$ - 0
3.2.6.3Operate and maintain telephone systems$ - 0$ - 0$ - 0$ - 0
aOperate and maintain the Defense Switched Network$ - 0$ - 0$ - 0$ - 0
bNotify on island customers of any outages that affect telephone or circuit usage$ - 0$ - 0$ - 0$ - 0
cEnsure all telephone records are updated$ - 0$ - 0$ - 0$ - 0
3.2.6.4Operate and maintain Network and Computer systems$ - 0$ - 0$ - 0$ - 0
aOperate and maintain the extension of the JBER Metropolitan Area Network$ - 0$ - 0$ - 0$ - 0
bHave at least one qualified Information Assurance Management (IAM) Level II$ - 0$ - 0$ - 0$ - 0
cHave Information Assurance Training (IAT) Level II certifications$ - 0$ - 0$ - 0$ - 0
dEnsure emails containing Privacy Act Information or For Official Use Only are encrypted$ - 0$ - 0$ - 0$ - 0
eProvide administrative support$ - 0$ - 0$ - 0$ - 0
fComply with Air Force Network Operations Center (AFNOSC) directives$ - 0$ - 0$ - 0$ - 0
gEnsure all workstations connected to AF network is loaded$ - 0$ - 0$ - 0$ - 0
hInventory Automated Data Processing Equipment$ - 0$ - 0$ - 0$ - 0
iManage computer software IAW AFMAN 33-153$ - 0$ - 0$ - 0$ - 0
jProvide updated documentation for revised custom software applications$ - 0$ - 0$ - 0$ - 0
kMaintain all IMS hardware IAW AFMAN 33-153$ - 0$ - 0$ - 0$ - 0
lRespond to all network issues$ - 0$ - 0$ - 0$ - 0
mUpdate, revise, and modify custom software applications$ - 0$ - 0$ - 0$ - 0
3.2.6.5Operate and maintain Communications Infrastructure$ - 0$ - 0$ - 0$ - 0
aCreate and maintain an electronic master copy$ - 0$ - 0$ - 0$ - 0
bLabel and maintain labels$ - 0$ - 0$ - 0$ - 0
cIn-facility Circuit Layout Records must be completed/updated$ - 0$ - 0$ - 0$ - 0
dOperate and maintain the base-wide cable plant$ - 0$ - 0$ - 0$ - 0
eMaintain accurate cable records on site$ - 0$ - 0$ - 0$ - 0
fInstall and maintain cable markers$ - 0$ - 0$ - 0$ - 0
3.2.6.6Operate and maintain radio and antenna systems$ - 0$ - 0$ - 0$ - 0
aOperate and maintain Ground-Air-Ground (GAG) Radio systems$ - 0$ - 0$ - 0$ - 0
bEnsure all GAG antenna and GRC-171B(V)4 HaveQuick II (anti-jam) antenna system$ - 0$ - 0$ - 0$ - 0
cFurnish the Gov with five (5) radios$ - 0$ - 0$ - 0$ - 0
dLMR equipment will be provided as is$ - 0$ - 0$ - 0$ - 0
3.2.6.7Notify Gov of outages$ - 0$ - 0$ - 0$ - 0
aRequest Gov emergency/urgent support assistance$ - 0$ - 0$ - 0$ - 0
bNotify PMO and 673 CS help desk of network/computer outages$ - 0$ - 0$ - 0$ - 0
cNotify the PMO, as well as any other agency the PMO identifies$ - 0$ - 0$ - 0$ - 0
3.2.6.8Establish, operate, and maintain Communications Security (COMSEC) and Information Protection$ - 0$ - 0$ - 0$ - 0
aEstablish and administer a Communications Security (COMSEC) account$ - 0$ - 0$ - 0$ - 0
bCOMSEC manager and alternate COMSEC manager meeting training requiements$ - 0$ - 0$ - 0$ - 0
cEnsure the accuracy of key material$ - 0$ - 0$ - 0$ - 0
dIn addition to normal COMSEC account distribution$ - 0$ - 0$ - 0$ - 0
eStore, operate, and protect all Controlled Cryptographic Item (CCI) equipment$ - 0$ - 0$ - 0$ - 0
fOperate, maintain, rekey, and protect all Secure Voice Equipment (SVE)$ - 0$ - 0$ - 0$ - 0
gBe a Hand Receipt Holder under Missile Defense Agency$ - 0$ - 0$ - 0$ - 0
