Appendix_J_-_Government_Furnished_Facilities_(GFF).xls

XLS spreadsheet 233 KB Posted

Attached to
War Reserve Materiels (WRM) Federal contract opportunity
Solicitation number
FA4890-15-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Appendix J

View the file

Other files for this federal contract opportunity

Other files attached to War Reserve Materiels (WRM), newest first.
File Type Posted
FA4890-15-R-0004_Amendment_0005.doc DOC document
Industry_Questions_-_Reference_to_Amendment_2_-_20151001.xls XLS spreadsheet
Section_J _Atch_VII_-Omani_Salary_Ranges_for_Employees.xls XLS spreadsheet
WRMMS_User_Guide_(20150902).pdf PDF
Industry_Questions_(PPC)_(20150902).xlsx XLSX spreadsheet
Appendix_M_-_Certifications_(20150902).docx DOCX document
Signed_Shaw_CBA_(1_Aug_15_-_31_Jul_18).pdf PDF
Appendix_K_-_Government_Furnished_Property_(GFP)_(20150902).doc DOC document
WRMMS_Data_Element_Map_(20150902).jpg JPG image
FA4890-15-R-0004_Amendment_0002.doc DOC document
Service_Summary_(20150902).xls XLS spreadsheet
Appendix_B_-_Deliverables_(20150902).doc DOC document
Appendix_G_-_Level_of_Effort_(LOE)_.doc DOC document
FA4890-15-R-0004_Amendment_0001.doc DOC document
Appendix_O_-_WRM_Authorizations.doc DOC document
Solicitation__FA4890-15-R-0004___WRM.doc DOC document
Appendix_M_-_Certifications.doc DOC document
DD254__FA4890-15-R-0004_Solicitation.pdf PDF
Performance_Work_Statement_(201500715).doc DOC document
Service_Summary.xls XLS spreadsheet
Appendix_F_-_AFCENT_WRM_Award_Fee_Plan_with_Quality_Performance_Index_(1).pdf PDF
WRM_Cost_Summary_Report.xls XLS spreadsheet
WRM_QASP.docx DOCX document
Appendix_K_-_Government_Furnished_Property_(GFP).doc DOC document
DynCorp_Shaw_CBA_1_Aug_15_-_31_Jul_18.pdf PDF
Industry_Q A_from_Site_Visits_ _Draft_RFP_(20150609).docx DOCX document
WRM_Recompete_Synopsis.doc DOC document
NOTICE_-_WRM_Recompete_Pre-Proposal_Conference_Update.doc DOC document
WRM_Questions_and_Answers_to_Industry_-_20_Mar_15.doc DOC document
Industry_Site_Visit_Itinerary_-_6-16_Apr_2015.pdf PDF
Industry_Site_Visit_Itinerary_-_6-15_Apr_2015_(REVISED).pdf PDF
WRM_Industry_Day_Questions_ _Answers_(3-5_Dec_14).pdf PDF
WRM_Industry_Day_Schedule.pdf PDF
Sections_L_and_M_(Draft_-_19_Nov_14).doc DOC document
Final_-_WRM_Industry_Day_Announcement.doc DOC document
CDRL_A015_Health_and_Safety_Plan_(Draft_-_24_Oct_14).doc DOC document
CDRL_A010_Test_and_Inpsection_Report_(Draft_-_24_Oct_14).doc DOC document
CDRL_A009-_Emergency_Response_Plan_(Draft_-_24_Oct_14).doc DOC document
Appendix_B_-_Deliverables.doc DOC document
DD_Form_254_(Draft_-_24_Oct_14).pdf PDF
ppi_tool.accdb.mdb MDB file
CDRL_A014_Spill_Report_(Draft_-_24_Oct_14).doc DOC document
Appendix_C_-_Pubs_and_Forms.xls XLS spreadsheet
CDRL_A011_Project_Completion_Report_(Draft_-_24_Oct_14).doc DOC document
Performance_Work_Statement_(Draft_-_24_Oct_14).doc DOC document
CDRL_A007_Pesticide_Herbicide_Report_(Draft_-_24_Oct_14).doc DOC document
CDRL_list_(Draft_-_24_Oct_14).xlsx XLSX spreadsheet
Appendix_C_-_Publications_and_Forms_(Draft_-_24_Oct_14).xlsx XLSX spreadsheet
Appendix_G_-_Level_of_Effort_(Draft_-_24_Oct_14).docx DOCX document
DD254__FA4890-15-R-0004_Solicitation.pdf PDF
Show all 50

