App B 1.1 GPMS - App B Deliverable Matrix (Rev 4 Dec 20) AMD 2.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Global Prepositioned Materiel Services (GPMS) Federal contract opportunity
- Solicitation number
- FA4890-19-R-A004
About this file
This document outlines deliverables and reporting requirements for the Global Prepositioned Materiel Services contract. The contractor shall provide a variety of management, safety, maintenance, and logistics plans and reports on a defined schedule, such as a Management Plan within 30 days of award, monthly Cost/Schedule Status Reports by the 10th of each month, and an Environmental Protection Plan annually by September 15th. The contractor must submit deliverables to the Air Force Materiel Command and Pacific Air Forces via a contractor management information system and email notification. Government review times range from 3 to 45 days with contractor resubmittal periods of 1 to 15 days. Non-compliance may result in withholding of payments.
The related solicitation seeks proposals for the Global Prepositioned Materiel Services requirement. Offerors should attend the tentatively scheduled pre-proposal conference on November 3, 2020 and submit any questions by the stated due date. Proposals must be submitted no later than December 3, 2020 at 2:00pm Eastern Time. The requirement is for the Department of the Air Force Air Combat Command.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Deliverables
| The contractor shall make every attempt to ensure all plans, instructions, reports, and special publications are non-proprietary. In the event the Contractor determines that proprietary information must be included within a document, all proprietary information must be clearly marked “[contractor name] Proprietary” (e.g. Alpha Business Company (ABC) would mark their proprietary information as “ABC Proprietary” at both the document level and to the sub-paragraph level. Unless otherwise required by the specific deliverable, all submitted reports and plans shall be accurate to the last calendar day of the previous month. (Amendment 2 dtd 4 Dec 20) | ||||||||||
| Deliverable | Functional Area | Deliverable Title | Government Recipients | How | Frequency | When (NLT) | Primary PWS Reference(s) | Gov't Review Time | Contractor Resubmit Time | |
| 1 | Management | Management Plan (includes HR Plan, Labor Strike Plan, Training Plan, Site Management Plan, Contingency Plan, Employment in Time of War Plan, Evacuation Plan, Expeditionary Site Plan, Outload Plan, Deployable Teams Plan, Security Plan) | AMIC PMCS/PKFB/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Annually | Initial plan NLT 30 calendar days after contract award date & annually NLT 30 calendar days before the start of the next period of performance, or within 10 calendar days of a substantive revision. | PWS Section A | ||||||
| Para 2.1.1 | 45 calendar days | 15 calendar days | ||||||||
| 2 | Management | Key Personnel Manning Report | AMIC PKFB/PMCS/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly1 | Initial plan NLT 45 calendar days after contract award date & monthly NLT 10th calendar day of the month; data current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 2.1.1.1 | 10 calendar days | 5 calendar days | ||||||||
| 3 | Safety | Health & Safety Plan | AMIC PCEC/PMCS/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Annually | Initial plan NLT 60 calendar days after contract performance start date; annually NLT 15 September | PWS Section A | ||||||
| Para 2.1.2.1. | 45 calendar days | 15 calendar days | ||||||||
| 4 | Safety | Safety Mishap Notification | AMIC PCEC/PMCS/DRQM | |||||||
| PACAF/A4RE | Email / archived on contractor MIS | As Required | NLT 24 hours after mishap/event | PWS Section A | ||||||
| Para 2.1.2.2. | 3 calendar days | 1 calendar day | ||||||||
| 5 | Safety | Saftey Mishap Report | AMIC PCEC/PMCS/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | As Required | NLT 7 calendar days after date of mishap/event | PWS Section A | ||||||
| Para 2.1.2.2 | 3 calendar days | 1 calendar day | ||||||||