hEareckson Hand Receipt Holder shall receipt$ - 0$ - 0$ - 0$ - 0
3.2.6.9Operate and maintain Long Haul Communications$ - 0$ - 0$ - 0$ - 0
aProvide Long haul Communication personnel$ - 0$ - 0$ - 0$ - 0
bProvide intermediate level maintenance support for system failures$ - 0$ - 0$ - 0$ - 0
cPrepare, submit, process and file reports IAW DISAC 270-A85-1$ - 0$ - 0$ - 0$ - 0
dMaintain DSCS network membership$ - 0$ - 0$ - 0$ - 0
eAccomplish contingent mission planning$ - 0$ - 0$ - 0$ - 0
fConduct communications circuit, trunk and link reliability, and quality testing$ - 0$ - 0$ - 0$ - 0
gEstablish communications circuits as directed by DISA directives$ - 0$ - 0$ - 0$ - 0
hConduct Node Site Coordinator duties$ - 0$ - 0$ - 0$ - 0
3.2.6.10Operate and maintain Maintenance Data Collection system$ - 0$ - 0$ - 0$ - 0
aManage the three distinct areas of the Air Force IMDS$ - 0$ - 0$ - 0$ - 0
bProvide the means for accurately recording, tracking, monitoring, scheduling, and reporting$ - 0$ - 0$ - 0$ - 0
cUtilize IMDS for tracking all maintenance$ - 0$ - 0$ - 0$ - 0
dDevelop a process for collecting and reporting IMDS$ - 0$ - 0$ - 0$ - 0
eEnsure the IMDS database contains inventory data$ - 0$ - 0$ - 0$ - 0
fEstablish and maintain current inventory and current status data$ - 0$ - 0$ - 0$ - 0
gEnter current electronics equipment inventory data into IMDS database$ - 0$ - 0$ - 0$ - 0
hUtilize the most accurate and descriptive delay code(s) available$ - 0$ - 0$ - 0$ - 0
iRecord status and inventory changes$ - 0$ - 0$ - 0$ - 0
jEnter DoD status data into the IMDS database$ - 0$ - 0$ - 0$ - 0
kDocument all applicable IMDS electronic equipment statuse$ - 0$ - 0$ - 0$ - 0
lSubmit all new requirements via WOMS$ - 0$ - 0$ - 0$ - 0
3.2.6.11Perform frequency management$ - 0$ - 0$ - 0$ - 0
aMaintain a current Radio Frequency Authorization$ - 0$ - 0$ - 0$ - 0
bSubmit frequency requests$ - 0$ - 0$ - 0$ - 0
cSubmit frequency requests in support of this contract to PMO$ - 0$ - 0$ - 0$ - 0
dReport known or suspected occurrences of Electromagnetic Interference$ - 0$ - 0$ - 0$ - 0
ePerform station Air Force Spectrum Interference Resolution (AFSIR) investigation and reporting.$ - 0$ - 0$ - 0$ - 0
fObtain a frequency assignment prior to operation of any S-D devices$ - 0$ - 0$ - 0$ - 0
gMaintain a copy of frequency authorizations received$ - 0$ - 0$ - 0$ - 0
hRequest the minimum number of frequencies necessary to accomplish the mission$ - 0$ - 0$ - 0$ - 0
iEnsure EM radiating equipment operations comply with authorized parameters$ - 0$ - 0$ - 0$ - 0
jReport within 1 work day and resolve incidents of interference$ - 0$ - 0$ - 0$ - 0
kUse radiation-suppression devices (dummy loads) as much as possible$ - 0$ - 0$ - 0$ - 0
lProvide in writing to the ISM, or responsible spectrum management office$ - 0$ - 0$ - 0$ - 0
mNotify the ISM in writing when frequencies are no longer required$ - 0$ - 0$ - 0$ - 0
nObtain approval through the ISM before modifying any existing emitters or antennas$ - 0$ - 0$ - 0$ - 0
oAssist the ISM in reviewing and verifying equipment parameters$ - 0$ - 0$ - 0$ - 0
pComplete and maintain spectrum certification$ - 0$ - 0$ - 0$ - 0
3.2.6.12Operate and maintain television services$ - 0$ - 0$ - 0$ - 0
