Attachment 31 - RFI Log - 25Jan2021.xlsx

XLSX spreadsheet 47 KB Posted

Attached to
SABER Construction Services IDIQ
Solicitation number
FA488721R0003
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA488721R00030005 SF 30.pdf PDF
Attachment 31 - RFI Log - 3 Feb 2021.xlsx XLSX spreadsheet
Solicitation Amendment FA488721R00030004 SF 30.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 29Jan21.pdf PDF
Attachment 31 - RFI Log - 29Jan2021.xlsx XLSX spreadsheet
Solicitation Amendment FA488721R00030003 SF 30.pdf PDF
Attachment 1 - SABER SOW - 21 January 2021.pdf PDF
Attachment 32 - As-Built Elevation Drawings - 6Mar86.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 21Jan21.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 21Jan21.pdf PDF
Solicitation Amendment FA488721R00030002 SF 30.pdf PDF
Attachment 29 - NAF Standard Clauses Revised 22 January 2021.pdf PDF
Attachment 9 - Present Past Performance Questionnaire (PPPQ) Cover Letter Revised 25Jan21.pdf PDF
Attachment 33 - Asbestos LBP Reports - 19Feb03.pdf PDF
Attachment 28 - Resume Template - 21Jan21.docx DOCX document
Attachment 3 - Wage Determination AZ20210030 - Coconio County 1Jan21.pdf PDF
Attachment 31 - RFI Log - 13Jan21.xlsx XLSX spreadsheet
Attachment 5 - Section L Instructions to Offerors - 11Jan21.pdf PDF
Attachment 8 - Solicitation Cross Reference Matrix - 11 Jan 2021.docx DOCX document
Pre-Proposal Conference Attendees 6Jan21.pdf PDF
Attachment 2 - Wage Determination AZ20210031 - Maricopa County - 1Jan21.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 11Jan21.pdf PDF
Solicitation Amendment FA488721R00030001 SF 30.pdf PDF
Attachment 28 - Resume Template - 11Jan21.docx DOCX document
Attachment 29 - NAF Standard Clauses.pdf PDF
Attachment 2 - Wage Determination AZ20200031 - Maricopa County 4Dec20.pdf PDF
Attachment 15 - Luke AFB Disc Submittal Guidelines.pdf PDF
Attachment 16 - LUKE Design and Construction Standards cm.pdf PDF
Attachment 12 - Teaming Partner Consent Letter - 23Oct20.doc DOC document
Attachment 7 - Incentive Option Plan - 23Oct20.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 4Dec20.pdf PDF
Attachment 24 - Seed project RTA - 942 South - 1Jun17.pdf PDF
Attachment 11 - Present Past Performance Questionnaire (PPPQ) 23Oct20.docx DOCX document
Attachment 13 - Luke Master Specifications - 9Sep2020.pdf PDF
Attachment 23 - Seed Project RTA - 942 North - 1Jun17.pdf PDF
Attachment 4 - Price Evaluation Worksheet - 23Oct20.xlsx XLSX spreadsheet
Attachment 19 - Luke Specification for Fire Protection and Life Safety.pdf PDF
Attachment 22 - Basic Project Design Requirements - 23Oct20.pdf PDF
Attachment 9 - Present Past Performance Questionnaire (PPPQ) Cover Letter.pdf PDF
Attachment 1 - SABER SOW - 28Aug20.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 4Dec20.pdf PDF
Attachment 25 - SOW Seed Project - Upgrade F16 Simulator Area 18Aug20.pdf PDF
Solicitation - FA488721R0003.pdf PDF
Attachment 20 - Mass Notification Systems - 23Oct20.pdf PDF
Attachment 26 - AF Form 3064 Progress Schedule - 23Oct20.xlsx XLSX spreadsheet
Attachment 8 - Solicitation Cross Reference Matrix - 28Oct20.docx DOCX document
Attachment 30 - NAF Construction Clauses Definitions.pdf PDF
Attachment 17 - AETC First 400 Feet Standard Guidance.pdf PDF
Attachment 10 - Present Past Performance Information (PPPI) 23Oct20.docx DOCX document
Attachment 14 - AFI 33-118 Electromagnetic Spectrum Management.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

