Appendix_J_-_Government_Furnished_Facilities_(GFF).xls
XLS spreadsheet 233 KB Posted
- Attached to
- War Reserve Materiels (WRM) Federal contract opportunity
- Solicitation number
- FA4890-15-R-0004
About this file
Appendix J
View the file
Other files for this federal contract opportunity
Show all 50
War Reserve Materiels (WRM) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Thumrait
| Facility | Use | Description | Space Usage | ||||||||
| Costing | Total SF | RAFO | USAF | Other | RAFO | USAF | |||||
| 23 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 24 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 25 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 26 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 27 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 28 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 29 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 30 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is not bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 31 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is not bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 32 | Ammo Storage Magazine | 5,500,000 (total for all 11 magazines) | 4,000 | 4000 | 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. | 4000 (total for all 11 magazines) | 40000 (total for all 11 magazines) | 0 | 0 | 4000 | |
| 33 | Ammo Storage Igloo | 3,000,000 (total for all 11 igloos) | 2,000 | 2000 | 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. | 4000 (total for all igloos) | 18000 (total for all igloos) | 0 | 0 | 2000 | |
| 34 | Ammo Storage Igloo | 3,000,000 (total for all 11 igloos) | 2,000 | 2000 | 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. | 4000 (total for all igloos) | 18000 (total for all igloos) | 0 | 0 | 2000 | |
| 35 | Ammo Storage Igloo | 3,000,000 (total for all 11 igloos) | 2,000 | 2000 | 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. | 4000 (total for all igloos) | 18000 (total for all igloos) | 0 | 0 | 2000 | |
| 36 | Ammo Storage Igloo | 3,000,000 (total for all 11 igloos) | 2,000 | 2000 | 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. | 4000 (total for all igloos) | 18000 (total for all igloos) | 0 | 0 | 2000 | |
| 37 | Ammo Storage Igloo | 3,000,000 (total for all 11 igloos) | 2,000 | 2000 | 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. | 4000 (total for all igloos) | 18000 (total for all igloos) | 0 | 0 | 2000 | |
| 40 | Ammo Storage Igloo | 3,000,000 (total for all 11 igloos) | 2,000 | 2000 | 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. | 4000 (total for all igloos) | 18000 (total for all igloos) | 0 | 0 | 2000 | |
| 41 | Ammo Storage Igloo | 3,000,000 (total for all 11 igloos) | 2,000 | 2000 | 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. | 4000 (total for all igloos) | 18000 (total for all igloos) | 0 | 0 | 2000 | |
| 42 | Ammo Storage Igloo | 3,000,000 (total for all 11 igloos) | 2,000 | 2000 | 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. | 4000 (total for all igloos) | 18000 (total for all igloos) | 0 | 0 | 2000 | |
| 43 | Ammo Storage Igloo | 3,000,000 (total for all 11 igloos) | 2,000 | 2000 | 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. | 4000 (total for all igloos) | 18000 (total for all igloos) | 0 | 0 | 2000 | |
| 44 | Ammo Maintenance Pad 44 and Sunshade | 500,000 | 20,000 | 20,000 | 200’ x 100’ reinforced concrete pad barricade of consolidated earth and gravel with reinforced concrete end sections covered by a sunshade. | 0 | 20,000 | 0 | 0 | 20000 | |
| 45 | Ammo Storage Pad and Sunshade | 700,000 | 22,684 (11,342 each) | 11342 | Two sunshades (107’x106’ and 100’ x 100’) reinforced concrete slab with steel ‘I’ beam stanchions and rafters. Side and roof supports are fabricated ‘Z’ purlins. Mild steel cross bracing with corrugated metal siding to a mid point dado line. Roof is painted corrugated metal sheets. External eaves height is 23’. Minimum internal clearance is 19’ 7”. | 0 | 22,684 | 0 | 11342 | ||
| 46 | Ammo Storage Pad and Sunshade | 11342 | Two sunshades (107’x106’ and 100’ x 100’) reinforced concrete slab with steel ‘I’ beam stanchions and rafters. Side and roof supports are fabricated ‘Z’ purlins. Mild steel cross bracing with corrugated metal siding to a mid point dado line. Roof is painted corrugated metal sheets. External eaves height is 23’. Minimum internal clearance is 19’ 7”. | 11342 | |||||||
| 47 | Munitions Maintenance Building (MMF) | 400,000 | 4,524 | 3,300 | 116’ x 39’ reinforced concrete foundation slab. Concrete block internal and external walls. Pitched roof of corrugated sheets. Building consists of three workshop bays, two of which have an overhead crane. An office area is provided. External walls are a painted stucco finish. Bay 1 and the Generating Room are occupied by RAFO. | 1,100 | 2,200 | 1224 (Joint use office space RAFO/USAF) | 1,100 | 2200 | |