aOperate and maintain cable services$ - 0$ - 0$ - 0$ - 0
3.2.7Logistics$ - 0$ - 0$ - 0$ - 0
3.2.7.1Conduct annual planning for the Alaska Remote Resupply Barge (ARRB)$ - 0$ - 0$ - 0$ - 0
aProvide a barge POC no later than 30 Aug$ - 0$ - 0$ - 0$ - 0
bCoordinate/consolidate all annual bulk resupply barge cargo$ - 0$ - 0$ - 0$ - 0
cConsolidate all shippers barge cargo requirements on shipping documentation/data/ETRR$ - 0$ - 0$ - 0$ - 0
dEnsure Transportation Account Codes (TAC) are identified for each container/item of cargo$ - 0$ - 0$ - 0$ - 0
eEnsure Government-funded barge is utilized as the primary means of transport$ - 0$ - 0$ - 0$ - 0
fCoordinate/ensure all supplies/cargo arrive at the staging areas$ - 0$ - 0$ - 0$ - 0
gEnsure all shippers cargo to be shipped off is coordinated with SDDC$ - 0$ - 0$ - 0$ - 0
hContractor is liable for demurrage charges incurred$ - 0$ - 0$ - 0$ - 0
iCoordinate and configure all outgoing barge cargo (retrograde) shipments$ - 0$ - 0$ - 0$ - 0
jProvide all Stevedore services required$ - 0$ - 0$ - 0$ - 0
kEnsure the SDDC contract includes pick-up of runway deicer from DLA$ - 0$ - 0$ - 0$ - 0
lEnsure the SDDC contract includes staging area, and shipping and filling the containers provisions$ - 0$ - 0$ - 0$ - 0
mEnsure the SDDC contract requires the barge vendor to provide the crane and operator$ - 0$ - 0$ - 0$ - 0
nEnsure there is operational equipment capable of expediting all cargo on/off the pier$ - 0$ - 0$ - 0$ - 0
oImmediately empty all barge vendor owned containers$ - 0$ - 0$ - 0$ - 0
pEnsure all barges scheduled with an ETA to EAS pier is communicated$ - 0$ - 0$ - 0$ - 0
qAdvise 611 ASUS Resupply Barge Manager$ - 0$ - 0$ - 0$ - 0
rEnsure the barge ETA to Eareckson is NLT 10 June$ - 0$ - 0$ - 0$ - 0
sProvide specific bulk supply requirements to the PM$ - 0$ - 0$ - 0$ - 0
tProvide EAS Runway De-icer requirement projection when requested$ - 0$ - 0$ - 0$ - 0
uCoordinate telecom meetings to be held every two weeks starting mid-October$ - 0$ - 0$ - 0$ - 0
3.2.7.2Conduct annual operations for the Alaska Remote Resupply Barge (ARRB)$ - 0$ - 0$ - 0$ - 0
aEnsure the annual one time resupply barge sails from Seattle between 1 Apr and 10 May$ - 0$ - 0$ - 0$ - 0
3.2.7.3Conduct passenger services for EAS$ - 0$ - 0$ - 0$ - 0
aAdvise Air Terminal Operations Center of cargo and passenger information$ - 0$ - 0$ - 0$ - 0
bProcess all arriving and departing passengers and their accompanying baggage$ - 0$ - 0$ - 0$ - 0
cProcess and screen all Space Available passengers$ - 0$ - 0$ - 0$ - 0
dIdentify in writing, personnel who will be responsible for screening outbound passengers$ - 0$ - 0$ - 0$ - 0
eOffload inbound passengers and their accompanying baggage$ - 0$ - 0$ - 0$ - 0
fScreen all outboud passengers IAW TSA standards$ - 0$ - 0$ - 0$ - 0
gStore and retire passenger documentation IAW AMCI 24-101 Vol. 6$ - 0$ - 0$ - 0$ - 0
3.2.7.4Conduct capability forecasting$ - 0$ - 0$ - 0$ - 0
aForecast and coordinate airlift requirements with 732 AMS Capability Forecasting$ - 0$ - 0$ - 0$ - 0
3.2.7.5Conduct operations for air terminal and cargo$ - 0$ - 0$ - 0$ - 0
aAdvise Air Terminal Operations Center of cargo and passenger information$ - 0$ - 0$ - 0$ - 0