REQUEST FOR INFORMATION LOG
CONTRACT #:SOLICITATION #:Attachment 31 - Luke AFB Input 25 January 2021
TBDSABER FA488721R0003
SUBMITTED BY CONTRACTORTO BE COMPLETED BY GOVERNMENT
RFI #DATEDOCUMENTSHEET / PAGE / PARADISCIPLINEQUESTION / ISSUERESPONSE DATERESPONSEPOCCHANGE TO SOLICITATION REQUIRED (YES OR NO)DOCUMENT REVISEDQUESTION SUBMITTED BY
OFFICE SYMNAME
00121-Dec-20Attachment 6Table M.4.2.2RelevancyDo all four (4) example projects submitted have to be concurrent with each other or can the contractor show other projects being performed concurrently with other projects the contractor is performing?1/13/21All four (4) example projects submitted do not have to be concurrent with each other. The offeror can demonstrate in the Present Past Performance Information (PPPI) - Attachment 10 how this effort was performed concurrently with other contracts/projects in paragraph G. Provide specific references, to include contract numbers, contract description, contract performance period, contract price etc. to demonstrate it is similar in scope and complexity and meets the relevancy definition in Section M, paragraph M.4.2.2.CE/CONSPorter and MerrittNoElicia Karras
00221-Dec-20Attachment 6Table M.4.2.2RelevancyDo all 4 projects submitted need to be performed at the same military or government facility or can they be performed on different military or government facilities?1/13/21The four (4) projects submitted do not need to be performed at the same military or government facility and can be performed on different military or government facilities.CE/CONSPorter and MerrittNoElicia Karras
00322-Dec-20Solicitation Close DateFBO PostSolicitationI’m requesting an Extension until Feb 10, 2021. With the Site Visit being on January 6th, and due date on January 18th there isn’t enough time to put the proposal together. With the Extension, we’ll be able to Finalize our Proposal.1/13/21Solicitation response date of 18 January 2021 changed to 29 January 2021, 2:00 PM MST.CE/CONSPorter and MerrittYesSF 1442, FBO NoticeAnnette Anderson
00429-Dec-20Attachment L Table L.2.1.1 Page Limits and Attachment 28 – Resume TemplateTable L.2.1.1SolicitationIs this part of the 2 page min. for each resume or is it separate?1/13/21The purpose of Attachment 28 - Resume Template is to fill in the 3 items and check all applicable boxes and attach to key personnel's resume. In addition to submission of Attachment 28 – Resume Template, Offerors shall submit a second page resume detailing the key personnel’s experience and how it meets the requirements of Attachment 28. The two page limit referenced in Attachment 5 – Section L – Instructions to Offerors includes a single page for submission of Attachment 28 – Resume Template and a single page for the Resume. Both documents must be submitted for the Project Manager, Project Superintendent, and Quality Control Manager, for a total of not to exceed 6 pages for Key Personnel Resumes. This information has been added to Attachment 28 - Resume Template, Revised 11 January 2021. This revision was made to clarify resume submission requirement.CE/CONSPorter and MerrittYesAttachment 28 - Resume TemplateMichele Engelbrecht
00529-Dec-20Attachment 28 – Resume TemplateTable L.2.1.1SolicitationPlease confirm if this is correct. The purpose of this “template” is to fill in 3 items and check 2 boxes?1/13/21The purpose of Attachment 28 - Resume Template is to fill in the 3 items and check all applicable boxes and attach to key personnel's resume. In addition to submission of Attachment 28 – Resume Template, Offerors shall submit a second page resume detailing the key personnel’s experience and how it meets the requirements of Attachment 28. The two page limit referenced in Attachment 5 – Section L – Instructions to Offerors includes a single page for submission of Attachment 28 – Resume Template and a single page for the Resume. Both documents must be submitted for the Project Manager, Project Superintendent, and Quality Control Manager, for a total of not to exceed 6 pages for Key Personnel Resumes. This information has been added to Attachment 28 - Resume Template, Revised 11 January 2021. This revision was made to clarify resume submission requirement.CE/CONSPorter and MerrittYesAttachment 28 - Resume TemplateMichele Engelbrecht
00629-Dec-20Attachment 5 - Section L - Volume I and IIParagraph L.2.1.1.b and Table L.2.1.1SolicitationAre you allowed to have a Proposal Overview page? Or any Introduction pages outside of the page limits?1/13/21No, a proposal overview or introduction page is not required and should not be submitted. Therefore, offertory should only submit what is required in the Table L.2.1. and subsequent paragraphs for Technical, Past Performance, and Price. Further, Attachment 5 paragraph L.2.1.1. Page Limitations: … Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read/considered in the evaluation of the proposal.CE/CONSPorter and MerrittNoMichele Engelbrecht
00729-Dec-20Attachment 5 Section LParagraph L.4.2.2.SolicitationPresent/Past Performance Questionnaires (PPPQs) states “PPPQ’s should cover a period of three (3) to five (5) years.” However, section M.4.2.1 defines recency as a period covering three (3) years. Could you be so kind and clarify if we can use past performance going back 3 or 5 years?1/13/21Reference Revised Attachment 5 Paragraph L.4.2.2. PPPQs should cover a period of three (3) years.CE/CONSPorter and MerrittYesAttachment 5 Section LMarissa L. Hine
00829-Dec-20Attachment 5 - Section LParagraph L.4.2.1.bSolicitationOfferors will return completed information PPPI(s) (Attachment 10) via email directly to the Contracting Officers and Contract Specialist, listed in Section L, paragraph 1.2. Question, do we need to email the PPPI’s in a separate email AND also include them in our final submission?1/13/21No, Reference Revised Attachment 5 Paragraph L.4.2.1.b. Offerors will return completed information PPPI(s) (Attachment 10) with their overall final proposal submission NLT solicitation due date and time.CE/CONSPorter and MerrittYesAttachment 5 Section LMarissa L. Hine
00929-Dec-20Attachment 5 - Section LParagraph L.2.1.6.SolicitationDoes any information other than the name of the Offeror Firm (e.g., names of key personnel) need to be redacted from the sanitized copy of the Technical Volume?1/13/21As specified in paragraph L.2.1.6 of Attachment 5, Section L Instructions to Offerors, the sanitized copy includes the CAGE code but does not have any company names or markings. All other information, i.e. names of key personnel, should remain.CE/CONSPorter and MerrittNoMarissa L. Hine
01029-Dec-20Attachment 28 - Resume TemplateAttachment 28 - Paragraph 3SolicitationAttachment 28, number 3 under Project Superintendent states the exact same description as number 1 under Project Manager. Shouldn’t number 3 read as Table M.4.1.3 Project Superintendent “The CPS should have a minimum of 5 years previous experience as a project superintendent (exclusive of time employed as a tradesman or working foreman) for a general contracting firm overseeing one or more multi-discipline commercial construction projects. “1/13/21Attachment 28 revised to correct paragraph 3 to "Superintendents should have a minimum of 5 years previous experience as a project superintendent (exclusive of time employed as a tradesman or working foreman) for a general contracting firm overseeing one or more multi-discipline commercial construction projects."CE/CONSPorter and MerrittYesAttachment 28 Resume TemplateMarissa L. Hine