War Reserve Materiels (WRM) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Thumrait

FacilityUseDescriptionSpace Usage
CostingTotal SFRAFOUSAFOtherRAFOUSAF
23Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
24Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
25Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
26Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
27Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
28Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
29Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
30Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is not bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
31Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is not bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
32Ammo Storage Magazine5,500,000 (total for all 11 magazines)4,0004000100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed.4000 (total for all 11 magazines)40000 (total for all 11 magazines)004000
33Ammo Storage Igloo3,000,000 (total for all 11 igloos)2,000200080’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted.4000 (total for all igloos)18000 (total for all igloos)002000
34Ammo Storage Igloo3,000,000 (total for all 11 igloos)2,000200080’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted.4000 (total for all igloos)18000 (total for all igloos)002000
35Ammo Storage Igloo3,000,000 (total for all 11 igloos)2,000200080’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted.4000 (total for all igloos)18000 (total for all igloos)002000
36Ammo Storage Igloo3,000,000 (total for all 11 igloos)2,000200080’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted.4000 (total for all igloos)18000 (total for all igloos)002000
37Ammo Storage Igloo3,000,000 (total for all 11 igloos)2,000200080’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted.4000 (total for all igloos)18000 (total for all igloos)002000
40Ammo Storage Igloo3,000,000 (total for all 11 igloos)2,000200080’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted.4000 (total for all igloos)18000 (total for all igloos)002000
41Ammo Storage Igloo3,000,000 (total for all 11 igloos)2,000200080’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted.4000 (total for all igloos)18000 (total for all igloos)002000
42Ammo Storage Igloo3,000,000 (total for all 11 igloos)2,000200080’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted.4000 (total for all igloos)18000 (total for all igloos)002000
43Ammo Storage Igloo3,000,000 (total for all 11 igloos)2,000200080’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted.4000 (total for all igloos)18000 (total for all igloos)002000
44Ammo Maintenance Pad 44 and Sunshade500,00020,00020,000200’ x 100’ reinforced concrete pad barricade of consolidated earth and gravel with reinforced concrete end sections covered by a sunshade.020,0000020000
45Ammo Storage Pad and Sunshade700,00022,684 (11,342 each)11342Two sunshades (107’x106’ and 100’ x 100’) reinforced concrete slab with steel ‘I’ beam stanchions and rafters. Side and roof supports are fabricated ‘Z’ purlins. Mild steel cross bracing with corrugated metal siding to a mid point dado line. Roof is painted corrugated metal sheets. External eaves height is 23’. Minimum internal clearance is 19’ 7”.022,684011342
46Ammo Storage Pad and Sunshade11342Two sunshades (107’x106’ and 100’ x 100’) reinforced concrete slab with steel ‘I’ beam stanchions and rafters. Side and roof supports are fabricated ‘Z’ purlins. Mild steel cross bracing with corrugated metal siding to a mid point dado line. Roof is painted corrugated metal sheets. External eaves height is 23’. Minimum internal clearance is 19’ 7”.11342
47Munitions Maintenance Building (MMF)400,0004,5243,300116’ x 39’ reinforced concrete foundation slab. Concrete block internal and external walls. Pitched roof of corrugated sheets. Building consists of three workshop bays, two of which have an overhead crane. An office area is provided. External walls are a painted stucco finish. Bay 1 and the Generating Room are occupied by RAFO.1,1002,2001224 (Joint use office space RAFO/USAF)1,1002200
302Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
389Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
390Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
391Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
392Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
393Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
396Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
397Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
398Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
399Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
400Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
401Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
402Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
403Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
404Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
405Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
406Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
407Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
408Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
409Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
410Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
411Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
412Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
413Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
414Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
415Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
416Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
417Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
418Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
419Junior Western Accommodation250,000 628,000 (total for Junior Western Housing Units)591 added 221 sq ft each81243’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006.0 0591 plus the added 221 sq. ft. each0 0812
501BEAR Base Office 1 (AFS - QC Office)100,00057657624’ x 24’ reinforced concrete slab with vinyl tiled floor. Walls from prefabricated 4’ modular section, mineral fiber panels with insulation and hardboard facing internally. External wall panels are painted along with the pitched roof of corrugated sheets.05760576
502BEAR Base Office 2 (AFS - QC Office 2)100,00057657624’ x 24’ reinforced concrete slab with vinyl tiled floor. Walls from prefabricated 4’ modular section, mineral fiber panels with insulation and hardboard facing internally. External wall panels are painted with the pitched roof of corrugated sheets.05760576
503BEAR Base Yard Latrine40,00024024020’ x 12’ prefabricated building with timber flooring and vinyl tiles mounted on a metal skid. Walls from prefabricated 4’ modular section, mineral fiber panels with insulation and hardboard facing internally. External wall panels are painted along with the pitched roof of corrugated sheets. Building is mounted on concrete block footings. (New unit installed September 2002 of the same dimensions as the original structure)02400240
504Battery Room150,0001,4561,45652’ x 28’ reinforced concrete foundation slab with vinyl tiled floor. Walls are prefabricated 4’ modular section, mineral fiber panels with insulation and hardboard plywood internally. External wall panels are painted with a pitched roof of corrugated metal sheeting.01,45601456
5051. BEAR Base Maintenance Area 1