bManage and store 463L Pallets and Nets$ - 0$ - 0$ - 0$ - 0
cMaintain scales IAW AMCI 24-101 Vol. 11$ - 0$ - 0$ - 0$ - 0
dSubmit documents for all DoD or DoD contracted aircraft transported passengers and cargo$ - 0$ - 0$ - 0$ - 0
eLabel, mark, pack and document cargo$ - 0$ - 0$ - 0$ - 0
fEnsure only personnel qualified act as handlers, packers, and preparers to certify hazardous cargo$ - 0$ - 0$ - 0$ - 0
gComplete the Shipper's Declaration for Dangerous Goods$ - 0$ - 0$ - 0$ - 0
hBrief aircraft commanders$ - 0$ - 0$ - 0$ - 0
iNote the hazardous cargo briefing on the manifest$ - 0$ - 0$ - 0$ - 0
jProcess all originating outbound cargo shipment$ - 0$ - 0$ - 0$ - 0
kEnsure all receipt shipment labels are removed from food tubes$ - 0$ - 0$ - 0$ - 0
3.2.7.6Develop and implement a vehicle management program$ - 0$ - 0$ - 0$ - 0
aManage the utilization of contractor provided vehicles$ - 0$ - 0$ - 0$ - 0
bMaintain special purpose vehicles IAW applicable Tos$ - 0$ - 0$ - 0$ - 0
cNotify PMO when Gov vehicle inventory falls below authorized levels$ - 0$ - 0$ - 0$ - 0
dProvide necessary information when requested$ - 0$ - 0$ - 0$ - 0
eProvide 2x Contractor 15-pax and 2x Contractor 3-pax$ - 0$ - 0$ - 0$ - 0
3.2.7.6.1Maintain Gov furnished vehicles (GFV) and Gov furnished equipment (GFE)$ - 0$ - 0$ - 0$ - 0
aMaintain GFV specialized equipment IAW TO 36-1-191$ - 0$ - 0$ - 0$ - 0
bMaintain on site current copies of Air Force TOs for all GFV$ - 0$ - 0$ - 0$ - 0
cPerform preventative maintenance inspections, tests and services$ - 0$ - 0$ - 0$ - 0
dSubmit requests to exceed the one-time repair limit to the CO and PM$ - 0$ - 0$ - 0$ - 0
eCoordinate depot level repair requirements with the host LRS$ - 0$ - 0$ - 0$ - 0
fEnsure vehicles are operated in compliance with AFI 24-301$ - 0$ - 0$ - 0$ - 0
gMaintain a permanent waiver card for each Gov vehicle$ - 0$ - 0$ - 0$ - 0
hInspect Gov vehicles prior to use IAW TO 36-1- 191$ - 0$ - 0$ - 0$ - 0
3.2.7.6.2Properly coordinate GFE/GFV shipments$ - 0$ - 0$ - 0$ - 0
aEnsure that the vehicle is safe and serviceable prior to shipment$ - 0$ - 0$ - 0$ - 0
bSubmit completed OLVIMS LTI to the CO and PM prior to shipment$ - 0$ - 0$ - 0$ - 0
3.2.7.6.3Develop and implement a vehicle safety program$ - 0$ - 0$ - 0$ - 0
aComply with applicable safety requirements and base fire regulations$ - 0$ - 0$ - 0$ - 0
bProvide and replace (as necessary) all Personal Protective Equipment (PPE)$ - 0$ - 0$ - 0$ - 0
3.2.7.7Develop and implement a fuels management program$ - 0$ - 0$ - 0$ - 0
aStaff with qualified personnel$ - 0$ - 0$ - 0$ - 0
bRespond and provide required support within 1 hour$ - 0$ - 0$ - 0$ - 0
cConduct all necessary fuels operations$ - 0$ - 0$ - 0$ - 0
dEnsure safe, accurate, and timely receipt, storage, transfer, issue, and accountability$ - 0$ - 0$ - 0$ - 0
ePerform required maintenance$ - 0$ - 0$ - 0$ - 0
fMaintain up-to-date vehicle/facility/inventory status$ - 0$ - 0$ - 0$ - 0
gMaintain a current electronic log$ - 0$ - 0$ - 0$ - 0
hMaintain key control$ - 0$ - 0$ - 0$ - 0
iMaintain communications$ - 0$ - 0$ - 0$ - 0
jNotify the Property Administrator$ - 0$ - 0$ - 0$ - 0
3.2.7.7.1Ensure proper product receipt$ - 0$ - 0$ - 0$ - 0
aReceive products without causing operational delays$ - 0$ - 0$ - 0$ - 0