01129-Dec-20SolicitationSection I FAR 52.209-11 and 52.219-28Solicitation Section IDo we need to answer and submit sections 52.209-11 and 52.219-28 from the solicitation? If so, where should these pages be included?1/13/21In Section I, 52.209-11 should be filled in and returned with Volume IV - Contract Forms/Responsibility. 52.219-28 does not need to be completed and returned with the solicitation as it is a representation that is filled out in the future prior to exercising an option. Additionally, all other fill-ins and reps and certs must be filled in and submitted with the SF 1442 in Volume IV Contract Forms/Responsibility along with having the Offeror's online Representations and Certifications record current, accurate and complete within the System for Award Management (SAM). This information was revised in Attachment 5 Section L - Instructions to Offerors paragraph L.6.0.c. and in Attachment 6 Section M - Evaluation Criteria paragraph M.5.0.CONSMerrittYesAttachment 5 Section L & Attachment 6 Section MMarissa L. Hine
01229-Dec-20Attachment 1 - SABER SOWParagraph 2.9SolicitationWhich cost estimating software are you requiring?1/13/21Reference Attachment 1 - SABER SOW Paragraph 2.9 "… The “e4Clicks Professional Project Estimator” or “e4Clicks Premier Project Estimator" software in conjunction with the current year “RS MEANS Master Composite Bare Cost” Database is the preferred method for estimates, but is not mandatory for the contractor.CE/CONSPorter and MerrittNoMichele Engelbrecht
01329-Dec-20Solicitation Close DateSolicitationFrom the site visit date to the proposal due date, it is only 7 working days in between. Would you consider extending the due date?1/13/21Solicitation response date of 18 January 2021 changed to 29 January 2021, 2:00 PM MST.CE/CONSPorter and MerrittYesSF 1442, FBO NoticeMichele Engelbrecht
01429-Dec-20Attachment 5L.4.2.1.bSolicitationThe Bolded sentence says we are to return completed PPPIs directly to CO. Please confirm if this was supposed to reference the PPQs. Isn’t the PPPIs to be included in the proposal and then it’s the PPQ’s that you want sent directly to the CO? Please clarify.1/13/21Reference RFI# 8.CE/CONSPorter and MerrittYesAttachment 5 Section LMichele Engelbrecht
01529-Dec-20Attachment 5 Section L - InstructionsL.5.0.c.Solicitation Section L and ML.5.0.c – You are requesting after the SF 1442 “and all pages originally included in the RFP”. This is an email submission with size restrictions. Please clarify if you are wanting all 93 pages of the original posted solicitation to be included in Volume III?1/13/21Reference revised Paragraph L.5.0.c. deleted and moved to moved to L.6.0. Volume IV - Contract Forms/Responsibility. The revision at Paragraph L.6.0.c. specifies the contents of the SF 1442 that need to be submitted with Volume IV. Section M.5.0. was added to clarify submission of SF 1442.CONSMerrittYesAttachment 5 Section L & Attachment 6 Section MMichele Engelbrecht
01629-Dec-20Attachment 5 Section L - InstructionsL.5.1.Solicitation Section LL.5.1. Please confirm that you want all 3 TAB pages submitted in proposal1/13/21Reference Revised Attachment 5 Paragraph L.5.1.a - d. Yes, all 3 TAB pages must be submitted.CONSMerrittYesAttachment 5 Section LMichele Engelbrecht
0174-Jan-21Attachment 1 SABER SOWParagraph 4.2SOWWe had a question in regards to Paragraph 4.2 of the Statement of Work. Question: The last sentence in Paragraph 4.2 of the Statement of Work requires 35% Design on each Task Order whether the Design requirement is written in each Task Order’s scope of work or not. Please clarify whether 35% Design will be required on all Task Orders or not? Please clarify that if Task Orders do not require 35% Design that contractor shop drawings will suffice? Please also clarify that if 35% Design requirements will be required on specific Task Orders, that this will be considered outside the parameters of the SABER program and that the scope of work for those specific Task Orders will include a written design requirement? Also, please clarify that if the 35% Design requirements will be required on specific Task Orders that this design will be required to be performed by professional engineers and licensed architects or if contractor shop drawings will be sufficient? Lastly, please clarify that if the specific Task Order will require 35% Design, that the contractor will be able to add RS Means Line Items in Division 1 to accurately be reimbursed for this?1/13/2135% design drawings are not required on every Task Order (TO), only if specified in TO SOW. As-built drawings will be required for all TO's and will require following the AutoCAD specifications stated. If 35% designs are not required, shop drawings will suffice dependent on TO SOW; however final as-builts will still need to meet requirements in SOW for all TOs. 35% design requirements are not outside the scope of the SABER as it is stated in the SABER SOW. Specific requirements for design and construction will be specified in TO SOW to include whether or not designs are required by licensed Professional Engineers/Architects. Contractor will be allowed to use RS Means line items in Div 1 as part of TO proposal.CEPorterNoChristian Diaz
0184-Jan-21Attachment 25 Seed Project SOWParagraph 2.1 and 2.6Seed Project SOWPlease clarify the Seed Project SOW attachment #25. The North & South Drawings inclusive of 37 and 44 sheets, respectively, indicate quite a comprehensive SOW. The three-page SOW for the Seed Project attachment #25, dated 08/18/2020, indicates a complete scope in section 1. Overview, but in section 2. Description of Work, paragraph 2.1 indicates ‘… all necessary demolition, construction and testing to perform the work as listed in the description below.”, that work is defined in paragraph 2.6. Electrical involving lighting replacement only. Please clarify the Scope of Work for the Seed Project.1/13/21Seed project scope includes North & South side drawings and TO SOW.CEPorterNoMichele Engelbrecht
0194-Jan-21Attachment 25 Seed Project SOW and Attachment 27Paragraph 4.3.1Seed Project SOWHas the Form 66 been provided for the Seed Project as indicated in paragraph 4.3.1 of the Seed Project SOW attachment #25? The RFP contains only a Master AF Form 66 attachment #27 not a project specific AF 66 as indicated in the SOW.1/13/21Contractor shall submit completed AF Form 66 as part of proposal package included in Attachment 5 - Section L at paragraph L.3.2.2.c., which states "A Schedule of Materials reflecting all proposed materials shall be submitted on the AF Form 66 provided for the Seed project. AF Form 66 attachment is an example that Offerors can use to submit their schedule of materials.".CE/CONSPorter and MerrittNoMichele Engelbrecht
0204-Jan-21Attachment 25 Seed Project SOWParagraph 4.3.2Seed Project SOWAre we correct that the AF Form 3064 is required with our proposal and not as required by paragraph 4.3.2 in the Seed Project SOW attachment #25?1/13/21An AF Form 3064 required with proposal in accordance with Attachment 5 Section L, paragraph L.3.2.2.b. Offerors can use dummy dates to resemble or serve as the real dates as long as the schedule is based on the 150 calendar days included in paragraph 2.2. of the Seed Project SOW is used as the basis for the schedule. If the seed project is funded, the awardee will need to comply with paragraph 4.3.2. of the Seed Project SOW - Attachment 25 and provide a schedule with actual dates based on issuance of Notice to Proceed.CE/CONSPorter and MerrittNoMichele Engelbrecht
