Appendix_H_-_Special_Requirements__for_Deployment_Support_(1).doc

DOC document 38 KB Posted

Attached to
War Reserve Materiels (WRM) Federal contract opportunity
Solicitation number
FA4890-15-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Appendix H

View the file

Other files for this federal contract opportunity

Other files attached to War Reserve Materiels (WRM), newest first.
File Type Posted
Solicitation_FA4890-15-R-0004_Amendment_0004.doc DOC document
Industry_Questions_-_Reference_to_Amendment_2_-_20151001.xls XLS spreadsheet
Solicitation_FA4890-15-R-0004-Amendment_0003.doc DOC document
Appendix_G_-_Level_of_Effort_(LOE)_(20150902).doc DOC document
Appendix_O_-_WRM_Authorizations_(20150902).doc DOC document
WRMMS_User_Guide_(20150902).pdf PDF
Industry_Questions_(PPC)_(20150902).xlsx XLSX spreadsheet
Appendix_M_-_Certifications_(20150902).docx DOCX document
Signed_Shaw_CBA_(1_Aug_15_-_31_Jul_18).pdf PDF
Performance_Work_Statement_(20150902).doc DOC document
Appendix_F_-_AFCENT_WRM_Award_Fee_Plan_with_Quality_Performance_Index_(20150902).doc DOC document
Appendix_B_-_Deliverables_(20150902).doc DOC document
WRM_Cost_Summary_Report_(20150902).xls XLS spreadsheet
Pre-Proposal_Conf_Attendees_-_11_Aug_2015.pdf PDF
Appendix_O_-_WRM_Authorizations.doc DOC document
Solicitation__FA4890-15-R-0004___WRM.doc DOC document
Appendix_M_-_Certifications.doc DOC document
Database1.mdb MDB file
Appendix_B_-_Deliverables.doc DOC document
Appendix_A_-_Definitions _Abbreviations_and_Acronyms.doc DOC document
WRM_Cost_Summary_Report.xls XLS spreadsheet
WRM_QASP.docx DOCX document
Appendix_J_-_Government_Furnished_Facilities_(GFF).xls XLS spreadsheet
Appendix_K_-_Government_Furnished_Property_(GFP).doc DOC document
DynCorp_Shaw_CBA_1_Aug_15_-_31_Jul_18.pdf PDF
Correction_to__Award_Date_of_WRM_Contract.doc DOC document
Industry_Q A_from_Site_Visits_ _Draft_RFP_(20150609).docx DOCX document
WRM_Recompete_Synopsis.doc DOC document
Industry_Site_Visit_Itinerary_-_6-16_Apr_2015.pdf PDF
Industry_Site_Visit_Itinerary_-_6-15_Apr_2015_(REVISED).pdf PDF
Questions_for_Industry_Day.doc DOC document
Sections_L_and_M_(Draft_-_19_Nov_14).doc DOC document
Final_-_WRM_Industry_Day_Announcement.doc DOC document
CDRL_A015_Health_and_Safety_Plan_(Draft_-_24_Oct_14).doc DOC document
CDRL_A010_Test_and_Inpsection_Report_(Draft_-_24_Oct_14).doc DOC document
CDRL_A009-_Emergency_Response_Plan_(Draft_-_24_Oct_14).doc DOC document
Appendix_B_-_Deliverables.doc DOC document
DD_Form_254_(Draft_-_24_Oct_14).pdf PDF
ppi_tool.accdb.mdb MDB file
Appendix_J_-_Government_Furnished_Facilities_(Draft_-_24_Oct_14).doc DOC document
Performance_Work_Statement_(20150715).doc DOC document
CDRL_A008__Environmental_Protection_Plan_(Draft_-_24_Oct_14).doc DOC document
Service_Summary_(Draft_-_24_Oct_14).xlsx XLSX spreadsheet
Solicitation__FA4890-15-R-0004___WRM.doc DOC document
Appendix_A_-_Definitions _Abbreviations_and_Acronyms.doc DOC document
WRM_Cost_Summary_Report.xls XLS spreadsheet
DD_FORM_254_Continuation_Page_(Draft_-_24_Oct_14).pdf PDF
WRM_QASP.docx DOCX document
DD254__FA4890-15-R-0004_Solicitation.pdf PDF
CDRL_A001_Facilities_MCP_(Draft_-_24_Oct_14).doc DOC document
Show all 50

War Reserve Materiels (WRM) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: FA4890-15-R-0004

APPENDIX H

SPECIAL REQUIREMENTS FOR TEMPORARY DEPLOYMENT SUPPORT

1.0 Contract performance at the deployed locations is subject to DoDI 3020.41, Contractor Personnel Authorized to Accompany the U.S. Armed Forces, and DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises. Services performed at the deployed locations under this contract are designated as “mission essential.”

2.0 Contingency Plan. The contractor shall provide the government with a Contingency Plan of Operations in support of temporary deployed location, the plan will articulate sustainment of contractor personnel, who will provide essential contractor services, i.e., establish initial billeting, hygiene, and latrine capabilities for the first 250 to 350 personnel. Build-up and temporary contractor deployment will generally not exceed 96 hours. The plan shall also provide the government with ‘reasonable assurance’ of contractor deployment, employment, and continuation of services at deployed location during crisis situations.

2.1 Contractor shall be responsible for all life support needs to include: Medical; housing, feeding, and transportation (unless provided by the government).

File details come from the government source that posted it. Updated .