2. Breakroom

3. Maintenance Area 2 450,000 5,246 3,596 1. 60’ x 33’6” reinforced concrete slab with steel pipe stanchions and timber side purlins. Steel roof trusses with timber purlins and corrugated metal sheeting for siding and pitched roof. Doors fabricated from steel pipe with corrugated metal sheeting.

2. 12’ x 24’8”’ Lean-to integrated into the main structure on a reinforced concrete slab with vinyl tiled floor. Walls formed from prefabricated 4’ modular section, mineral fiber panels with internal insulation and hardboard facing internally covered by a pitched roof of painted corrugated metal sheeting.

3. 60’ x 21’6” Lean- to integrated into the main structure on a reinforced concrete slab with steel pipe stanchions and timber purlins. Mild steel rafters with timber purlins form a sloping roof. Roof and siding are covered with corrugated metal sheeting. 0 5,246 0 1. 2010

2. 296

3. 1290

506BEAR Base Hazardous Storage Area250,0002,6462,646182’6” x 14’6” reinforced concrete foundation slab with painted concrete block walls to partition off 12 various sized compartments. Metal framed gates with chainlink infill on each compartment. Sloping roof with timber purlins and a painted corrugated sheet roof.02,646002646
507WRM assets Wash Area300,0009,2809,280116’ x 80’ reinforced concrete slab raised above ground level with a collection gully installed around the perimeter of the slab. Gully routes into an Oil/Water Separator so water can be recycled. Steel framed structure erected over the area. Concrete block wall on two sides with corrugated metal siding down to a dado line of 9’9”. Partition walls are of concrete block 6’ high.09,28009280
508Wash Area Office47,00012816’ x 8’ prefabricated building with timber flooring mounted on a metal skid. Walls are prefabricated modular section mineral fiber panels with insulation. External wall panels are stucco painted timber topped with a pitched roof of corrugated metal sheeting.128
509Sunshade Extension to BEAR Base Workshop50,000630248381’ x 30’8”’ (stand alone) stanchions are formed using 6” steel pipe with mild steel trusses and wooden purlins following the length of the structure, covered with corrugated metal roof sheeting erected over an existing concrete slab.063002483
510Acid Pit50,00016816814’ x 12’ reinforced concrete slab with grating in the center and acid pit filled with hardcore (limestone). Chainlink fence with single metal framed gate with chainlink infill.01680168
511General Support Warehouse 91,900,00039,35039,350273’ x 140’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish. 1 run of steel mezzanine racking in the center of the warehouse. 276’ x 56’ = 15348 sq. ft.039,3500039350