0214-Jan-21Attachment 25 Seed Project SOW and Attachment 13Seed Project SOWWe have not found the calendar day duration for the Government review time for Contractor Submittals in the Seed Project SOW attachment #25, SABER SOW (SSOW) attachment #1, or the Luke Master Specifications (LMS) attachment #13. As a project schedule is required for all projects, will the Government provide the maximum amount of time in calendar days for review of submittals required prior to purchasing and/or installing materials and systems on the projects?1/13/21Govt review time will be specified in TO SOW. For seed project, use 14 calendar day government review period for all submittals.CEPorterNoMichele Engelbrecht
0224-Jan-21Attachment 1 and Attachment 13Page 43SOWPlease verify that in accordance with the LMS attachment #13, page 43 of 1865, 1.12 Testing that is required by the CO, after approval of the Testing Laboratory by the CO, page 49 of 1865 will be coordinated by the Contractor and included in cost estimate for the project. In the SSOW attachment #1, page 16 of 58, paragraph 9.2, indicates that testing is included in the coefficient. Due to the unknown amount of testing required on an annual basis, are we correct that the cost of testing services is not to be included in the Contractor’s Coefficient?1/13/21Costs associated with lab testing shall not be included in contractor's coefficient.CEPorterNoMichele Engelbrecht
0234-Jan-21Attachment 1Page 16 and 22; paragraph 10.3.1.2 and paragraph 13.3SOWIn the SSOW attachment #1 page 16 of 58 it states that taxes are included in the contractor’s coefficient. However, in paragraph 10.3.1.2 on page 18 it states that Arizona state tax on materials is priced separately as shown in the numerical example in paragraph 13.3 on page 22 of 58. Which is correct? Please clarify the Government’s intent.1/13/21AZ State Tax on materials is only tax not to be included in coefficient as specified in the SABER SOW Attachment 1, paragraph 10.3.1.2.CEPorterNoMichele Engelbrecht
0244-Jan-21Attachment 1 and Attachment 13Page 47 and 29; paragraph 10.3.1.2 and paragraph 13.4SOWIn the LMS attachment #13, page 47 of 1865, paragraph 1.10 Software states that the Contractor is to provide the Government with 2 copies of the scheduling network analysis software. This is not required in paragraph 16.1 of the SABER SOW (SSOW) attachment #1, page 29 of 58. Which is correct? If scheduling software is to be provided, how will the cost be covered, and will annual updates be required?1/13/21Contractor is not required to provide government with scheduling software under the SABER IDIQ.CEPorterNoMichele Engelbrecht
0254-Jan-21Attachment 1 and Attachment 13Attachment 1 - Page 51. Attachment 13 Page 12 & 15SOWThere are significant differences regarding Contractor provided Superintendent and QC Personnel between the LMS attachment #13, Section 014500 Contractor Quality Control starting on page 51 of 1865 and the requirements set forth in the SSOW attachment #1, pages 12 & 15 of 58. In summary, LMS requires a Superintendent and QCM for each project on a full-time basis, the SSOW requires daily visits on each active project by the Superintendent and the QCM. Which is correct?1/13/21The SABER SOW Attachment 1, paragraph 5.2.1. requires "Superintendent shall be on-site at all times during work hours for each TO". In paragraph 5.2.2. of the SABER SOW, the QCM shall "visit each active project site daily to ensure full compliance with all safety requirements, and verify that the materials and workmanship are in accordance with approved construction drawings, shop drawings, material submittals and technical specifications." The government sees no conflict between QCM duties in LMS and SABER SOW.CE/CONSPorter and MerrittNoMichele Engelbrecht
0264-Jan-21Attachment 1 and Attachment 13Page 64SOWThe LMS attachment #13 on page 64 of 1865 requires an Administrative Field Office for each project, the SSOW attachment #1 states that it is the Contractor’s Option. Which is correct?1/13/21In accordance with paragraph 49.1 and 49.2. of the SABER SOW, there is no requirement for the contractor to establish and maintain a management office on-base. A physical trailer on site is the contractor's option; however, contractor shall provide latrine facilities for workers and have a designated area/location where contractor's management team will be located on site when not supervising construction duties.CE/CONSPorter and MerrittNoMichele Engelbrecht
0274-Jan-21Attachment 1 and Attachment 13Page 64SOWThe same holds true for a Contractor Storage area, which is correct?1/13/21If contractor storing materials on site it must follow Contractor Storage Area requirements in the SABER SOW - Attachment 1, paragraph 49.2.CE/CONSPorter and MerrittNoMichele Engelbrecht
0284-Jan-21Attachment 1Paragraph 10.3.1.5SOWPlease clarify the Government’s intent regarding SSOW attachment #1, paragraph 10.3.1.5, page 18 of 58 regarding equipment rental. Using the example of the scissor lift, that is an allowable cost when needed for any contractor/subcontractor when necessary to perform their work? As another example, core-drills and concrete cutting equipment is normally rented when needed by contractors is this cost permitted? Are cranes and hoisting equipment costs permitted when necessary to accomplish the work? Will the Government consider identifying which equipment is to be permits for project cost recovery in a typical project estimate?1/13/21Equipment that is customary to the trade will not be allowable equipment rental costs. Specialized equipment for the TO will be considered for an allowable cost.CEPorterNoMichele Engelbrecht
0294-Jan-21SolicitationAre rental costs permitted for asbestos abatement equipment such as air movers and specialty equipment necessary for the removal of ACM? Also is cost recovery of one-time use PPE permitted when considering ACM and Lead removal projects?1/13/21Rental costs for ACM removal are not required to be included in contractor coefficient. Yes, one-time use PPE is permitted in the line items of the estimate, depending on the project requirements.CEPorterNoMichele Engelbrecht
0304-Jan-21Attachment 1Paragraph 4.2SOWIn the SSOW attachment #1, page 8 of 58 paragraph 4.2, “Purchase cost of AutoCAD software may be included in the Contractor’s coefficient.” What exactly is the requirement and is the intent to require the contractor to include this cost in the coefficient regardless of the number of versions issued during the contract term?1/13/21All TO's require as-built drawings to be performed in AutoCAD as specified. Contractor shall not include costs for AutoCAD as separate line items.CEPorterNoMichele Engelbrecht