| 6 | Management | Supplemental Manpower Report | AMIC PKFB/PMCS | Contractor MIS, with email notification | Monthly1 | Initial plan NLT 45 calendar days after contract award date & monthly NLT 10th calendar day of the month; data current as of the last calendar day of the previous month | PWS Section A | |||
| Para 2.1.11.1. | 30 calendar days | 10 calendar days | ||||||||
| 7 | Management | Life-Cycle Management Plan | AMIC PMCS/PKFB/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Annually | NLT 31 March of each year | PWS Section A | ||||||
| Para 2.1.12 | 45 calendar days | 15 calendar days | ||||||||
| 8 | Management | Cost/Schedule Status Report | AMIC PKFB/PMCS | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly1, 2 | Initial plan NLT 30 calendar days after contract award date & monthly NLT 10th calendar day of the month; data current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 2.4.3 | 30 calendar days | 10 Calendar days | ||||||||
| 9 | Management | Maintenance Control Plan | AMIC PLG/PSC/PMCS/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Annually | Initial plan NLT 60 calendar days after the contract performance start date & annually NLT 45 days prior to start of the next period of performance | PWS Section A | ||||||
| Para. 3.1.2. | 45 calendar days | 15 calendar days | ||||||||
| 10 | BEAR | BEAR Inventory Report | AMIC PMCS/PCEC | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | NLT 10th calendar day of the month; data current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 3.2.1.1.1. | 15 calendar days | 7 calendar days | ||||||||
| 11 | BEAR | BEAR UTC Status Report | AMIC PMCS/PCEC | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | NLT 10th calendar day of the month; data current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 3.2.1.1.2. | 15 calendar days | 7 calendar days | ||||||||
| 12 | Fuels | FSE Status report | AMIC PMCS/PLGF | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | Initial plan due 45 calendar days after contract award date; NLT 5th calendar day of the month; data current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 3.2.2.6.1 | 15 calendar days | 7 calendar days | ||||||||
| 13 | Fuels | FSE Dispositon Report | AMIC PMCS/PLGF | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 3.2.2.6.2. | 15 calendar days | 7 calendar days | ||||||||
| 14 | Fuels | FSE Hose Report | AMIC PMCS/PLGF/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Quarterly | Initial plan NLT 45 contract award date; NLT the 5th calendar day of the quarter (Oct, Jan, Apr, Jul); data shall be current as of the last calendar day of the previous quarter | PWS Section A | ||||||
| Para 3.2.2.6.3. | 30 calendar days | 15 calendar days | ||||||||
| 15 | Vehicles | Vehicle Inspection Report | AMIC PMCS/PLGT/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 3.2.3.2.1. | 15 calendar days | 7 calendar days | ||||||||
| 16 | Vehicles | Vehicle Serviceability Report | AMIC PMCS/PLGT/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | NLT 5th calendar of the month; data shall be current as of the date of submission | PWS Section A | ||||||
| Para 3.2.3.2.2 | 15 calendar days | 7 calendar days | ||||||||
| 17 | Vehicles | 60K Tunner & 25K Halverson Report | AMIC PMCS/PLGT/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 3.2.3.2.3 | 15 calendar days | 7 calendar days | ||||||||
| 18 | RADR | RADR Inventory Report | AMIC PMCS/PLG/PCEC/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month. | PWS Section A | ||||||
| Para 3.2.4.1.1. | 15 calendar days | 7 calendar days | ||||||||
| 19 | RADR | RADR UTC Status Report | AMIC PMCS/PLG/PCEC/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | NLT 5th calendar day of the month; data shall be current as of the last calendar day of the previous month. | PWS Section A | ||||||
| Para 3.2.4.1.2. | 15 calendar days | 7 calendar days | ||||||||
| 20 | Logistics | GFP Inventory | AMIC PMCS/PLGT/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Annually | NLT 5 October | PWS Section A | ||||||
| Para 4.1.2 | 45 calendar days | 15 calendar days | ||||||||
| 21 | Fuels | Fuel Report | AMIC PMCS/PLGF/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | NLT the 5th calendar day of the month; data shall be current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 4.3.6.1. | 15 calendar days | 7 calendar days | ||||||||