| 302 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 389 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 390 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 391 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 392 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 393 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 396 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 397 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 398 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 399 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 400 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 401 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 402 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 403 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 404 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 405 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 406 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 407 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 408 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 409 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 410 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 411 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 412 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 413 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 414 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 415 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 416 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 417 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 418 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 419 | Junior Western Accommodation | 250,000 628,000 (total for Junior Western Housing Units) | 591 added 221 sq ft each | 812 | 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. | 0 0 | 591 plus the added 221 sq. ft. each | 0 0 | 812 | ||
| 501 | BEAR Base Office 1 (AFS - QC Office) | 100,000 | 576 | 576 | 24’ x 24’ reinforced concrete slab with vinyl tiled floor. Walls from prefabricated 4’ modular section, mineral fiber panels with insulation and hardboard facing internally. External wall panels are painted along with the pitched roof of corrugated sheets. | 0 | 576 | 0 | 576 | ||
| 502 | BEAR Base Office 2 (AFS - QC Office 2) | 100,000 | 576 | 576 | 24’ x 24’ reinforced concrete slab with vinyl tiled floor. Walls from prefabricated 4’ modular section, mineral fiber panels with insulation and hardboard facing internally. External wall panels are painted with the pitched roof of corrugated sheets. | 0 | 576 | 0 | 576 | ||
| 503 | BEAR Base Yard Latrine | 40,000 | 240 | 240 | 20’ x 12’ prefabricated building with timber flooring and vinyl tiles mounted on a metal skid. Walls from prefabricated 4’ modular section, mineral fiber panels with insulation and hardboard facing internally. External wall panels are painted along with the pitched roof of corrugated sheets. Building is mounted on concrete block footings. (New unit installed September 2002 of the same dimensions as the original structure) | 0 | 240 | 0 | 240 | ||
| 504 | Battery Room | 150,000 | 1,456 | 1,456 | 52’ x 28’ reinforced concrete foundation slab with vinyl tiled floor. Walls are prefabricated 4’ modular section, mineral fiber panels with insulation and hardboard plywood internally. External wall panels are painted with a pitched roof of corrugated metal sheeting. | 0 | 1,456 | 0 | 1456 | ||
| 505 | 1. BEAR Base Maintenance Area 1 |
2. Breakroom
3. Maintenance Area 2 450,000 5,246 3,596 1. 60’ x 33’6” reinforced concrete slab with steel pipe stanchions and timber side purlins. Steel roof trusses with timber purlins and corrugated metal sheeting for siding and pitched roof. Doors fabricated from steel pipe with corrugated metal sheeting.
2. 12’ x 24’8”’ Lean-to integrated into the main structure on a reinforced concrete slab with vinyl tiled floor. Walls formed from prefabricated 4’ modular section, mineral fiber panels with internal insulation and hardboard facing internally covered by a pitched roof of painted corrugated metal sheeting.
3. 60’ x 21’6” Lean- to integrated into the main structure on a reinforced concrete slab with steel pipe stanchions and timber purlins. Mild steel rafters with timber purlins form a sloping roof. Roof and siding are covered with corrugated metal sheeting. 0 5,246 0 1. 2010
2. 296
3. 1290