0314-Jan-21Attachment 1Paragraph 14.1.3SOWThe SSOW attachment #1, paragraph 14.1.3 on page 23 of 58, describes incidental design required during the TOPR proposal process. The description contained herein appears to be beyond what is considered incidental design and the paragraph provides for Contractor notice to the CO in cases where professional services are required. Sizing of MEP equipment and components as required by the paragraph are normally considered professional services not incidental services. Additionally, these services are all required during the proposal phase of the project prior to award of a TO. Therefore, if the TO is not awarded, who will retain ownership of the design provided to the Government? Can and will the Contractor’s design be used by the Government and others to perform the work required by the TOPR at a later date?1/13/21Designs and/or engineering calculations will not be required to be submitted prior to award of TO.CEPorterNoMichele Engelbrecht
0324-Jan-21Attachment 1SOWIf a TOPR is not awarded, is the incidental design provided by the Contractor to the Government considered to be the Contractor’s Proprietary information and as such may not be utilized in any way by the Government or other Contractors at a future date on the project described in the TOPR or any other similar project?1/13/21Designs and/or engineering calculations will not be required to be submitted prior to award of TO.CEPorterNoMichele Engelbrecht
0334-Jan-21Attachment 1Paragraph 14.4.1.3SOWDesign Documentation is further described in paragraph 14.4.1.3, starting on page 25 of 58. This section further indicates the comprehensive requirements set forth by the Government for “incidental design” to include design documentation, detailed drawings, shop drawings, fabrication drawings, complete project design drawings and details for all work trades, design calculations sizing of MEP systems and components, site work, energy savings and Return on Investment calculations. This definition of incidental design far exceeds what is common practice for a general contractor involved in Federal JOC or SABER contract vehicles without being compensated for professional services at the time of TOPR or for that matter even after award of a TO. Will the Government reconsider and revise these requirements? If not, will the Government provide an anticipated scope of projects to be performed under this SABER Contract in order for the Contractor to estimate the costs to be included in their Contractor’s coefficient to cover the costs for this incidental design.1/13/21Design drawings and engineering calculation costs required for a TO can be proposed using RS Means line items and are not required to be part of the contractor's coefficient.CEPorterNoMichele Engelbrecht
0344-Jan-21Is there any Historical data regarding prior SABER Contracts similar to this at Luke AFB? If so please, provide the dollar amount and number of TOPR’s and TO’s awarded.1/13/21Historical data is irrelevant to proposal preparation and will not be provided.CEPorterNoMichele Engelbrecht
0354-Jan-21Attachment 1Paragraph 14.6.1SOWSSOW attachment #1, paragraph 14.6.1, page 28 of 58, will the Contractor be permitted to update proposals that are not awarded immediately and held up to one year if there have been changes in the RS Means Unit Price Book, (UPB), due to the RS Means Quarterly pricing? The quarterly pricing adjustments to the UPB are permitted during the contract period as set forth in the SSOW, paragraph 11.2 on page 19 of 58.1/13/21Task Order Proposal Request will normally specify the period in which proposals shall remain valid. If the contractor takes exception to this period, they shall qualify how long pricing is valid for in their Task Order Proposal. If established timeframe is exceeded, contractor will have an opportunity to update pricing using the relevant RS Means quarterly pricing.CE/CONSPorter and MerrittNoMichele Engelbrecht
0364-Jan-21Attachment 13Page 54 and 77Luke Master SpecsIn the LMS attachment #13, Section 017000, page 77 of 1865, As-Built submission to the CO is required within 5 days of the project final acceptance, in the SSOW attachment #1, page 54 of 58 As-Built submission is required to accompany the request for final inspection, which is correct?1/13/21As-built submission required with request for final inspection.CEPorterNoMichele Engelbrecht
0374-Jan-21Attachment 1 and Attachment 13Page 76In the LMS attachment #13, Section 017000, Contract Closeout, page 76 of 1865, a Building Inventory/Condition Assessment is required to be performed by the Contractor, no mention of this is made in the SSOW attachment #1, is this a requirement for each TO? If required, is this work to be included in the Contractor’s Coefficient?1/13/21Building Inventory/Condition Assessment will be required for each TO. Costs shall not be included in contractor's coefficient.CEPorterNoMichele Engelbrecht
0384-Jan-21Attachment 5 and 6Section L and MSections L and M identify one of the Key Personnel as the “Program Manager” no reference is made to the Program Manager in the SSOW attachment #1. The SSOW refers to the “Project Manager”. Is the Program Manager and the Project Manager the same person?1/13/21Reference Revised Attachment 5 and Attachment 6. All references to Program Manager have been changed to Project Manager.CONSMerrittYesAttachment 5 Section L & Attachment 6 Section MMichele Engelbrecht
0394-Jan-21Attachment 13Page 556Luke Master SpecsReference to a Commissioning Agent, CxA is made in LMS attachment #13, Section 01 33 29, page 556 of 1865. Will this be required on all mechanical, electrical, & plumbing components and system on the SABER projects? If so, how is the contractor compensated for these activities and testing? Will the selection and inclusion of the appropriate line items from the RS Means UPB be permitted in the job cost estimates as an allowable cost? Is the CxA hire by the Government or the Contractor?1/13/21Commissioning will be specified per TO and appropriate line items from RS Means UPB will be permitted on TO proposals. TO will specify who hires CxA.CEPorterNoMichele Engelbrecht
0404-Jan-21Due to the confusion regarding what testing is included in the Contractor’s Coefficient, is Testing, Adjusting and Balancing of HVAC Systems permitted as an allow job cost as included in the RS Means UPB?1/13/21Yes, TAB is permitted to be priced per RS Means UPB.CEPorterNoMichele Engelbrecht
0414-Jan-21Attachment 13Luke Master SpecsThe LMS attachment #13 technical specifications have blanks left to be filled in by others. If the LMS is to apply to a TOPR will the blanks be filled in and included as applicable to each TOPR issued by the Government? If not should the Contractor assume that these sections of the technical specifications will not apply to each respective TOPR?1/13/21Both LMS and UFGS will have blanks completed when issued with the TOPR or the TO SOW will address. Specs should never be assumed not applicable.CEPorterNoMichele Engelbrecht
0424-Jan-21Attachment 13Luke Master SpecsIn the LMS attachment #13, Section 015000 page 66 of 1865 requires security fencing at the jobsite within 15 days of the NTP, will this requirement be identified as a requirement or as not being required in each TOPR issued by the Government? If required is this cost included in the Contractor’s Coefficient?1/13/21TOPR may address, if not addressed contractor shall follow specifications.CEPorterNoMichele Engelbrecht
0434-Jan-21Attachment 13Page 70Luke Master SpecsIn the LMS attachment #13, Section 015800 page 70 of 1865 requires a project sign be erected at the jobsite within 30 days of the NTP, will this requirement be identified as a requirement or as not being required in each TOPR issued by the Government? If required is this cost included in the Contractor’s Coefficient?1/13/21TOPR may address, if not addressed contractor shall follow specifications. Contractor shall include this cost in coefficient.CEPorterNoMichele Engelbrecht