| 22 | Management | Comprehensive Tasking Report (CTR) | AMIC PMCS/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Weekly | ||||||||
| (as requried) | NLT COB (local time) Fridays when Contingency or Exercise outload taskings have been directed. Submit reports weekly until a report reflects all taskings are closed; submit again upon receipt of additional taskings | PWS Section A | ||||||||
| Para 5.3.1. | 5 calendar days | 1 calendar day | ||||||||
| 23 | Management | Emergency Response Plan(s) | AMIC PKFB/PMCS/PCEC/DRQM | |||||||
| PACAF/A4C/A4RE | Contractor MIS, with email notification | Initial / | ||||||||
| After Revision | Initial plan due 90 calendar days after contract performance start date & 10 calendar days after a revision | PWS Section A | ||||||||
| Para 6.1.4.1 | 30 calendar days | 15 calendar days | ||||||||
| 24 | Environmental | Pesticide and Herbicide Report | AMIC PCEC/PMCS/DRQM | |||||||
| PACAF/A4C | Contractor MIS, with email notification | Monthly | NLT the 10th calendar day of the month; data shall be current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 6.2.1.7.2 | 15 calendar days | 7 calendar days | ||||||||
| 25 | Facilities | Project Completion Report | AMIC PCEC/PKFB/PMCS/DRQM | |||||||
| PACAF/A4C/A4RE | Contractor MIS, with email notification | As Required | NLT 30 calendar days after project acceptance by the Government | PWS Section A | ||||||
| Para 6.2.3.5 | 10 calendar days | 5 calendar days | ||||||||
| 26 | Environmental | Environmental Protection Plan (EPP) | AMIC PCEC/PMCS/DRQM | |||||||
| PACAF/A4C | Contractor MIS, with email notification | Annually | Initial report due 60 calendar days after contract performance start date & annually NLT 15 September | PWS Section A | ||||||
| Para 6.3.1. | 45 calendar days | 15 calendar days | ||||||||
| 27 | Environmental | Spill Report | AMIC PCEC/PMCS/DRQM | |||||||
| PACAF/A4C | Contractor MIS, with email notification | As Required | NLT 30 calendar days after project acceptance by the Government | PWS Section A | ||||||
| Para 6.3.1.1 | 10 calendar days | 5 calendar days | ||||||||
| 28 | Environmental | Ozone Depleting Substances Report | AMIC PCEC/PMCS/DRQM | |||||||
| PACAF/A4C | Contractor MIS, with email notification | Semi-Annually | NLT 31 March and 30 September of each year | PWS Section A, Para 6.3.1.2 | 30 calendar days | 15 calendar days | ||||
| 29 | Management | Transition/Phase-In Plan | AMIC PKFB/PMCS/DRQM | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Once per Award or Site Initiation | Final plan due 15 calendar days after contract award date; additional GPMS site-specific plans associated with site initiation due as directed by the PCO. | PWS Section D | ||||||
| Para 1.3. | 15 calendar days | 7 calendar days | ||||||||
| 30 | Management | Existing Conditions Report | AMIC PKFB/PMCS/DRQM/PCEC | |||||||
| PACAF/A4RE | Contractor MIS, with email notification | Once per Award | NLT 90 days after contract performance start date | PWS Section D | ||||||
| Para 1.6. | 90 calendar days | 30 calendar days | ||||||||
| 31 | Quality | Quality Manual | AMIC PMCS/DRQM, PACAF/A4RE | Contractor MIS, with email notification | Initial / | |||||
| After Revision | Draft NLT 30 calendar days after start of transition period; final due NLT last day of the transition period; NLT 10 calendar days after a revision | PWS Appendix D, Para 4.1. | 15 calendar days | 7 calendar days | ||||||
| 32 | AGE | AGE Status Report | ||||||||
| (JBER and Optional Site X Only) | AMIC PMCS/PLGT/DRQM | |||||||||
| PACAF/A4RE | Contractor MIS, with email notification | Monthly | Initial report NLT 10 calendar days after the performance start date with the Readiness Tab containing current information. Monthly NLT 10th calendar days of the month; data current as of the last calendar day of the previous month | PWS Section A | ||||||
| Para 3.2.1.3.1. | 15 calendar days | 7 calendar days | ||||||||
| Notes: |
1 Deliverables shall be submitted at the same time.
2 Contractor may request change in monthly due date to coincide with its normal WAWF billing cycle.
Solicitation FA4890-15-R-0004
Page &P of &N