bCoordinate receipt scheduling and quantities$ - 0$ - 0$ - 0$ - 0
cVerify documentation, seals$ - 0$ - 0$ - 0$ - 0
dPerform required initial visual inspection$ - 0$ - 0$ - 0$ - 0
eEnsure sampling and laboratory analysis$ - 0$ - 0$ - 0$ - 0
fWill not offload products$ - 0$ - 0$ - 0$ - 0
gPrepare all documents required for product receipt$ - 0$ - 0$ - 0$ - 0
3.2.7.7.2Ensure proper Return to Bulk (RTB)$ - 0$ - 0$ - 0$ - 0
aRTB non-suspect quality fuel from bowsers upon request$ - 0$ - 0$ - 0$ - 0
bSample/test RTB bowsers$ - 0$ - 0$ - 0$ - 0
3.2.7.7.3Ensure proper product storage$ - 0$ - 0$ - 0$ - 0
aEnsure product integrity$ - 0$ - 0$ - 0$ - 0
bMaintain product to preclude actions which render the product unsuitable$ - 0$ - 0$ - 0$ - 0
cNotify the PA and FSC of any issues$ - 0$ - 0$ - 0$ - 0
3.2.7.7.4Ensure product is issued properly$ - 0$ - 0$ - 0$ - 0
aIssue fuel$ - 0$ - 0$ - 0$ - 0
bNotify the PA and FSC$ - 0$ - 0$ - 0$ - 0
cInitiate required corrective actions$ - 0$ - 0$ - 0$ - 0
dPrepare all documents$ - 0$ - 0$ - 0$ - 0
3.2.7.7.5Respond to requests for aircraft refueling/defueling and flightline support equipment$ - 0$ - 0$ - 0$ - 0
aRespond to requests$ - 0$ - 0$ - 0$ - 0
bProvide support for aircraft defueling$ - 0$ - 0$ - 0$ - 0
cRequests for service$ - 0$ - 0$ - 0$ - 0
dAnnotate the circumstances$ - 0$ - 0$ - 0$ - 0
3.2.7.7.6Respond to servicing requests for organizational tanks$ - 0$ - 0$ - 0$ - 0
aRespond to servicing requests$ - 0$ - 0$ - 0$ - 0
bDo not defuel organizational tanks until the quality has been verified and approval provided$ - 0$ - 0$ - 0$ - 0
3.2.7.7.7Operate and maintain the self-service automated service station$ - 0$ - 0$ - 0$ - 0
aOperate and maintain the Gov provided self-service automated service station$ - 0$ - 0$ - 0$ - 0
bManually operate the service station$ - 0$ - 0$ - 0$ - 0
cProvide ground product support$ - 0$ - 0$ - 0$ - 0
dProvide refueling support$ - 0$ - 0$ - 0$ - 0
eIssue and maintain Vehicle Identification Link$ - 0$ - 0$ - 0$ - 0
3.2.7.7.8Properly conduct inventory management$ - 0$ - 0$ - 0$ - 0
aCoordinate inventory management$ - 0$ - 0$ - 0$ - 0
3.2.7.7.9Follow and adhere to directives for physical inventory management procedures$ - 0$ - 0$ - 0$ - 0
aFollow the physical inventory management procedures$ - 0$ - 0$ - 0$ - 0
bEnsure all orders$ - 0$ - 0$ - 0$ - 0
cMaintain control$ - 0$ - 0$ - 0$ - 0
dEnsure inventory variations are within allowable limits$ - 0$ - 0$ - 0$ - 0
eMaintain manual gauging equipment/supplies$ - 0$ - 0$ - 0$ - 0
fProvide all applicable documents$ - 0$ - 0$ - 0$ - 0
3.2.7.7.10Ensure accounting and auditability for fuel resources$ - 0$ - 0$ - 0$ - 0
aEnsure proper accounting and maintain auditability$ - 0$ - 0$ - 0$ - 0
bImplement procedures specified in applicable directives$ - 0$ - 0$ - 0$ - 0
cEnsure all orders$ - 0$ - 0$ - 0$ - 0
dInitiate research for out-of-tolerance gains or losses$ - 0$ - 0$ - 0$ - 0
eMaintain files and evidentiary matter documentation$ - 0$ - 0$ - 0$ - 0
fCoordinate with the PA, DLA Energy Region Inventory Manager$ - 0$ - 0$ - 0$ - 0
gPerform daily and monthly closeouts$ - 0$ - 0$ - 0$ - 0
hReconcile fuel orders$ - 0$ - 0$ - 0$ - 0