512warehouse 8750,000 404,00020,78820,788302’ x 72’ Reinforced concrete foundation slab with a steel arch frame and fabric covering along with 2 ea. roller shutter doors. Structure fitted with a dehumidifier. 1 Run of steel mezzanine racking both sides of the Portamod. 2 x 245’ x 17' = 8330 sq. ft. This facility was “re-skinned” in September 2006.020,7880020788
513warehouse 7750,000 404,00020,78820,788302’ x 72’ reinforced concrete foundation slab with a steel arch frame and fabric covering along with 2 ea. roll-up doors. Structure is fitted with a dehumidifier. 1 run of steel mezzanine racking in the Portamod. 245’ x 18' = 4410 sq. ft. This facility was “re-skinned” in September 2006.020,7880020788
514warehouse 6750,00020,78820,788302’ x 72’ reinforced concrete foundation slab with a steel arch frame and fabric covering along with 2 ea. roll-up doors. Structure is fitted with a dehumidifier. 1 run of steel mezzanine flooring each side of the Portamod. 2 x 245’x 17.5’ = 8575 sq. ft. Internal temporary offices are constructed of timber.020,7880020788
515warehouse 5750,00020,78820,788302’ x 72’ reinforced concrete foundation slab with a steel arch frame and fabric covering along with 2 ea. roll-up doors. Structure is fitted with a dehumidifier. 1 run of steel mezzanine racking on both side of the Portamod. 2 x 245’x 17.5’ = 8575 sq. ft.020,7880020788
516warehouse 42,000,00030,73130,731225’ x 140’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated profiled metal sheets. Masonry walls are painted a stucco finish. 1 run of steel mezzanine racking in the center and each side of the warehouse. 2 x 204' x 20’ = 8160 sq ft. 1 x 204' x 56’6” = 11526 sq ft. The total mezzanine racking area is 19,681 sq. ft. Temporary internal offices manufactured from timber have been erected.030,731030731
517SMTC Shop 1165,0002,1002,100Corrosion Control Workshop ‘B’: 70’ x 30’ reinforced concrete slab with ‘I’ beam stanchions and ‘Z’ purlins to the side walls. ‘I” beam steel trusses with ‘Z’ roof purlins. Corrugated metal sheeting for side walls and roof. Doors are fabricated from a channel iron framework with corrugated metal sheeting infill. Spray Booth installed02,10002100
5181. Corrosion Control Preparation Shed

2. Compressor Room 165,000 2,196 96 2,292 1. Preparation Shed: 70’ x 30’ reinforced concrete slab with ‘I’ beam stanchions and ‘Z’ purlins on the side walls. ‘I’ beam steel trusses with ‘Z’ roof purlins. Corrugated metal sheets for siding and roof. Doors are fabricated from a channel iron framework with corrugated metal sheeting infill.