0444-Jan-21Attachment 1Paragraph 23.2In the SSOW attachment #1, paragraph 23.2. Construction Testing, page 33 of 58, the last sentence of the paragraph starting with “Any line items in this section of RS Means dealing with normal day to day construction inspection of a job site shall not be used on any task order..”. Are the line items for Technician for inspection per day for earthwork, concrete, bolting, roofing, & welding permitted as their presence on site is required to perform the respective QC tests as included within the RS Means Section 01-45-23.50. Please clarify.1/13/21Unclear on the what the RFI is asking. Specialized QC testing can be included as line items as stated in 23.2, additional costs outside of the line items will not be accepted.CEPorterNoMichele Engelbrecht
0455-Jan-21Attachment 25What is the Seed Task order ROM cost or Government Range Cost.1/13/21Rough Order of Magnitude is between $1,000,000 and $5,000,000 which was added to Attachment 5 - Section L, paragraph L.5.2..CONSMerrittYesAttachment 5 Section LMeshach Alvarado
0465-Jan-21If available, what were the previous SABER contractor’s coefficients for the same areas.1/13/21This information would need to be requested through a Freedom of Information Act request.CONSMerrittNoMeshach Alvarado
0475-Jan-21Attachment 1SOWWhat is the Governments preferred RS Means Unit Price Estimating Software Platform if any “ 4clicks, JOC Core, E Gordian, Costworks, Etc.”1/13/21Reference Attachment 1 - SABER SOW Paragraph 2.9 "… The “e4Clicks Professional Project Estimator” or “e4Clicks Premier Project Estimator" software in conjunction with the current year “RS MEANS Master Composite Bare Cost” Database is the preferred method for estimates, but is not mandatory for the contractor.CE/CONSPorter and MerrittNoMeshach Alvarado
0485-Jan-21Has the site visit time changed and if so what time?1/13/21Site visit times were changed due to facility availability. Two site visits were performed.CONSMerrittYesAttachment 5 Section LMeshach Alvarado
0495-Jan-21Attachment 25Paragraph 1 and 4.1Seed Project SOWPer the Seed Task Order SOW.. paragraph 1 states “Construction will follow the included design” while section 4.1 on the next page of the SOW states “ the contractor shall furnish all materials, equipment, and personnel necessary to design, manage and accomplish the project” Please clarify if the seed task order will require expanded design by the contractor or not.1/13/21The language in paragraph 1 of the Seed Project Task Order is generic in nature. The Seed Project has been fully designed by USACE and included in Attachments 23 and 24 of the solicitation. Expanded design is not required.CONSMerrittNoMeshach Alvarado
0505-Jan-21Attachment 5L.4.2.1.b.1SolicitationAre these questions ( (a) – (h) ) separate from Attachment 10?1/13/21No. Attachment L Paragraph L.4.2.1.b.1 (a-h) are instructions for completing Attachment 10 Present/Past Performance Information (PPPI) Sheets. The information at L.4.2.1.b.1 (a-h) should be detailed on the PPPI sheet.CONSMerrittNoClaudia Carlos
0515-Jan-21Attachment 5L.4.2.2SolicitationIs a PPPQ required if a CPAR evaluation has been issued for the project?1/13/21Yes, PPPQ's should be submitted even if a CPARS was issued for the project in accordance with Attachment 5 - Section L paragraph L.4.2.2., "Offerors should make their best effort to send out a sufficient number of PPPQs to reasonably expect the Contracting Office will receive at least one questionnaire on each cited contract/work effort". CPARs may be used to review performance in accordance with Attachment 6 - Section M, paragraph M.4.2.a. to evaluate Past Performance."CONSMerrittNoClaudia Carlos
0525-Jan-21Attachment 5SF 1442SolicitationIn order to provide our PPPQ references sufficient time to evaluate our PPPI, will the Government please consider a two-week extension to the proposal submission due date?1/13/21Solicitation response date of 18 January 2021 changed to 29 January 2021, 2:00 PM MST.CONSMerrittYesSF 1442, FBO NoticeTrina Bisaro
0535-Jan-21Attachment 5L.4.2.1SolicitationIt reads Present and Past; are present project allowed?, If present projects are allowed; is there a minimum completed percentage?1/13/21Reference Attachment 6 - Section M, Paragraph M.4.2.1 Recency, which states "Ongoing projects may be used as long as they are at least 80% complete as of the date of issuance of this solicitation (A progress report signed by a Government Contracting Officer or Non-Federal Government equivalent must be provided to prove actual completion percentage)".CONSMerrittNoClaudia Carlos
0545-Jan-21Attachment 5L.4.1.1SolicitationCan we provide projects within the past five (5) years.1/13/21Reference Revised Attachment 6 - Section M Evaluation Criteria paragraph M.4.2.1., which now states "PPPQ's should cover a period of three (3) years and Attachment 6 Paragraph M.4.2.1.a, which states "Recency is defined as active contract performance during the three (3) years preceding the date of issuance of this solicitation. Contracts that were started prior to this time, but still in effect with active performance as of three (3) years from the date of this solicitation, will be considered recent.". Also see revision to Table M.4.2.1. Attachment 5 - Section L Instructions to Offerors, paragraph L.4.2.2. was also revised to state "PPPQ’s should cover a period of three (3) years." Table L.4.2. was also revised to indicate a three (3) year period.CONSMerrittYesAttachment 5 Section L & Attachment 6 Section MClaudia Carlos
0555-Jan-21Attachment 5L.6.0.dSolicitationIs there a minimum $$ for each contract to meet RFP Requirements.1/13/21In accordance with Attachment 5 Paragraph L.6.0.d., the government anticipates issuing a task order at the time of award for the minimum guarantee of $2,000 and issuing project task orders at a later time but reserves the right as previously stated to fulfill the minimum guarantee by executing the seed project if funding becomes available.CONSMerrittNoClaudia Carlos
0565-Jan-21Attachment 5L.4.2.1.b.1SolicitationInstructions in BOLD read to return completed PPPIs via e-mail directly to the Contracting Officers, etc. Does this mean that do not include them in Volume II? Due Date same? Or earlier1/13/21Reference RFI# 8.CONSMerrittNoClaudia Carlos
0576-Jan-21Attachment 5L.4.2.1.b.1SolicitationSection L, Paragraph L.4.2.1, b. states Offerors will return the completed information PPPIs (Attachment 10) via email directly to the Contracting Officers; table L.4.2 under Volume 3, lists PPPI sheets to be included as part of our proposal. Are offerors to email Attachment 10 to the Government separately as well as include in our proposal?1/13/21Reference RFI# 8.CONSMerrittNoTrina Bisaro
0586-Jan-21Attachment 5L.4.2.1.b..b (1)SolicitationThe format of the PPPI (Attachment 10) allows very little space to appropriately respond to each of the criteria provided in Section L, Paragraph L.4.2.1, b. (1) within the three-page limit. Will the Government allow Offerors to adjust the formatting of Attachment 10?1/13/21Yes, the formatting of Attachment 10 can be changed as long as it meets the requirements of Attachment 5 - Section L Instructions to Offerors, paragraph L.2.1.2..CONSMerrittNoTrina Bisaro