| 506 | BEAR Base Hazardous Storage Area | 250,000 | 2,646 | 2,646 | 182’6” x 14’6” reinforced concrete foundation slab with painted concrete block walls to partition off 12 various sized compartments. Metal framed gates with chainlink infill on each compartment. Sloping roof with timber purlins and a painted corrugated sheet roof. | 0 | 2,646 | 0 | 0 | 2646 |
| 507 | WRM assets Wash Area | 300,000 | 9,280 | 9,280 | 116’ x 80’ reinforced concrete slab raised above ground level with a collection gully installed around the perimeter of the slab. Gully routes into an Oil/Water Separator so water can be recycled. Steel framed structure erected over the area. Concrete block wall on two sides with corrugated metal siding down to a dado line of 9’9”. Partition walls are of concrete block 6’ high. | 0 | 9,280 | 0 | 9280 | |
| 508 | Wash Area Office | 47,000 | 128 | 16’ x 8’ prefabricated building with timber flooring mounted on a metal skid. Walls are prefabricated modular section mineral fiber panels with insulation. External wall panels are stucco painted timber topped with a pitched roof of corrugated metal sheeting. | 128 | |||||
| 509 | Sunshade Extension to BEAR Base Workshop | 50,000 | 630 | 2483 | 81’ x 30’8”’ (stand alone) stanchions are formed using 6” steel pipe with mild steel trusses and wooden purlins following the length of the structure, covered with corrugated metal roof sheeting erected over an existing concrete slab. | 0 | 630 | 0 | 2483 | |
| 510 | Acid Pit | 50,000 | 168 | 168 | 14’ x 12’ reinforced concrete slab with grating in the center and acid pit filled with hardcore (limestone). Chainlink fence with single metal framed gate with chainlink infill. | 0 | 168 | 0 | 168 | |
| 511 | General Support Warehouse 9 | 1,900,000 | 39,350 | 39,350 | 273’ x 140’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish. 1 run of steel mezzanine racking in the center of the warehouse. 276’ x 56’ = 15348 sq. ft. | 0 | 39,350 | 0 | 0 | 39350 |
| 512 | warehouse 8 | 750,000 404,000 | 20,788 | 20,788 | 302’ x 72’ Reinforced concrete foundation slab with a steel arch frame and fabric covering along with 2 ea. roller shutter doors. Structure fitted with a dehumidifier. 1 Run of steel mezzanine racking both sides of the Portamod. 2 x 245’ x 17' = 8330 sq. ft. This facility was “re-skinned” in September 2006. | 0 | 20,788 | 0 | 0 | 20788 |
| 513 | warehouse 7 | 750,000 404,000 | 20,788 | 20,788 | 302’ x 72’ reinforced concrete foundation slab with a steel arch frame and fabric covering along with 2 ea. roll-up doors. Structure is fitted with a dehumidifier. 1 run of steel mezzanine racking in the Portamod. 245’ x 18' = 4410 sq. ft. This facility was “re-skinned” in September 2006. | 0 | 20,788 | 0 | 0 | 20788 |
| 514 | warehouse 6 | 750,000 | 20,788 | 20,788 | 302’ x 72’ reinforced concrete foundation slab with a steel arch frame and fabric covering along with 2 ea. roll-up doors. Structure is fitted with a dehumidifier. 1 run of steel mezzanine flooring each side of the Portamod. 2 x 245’x 17.5’ = 8575 sq. ft. Internal temporary offices are constructed of timber. | 0 | 20,788 | 0 | 0 | 20788 |
| 515 | warehouse 5 | 750,000 | 20,788 | 20,788 | 302’ x 72’ reinforced concrete foundation slab with a steel arch frame and fabric covering along with 2 ea. roll-up doors. Structure is fitted with a dehumidifier. 1 run of steel mezzanine racking on both side of the Portamod. 2 x 245’x 17.5’ = 8575 sq. ft. | 0 | 20,788 | 0 | 0 | 20788 |
| 516 | warehouse 4 | 2,000,000 | 30,731 | 30,731 | 225’ x 140’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated profiled metal sheets. Masonry walls are painted a stucco finish. 1 run of steel mezzanine racking in the center and each side of the warehouse. 2 x 204' x 20’ = 8160 sq ft. 1 x 204' x 56’6” = 11526 sq ft. The total mezzanine racking area is 19,681 sq. ft. Temporary internal offices manufactured from timber have been erected. | 0 | 30,731 | 0 | 30731 | |
| 517 | SMTC Shop 1 | 165,000 | 2,100 | 2,100 | Corrosion Control Workshop ‘B’: 70’ x 30’ reinforced concrete slab with ‘I’ beam stanchions and ‘Z’ purlins to the side walls. ‘I” beam steel trusses with ‘Z’ roof purlins. Corrugated metal sheeting for side walls and roof. Doors are fabricated from a channel iron framework with corrugated metal sheeting infill. Spray Booth installed | 0 | 2,100 | 0 | 2100 | |
| 518 | 1. Corrosion Control Preparation Shed |
2. Compressor Room 165,000 2,196 96 2,292 1. Preparation Shed: 70’ x 30’ reinforced concrete slab with ‘I’ beam stanchions and ‘Z’ purlins on the side walls. ‘I’ beam steel trusses with ‘Z’ roof purlins. Corrugated metal sheets for siding and roof. Doors are fabricated from a channel iron framework with corrugated metal sheeting infill.
2. Preparation Shed Compressor Room: 12’ x 8’ reinforced concrete slab with ‘I’ beam stanchions and ‘Z’ purlins on the side walls. ‘I’ beam steel trusses with ‘Z’ roof purlins. Corrugated metal sheets for siding and roof. Doors are fabricated from a channel iron framework with corrugated metal sheeting infill. 0 0 2,196 96 0 0 0 1. 2196
2. 96
| 519 | Warehouse 10 | 5,500,000 | 92,092 | 92,092 | 304’ x 301’6” reinforced concrete foundation slab with a steel framed structure terminating in a pitched roof. Masonry walls to a height of 10’ with double skin insulated siding above this dado. Partitions are concrete block walls erected internally to form two separate storage areas. Roof consists of double skin insulated corrugated metal sheets. External masonry walls are a painted stucco finish. There are two sections of mezzanines in each warehouse totaling 24,025 sq. ft. Internal temporary offices are constructed of timber. | 0 | 92,092 | 0 | 0 | 92092 |
| 520 | 1. Communication Building – SBSS |
2. Two Vehicle Sunshades 600,000 5,996 7,546 97’6” x 61’6” reinforced concrete foundation slab with concrete block external and internal partition walls. Additional wooden partition walls have been erected for use as SBSS office spaces. There is a reinforced concrete flat roof with a parapet. Masonry walls are a painted stucco finish. NOTE: Central air conditioning was replaced with split units in April 2006.
2. Two vehicle sunshades (20’x49’ and 20’x10’) were erected in October 2006. 0 5,996 0 1. 5996
2. 1550
| 521 | SMTF Office | 100,000 | 240 | 240 | 20’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Walls from 4’ modular section plywood panels, internal and external with an insulation insert. External walls are a painted stucco finish. Pitched roof of painted corrugated metal sheeting. Building is mounted on concrete block footing. | 0 | 240 | 0 | 240 |
| 522 | 1. Refueler Maintenance Facility |
2. Sunshade 700,000 3,000 6,360 1. 60’ x 50’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.
2. Sunshade: 60’ x 50’ reinforced concrete slab with a 60’ x 6’ concrete ramp. Steel framed structure at right angles to the existing building. Roof consists of single skin corrugated metal sheets. Side walls are partly covered down to a dado line of 10’. 0 3,000 0 1. 3000
2. 3360 523 1. Transportation Workshop
2. Sunshade
3. Sunshade 800,000 10,216 13,408 1. 147’ x 69’6” reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.
2. Sunshade: 56’x57’ consolidated and compacted ground with asphalt applied. A steel structure with corrugated metal roofing that slopes away from the existing structure. Ridge elevation is 16’5” in height. Three sides are partially shaded above 9’ elevation. Construction was completed in November 2006.
3. Sunshade 2: 57’ x 71’ reinforced concrete slab with steel ‘I’ beam stanchions and rafters. Side and roof sheet supports are fabricated from ‘Z’ purlins. Mild steel cross bracings with corrugated metal siding to a mid-point dado line on the side walls. Painted corrugated metal sheets for roofing. 0 10,216 0 1. 10216
2. 3192
3. 4047 524 1. General Purpose Warehouse – SBSS
2. Sunshade 1,250,000 30,375 31,955 1. 225’ x 135’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish. 1 run of steel mezzanine racking to one side of this warehouse. 197’6” x 47’ = 9,282 sq. ft.
Temporary interior offices manufactured from timber have been erected.
2. A 20’x79’ vehicle sunshade was erected in September 2006. 0 30,375 0 0 1. 30375
2. 1580
| 525 | Medical Warehouse | 4,500,000 | 38,500 | 38,500 | 275’ x 140’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish. Central air conditioning has been installed in the building. Temporary interior offices manufactured from timber have been erected. | 0 | 38,500 | 0 | 0 | 38500 |
| 526 | WRM warehouse | 1,000,000 | 20,250 | 20,250 | 150’ x 135’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish. 1 run of steel mezzanine racking to one side of the warehouse. 97’6” x 47’6” = 4,631 sq. ft. | 0 | 20,250 | 0 | 0 | 20250 |
| 527 | Admin. Office | 366,000 | 5,445 | 5,445 | 121’x 45’ reinforced concrete slab foundation with concrete block side walls 12’ in height and 3’ parapet with a flat reinforced concrete roof. The interior is divided into offices, male/female restrooms, conference room and breakroom and cooled by split unit air conditioners. Construction was completed in September 2006. | 5,445 | 5445 | |||
| 528 | BEAR Base Load Bank | 50,000 (+load bank equipment) | 512 | 512 | 31’ x 16’6” reinforced concrete slab with steel pipe stanchions and metal side purlins. Steel roof trusses with timber purlins and corrugated metal siding. Plus adjoining run-up pad, 44’ x 27’ reinforced concrete slab. | 0 | 512 | 0 | 512 |