2. Preparation Shed Compressor Room: 12’ x 8’ reinforced concrete slab with ‘I’ beam stanchions and ‘Z’ purlins on the side walls. ‘I’ beam steel trusses with ‘Z’ roof purlins. Corrugated metal sheets for siding and roof. Doors are fabricated from a channel iron framework with corrugated metal sheeting infill. 0 0 2,196 96 0 0 0 1. 2196

2. 96

519Warehouse 105,500,00092,09292,092304’ x 301’6” reinforced concrete foundation slab with a steel framed structure terminating in a pitched roof. Masonry walls to a height of 10’ with double skin insulated siding above this dado. Partitions are concrete block walls erected internally to form two separate storage areas. Roof consists of double skin insulated corrugated metal sheets. External masonry walls are a painted stucco finish. There are two sections of mezzanines in each warehouse totaling 24,025 sq. ft. Internal temporary offices are constructed of timber.092,0920092092
5201. Communication Building – SBSS

2. Two Vehicle Sunshades 600,000 5,996 7,546 97’6” x 61’6” reinforced concrete foundation slab with concrete block external and internal partition walls. Additional wooden partition walls have been erected for use as SBSS office spaces. There is a reinforced concrete flat roof with a parapet. Masonry walls are a painted stucco finish. NOTE: Central air conditioning was replaced with split units in April 2006.

2. Two vehicle sunshades (20’x49’ and 20’x10’) were erected in October 2006. 0 5,996 0 1. 5996

2. 1550

521SMTF Office100,00024024020’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Walls from 4’ modular section plywood panels, internal and external with an insulation insert. External walls are a painted stucco finish. Pitched roof of painted corrugated metal sheeting. Building is mounted on concrete block footing.02400240
5221. Refueler Maintenance Facility

2. Sunshade 700,000 3,000 6,360 1. 60’ x 50’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

2. Sunshade: 60’ x 50’ reinforced concrete slab with a 60’ x 6’ concrete ramp. Steel framed structure at right angles to the existing building. Roof consists of single skin corrugated metal sheets. Side walls are partly covered down to a dado line of 10’. 0 3,000 0 1. 3000

2. 3360 523 1. Transportation Workshop

2. Sunshade

3. Sunshade 800,000 10,216 13,408 1. 147’ x 69’6” reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

2. Sunshade: 56’x57’ consolidated and compacted ground with asphalt applied. A steel structure with corrugated metal roofing that slopes away from the existing structure. Ridge elevation is 16’5” in height. Three sides are partially shaded above 9’ elevation. Construction was completed in November 2006.

3. Sunshade 2: 57’ x 71’ reinforced concrete slab with steel ‘I’ beam stanchions and rafters. Side and roof sheet supports are fabricated from ‘Z’ purlins. Mild steel cross bracings with corrugated metal siding to a mid-point dado line on the side walls. Painted corrugated metal sheets for roofing. 0 10,216 0 1. 10216

2. 3192

3. 4047 524 1. General Purpose Warehouse – SBSS

2. Sunshade 1,250,000 30,375 31,955 1. 225’ x 135’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish. 1 run of steel mezzanine racking to one side of this warehouse. 197’6” x 47’ = 9,282 sq. ft.

Temporary interior offices manufactured from timber have been erected.

2. A 20’x79’ vehicle sunshade was erected in September 2006. 0 30,375 0 0 1. 30375

2. 1580

525Medical Warehouse4,500,00038,50038,500275’ x 140’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish. Central air conditioning has been installed in the building. Temporary interior offices manufactured from timber have been erected.038,5000038500
526WRM warehouse1,000,00020,25020,250150’ x 135’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish. 1 run of steel mezzanine racking to one side of the warehouse. 97’6” x 47’6” = 4,631 sq. ft.020,2500020250
527Admin. Office366,0005,4455,445121’x 45’ reinforced concrete slab foundation with concrete block side walls 12’ in height and 3’ parapet with a flat reinforced concrete roof. The interior is divided into offices, male/female restrooms, conference room and breakroom and cooled by split unit air conditioners. Construction was completed in September 2006.5,4455445
528BEAR Base Load Bank50,000 (+load bank equipment)51251231’ x 16’6” reinforced concrete slab with steel pipe stanchions and metal side purlins. Steel roof trusses with timber purlins and corrugated metal siding. Plus adjoining run-up pad, 44’ x 27’ reinforced concrete slab.05120512