Attachment 22 – FA488721R0003 Basic Project Design Requirements
23 October 2020
“Basic Project Design Requirements”
Ron Martin, Asst Fire Chief
Chief, Fire Prevention...x7421
Technical Codes/Reference:
AFI’s, IBC, IFC, NFPA & UFC Std’s… Luke Specification for Fire Protection & Life Safety… Luke AFB Master Specification…
Required per code:
Install Fire Sprinkler System …> 5000sf w/exceptions per AHJ… UFC 3-600-01… Replace existing Fire Alarm Control Panel (FACP)… UFC 3-600-01…
Install Mass Notification System (MNS) per UFC 4-021-01…
Install Annunciator Panel; required at front entrance... per AHJ...
Need exterior FA/MNS Speakers @ entrance/exits; allowing hearing within a distance of 16 feet of doorways... UFC 4-021-01
Install Lexan covers on all manual pull stations for dual action effect to prevent malicious false alarms/provide protection from physical damage... IBC 907.4.2.5…
S/D needs to be above/within 4' of control panels... (i.e.: FACP, notification appliance circuit power extenders, and supervising station-transmitting equipment...)
Install fire exit hardware on all exit doors...per AHJ…
Ensure Smoke/Heat detectors are at least 3' from air source... not just air supply…
Knox Box required at front/rear entrance... approved by AHJ…FPO has Cert…
CO detectors are required in area of gas appliance... tied into the FACP & MNS messages...UFC 3-
600-01; 9-19…
If AED's are installed; they must be connected to the FACP...
Contact the FPO for list of recorded MNS standardized messages...