0596-Jan-21Attachment 5L.4.2.1.b..b (1)SolicitationThe format of the PPPI (Attachment 10) allows very little space to respond to each of the criteria provided in Section L, Paragraph L.4.2.1, b. (1) within the three-page limit. Will the Government consider allowing Offerors an additional page to provide an appropriate response for each criteria?1/13/21No. Reference attachment 5 paragraph L.2.1.2. Pages shall be typed with 1 line spacing. Except for any reproduced sections of the solicitation document, the text size shall not be less than 12 point font with margins of at least 1" on all sides. Attachment L Table L.4.2 Volume 3 page NTE revised to allow for 4 pages.CONSMerrittYesAttachment 5 Section LTrina Bisaro
AMENDMENT 0001 ISSUED 13 JANUARY 2021 ANSWERED QUESTIONS 001 THROUGH 059
AMENDMENT 0002 ISSUED 25 JANUARY 2021 ANSWERED QUESTIONS 060 THROUGH 150
06029-Dec-20Attachment 1 - SABER SOWParagraph 4.1 and 5.3SOWSOW paragraph 4.1. The Contractor’s staff shall have multidiscipline experience. Areas of required technical design competence shall include engineering and drafting capabilities. Also in section 5.3 states that The Contractor shall provide and maintain the following capabilities: Cost estimator and Draftsman…”However, engineering, drafting or cost estimator are not included under Key Personnel. Could you please clarify?1/25/21Contractor is expected to have and maintain these capabilities throughout the contract period. These capabilities should be addressed in the Management Approach. Resumes for these positions are not required. Reference Revised Attachment 5 Paragraph L.3.2.3.a.(2), Attachment 6 Table M.4.1.3., and Paragraph M.4.1.3.a(2)CEPorterYesAttachment 5 - Section L & Attachment 6 - Section MMarissa L. Hine
0615-Jan-21Attachment 5L.3.2.2.aSolicitationWould the Government please consider allowing more than two (2) pages for Offerors to appropriately respond to the requirements for Subfactor 2, provided in Section L, Paragraph 3.2.2.a?1/25/21No, offerors shall work within the page limit provided in Attachment 1 - Section L Instructions to Offerors, Table L.2.1.6.a.CEPorterNoTrina Bisaro
0627-Jan-21Attachment 5Paragraph L.4.2SolicitationPlease clarify whether PPPI(s) (Attachment 10) are completed by the contractor and submitted via email to the Contracting Officers and Contract Specialist, instead of including them in Volume No. 3, as indicated by Paragraph L.4.2.?1/25/21PPPIs (Attachment 10) are completed by the Offerors and submitted with the Volume III - Past Performance contents. PPPQs (Attachment 11) are submitted by references, who are requested to return completed questionnaires via email or DoD SAFE directly to the Contracting Officers as indicated in Attachment 5 - Section L Instructions to Offerors, paragraph L.4.2.2.. PPPQ submission as part of Volume III - Past Performance proposal contents has been removed from Attachment 5, Table L.4.2.. Attachment 9 - PPPQ Cover Letter Revised to include these requirements. Any PPPQs already submitted do not have to be resubmitted.CONSMerrittYesAttachment 5 - Section L, Attachment 9 - PPPQ Cover LetterChristian Diaz
0637-Jan-21Attachment 5Paragraph L.4.2.2.SolicitationWill the Government allow a contractor to submit CPARS from the contractor’s references in place of the PPPQ for any of the four (4) PPPI(s) required in Paragraph L.4.2.1.?1/25/21No, submission of CPARS instead of completed PPPQs are not authorized or requested in Section L.4.2.2..CONSMerrittNoChristian Diaz
0647-Jan-21Attachment 25SOWFor the Seed project, will the building remain occupied during construction?1/25/21The building will be occupied on the north and south side as seen during the site visit. Contractor shall work the south vault first and perform all required work required per plans on the south vault. North side occupants will then move into south side vault, after certification, while north side vault work is performed.CEPorterNoMarissa L. Hine
0657-Jan-21Attachment 5Table L.2.1.1SolicitationWill you consider extending the page limit for the Sub-factor 2, Project Approach?1/25/21No, the page limit remains at two (2) pages in accordance with Attachment 5 Section L Instructions to Offerors, Table L.2.1.1.CONSMerrittNoMarissa L. Hine
0667-Jan-21Attachment 1 - SABER SOWSOWTo remove and reroute the hot water return and supply, the boiler will have to be shut off. If the building is to remain occupied during the construction project will the shutdown be allowed during regular business hours or will it be after hours?1/25/21Domestic hot water shut off will be permitted during regular business hours.CEPorterNoMarissa L. Hine
0678-Jan-21SolicitationCan we please be provided a list of the sight visit attendees from 1/6/20211/25/21List of attendees was added to https://beta.sam.gov/ SABER Amendment 0001 13 Jan 2021.CONSMerrittNoAlex Brehier
0688-Jan-21SF 1442SolicitationWe are requesting 1 week extension on the due date to 1/25.1/25/21Solicitation response date of 18 January 2021 changed to 29 January 2021, 2:00 PM MST on Amendment 0001 dated 13 Jan 2021. The solicitation response date has been extended further with Amendment 0002 to 5 February 2021, 2:00PM MST.CONSMerrittNoAlex Brehier
0698-Jan-21Are projects at a Veteran Administration considered “Federal”?1/25/21Yes.CONSMerrittNoClaudia Carlos
0708-Jan-21Are projects for GSA considered “Federal”?1/25/21Yes.CONSMerrittNoClaudia Carlos
0718-Jan-21Attachment 6SolicitationPer Section M.4.2.2, paragraph b. Relevant Cost Range: $ 200,000.00 - $ 5 Million – are we allowed to submit projects above the $ 5 Million range?1/25/21Refer to Attachment 6 - Section M Evaluation Criteria and the Past Performance Relevancy Rating Method Chart at Table M.4.2.2. and the statement at M.4.2.2b., which states "Relevant Present/Past project(s) cost should be in the range of $200,000 - $5,000,000."CONSMerrittNoClaudia Carlos
07210-Jan-21Attachment 1 - SABER SOWParagraph 14.1.3SOWPlease clarify “design” requirements….Per Page 23, para 14.1.3 “If the design requires the services of a registered architect or professional engineer, it should be considered outside the parameters of the SABER program and the Contractor shall notify the Contracting Officer immediately.” Contradicts other paragraphs through out the SOW. Page 11, para 4.3 “All structural steel, roofing systems, and/or fire suppression design or shop drawings shall be stamped by the applicable engineer prior to submittal to the Government.” Page 11, para 4.5 “…the contract may be required to furnish documents/drawings bearing the stamp and signature of a registered architect or professional engineer.”1/25/21Design requirements will be specified in the TO SOW. The statement on Page 23 of Attachment 1- SABER SOW, para 14.1.3 “If the design requires the services of a registered architect or professional engineer, it should be considered outside the parameters of the SABER program and the Contractor shall notify the Contracting Officer immediately.” has been removed.CEPorterYesAttachment 1 - SABER SOWAlicia Hernandez
07310-Jan-21Attachment 23Seed ProjectSEED PROJECT RFI’s: North SAPF RE: Electrical drawings, request clarification for the electrical work on this project. Please see below: • Sheet ED101, Are all items, including all conduit and conductors to these items to be removed?

• Sheet ED101, only shows (2) light fixtures to be removed. Is this correct?

• Sheet E101/102, Is all conduit to be surface mounted on walls/ceilings?

• Attachment 25, Statement of work 2.6.3, Is all electrical conduit to be IMC or Rigid conduit?

• Sheet E102, Shows wall mounted light fixtures Type WF1 & WF2. Are these government furnished or contractor supplied?

• If WF1 & WF2 are contractor supplied, is there a make and model number?

• Attachment 25, Statement of work 2.6.2 states lighting shall have a minimum of one fixture per room equipped with a nightlight and backup battery to ensure egress path is lit, excluding individual offices. Is this work shown on the electrical plans, I only see (2) RF1 fixtures in room 102?

• Sheet E101, Key note #3, States power feeding Panel AA shall be filtered. I don’t see that key note on the drawing. Please advise and explain what is wanted. Power is already feeding this existing panel.

1/25/211. All items, including conduit and conductors, to be removed. 2. Only (2) light fixtures is correct. 3. All conduit is required to be surface mounted. 4. Attachment 25 SOW 2.6.3. exterior conduit shall be IMC or rigid. 5. WF1 and WF2 fixtures are contractor supplied and installed, no make or model preferred. 6. Work not shown on drawings - added in Attachment 25 - Seed Project SOW as a requirement at paragraph 2.6.2. (no revisions to Seed Project SOW required since it was already identified in SOW). 7. Power filter required on line feeding panel AA.CEPorterNoAlicia Hernandez
07410-Jan-21Attachment 24Seed ProjectSEED PROJECT RFI’s: South SAPF • Sheet ED101, Are all items, including all conduit and conductors to these items to be removed?

• Sheet E101/102, Is all conduit to be surface mounted on walls/ceilings?

• Attachment 25, Statement of work 2.6.3, Is all electrical conduit to be IMC or Rigid conduit?

• Sheet E102, Shows wall mounted light fixtures Type WF1 & WF2. Are these government furnished or contractor supplied?

• If WF1 & WF2 are contractor supplied, is there a make and model number?

• Attachment 25, Statement of work 2.6.2 states lighting shall have a minimum of one fixture per room equipped with a nightlight and backup battery to ensure egress path is lit, excluding individual offices. Is this work shown on the electrical plans, I only see (2) RF1 fixtures in room 102?

1/25/211. All items, including conduit and conductors, to be removed. 2. All conduit is required to be surface mounted. 3. Attachment 25 Seed Project SOW 2.6.3. exterior conduit shall be IMC or rigid. 4. WF1 and WF2 fixtures are contractor supplied and installed, no make or model preferred. 5. Work not shown on drawings - added as a requirement in Attachment 25 - Seed Project SOW as a requirement at paragraph 2.6.2 (no revisions to Seed Project SOW required since it was already identified in SOW).CEPorterNoAlicia Hernandez
07511-Jan-21Attachment 23 and 24Seed ProjectIn Bldg. 942 will the Gov’t furniture and wall pictures be removed prior to project start?1/25/21Government will remove pictures, memorabilia, computers and files. Contractor will be responsible for relocating furniture and specific electronics ( i.e.. TVs, Projectors, etc.) out of the North side vault and setting up in the South Side Vault for use while construction happens in the North Side.CEPorterNoDarrel Calipo
07611-Jan-21Attachment 23 and 24Seed ProjectCan the Gov’t indicate the HVAC Controls System in the Bldg. and the extent of that scope?1/25/21Base-wide EMCS system requires Distech controls and scope is included in the design documents to include M-101 and Luke Master Specifications Section 255100.CEPorterNoDarrel Calipo
07711-Jan-21Attachment 23 and 24Seed ProjectThe existing T-Bar Ceiling butts into the existing walls; once the demo and new walls are complete the layout of the gid will not match. Is it the Gov’t’s intent to replace the complete ACT in this area?1/25/21ACT to be replaced as needed within renovation area.CEPorterNoDarrel Calipo
07811-Jan-21Attachment 23 and 24Seed ProjectThere are Security Cameras in the ceilings, during construction will the Gov’t’s Security contractor performing the removal and replacement of these cameras?1/25/21There are currently no security cameras in place.CEPorterNoDarrel Calipo