3.2.7.7.11Implement and maintain automated information technology (AIT) equipment$ - 0$ - 0$ - 0$ - 0
aOperate and maintain the Automated Information Technology (AIT) Equipment$ - 0$ - 0$ - 0$ - 0
bMaintain existing fuels automation software$ - 0$ - 0$ - 0$ - 0
cCoordinate necessary updates$ - 0$ - 0$ - 0$ - 0
3.2.7.7.12Maintain and operate a quality surveillance laboratory$ - 0$ - 0$ - 0$ - 0
aVerify quality of product receipts$ - 0$ - 0$ - 0$ - 0
bFollow all applicable directives$ - 0$ - 0$ - 0$ - 0
cProvide all necessary laboratory supplies$ - 0$ - 0$ - 0$ - 0
dThe laboratory technician will$ - 0$ - 0$ - 0$ - 0
3.2.7.7.13Develop and implement fuels management maintenance plan$ - 0$ - 0$ - 0$ - 0
aProvide a detailed fuels management maintenance plan$ - 0$ - 0$ - 0$ - 0
bParts, supplies, and material needed to perform maintenance$ - 0$ - 0$ - 0$ - 0
cEquipment needed to perform maintenance will be furnished as CFE$ - 0$ - 0$ - 0$ - 0
dThe maintenance records and fuels management maintenance plan shall be updated$ - 0$ - 0$ - 0$ - 0
eEnsure maintenance activities are scheduled$ - 0$ - 0$ - 0$ - 0
fImmediately notify the PMO/designated office and the FSC$ - 0$ - 0$ - 0$ - 0
gImplement a tool control program$ - 0$ - 0$ - 0$ - 0
3.2.7.7.14Develop and implement operator maintenance program$ - 0$ - 0$ - 0$ - 0
aPerform operator maintenance to inspect, service, and maintain all fuel distribution systems$ - 0$ - 0$ - 0$ - 0
3.2.7.7.15Develop and implement preventive maintenance program$ - 0$ - 0$ - 0$ - 0
aComplete preventive maintenance$ - 0$ - 0$ - 0$ - 0
bImplement a systematic PM program$ - 0$ - 0$ - 0$ - 0
3.2.7.7.16Facilitate requirements for SRM and MILCON$ - 0$ - 0$ - 0$ - 0
aInitiate action$ - 0$ - 0$ - 0$ - 0
3.2.7.7.17Develop and implement a fuels training program$ - 0$ - 0$ - 0$ - 0
aAll personnel shall be fully qualified to perform PWS tasks$ - 0$ - 0$ - 0$ - 0
bDocument all training$ - 0$ - 0$ - 0$ - 0
cTraining provided shall include$ - 0$ - 0$ - 0$ - 0
dConduct DoD/DLA publication familiarization training$ - 0$ - 0$ - 0$ - 0
eEnsure employees have all current and valid professional certifications$ - 0$ - 0$ - 0$ - 0
fProvide tank custodian training$ - 0$ - 0$ - 0$ - 0
3.2.7.8Develop and implement a leak detection program$ - 0$ - 0$ - 0$ - 0
aProvide fuel system access$ - 0$ - 0$ - 0$ - 0
bConduct testing$ - 0$ - 0$ - 0$ - 0
cFor PLDS technical and operation support enter a trouble ticket$ - 0$ - 0$ - 0$ - 0
3.2.7.9Perform other performance requirements$ - 0$ - 0$ - 0$ - 0
aProvide the data needed to the PA$ - 0$ - 0$ - 0$ - 0
bRespond to higher headquarters$ - 0$ - 0$ - 0$ - 0
3.2.7.10Develop, implement, maintain, and manage a supply system$ - 0$ - 0$ - 0$ - 0
aProject and plan supply requirements$ - 0$ - 0$ - 0$ - 0
bEnsure disposition instructions have been provided$ - 0$ - 0$ - 0$ - 0
cManage government supply accounts and property IAW$ - 0$ - 0$ - 0$ - 0
1Account for EAID and TMDE$ - 0$ - 0$ - 0$ - 0
2Account for purchased items on the CAP CLIN Expenditure Report$ - 0$ - 0$ - 0$ - 0
3Use appropriate forms to reconcile, verify, track, monitor, and manage$ - 0$ - 0$ - 0$ - 0
4Maintain completed documentation$ - 0$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .