Attachment 24 - Seed project RTA - 942 South - 1Jun17.pdf

PDF 12 MB Posted

Attached to
SABER Construction Services IDIQ
Solicitation number
FA488721R0003
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA488721R00030005 SF 30.pdf PDF
Attachment 31 - RFI Log - 3 Feb 2021.xlsx XLSX spreadsheet
Solicitation Amendment FA488721R00030004 SF 30.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 29Jan21.pdf PDF
Attachment 31 - RFI Log - 29Jan2021.xlsx XLSX spreadsheet
Solicitation Amendment FA488721R00030003 SF 30.pdf PDF
Attachment 31 - RFI Log - 25Jan2021.xlsx XLSX spreadsheet
Attachment 1 - SABER SOW - 21 January 2021.pdf PDF
Attachment 32 - As-Built Elevation Drawings - 6Mar86.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 21Jan21.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 21Jan21.pdf PDF
Solicitation Amendment FA488721R00030002 SF 30.pdf PDF
Attachment 29 - NAF Standard Clauses Revised 22 January 2021.pdf PDF
Attachment 9 - Present Past Performance Questionnaire (PPPQ) Cover Letter Revised 25Jan21.pdf PDF
Attachment 33 - Asbestos LBP Reports - 19Feb03.pdf PDF
Attachment 28 - Resume Template - 21Jan21.docx DOCX document
Attachment 3 - Wage Determination AZ20210030 - Coconio County 1Jan21.pdf PDF
Attachment 31 - RFI Log - 13Jan21.xlsx XLSX spreadsheet
Attachment 5 - Section L Instructions to Offerors - 11Jan21.pdf PDF
Attachment 8 - Solicitation Cross Reference Matrix - 11 Jan 2021.docx DOCX document
Pre-Proposal Conference Attendees 6Jan21.pdf PDF
Attachment 2 - Wage Determination AZ20210031 - Maricopa County - 1Jan21.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 11Jan21.pdf PDF
Solicitation Amendment FA488721R00030001 SF 30.pdf PDF
Attachment 28 - Resume Template - 11Jan21.docx DOCX document
Attachment 29 - NAF Standard Clauses.pdf PDF
Attachment 2 - Wage Determination AZ20200031 - Maricopa County 4Dec20.pdf PDF
Attachment 15 - Luke AFB Disc Submittal Guidelines.pdf PDF
Attachment 16 - LUKE Design and Construction Standards cm.pdf PDF
Attachment 12 - Teaming Partner Consent Letter - 23Oct20.doc DOC document
Attachment 7 - Incentive Option Plan - 23Oct20.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 4Dec20.pdf PDF
Attachment 11 - Present Past Performance Questionnaire (PPPQ) 23Oct20.docx DOCX document
Attachment 13 - Luke Master Specifications - 9Sep2020.pdf PDF
Attachment 23 - Seed Project RTA - 942 North - 1Jun17.pdf PDF
Attachment 4 - Price Evaluation Worksheet - 23Oct20.xlsx XLSX spreadsheet
Attachment 19 - Luke Specification for Fire Protection and Life Safety.pdf PDF
Attachment 22 - Basic Project Design Requirements - 23Oct20.pdf PDF
Attachment 9 - Present Past Performance Questionnaire (PPPQ) Cover Letter.pdf PDF
Attachment 1 - SABER SOW - 28Aug20.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 4Dec20.pdf PDF
Attachment 25 - SOW Seed Project - Upgrade F16 Simulator Area 18Aug20.pdf PDF
Solicitation - FA488721R0003.pdf PDF
Attachment 20 - Mass Notification Systems - 23Oct20.pdf PDF
Attachment 26 - AF Form 3064 Progress Schedule - 23Oct20.xlsx XLSX spreadsheet
Attachment 8 - Solicitation Cross Reference Matrix - 28Oct20.docx DOCX document
Attachment 30 - NAF Construction Clauses Definitions.pdf PDF
Attachment 17 - AETC First 400 Feet Standard Guidance.pdf PDF
Attachment 10 - Present Past Performance Information (PPPI) 23Oct20.docx DOCX document
Attachment 14 - AFI 33-118 Electromagnetic Spectrum Management.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET

IDENTIFICATION

D ra w in g C od e:

D es ig ne d by

Sp ec

N o.

D es ig n

Fi le

N o.

D ra w n by

TH

IS

P

RO

JE

CT

W

AS

D

ES

IG

NE

D

BY

T

HE

SA

CR

AM

EN

TO

D

IS

TR

IC

T

O F

TH

E

U.

S.

AR

M

Y

CO

RP

S

O F

EN

G

IN

EE

RS

TH

E

IN

IT

IA

LS

O R

SI

G

NA

TU

RE

S

AN

D

RE

G

IS

TR

AT

IO

N

DE

SI

G

NA

TI

O

NS

O F

IN

DI

VI

DU

AL

S

AP

PE

AR

O

N

TH

ES

E

PR

O

JE

CT

D O

CU

M

EN

TS

W

IT

HI

N

TH

E

SC

O

PE

O

F

TH

EI

R

EM

PL

O

YM

EN

T

AS

RE

Q

UI

RE

D

BY

E

R

-1

-8

Ap p r ov ed

F u n ct io na l A de qu ac y:

Ap pr ov ed

Pr ep ar ed

U nd e r th e D ire c t io n of

Pr ep ar ed b y:

SA

C

R

AM

EN

TO

D

IS

TR

IC

T D

ES

IG

N B

R

AN

C H

US Army Corps of Engineers Sacramento District

C hi ef , D es ig n Br an ch

C hi ef , E ng in ee rg in g

D iv is io n

C hi ef , A rc h.

D es ig n

Se ct io n

D at e:

C ol

C or ps o f E ng in ee rs

US Army Corps of Engineers ®

/s / S co tt

Ti nc he r, P.

E.

/s / M ar k

K.

B ag le y

JU

N E

D at e:

JU

N E

D at e:

JU

N E

/s / R ic k

Po ep pe lm an , P

.E

D is tri ct

E ng in ee r

JU

N E

C O

L.

D

AV

ID

G . R

AY

, P

.E

C

B

A

1 2 3 4

DISTRIBUTION STATEMENT A

Approved for public release; distribution is unlimited.

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

R

TA

S

U

BM

IT

TA

L

M

ZV

G-001

C O

VE

R

SH

EE

T

B942 SOUTH SQUAD OPS SAPF

UPGRADE

AZ

P2 #464765 P2

RTA SUBMITTAL

M

VA

LE

N

TI

N

ELUKE AFB

9-

-0

SHEET INDEX

Sheet Number Sheet Name

TELECOMM

TD101 TELECOMMUNICATIONS DEMO

T-010 SPECIFICATIONS

T-100 LEGEND

T-101 TELECOMMUNICATIONS PLAN

T-501 TELECOMMUNICATION DETAILS

SHEET INDEX

Sheet Number Sheet Name

MECHANICAL

MD101 HVAC DUCT DEMOLITIONPLAN

MD102 HVAC PIPING DEMOLITION PLAN

MD103 HVAC PIPING DEMOLITION PLAN (NORTH)

M-001 GENERAL MECHANICAL NOTES

M-101 HVAC DUCT PLAN

M-102 HVAC PIPING PLAN

M-501 DETAIL

ELECTRICAL

ED101 ELECTRICAL DEMO PLAN

E-010 SPECIFICATIONS

E-100 ELECTRICAL LEGEND

E-101 POWER PLAN

E-102 LIGHTING

E-103 SECURITY PLAN

E-104 FIRE ALARM PLAN - AREA A

E-105 FIRE ALARM PLAN - AREA B

E-401 ENLARGED VESTIBULE PLAN

E-501 LIGHTING DETAILS

E-502 POWER DETAILS

E-503 FIRE ALARM DETAILS

E-601 SECURITY DIAGRAMS

E-602 PANEL SCHEDULE

SHEET INDEX

Sheet Number Sheet Name

GENERAL

G-001 COVER SHEET

G-010 SPECIFICATIONS

G-101 VICINITY MAP

G-102 BASE MAP / CONTRACTOR HAUL ROUTE

ARCHITECTURAL

AD101 FLOOR PLAN - EXISTING

AD102 FLOOR PLAN - DEMOLITION & NEW SAPF AREAS

A-001 ARCHITECTURAL NOTES & ABBREVIATIONS

A-002 WALL TYPES

A-010 ARCHITECTURAL & INTERIOR DESIGN

SPECIFICATIONS

A-101 FLOOR PLAN - NEW

A-510 TYPICAL SUSPENDED CEILING DETAILS

A-520 TYPICAL DOOR DETAILS

A-550 TYPICAL WALL DETAILS

A-590 TYPICAL SEALANT DETAILS

A-620 DOOR AND FINISH SCHEDULE

LIFE SAFETY

F-101 LIFE SAFETY PLAN

FX101 FIRE PROTECTION PLAN

FX701 SHEET SPECIFICATIONS

TOTAL: 44 SHEETS

LUKE PROJECT # FY-16 NUEX 1030707

Attachment 24 - FA488721R0003 Seed Project RTA - 942 South

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

/3

0/

:2 9:

A

M

B 9

S O

UT

H

SQ

UA

D O

PS

S

AP

F

UP

G

RA

D E

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

G-010

SP

EC

IF

IC

AT

IO

NS

SA

C R

AM

EN

TO

D

IS

TR

IC

T

J S

TR

EE

T

SA

C R

AM

EN

TO

, C

A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

GENERAL NOTE:

THE CONTRACTOR IS REQUIRED TO ABIDE BY ALL APPLICABLE REQUIREMENTS OF

THE UNIFIED FACILITIES GUIDE SPECIFICAIONS (UFGS) FOR AIR FORCE PROJECTS.

THE INFORMATION PROVIDED HERE IS IN ADDITION TO THE APPLICABLE

REQUIREMENTS OF THE UFGS. ADDITIONAL FRONT-END SPECIFICATIONS PROVIDED

IN A SEPARATE DOCUMENT.

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION:

THE CONTRACTING OFFICER SHALL APPROVE THE CONTRACTOR'S DEMOLITION

AND DECONSTRUCTION PLAN PRIOR TO THE START OF WORK. THE PLAN MUST

INCLUDE DESCRIPTIONS OF HOW EXISTING CONSTRUCTION TO REMAIN WILL BE

PROTECTED, METHODS OF DEMOLITION, METHODS OF DECONSTRUCTION,

MATERIALS TO BE SALVAGED OR REUSED, MATERIALS TO BE RECYCLED, AND

MATERIALS TO BE DISPOSED OF. DEMOLITION WASTE SHALL BE DIVERTED TO THE

GREATEST EXTENT POSSIBLE.

PATCHING: WHERE REMOVAL LEAVES HOLES OR DAMAGED FINISH SURFACES,

PATCH AND REPAIR TO MATCH ADJACENT SURFACES. WHERE NEW WORK IS TO

BE APPLIED TO EXISTING SURFACES, PATCH TO PRODUCE SURFACE SUITABLE FOR

RECEIVING NEW WORK. PATCHED SURFACES SHALL BE FLUSH AND MATCH

EXISTING ADJACENT SURFACES AS CLOSELY AS POSSIBLE. SALVAGE

MECHANICAL FIXTURES, MOTORS AND MACHINES, AND TAG FOR IDENTIFICATION.

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/3

0/

:2 9:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

G-101

VI

CI

NI

TY

M

AP

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

PLAN NORTH

VICINITY MAP

NOT TO SCALE

EL

M

IR

AG

E R

D

LUKE AFB

LUKE AFB

TO PHOENIX

PROJECT LOCATION

INDIAN SCHOOL RD.

NORTHERN PKWY.

LI

TC

H

FI

EL

D

R D

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

LUKE AFB PROJECT

OFFICE

ARIZONA

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/3

0/

:2 9:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

G-102

BA

SE

M

AP

C O

NT

R A

CT

O

R

HA

U L R O

UT

E

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

PLAN NORTHLOCATION MAP / CONTRACTOR HAUL ROUTE

NOT TO SCALE

SPAD ST.

N nd

A

VE

N rd

D R

N th

A

VE

SUPER SABRE ST.

FI

G

H

TE

R C

O U

N

TR

Y

AV

E.

N th

D R

W. PHANTOM ST.

W. MUSTANG ST.

LI

TC

H

FI

EL

D

R D

.PROJECT LOCATION

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

NOTE: COORDINATE WITH CUSTOMER AND COR TO DETERMINE LAYDOWN AREA.

HAUL ROUTE

SOUTH GATE VISITOR CENTER /

VEHICLE INSPECTION AREA

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/1

6"

'-0

/3 0/

:2

6:

A M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

AD101

FL

O

O R

P L

AN

EX

IS

T I

NG

SA

C R

AM

EN

TO

D

IS

TR

IC

T

J S

TR

EE

T

SA

C R

AM

EN

TO

, C

A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

NTSAD101

1 AS-BUILT W/ EXISTING CONSTRUCTION LAYOUT

NOTE: AS-BUILT NOT TO SCALE,

PROVIDED FOR INFORMATION ONLY

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PROJECT BOUNDARY

49' - 9 1/2"

20' - 0"

6' - 6"

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/8

'-0

/3

0/

:2 6:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

AD102

FL

O

O R

P L

AN

DE

M O

LI

TI

O N

N E

W

SA

P F A

RE

AS

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

1/8" = 1'-0"AD102

2 FLOOR PLAN - NEW SAPF BOUNDARY

PLAN NORTH

8 6 4 2 0 8 16

SCALE: 1/8"=1'-0"

1/8" = 1'-0"AD102

1 FLOOR PLAN - DEMOLITION

Keynote Legend

Key Value Keynote Text

1 REMOVE (E) DOOR AND WALL; PREPARE FOR NEW DOOR AND WALL CONSTRUCTION.

2 REMOVE (E) WALL; PATCH AND PAINT AFFECTED AREAS TO MATCH (E). SEE A-101.

3 REMOVE (E) WALL; PREPARE FOR NEW WALL CONSTRUCTION. PATCH AND PAINT AFFECTED AREAS TO MATCH (E). SEE A-101.

4 REMOVE (E) FURRED OUT STUDS AND GWB; PREPARE FOR REPLACEMENT WITH NEW STUDS, SOUND BATT INSULATION, AND

2 LAYERS GWB (MIN. 50 STC).

5 REMOVE (E) VAULT DOOR; PREPARE FOR INSTALLATION OF (N) VAULT DOOR.

6 REMOVE (E) VAULT DOOR; PREPARE FOR INSTALLATION OF (N) EXIT-ONLY VAULT DOOR.

7 REMOVE (E) DOOR AND FRAME; PREPARE FOR INSTALLATION OF (N) DOOR AND FRAME.

8 REMOVE (E) DOOR; INFILL WITH STUD WALL TO MATCH (E) ADJACENT. PATCH AND PAINT TO MATCH (E).

NEW SAPF BOUNDARY

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

KEY PLAN

SHEET NOTE: A GOVERNMENT REPRESENTATIVE MUST BE

PRESENT WHILE ANY WORK IS OCCURING IN THIS AREA DUE TO

CLASSIFIED OPERATING EQUIPMENT.

ACT

ADDL.

ALUM

ANOD.

B.O.

BU

BLDG

BLKG

BRG

CLG, CEIL'G

CLR

CMU

CNTRSUNK

C.O.

CO2

COL

COMM.

COMP

CONC

CONT

CORR.

CT

D.B.G.

DBL.

DET.

DEPT.

DIM.

DN

DS

DWGS

DWD

EA

EL.

ELEC.

ELEV

EMERG.

EPS

EQ

EQUIP

EXIST

EXP†

EXTING.

EW

EWC

F.H.

F.H.W.S.

FD

FEC

FEH

FF, FFL.

FIN

FLASH

FLR

F.O.C.

FOM

FOS

FS

FT

FTG

GA

GALV.

G.S.U.

GWB

HC

HDWD

HGHT, HT

HR

HSS

HVAC

ICF

INSUL

JAN

JT

LG

ACOUSTICAL CEILING TILE

ADDITIONAL

ALUMINUM

ANODIZED

BOTTOM OF

BUILT UP

BUILDING

BLOCKING

BEARING

CEILING

CLEAR

CONCRETE MASONRY UNIT

COUNTERSUNK

SONCRETE OPENING

CARBON DIOXIDE

COLUMN

COMMUNICATIONS

COMPOSITION

CONCRETE

CONTINUOUS

CORRIDOR

CERAMIC TILE

DISTANCE BETWEEN GUIDES

DOUBLE

DETAIL

DEPARTMENT

DIMENSIONS

DOWN

DOWNSPOUT

DRAWINGS

DRINKING WATER DISPENSER

EACH

ELEVATION

ELECTRICAL

ELEVATION

EMERGENCY

EXTRUDED POLYSTYRENE

EQUAL

EQUIPMENT

EXISTING

EXPANSION

EXTINGUISHER

EACH WAY

ELECTRIC WATER COOLER

FLAT HEAD

FLAT HEAD WOOD SCREW

FLOOR DRAIN

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHER HOLDER

FINISHED FLOOR

FINISHED

FLASHING

FLOOR

FACE OF CONCRETE

FACE OF MASONRY

FACE OF STEEL OR STUD

FLOOR SINK

FOOT OR FEET

FOOTING

GAUGE

GALVANIZED

GLZED STRUCTURAL UNITS

GYPSUM WALL BOARD

HANDICAP

HARDWOOD

HEIGHT

HOUR

HOLLOW STRUCTURAL SECTION

HEATING, VENTILATING & AIR CONDITIONING

INSULATED CONCRETE FORM

INSULATION

JANITOR

JOINT

LONG

MAX.

M.B.

MDF

MECH

MTL., MET.

MFR'S

MIN.

MISC.

M.O.

N/A N.I.C.

NTS

O.C.

O.D.

OPNG

OWJ

PHSMS

PJF

PLYWD

PRE-ENG

PREP

QT

R

RC

RDWD

REHAB

REQ'D

RES

RM

R'FING

R.S.

SAFB

SD

SHT

SIM.

SMS

SND

SNTD

SPECS

SQ

STD

SSTL

STL

STRUCT

T&G T.O.

T.O.C.

TOM, T.O.M

TOS, T.O.S.

T.O.W.

TELE

THK.

TR

TS

TTD

TYP.

U.O.N.

UL

VAT

VCT

VWC

W/

WD

WNDW

WP, W.P.

W/O

Ø, DIA

#, NO.

MAXIMUM

MACHINE BOLT

MEDIUM DENSITY FIBERBOARD

MECHANICAL

METAL

MANUFACTURER'S

MINIMUM

MISCELLANEOUS

MASONRY OPENING

NOT APPLICABLE

NOT IN CONTRACT

NOT TO SCALE

ON CENTER

OUTSIDE DIAMETER

OPENING

OPEN WEB JOIST

PAN HEAD SHEET METAL SCREW

PERIMETER FELT JOINT

PLYWOOD

PRE-ENGINEERED

PREPARATION

QUART

RADIUS

RESILIENT CHANNEL

REDWOOD

REHABILITATE

REQUIRED

RESILIENT

ROOM

ROOFING

ROUGH SAWN

SOUND ATTENUATING FIRE BLANKET

SOAP DISPENSER

SHEET

SIMILAR

SHEET METAL SCREW

SANITARY NAPKIN DISPOSER

SANITARY NAPKIN DISPENSER

SPECIFICATIONS

SQUARE

STANDARD

STAINLESS STEEL

STEEL

STRUCTURAL

TONGUE AND GROOVE

TOP OF

TOP OF CONCRETE

TOP OF MASONRY

TOP OF STEEL

TOP OF WALL

TELEPHONE

THICK

TELECOMMUNICATION ROOM

TUBE SECTION

TOILET PAPER DISPENSER

TYPICAL

UNLESS OTHERWISE NOTED

UNDERWRITERS LABORATORIES

VINYL ASBESTOS TILE

VINYL COMPOSITION TILE

VINYL COATED WALL COVERING

WITH

WOOD

WINDOW

WORKING POINT

WITHOUT

AND

ANGLE

AT

CENTERLINE

DIAMETER

NUMBER

PLATEPL

UNLESS OTHERWISE SPECIFICALLY REDEFINED ON SCHEDULE DRAWINGS

I.E. EXP = EXPOSED ON FINISH SCHEDULE

SECTION & DETAIL DESIGNATION SYMBOL

SECTION IDENTIFICATION

NUMBER

NUMBER OF SHEET

ON WHICH SECTION

IS DRAWN

TYPICAL ARCHITECTURAL ABBREVIATIONS FLOOR PLAN & WALL

LEGEND

2 LAYERS TYPE 'X' 5/8" GWB ON MTL. STUDS

2 LAYERS TYPE 'X' 5/8" GWB ON ONE SIDE OF 3-5/8" MTL. STUDS

1 LAYER TYPE 'X' 5/8" GWB ON ONE SIDE OF 3-5/8" MTL. STUDS

X

LX

VESTIBULE

A-4XX

X

X

XX

WINDOW NUMBER; SEE WINDOW SCHEDULE A-630

LOUVER AND LOUVER NUMBER;

SEE LOUVER SCHEDULE

DOOR AND DOOR NUMBER;

SEE DOOR SCHEDULE A-620

ROOM NAME & NUMBER;

SEE COLOR FINISH SCHEDULE A-610

WALL TYPE INDICATOR; SEE SHEET A-002

AND FLOOR PLANS

INTERIOR ELEVATION INDICATOR AND SHEET

WHERE ELEVATIONS ARE SHOWN

MECHANICAL DIFFUSER AND RETURN; SEE M

SHEETS

LIGHTING; SEE E SHEETS

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

2"

'-0

/3

0/

:2 6:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

A-001

AR

CH

IT

EC

TU

RA

L

NO

T E S

AB

BR

EV

IA

T I

O

NS

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

NEW WALL TYPE

SCALE: 1 1/2" = 1'-0"

2 LAYERS 5/8"

TYPE X GWB,

EACH SIDE3" SAFB

3-5/8" MET. STUDS

@ 16" O.C.

6"

NEW WALL TYPE

SCALE: 1 1/2" = 1'-0"

2 LAYERS 5/8"

TYPE X GWB

3" SAFB

3-5/8" MET. STUDS

@ 16" O.C.

5"

(E) WALL (N) WALL

(E) WALL

NEW WALL TYPE

SCALE: 1 1/2" = 1'-0"

NOTE: WALL EXTENDS TO

STRUCTURE ABOVE. CUT

DRYWALL TO MATCH SLAB

FLUTING. SEAL GAPS AT DECK

CONNECTION WITH

ACOUSTICAL SEALANT.

MIN. 50 STC

(N) RF SHIELDING -

SEE A-550

NOTE: WALL EXTENDS TO

STRUCTURE ABOVE. CUT

DRYWALL TO MATCH SLAB

FLUTING. SEAL GAPS AT DECK

CONNECTION WITH

ACOUSTICAL SEALANT.

MIN. 50 STC

(N) RF SHIELDING -

SEE A-550

2 LAYERS 5/8"

TYPE X GWB,

EACH SIDE3" SAFB

3-5/8" MET. STUDS

@ 16" O.C.

6"

NOTE: WALL EXTENDS TO

STRUCTURE ABOVE. CUT

DRYWALL TO MATCH SLAB

FLUTING. SEAL GAPS AT DECK

CONNECTION WITH

ACOUSTICAL SEALANT.

MIN. 50 STC

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/2

'-0

/3 0/

:2

6:

A M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

A-002

W A L

L

TY

P E S

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

0 1 2

SCALE: 1-1/2"=1'-0"

1/2

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/3

0/

:2 6:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

A-010

AR

CH

IT

EC

TU

RA

L

IN

TE

RI

O

R

DE

SI

G

N

SP

EC

IF

IC

AT

IO

NS

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

GENERAL NOTE:

THE CONTRACTOR IS REQUIRED TO ABIDE BY ALL APPLICABLE REQUIREMENTS OF THE

UNIFIED FACILITIES GUIDE SPECIFICAIONS (UFGS) FOR AIR FORCE PROJECTS. THE

INFORMATION PROVIDED HERE IS IN ADDITION TO THE APPLICABLE REQUIREMENTS OF

THE UFGS.

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY:

PROVIDE SMOOTH FACE, NORMAL WEIGHT BLOCKS, 8" TO MATCH EXISTING. PROVIDE

LOAD-BEARING UNITS FOR EXTERIOR WALLS, FOUNDATION WALLS, LOAD-BEARING

WALLS, AND SHEAR WALLS.

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION:

ASTM C665, TYPE I, CLASS A, WITH A FLAME SPREAD RATING OF 25 OR LESS AND A

SMOKE DEVELOPED RATING OF 150 OR LESS PER ASTM E84. WHERE INSTALLED IN AN

ACOUSTICALLY RATED WALL, PROVIDE SOUND ATTENUATION FIRE BATTS.

07 92 00 JOINT SEALANTS:

USE ASTM C920 INTERIOR SEALANT, TYPE S OR M, GRADE NS, CLASS 12.5, USE NT, FOR

INTERIOR APPLICATIONS. USE ASTM C920 EXTERIOR SEALANT, TYPE S OR M, GRADE

NS, CLASS 25, USE NT, FOR EXTERIOR APPLICATIONS. USE ASTM C919 ACOUSTIACAL

SEALANT IN ALL STC-RATED CONSTRUCTION. CAULKING SHALL BE PROVIDED ONLY

WHERE MOVEMENT OF THE JOINT IS NOT EXPECTED. PROVIDE ALL REQUIRED

PRIMERS, BOND BREAKERS AND BACKSTOPS. COLOR OF SEALANT AND CAULKING

SHALL MATCH ADJACENT MATERIALS. ACOUSTICAL SEALANT REQUIRED FOR ALL

CONNECTIONS AT STC-RATED WALLS.

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES:

PROVIDE STANDARD DUTY DOORS UNLESS OTHERWISE NOTED. PROVIDE WELDED

FRAMES. DOORS AND FRAMES SHALL HAVE A FACTORY-APPLIED FINISH. INTERIOR

STEEL DOORS SHALL BE SOUND RATED IF LOCATED IN A WALL WITH A STC RATING.

PROVIDE FIRE RATED DOORS WHERE REQUIRED.

08 34 59 VAULT DOORS:

DOORS SHALL BE STEEL SECURITY-VAULT TYPE DOOR WITH FRAME AND RAMP TYPE

THRESHOLD, WHICH IS A STANDARD PRODUCT OF A MANUFACTURER SPECIALIZING IN

THIS TYPE OF FABRICATION. LUKE AFB CVN APPROVED MANUFACTURERS ARE AS

FOLLOWS:

A. OVERLY DOOR COMPANY.

B. ASSA ABLOY – SECURITY METAL PRODUCTS.

C. LOCKMASTERS INCORPORATED.

D. AMBICO SPECIALIZED DOORS.

E. KRIEGER SPECIALTY DOORS.

08 34 73 SOUND CONTROL DOOR ASSEMBLIES:

PROVIDE SOUND RETARDANT DOOR ASSEMBLIES OF THE THICKNESS, WIDTH, AND

HEIGHT INDICATED, COMPLETE WITH PERIMETER SEALS, SEAL HOUSINGS, GASKETING,

AUTOMATIC DOOR BOTTOMS, THRESHOLDS, DOOR FRAMES, AND ASTRAGALS AS

REQUIRED TO CONFORM TO MINIMUM STC 50.

08 71 00 DOOR HARDWARE:

ALL HARDWARE MUST COMPLY WITH ANSI/BHMA 156 SERIES. SEE SHEET A-620 FOR

DOOR HARDWARE. CONTRACTOR SHALL COORDINATE KEYING WITH USER; BASE

STANDARD IS BEST COREMAX. ABA COMPLIANT LEVERS SHALL BE USED; KNOBS ARE

PROHIBITED.

DIVISION 09 - FINISHES

09 28 00 GYPSUM BOARD:

STANDARD GYPSUM WALL BOARD USED SHALL BE MOISTURE RESISTANT TYPE 'X'. USE

ABUSE RESISTANT GYPSUM WALL BOARD IN AREAS SUBJECT TO HEAVY TRAFFIC OR

HIGH IMPACT. USE GLASSMAT GYPSUM BOARD FOR THE INTERIOR SIDE OF EXTERIOR

WALLS. USE ACCOUSTICALLY ENHANCED GYPSUM BOARD IN SAPF AREAS. USE

EXTERIOR SHEATHING FOR EXTERIOR PATCH/REPAIR APPLICATIONS.

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

DIVISION 09 - FINISHES

09 51 00 ACOUSTICAL CEILINGS:

ACT UNIT SIZE SHALL BE AS NOTED, TO MATCH EXISTING ADJACENT UNITS AND AREAS.

ALL TILES AND SUPPORTS DAMAGED DURING DEMOLITION AND NEW CONSTRUCTION

SHALL BE REINSTALLED WITH NEW. ACOUSTICAL UNITS SHALL CONFORM TO ASTM E

1264, CLASS A. ACOUSTICAL CEILING TILES SHALL HAVE A MINIMUM 0.55 NRC RATING

AND A CAC OF 33. ACOUSTICAL CEILING SHALL BE ASBESTOS FREE MATERIALS. USG

ASTRO ACOUSTICAL PANELS, OR SIMILAR; IDENTIFIED MANUFACTURER DOES NOT

LIMIT SELECTION TO OTHER MANUFACTURERS.

09 68 00 CARPETING:

PROVIDE NEW CARPETING TO MATCH EXISTING. IF EXISTING FINISHES ARE NOT

AVAILABLE, ALTERNATE FINISHES SHALL COORDINATE AND COMPLEMENT THE

EXISTING FINISHES. CARPET SHALL BE FIRST QUALITY, FREE OF VISUAL BLEMISHES,

STREAKS, POORLY DYED AREAS, FUZZING OF PILE YARN, SPOT, STAINS AND OTHER

MANUFACTURING DEFECTS. INSTALLATION SHALL BE IN ACCORDANCE WITH THE

MANUFACTURER'S INSTRUCTIONS AND SHALL CONFORM TO THE FOLLOWING:

CARPET CONSTRUCTION: MULTI LEVEL PATTERN LOOP

TYPE: MODULAR TILE

PILE FIBER: ECO SOLUTION Q NYLON

DYE METHOD: SOLUTION DYED

TUFTED WEIGHT: 18 OZ / SQ YARD

GAUGE: 1/12TH INCH IN ACCORDANCE WITH

ASTM D 5793

STITCHES PER INCH: 10.2

PILE THICKNESS: 0.1 IN

AVERAGE DENSITY: MINIMUM 6000

09 90 00 PAINTS AND COATINGS:

PAINTING: ALL EXPOSED NEW AND ALTERED SURFACES SHALL RECEIVE A MINIMUM OF

ONE PRIME COAT AND TWO FINISH COATS OF PAINT. PAINT TO BE OF A PREMIUM

QUALITY. ALL PAINT SHALL BE LEAD FREE. USE ONLY PAINTS AND COATINGS THAT

MEET VOC LIMITS ALLOWED BY LOCAL AND STATE REGULATIONS. COLOR SHALL BE

APPROVED BY THE CONTRACTING OFFICER. PAINT SCHEDULE: THE CURRENT MASTER

PAINTERS INSTITUTE (MPI), "APPROVED PRODUCT LIST" WILL BE USED TO DETERMINE

COMPLIANCE WITH THE SUBMITTAL REQUIREMENTS OF THESE SPECS.

GYPSUM WALLBOARD (EGGSHELL):

PRIMER: MPI 50

INTERMEDIATE: MPI 52

TOPCOAT: MPI 52

GYPSUM WALLBOARD (FLAT):

PRIMER: MPI 50

INTERMEDIATE: MPI 143

TOPCOAT: MPI 143

WOOD STAIN: NATURAL FINISH, SEMI-TRANSPARENT

INTERMEDIATE: MPI 90

TOPCOAT: MPI 57

DIVISION 10 - SPECIALTIES

10 26 13 WALL AND CORNER GUARDS:

CORNER GUARDS SHALL BE SURFACE MOUNTED, RADIUS FORMED TO PROFILE.

CORNER GUARDS SHALL EXTEND FROM BASE TO 4'-0" ABOVE FINISHED FLOOR.

ASSEMBLY SHALL CONSIST OF A SNAP-ON CORNER GUARD FORMED FROM HIGH

IMPACT RESISTANT RESILIENT MATERIAL, MOUNTED ON A CONTINUOUS ALUMINUM

RETAINER. EXTRUDED ALUMINUM RETAINER SHALL CONFORM TO ASTM B221, ALLOY

6063, TEMPER T5 OR T6. FACTORY FABRICATED END CLOSURE CAPS SHALL BE

FURNISHED FOR TOP AND BOTTOM OF SURFACE MOUNTED CORNER GUARDS.

125 SF

BRIEFING ROOM

122 SF

BRIEFING ROOM

122 SF

BRIEFING ROOM

122 SF

BRIEFING ROOM

125 SF

BRIEFING ROOM

202 SF

BRIEFING ROOM

EQ EQ

23 SF

STO.

249 SF

(E) BRIEFING ROOM

188 SF

(E) BRIEFING ROOM

188 SF

(E) BRIEFING ROOM

5'

0"

/2

9' - 6 1/2"

19' - 6 1/2" 5' - 0"

102103104105

100A

49' - 9 1/2"

EQ EQ EQ EQ EQ

5' - 0"

26' - 2"

12' - 0"

6'

1/

2"

145 SF

COMM

72 SF

VESTIBULE

100B5

100C

113A

998 SF

OPEN OFFICE

1238 SF

(E) BRIEFING ROOM

113101 113B

113C

66666

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/8

'-0

/3

0/

:2 6:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

A-101

F L O

O R

PL

AN

NE

W

SA

C R

AM

EN

TO

D

IS

TR

IC

T

J S

TR

EE

T

SA

C R

AM

EN

TO

, C

A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

PLAN NORTH

8 6 4 2 0 8 16

SCALE: 1/8"=1'-0"

(N) COUNTER /

CASEWORK

(E) COUNTER /

CASEWORK

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

1/8" = 1'-0"A-101

1 FLOOR PLAN - NEW LAYOUT

Keynote Legend

Key Value Keynote Text

1 CONSTRUCT (N) WALL TYPE 1, FROM SLAB TO UNDERSIDE OF ROOF DECK.

2 CONSTRUCT (N) WALL TYPE 2, FROM SLAB TO UNDERSIDE OF ROOF DECK.

3 INSTALL (N) PERSONNEL DOOR. PAINT AND PATCH ADJACENT WALL TO MATCH (E).

4 CONSTRUCT (N) WALL TYPE 3.

5 INSTALL (N) VAULT DOOR (MIN. 50 STC) MEETING ICD/ICS 705 REQUIREMENTS; PATCH AND

PAINT (E) ADJACENT WALLS TO MATCH.

6 INSTALL (N) 2 x 4 CLG. GRID SYSTEM; SEE A-510.

7 INSTALL (N) EXIT ONLY VAULT DOOR (MIN. 50 STC) MEETING ICD/ICS 705 REQUIREMENTS;

PATCH AND PAINT (E) ADJACENT WALLS TO MATCH.

8 PROVIDE (N) LOCK CYLINDER AND CORE; SEE A-620.

KEY PLAN

SHEET NOTES:

1. CONTRACTOR RESPONSIBLE FOR FIELD-VERIFYING ALL MEASUREMENTS.

2. WALL TYPES CAN BE FOUND ON SHEET A-002.

3. DOOR SCHEDULE CAN BE FOUND ON SHEET A-620.

4. A GOVERNMENT REPRESENTATIVE MUST BE PRESENT WHILE ANY WORK IS OCCURING IN THE AREA INDICATED ON THE FLOOR

PLAN SHOWN ON THIS SHEET DUE TO CLASSIFIED OPERATING EQUIPMENT.

5. SEE AETC FIRST 400 FEET STANDARD GUIDANCE WITH LUKE SUPPLEMENT FOR INFORMATION ON ELECTRICAL BACKERBOARD

REQUIREMENTS (COMM RM. 112); SEE ALSO ELECTRICAL DRAWINGS.

6. CONTRACTOR SHALL ENSURE THAT FACILITY MEANS OF EGRESS ARE MAINTAINED DURING CONSTRUCTION.

1/8" = 1'-0"A-101

2 REFLECTED CEILING PLAN

CROSS TEE

MIN. 3/4"

MAX. 8" WIRE ANCHORED TO

STRUCTURE ABOVE

STABILIZER BAR (TYP)

SQUARE EDGE

LAY-IN PANELS

"T" BAR MAIN BEAM

TEGULAR EDGE

LAY-IN PANELS

BOTTOM CHORD OF TRUSS

NO12 GA HANGER OR

SPLAY WIRE WHERE OCCURS

3"X3"X1/4" ANGLE. WELD

TO BOTTOM CHORD OF TRUSSES

TYPICAL CONNECTION @ TRUSS

CHORD PARALLE/IN PLANE TO

TRUSS

TYPICAL CONNECTION @ CEILING

SUPPORT PERP/OUT OF PLANE TO

TRUSS

2"

3/4"

8" MAX

ISOMETRIC

ANGLE MOLDING

STABILIZER BAR,

OR OTHER SUITABLE SYSTEM,

TO KEEP PERIMETER COMPONENTS

FROM SPREADING APART

CROSS TEEMIN 3/4" @ UN-ATTACHED WALL

MIN 2"

SECTION

8" MAX

RIVET (TYP)

2"

ISOMETRIC

4'- 0"

M

AX

'-0

4'-0" MAX 12'-0" O.C.

8" MAX 3/4" AT TWO ADJACENT

WALLS

3/4" AT UN-ATTACHED WALL

A-510

TYP.

A-510

TYP.

A-510

TYP.

A-510

TYP.

A-510

TYP.

A-510

TYP.

45°

8" MAX

ACCOUSTICAL TILE CEILING

ON SUSPENDED GRID

SYSTEM

3/4" AT TWO ADJACENT

WALLS

A-510

TYP.

A-510

TYP.

A-510

TYP.

A-510

TYP.

2"

45° MAX TYP 45° MAX TYP

VERTICAL STRUT @ 12'-0" OC EACH

WAY WITH FIRST POINT TO BE

WITHIN 4'-0" FROM EACH WALL

FASTENED TO MAIN RUNNER &

STRUCTURE ABOVE. PER

ASCE-7.13.5.6.2.2

LATERAL BRACING: 12 GA.

BRACING WIRE WITH MIN 4 TIGHT

TURNS IN

1 1/2" AT BOTH ENDS OF WIRE

(TYP) AT EA VERTICAL STRUT (4)

DIRECTIONS

GRID SUPPORTS: 12 GA VERTICAL

HANGER WIRE @ 4-0" OC EACH

WAY WITH MIN 3 TIGHT TURNS IN

1 1/2: AT BOTH ENDS OF WIRE

(TYP). START POINT MAX 8" FROM

WALL.

MAIN RUNNERSCROSS RUNNERS

NOTE:

1. BRACING WIRES SECURED TO MAIN RUNNERS WITHIN 2" OF THE

CROSS RUNNER INTERSECTION AND SPLAYED 90 DEGREES FROM EACH

OTHER AT AN ANGLE NOT TO EXCEEDING 45 DEGREES FROM THE PLANE

OF THE CEILING.

2. A MINIMUM WALL ANGLE AT THE SIZE OF 2" HORIZONTAL LEG

SHALL BE USED AT PERIMETER WALLS AND INTERIOR FULL

HEIGHT PARTITION. THE FIRST TILE SHALL BE 3/4" CLEAR FROM

WALL SURFACE AT UN-ATTACHED END.

3. WHEN THE DISTANCE BETWEEN THE STRUCTURAL DECK AND

THE CEILING EXCEEDS 4, THE SPACING OF THE VERTICAL

HANGERS SHALL NOT EXCEED 2' OC ALONG THE ENTIRE LENGTH

OF THE MEANS OF EGRESS SERVICING AN OCCUPANT LOAD OF 30

OR MORE, AND AT LOBBIES ACCESSORY TO GROUP A OCCUPANCIES.

A-510

TYP.

3" = 1'-0"A-510

3 TYP. SEISMIC CEILING DETAIL

3" = 1'-0"A-510

1 TYPICAL ACT TO LAY-IN GRID ATT.

NOT TO SCALEA-510

2 TYPICAL CEILING SUPPORT @ TRUSS

3" = 1'-0"A-510

5 TYPICAL DETAIL CROSS RUNNERS UN-ATTACHED

3" = 1'-0"A-510

6 TYPICAL DETAIL CROSS RUNNERS ATTACHED

1/4" = 1'-0"A-510

7 TYPICAL GRID SUPPORT PLAN

1/4" = 1'-0"A-510

8 TYPICAL GRID SUPPORT PLAN - SECTION

1/4" = 1'-0"A-510

4 TYPICAL SUSPENDED CEILING VERTICAL AND LATERAL SUPPORT

SCALE:

3" = 1' - 0"

6" 6"

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

As in di ca te d

/3

0/

:2 6:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

A-510

TY

PI

C A L

SU

SP

EN

DE

D C E

IL

IN

G D

E T

AI

LS

SA

C R

AM

EN

TO

D

IS

TR

IC

T

J S

TR

EE

T

SA

C R

AM

EN

TO

, C

A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

SHEET NOTE: ALL DETAILS SHOW INTENDED NEW CONSTRUCTION.

7"

2"

5/8" GWB

MTL FRAME

STC 50 RATED

DOOR

ADJACENT WALL

WHERE OCCURS AT

JAMB (FACE OF

STUD, TYP.)

3-5/8" MTL STUD

4"

ACOUSTICAL

SEALANT, TYP.

ACOUSTIC DOOR

AUTOMATIC DOOR

BOTTOM

ACOUSTIC MTL

SADDLE

ACOUSTIC

SEALANT,

BOTH SIDES

(E) CONC. SLAB

2"

6"

(E) CMU WALL

1"

FULLY GROUTED FRAME

ACOUSTIC SEALANT, TYP.

MASONRY TEE

ANCHOR, 3 PER

JAMB

ACOUSTIC DOOR

ACOUSTIC SEAL

2"

6"

FULLY GROUTED FRAME

ACOUSTIC SEALANT, TYP.

ACOUSTIC DOOR

ACOUSTIC SEAL

BLOCKING,

AS REQ'D.

(N) MTL.

STUD

HEADER

3" = 1'-0"A-520

1 JAMB/HEAD - 3-5/8" STUD

6" = 1'-0"A-520

2 SILL - VAULT THRESHOLD

3" = 1'-0"A-520

3 (N) VAULT DOOR @ CMU - JAMB/HEAD SIM.

3" = 1'-0"A-520

(N) VAULT DOOR @ MTL. STUD - JAMB/HEAD

SIM.

SCALE:

6" = 1' - 0"

3" 3"

SCALE:

3" = 1' - 0"

6" 6"

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

As in di ca te d

/3

0/

:2 6:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

A-520

TY

P I

CA

L

DO

O

R

DE

TA

IL

S

SA

C R

AM

EN

TO

D

IS

TR

IC

T

J S

TR

EE

T

SA

C R

AM

EN

TO

, C

A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

SHEET NOTE: ALL DETAILS SHOW INTENDED NEW CONSTRUCTION.

BEAM

CONT. SLOTTED

TRACK OR

COMPRESSION

TRACK, 18 GA.

MET. STUD FRAMING, 18

GA FOR STUDS

CONNECTION TO DECK

OR BEAM

1/16" 3-6

ATTACHMENT OF BOTTOM TRACKS:

1. TRACK FOR STUD WALLS RESTING

ON CONCRETE SLAB SHALL BE

ANCHORED WITH POWER DRIVEN

FASTENER, HILTI X-DNI (0.145" DIA. X

MIN. EMBED AT CENTER LINE OF TRACK)

OR APPROVED EQUAL AT 16" O.C.

U.O.N.

2. TRACKS FOR STUDS MOUNTED ON

STRUCTURAL FRAMING MEMBERS

SHALL BE WELDED TO THEIR

SUPPORTS WITH 1/16" FILLET WELD X

2" @ EA. SIDE OF TRACK AT 16" O.C.,

MIN.

3. TRACKS AT DECK: USE FASTENERS

AS INDICATED ON NOTE. 1. ABOVE WITH

SPACING AT 12" O.C.

STL. STUDS

@ 16" O.C.

U.O.N.

BOTTOM

RACK (TOP

TRACK

SIMILAR)

FASTENER W/

WASHER

SEE NOTES 1 & 3

1/16

1. WELD

CONNECTION

LENGTH OF

FLANGE, OR 2.

THREADED

CONNECTION

(2) #8 SMS PER

SIDE

ROOF OR

FLOOR

DECK

16" X 18 GA CONT.

PLATE W/ #10 SMS

@ 16" O.C. EACH

EDGE

CONT.

SLOTTED

TRACK OR

COMPRESSION

TRACK, 18 GA.

METAL STUD

FRAMING, 18

GA. FOR

STUDS

CONNECTING

TO DECK OR

BEAM

ROOF OR

FLOOR DECK

#10 SMS @

16" O.C.

#10 SMS

@ 16" O.C.

C

LR1" C

LR1"

PERPENDICULAR TO DECK PARALLEL TO DECK

2"

5/8" TYPE 'X' GWB

STEEL STUD

1-5/8" CHROME

HD DRYWALL

SCREW 18"

VERTICAL

STAINLESS

STEEL RADIUS

COVER

MFR.'S ALUMINUM

REAINER

R 1/4"

ACOUSTIC SEALANT,

EA. SIDE

2 LAYERS OF 5/8"

GYP. WALL BD., ONE

LAYER WITH FOIL

LINED BACKING TO

MEET RF

REQUIREMENTS

(N) RF SHIELD

BOUNDARY

1 1/2"

NOTE: ALL JOINTS IN

FOIL LINED GYP. BD. TO

BE SEALED WITH RF

APPROVED TAPE.

MATERIALS MUST BE

APPROVED ON SITE BY

BASE CVN OR COR.

CONNECT RF

SHIELDING TO

UNDERSIDE OF ROOF

DECK (AT TOP), AND TOP

OF SLAB (AT BOTTOM).

2'-8" A.F.F.

6"

7'-4" A.F.F.

A-550

GLAZED FRONT

GWB

METAL STUD

1/ 2"

1" 0"

1/ 2"

ELEVATION

PLAN

HELVETICA MEDIUM

UPPER CASE LETTERS,

75% WIDTH FACTOR,

BOTH SIDES

FACE OF WALL

ALUM VERTICAL

SUPPORT

NOTE: TYP. @ ALL EXTINGUISHER LOCATIONS

PROVIDE MFR'S

STANDARD CLOSURE

@ TOP, BOTTOM,

& EXPOSED ENDS

PICTOGRAM

BOTH SIDES

SEMI-MATTE CAST

ACRYLIC PANEL ON

EXTRUDED

ALUMINUM FRAME

SUPPORTS

6" NOM.

6" N

O M

SIGN MFR'S

STD. MECH.

FASTENERS,

4 PER SIGN

SIGN MFR'S

STD. MECH.

FASTENERS,

4 PER SIGN

1" = 1'-0"A-550

3 STUD TO BEAM CONNECTION

3/4" = 1'-0"A-550

1 BOTTOM TRACK

3/4" = 1'-0"A-550

2 STUD TO DECK CONNECTION

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

As in di ca te d

/3

0/

:2 6:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

A-550

TY

P I

CA

L

W

AL

L

DE

TA

IL

S

SA

C R

AM

EN

TO

D

IS

TR

IC

T

J S

TR

EE

T

SA

C R

AM

EN

TO

, C

A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

6" = 1'-0"A-550

4 WALL CORNER GUARD

SCALE:

6" = 1' - 0"

3" 3"

6" = 1'-0"A-550

5 NEW RF SHIELDING

3" = 1'-0"A-550

6 SEMI RECESSED EXTINGUISHER CABINET

6" = 1'-0"A-550

7 FIRE EXTINGUISHER SIGN

SCALE:

3" = 1' - 0"

6" 6"

SECTION A-A

BOND BREAKER

NEOPRENE OR

BUTYL

CONC TOPPING

CONC SUBFLOOR

WALL

CERAMIC TILE

S OR M SEALANT,

1/4" TO 3/8" WIDE

"A" "A"

PIPE WITHOUT INSULATION PIPE WITH INSULATION

PIPE

SLEEVE

BACKUP

MATERIAL

PIPE

SEALANT

S OR M

PIPE

SLEEVE

BACKUP

MATERIAL

METAL

JACKET

SEALANT

S OR M

INSULATION

PIPE CL

WATERPROOF

MEMBRANE

WATERPROOF

CLAMPING

FLANGE

INSULATION

SEALANT S OR M

BACKUP

EXTERIOR WALL

CONCRETE OR

MASONRY WALL

PIPE SLEEVE

SEALANT J

(FOAM URETHANE

STRIP)

BACKUP

EXPANDED FOAM

INSULATION

METAL JACKET

PIPE CL

EXTERIOR WALL

SLEEVE

S OR M

SEALANT - JOINT 1/4"

MIN. WIDE BY 3/8"

DEEP

BACKUP MATERIAL

INTERIOR WALL

EXPANDED FOAM

INSULATION

INSULATION

METAL JACKET

ESCUTCHEON

3/ 8"

BACKUP MATERIAL METAL FRAME

SEALANT

S OR M

SILL

SWEEP SEAL

DOOR SEALANT S OR M

DOOR, ALTERNATE

LOCATION

METAL THRESHOLD

3/8"

FACE OF WALL

GROUT

-3/8" @ HEAD

3/16" @ JAMB

SEALANT

S OR M

PRIME

METAL FRAME

METAL EDGE BEAD

BOTH SIDES

TWO BEADS MINIMUM OF

ACOUSTICAL SEALANT

VISIBLE JOINTS CAULKED

WITH PAINTABLE SEALANT

BLANKET ACOUSTICAL INSUL.

SEALED WITH TAPE OR

ACOUSTICAL SEALANT

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

As in di ca te d

/3

0/

:2 6:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

A-590

TY

PI

C A L

SE

AL

AN

T

DE

T A

IL

S

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

NOT TO SCALEA-590

5 CERAMIC TILE CONTROL JOINT (MJI)

NOT TO SCALEA-590

6 PIPE PENETRATION DETAIL (MJM)

NOT TO SCALEA-590

7 PIPE THRU WALL-BELOW GRADE (MJN)

NOT TO SCALEA-590

8 PIPE THRU WALL-ABOVE GRADE (IPAG)

12" = 1'-0"A-590

4 SEALANT @ WINDOW SILL (TJD)

12" = 1'-0"A-590

3 THRESHOLD

12" = 1'-0"A-590

2 JOINT SHAPE @ DOOR FRAME (TJD)

3" = 1'-0"A-590

SEALANT @ PARTITIONS W/ SOUND

TRANSMISSION REQUIREMENTS (ARP)

SCALE:

3" = 1' - 0"

6" 6"

SCALE:

0 1' 2'

1" = 1' - 0"

1' 2'

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

F FF

2" 3' - 0" 2"

7'

0" 2"

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/4

'-0

/3

0/

:2 6:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

A-620

D O O

R

AN

D F I

NI

SH

S

CH

E D

UL

E

SA

C R

AM

EN

TO

D

IS

TR

IC

T

J S

TR

EE

T

SA

C R

AM

EN

TO

, C

A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

SHEET NOTES

1. ALL HARDWARE SHALL BE GRADE 1.

2. ALL HARDWARE SHALL COMPLY WITH ANSI/BHMA 156 SERIES.

3. KEYING SHALL BE COORDINATED WITH USER AND THROUGH THE CONTRACTING OFFICER.

SCHEDULE NOTES

1. PROVIDE STC 50 (MIN.) DOOR AND FRAME. FRAME PER SAPF DOOR MANUFACTURER.

2. COORDINATE HARDWARE WITH CARD READER.

3. EXIT-ONLY DOOR; NO HARDWARE PERMITTED ON EXTERIOR SIDE OF DOOR.

4. CONTRACTOR RESPONSIBLE FOR FIELD VERIFYING WALL CONSTRUCTION BEFORE WORK BEGINS.

5. PROVIDE NEW LOCK CYLINDER AND CORE; KEY CORE TO MEET BASE STANDARD KEYING SYSTEM DBZ1.

6. EGRESS DOORS 100C, 113A, AND 113B TO HAVE AUDIBLE ALARM DEVICE INSTALLAED; COORDINATE WITH ELECTRICAL.

ALUM

HM

P

STL

ALUMINIUM

HOLLOW METAL

PAINT

STEEL

ABBREVIATIONS

1/4" = 1'-0"

DOOR TYPES

1/4" = 1'-0"

FRAME TYPES

DOOR SCHEDULE

DOOR

NO. TYPE

DOOR

FIRE

RATING

FRAME DETAILS

COMMENTS

SIZE

MATL FINISH TYPE MATL FINISH HEAD JAMB SILLWIDTH HEIGHT THICKNESS

100A F 3' - 0" 7' - 0" 2" STL P -- 1 STL P 4/A-520 4/A-520 2/A-520 NOTE 1 & 2

100B F 3' - 0" 7' - 0" 2" STL P -- 1 STL P 4/A-520 4/A-520 2/A-520 NOTE 1 & 2

100C F 3' - 4" 7' - 0" 2" STL P -- 1 STL P 3/A-520 3/A-520 2/A-520 NOTE 1, 3, AND 4

101 F 3' - 0" 7' - 0" 2" STL P -- 1 STL P 1/A-520 1/A-520

102 F 3' - 0" 7' - 0" 2" STL P -- 1 STL P 1/A-520 1/A-520

103 F 3' - 0" 7' - 0" 2" STL P -- 1 STL P 1/A-520 1/A-520

104 F 3' - 0" 7' - 0" 2" STL P -- 1 STL P 1/A-520 1/A-520

105 F 3' - 0" 7' - 0" 2" STL P -- 1 STL P 1/A-520 1/A-520

106 F 3' - 0" 7' - 0" 2" STL P -- 1 STL P 1/A-520 1/A-520

107 F 3' - 0" 7' - 0" 2" STL P -- 1 STL P 1/A-520 1/A-520

112 F 3' - 0" 7' - 0" 2" STL P -- NOTE 5

113A F 3' - 4" 7' - 0" 2" STL P -- 1 STL P 3/A-520 3/A-520 2/A-520 NOTE 1, 3, AND 4 113B FF 6' - 0" 7' - 0" 2" STL P -- 1 STL P 3/A-520 3/A-520 2/A-520 NOTE 1, 3, AND 4 113C F 3' - 4" 7' - 0" 2" STL P 1-1/2 HR. 1 STL P 3/A-520 3/A-520 2/A-520 NOTE 1 AND 4

DOOR HARDWARE

D

EA

D

BO

LT

(F

ED

. S

PE

C

. F F-

L-

LO

C

K (F

ED

. S

PE

C

. F F-

L-

B)

LK

M

-7

X-

L

O C

K

EX

IT

D

EV

IC

E (T

YP

E

, F

U N

C

1)

EX

IT

D

EV

IC

E (T

YP

E

, F

U N

C

4)

LO

C

KS

ET

F

LO

C

KS

ET

F

EL

EC

TR

IC

L

O C

K E0

AU

TO

. D

O O

R B

O

TT

O M

H

IN

G

ES

(A

M

SP

H

IN

G

ES

(A

C

LO

SE

R

AC

O

U

ST

IC

T

H R

ES

H

O

LD

KI

C

KP

LA

TE

PA

N

IC

B

AR

X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X

X X X X X

X X X X X X X X X X X X X X

X X X X X X X

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

NOTE 1: ALL AREAS AFFECTED BY DEMOLITION AND NEW CONSTRUCTION SHALL BE PATCHED AND PAINTED TO MATCH EXISTING.

NEW ROOM FINISH SCHEDULE

ROOM

NO

ROOM

NAME

WALL

FINISH

BASE

FINISH

FLOOR

FINISH

CEILING

NOTES & REMARKSFIN. HT.

100 OPEN OFFICE NOTE 1 NOTE 1 NOTE 1 ACT 8'-0"

101 BRIEFING ROOM NOTE 1 NOTE 1 NOTE 1 ACT 8'-0"

102 BRIEFING ROOM NOTE 1 NOTE 1 NOTE 1 ACT 8'-0"

103 BRIEFING ROOM NOTE 1 NOTE 1 NOTE 1 ACT 8'-0"

104 BRIEFING ROOM NOTE 1 NOTE 1 NOTE 1 ACT 8'-0"

105 BRIEFING ROOM NOTE 1 NOTE 1 NOTE 1 ACT 8'-0"

106 STO. NOTE 1 NOTE 1 NOTE 1 ACT 8'-0"

107 BRIEFING ROOM NOTE 1 NOTE 1 NOTE 1 ACT 8'-0"

108 VESTIBULE NOTE 1 NOTE 1 NOTE 1 ACT 8'-0"

112 COMM NOTE 1 NOTE 1 SEALED CONC. OTS VARIES

125 SF

BRIEFING ROOM

122 SF

BRIEFING ROOM

122 SF

BRIEFING ROOM

122 SF

BRIEFING ROOM

104125 SF

BRIEFING ROOM

202 SF

BRIEFING ROOM

23 SF

STO.

249 SF

(E) BRIEFING ROOM

188 SF

(E) BRIEFING ROOM

188 SF

(E) BRIEFING ROOM

145 SF

COMM

72 SF

VESTIBULE

998 SF

OPEN OFFICE

1238 SF

(E) BRIEFING ROOM

CAPACITY OF DOOR:

40 IN / 0.22 IN / PERSON =

181 PERSONS

CAPACITY OF DOORS:

72 IN / 0.22 IN / PERSON =

327 PERSONS

'-0

CAPACITY OF DOOR:

40 IN / 0.2 IN / PERSON =

200 PERSONS

5' - 0"

38'-9"

18'-0"

6'- 4"

10'-9"

6'-3"

'-0

'-0

'-6

HORIZ. EXIT

CAPACITY OF DOORS:

40 IN / 0.22 IN / PERSON =

181 PERSONS

3' - 0" 3' - 0" (E) FIXED SEATING

'-2

23'-2"

'-1

'-1 0"

PLAN NORTH

FEH

FEH

FEC

FEC

FEC

NEW

5' - 1"

NEW

R = 37' - 6"

R = 37' - 6"

R = 37' - 6

ASSEMBLY OCCUPANCY

BUSINESS OCCUPANCY

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

As in di ca te d

/3

0/

:2 8:

A

M

J

U

LY

P2

M

VA

LE

N

TI

N

E M

ZV

/s / M ar k

K Ba gl ey

L0 3_

C en tra l.r vt

9-

-0

F-101

L I

FE

S A F

ET

Y

PL

AN

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

M

BA

G

LE

Y

R

TA

S U

BM

IT

T A L

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

1/8" = 1'-0"F-101

1 FLOOR PLAN - NEW LAYOUT

8 6 4 2 0 8 16

SCALE: 1/8"=1'-0"

PLAN NORTH

OCCUPANCY:

ASSEMBLY, A-2 IBC, 303.3

ASSEMBLY NFPA 101, 3.3.190.2

BUSINESS, B IBC, 304.1

BUSINESS NFPA 101, 3.3.190.3

HAZARD:

LIGHT UFC 3-600-01, B-1.1

CLASS A FIRE NFPA 10, 5.2.1

OCCUPANT LOAD FACTOR

ASSEMBLY, FIXED SEATING NFPA 101, TABLE 7.3.1.2

NO. OF SEATS

90 SEATS = 90 PERSONS MAXIMUM

COMM. ROOM 112 IS ANCILLARY, 0 PERSONNEL EXPECTED

BUSINESS NFPA 101, TABLE 7.3.1.2

100 SF/PERSON

2,762 GSF/100 SF/PERSON = 28 PERSONS MAXIMUM

DISTANCE TO EXIT

ASSEMBLY NFPA 101, 13.2.6

250' WITH SPRINKLERS

ACTUAL: 60'-7", FROM (E) BRIEFING ROOM 113

BUSINESS NFPA 101, 39.2.6

300' WITH SPRINKLERS

ACTUAL: 98'-8", FROM (E) BRIEFING ROOM 111

EGRESS CAPACITY

BUSINESS NFPA 101, 7.3.3.1

0.2 IN/PERSON

EXISTING ASSEMBLY NFPA 101, 13.2.3.2

.22 IN / PERSON

28 PERSONS X 0.2 IN / PERSON + 90 PERSONS X .22 IN / PERSON= 25.4

INCHES OF EXISTING WIDTH REQUIRED

(40") / 0.2 IN / PERSON + (40" + 72") / .22 IN / PERSON = 709 PERSONS

PROVIDED FOR

COMMON PATH OF TRAVEL

ASSEMBLY NFPA 101, 13.2.5.1.2

25', ANY NUMBER OF OCCUPANTS

ACTUAL: 0'

BUSINESS NFPA 101, 39.2.5.3.1

100' WITH SPRINKLERS

ACTUAL: 0'

MEANS OF EGRESS COMMENTS

ASSEMBLY: PER NFPA 7.2.4.1.2, HORIZONTAL EXITS SHALL BE PERMITTED

TO BE SUBSTITUTED FOR OTHER EXITS WHERE THE TOTAL EGRESS

CAPACITY AND THE TOTAL NUMBER OF THE OTHER EXITS (STAIRS,

RAMPS, DOOR OPENINGS LEADING OUTSIDE THE BUILDING) IS NOT LESS

THAN HALF THAT REQUIRED FOR THE ENTIRE AREA OF THE BUILDING OR

CONNECTED BUILDINGS, AND PROVIDED THAT NONE OF THE OTHER EXITS

IS A HORIZONTAL EXIT.

BUSINESS: PER NFPA 39.2.4.3, A SINGLE EXIT SHALL BE PERMITTED FOR A

ROOM OR AREA WITH A TOTAL OCCUPANT LOAD OF LESS THAN 100

PERSONS, PROVIDED THAT ALL OF THE FOLLOWING CRITERIA ARE MET:

(1) THE EXIT SHALL DISCHARGE DIRECTLY TO THE OUTSIDE AT THE LEVEL

OF EXIT DISCHARGE FOR THE BUILDING.

(2) THE TOTAL DISTANCE OF TRAVEL FROM ANY POINT, INCLUDING

TRAVEL WITHIN THE EXIT, SHALL NOT EXCEED 100 FT (30 M).

FIRE EXTINGUISHERS:

TYPE A, MAX TRAVEL DISTANCE: 75 FT

NFPA 10, 6.2.1.2.2

ACTUAL: 2 NEW EXTINGUISHER CABINETS PROVIDED, SEE A-550

EXTINGUISHERS ARE GF/GI

FEC

FEH

FEC

NEW

(E) FIRE EXTINGUISHER CABINET

(E) FIRE EXTINGUISHER HOOK

(N) FIRE EXTINGUISHER CABINET

1238 SF

(E) BRIEFING ROOM

249 SF

(E) BRIEFING ROOM

188 SF

(E) BRIEFING ROOM

188 SF

(E) BRIEFING ROOM

145 SF

COMM

125 SF

BRIEFING ROOM

122 SF

BRIEFING ROOM

122 SF

BRIEFING ROOM

122 SF

BRIEFING ROOM

125 SF

BRIEFING ROOM

23 SF

STO.

202 SF

BRIEFING ROOM

72 SF

VESTIBULE

998 SF

OPEN OFFICE

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/8

'-0

/3

0/

:2 8:

A

M

J

U

LY

P2

S.

B

AR

M

AN

N

J.

F

R

ES

C

AS

/s / J oh n

Pa rri sh

L0 3_

C en tra l.r vt

9-

-0

FX101

FI

RE

P

RO

TE

CT

IO

N

P L

AN

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

A.

M O

R

IT

A

R

TA

S U

BM

IT

T A L

1/8" = 1'-0"FX101

1 FIRE PROTECTION PLAN

KEY PLAN

PLAN NORTH

8 6 4 2 0 8 16

SCALE: 1/8"=1'-0"

NEW SAPF BOUNDARY

SHEET NOTE: A GOVERNMENT REPRESENTATIVE MUST BE

PRESENT WHILE ANY WORK IS OCCURING IN THIS AREA DUE TO

CLASSIFIED OPERATING EQUIPMENT.

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

NOTES:

1. DEMOLISH ALL EXISTING SPRINKLERS AND SPRINKLER PIPING IN THE AREA OF SAPF

RENOVATION.

2. DEMOLISH ALL EXISTING SPRINKLER PIPE HANGARS AND BRACES IN THE AREA OF SAPF

RENOVATION. EXISTING SPRINKLER PIPE HANGARS AND BRACES MAY BE RE-USED IF THEY ARE IN

GOOD SERVICABLE CONDITION, THEIR VERIFIED LOCATIONS ARE USABLE, AND THEY ARE

COMPLIANT WITH CONTRACT REQUIREMENTS.

3. DESIGN AND INSTALL A NEW SPRINKLER SYSTEM IN THE AREA OF SAPF RENOVATION.

PROVIDE A SINGLE POINT OF CONNECTION TO THE EXISTING SPRINKLER SYSTEM PIPING OUTSIDE

THE AREA OF SAPF RENOVATION (THIS WILL REDUCE SPRINKLER PIPE PENETRATIONS OF THE

SCIF PERIMETER TO JUST ONE WALL PENETRATION). ENSURE THE NEW SPRINKLER PIPING IS

DESIGNED AND INSTALLED TO SLOPE TOWARDS THIS ONE SAPF WALL PENETRATION FOR

SPRINKLER SYSTEM DRAINAGE.

4. PROVIDE A U.L. LISTED DIELECTRIC UNION INSIDE THE SAPF PERIMETER ADJACENT TO THE

SPRINKLER PIPE PENETRATION, OR GROUND THE PIPE WITHIN 6 INCH OF THE PERIMETER

PENETRATION USING A NO. 4 WIRE (0.2043-DIAMETER COPPER WIRE) TO THE BUILDING GROUND.

5. PROVIDE A NEW CROSS MAIN OUTSIDE THE SAPF TO CONNECT THE EXISTING BRANCH LINES

TOGETHER AS NEEDED FOR PROPER SPRINKLER SYSTEM FUNCTION AND DRAINAGE.

6. SAPF SPRINKLER SYSTEM DESIGN CRITERIA:

OCCUPANCY: LIGHT HAZARD

DESIGN DENSITY: 0.1 GPM/SF

DESIGN AREA: 1500 SF

MINIMUM K-FACTOR: 5.6

HOSE STREAM: 250 GPM

7. WATER SUPPLY DATA (TO BE VERIFIED BY WATERFLOW TESTING CONDUCTED BY THE

CONTRACTOR):

STATIC PRESSURE: 95 PSI

RESIDUAL PRESSURE: 85 PSI

FLOW: 1250 GPM

8. CONDUCT WATERFLOW TESTING IN ACCORDANCE WITH THE PROCEDURES CONTAINED IN

NFPA 291 TO DETERMINE AVAILABLE WATER SUPPLY FOR THE WATER-BASED FIRE

EXTINGUISHING SYSTEMS. THE FLOW TEST MUST BE PERFORMED UNDER THE DIRECTION OF THE

CORPS OF ENGINEERS FIRE PROTECTION ENGINEER.

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e :

Pr oj e c t N o:

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

R ev ie w ed b y:

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S c a le

Pl ot

D a t e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct i o n

B9

S O

UT

H

SQ

UA

D O

PS

SA

PF

U

PG

RA

DE

LU

KE

A

FB

AZ

/3

0/

:2 8:

A

M

J

U

LY

P2

S.

B

AR

M

AN

N

J.

F

R

ES

C

AS

/s / J oh n

Pa rri sh

L0 3_

C en tra l.r vt

9-

-0

FX701

SH

E E

T

SP

EC

IF

I C

AT

IO

NS

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

A.

M O

R

IT

A

R

TA

S U

BM

IT

T A L

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

WET-PIPE SPRINKLER SYSTEMS

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes: Modification of existing wet-pipe automatic fire sprinkler system as indicated on the Drawings and as specified.

1.2 SUBMITTALS

A. Preliminary Shop Drawings: Prior to detailed submission, submit preliminary layout of finished ceiling areas indicating only head locations coordinated with ceiling installation.

B. Shop Drawings: For areas of new work, provide hydraulic calculations, detailed pipe layout, hangers and supports, components and accessories. Indicate system controls. Depict demolition and renovation work; indicate points of disconnection and connection to and from the existing system for each phase of work. Indicate existing portions of system to remain.

C. Product Data: Provide data on sprinkler heads, valves, and specialties, including manufacturers’ catalog information. Submit performance ratings, rough-in details, weights, support requirements, and piping connections.

D. Submit shop drawings, product data, hydraulic calculations to authority having jurisdiction if required.

E. Manufacturer’s Certificate: Certify that system has been tested and meets or exceeds specified requirements.

1.3 SYSTEM DESCRIPTION

A. Existing system shall be modified to provide coverage for building renovation areas as noted on the Drawings.

1.4 RECORD DOCUMENTS

A. Record actual locations of sprinkler heads and deviations of piping from drawings. Indicate drain and test locations.

1.5 OPERATION AND MAINTENANCE DATA

A. Maintenance Data: Include components of system, servicing requirements, Record Drawings, inspection data, replacement part numbers and availability, and location and numbers of service depot.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with NFPA 13 (2016).

B. Equipment and Components: Bear UL and FM label or marking, as applicable.

C. Qualifications:

1. Sprinkler System Installer: Work specified in this section shall be performed by the Sprinkler System Installer who is regularly engaged in the installation of the type and complexity of system specified in the contract documents, and who has served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months. Submit the name and documentation of certification of the proposed Sprinkler System Installer, concurrent with submittal of the Fire Protection Specialist Qualifications.

2. Fire Protection Specialist: Perform work specified in this section under the supervision of and certified by the Fire Protection Specialist who is an individual registered professional engineer in a related engineering discipline with a minimum of 5 years experience, dedicated to fire protection engineering that can be verified with documentation or who is certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Automatic Sprinkler System Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7. Submit the name and documentation of certification of the proposed Fire Protection Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations.

D. Regulatory Requirements:

1. Hydraulic calculations, product data, shop drawings: Bear stamp of the Fire Protection Specialist.

PART 2 - PRODUCTS

2.1 APPROVED MANUFACTURERS

A. The following manufacturers are approved for use subject to the detailed requirements of the Drawings and Specifications.

1. Hangers: Elcen, Fee & Mason, Grinnell, F&M, Michigan.

2. Check, Gate, and Globe Valves: Jenkins, Crane, Mueller, Kennedy, Grinnell, United, Nibco, Clow, Central.

2.2 MATERIALS

A. Pipe and Fittings:

1. Aboveground piping shall be steel. Except as modified herein, steel pipe shall be black as permitted by NFPA 13 and shall conform to applicable provisions of ASTM A795/A795M, ASTM A53/A53M, or ASTM A135/A135M.

Pipe in which threads or grooves are cut or rolled formed shall be Schedule 40 or shall be listed by Underwriters' Laboratories to have a corrosion resistance ratio (CRR) of 1.0 or greater after threads or grooves are cut or rolled formed. Pipe shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation.

2. Fittings shall be cast iron conforming to ASME B16.4, steel conforming to ASME B16.9 or ASME B16.11, or malleable iron conforming to ASME B16.3. Fittings into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be used.

B. Sprinklers:

1. Pendant and Upright: Sprinklers shall match existing sprinklers. Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations. Temperature classification shall be ordinary. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13. Extended coverage sprinklers shall not be used. Pendent sprinkler shall be of the fusible strut or glass bulb type, recessed quick-response type with nominal 1/2 inch orifice.

Pendent sprinklers shall have a polished chrome finish. Upright sprinkler shall be brass quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.

2. Ensure the correct number (per NFPA 13) of spare sprinklers to match those in the areas of renovation work are provided and stored in the existing fire sprinkler head cabinet. Provide a wrench if necessary.

C. Piping Hangers:

1. Shall listed in the UL Fire Protection Directory or FM Approval Guide and conform to NFPA and UL standards for spacing, number, size, and type. Pipe to be generally supported by clamps and rods secured to overhead construction.

D. Piping specialties:

1. Sleeves: Unless otherwise detailed or required by code, provide 20 gauge galvanized sleeves around all pipes passing through walls and floors packed with Thical.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine architectural drawings for information pertinent to installation of piping and sprinkler heads.

B. Coordinate work of this Section with other affected work.

3.2 INSTALLATION - PIPING

A. Sprinkler piping shall be concealed above ceiling where possible. Sprinkler heads in ceiling shall be chrome plated, unless noted otherwise. Sprinkler heads located in rooms where there is no ceiling may be standard bronze upright or pendant as required. Sprinkler heads located in areas with lay-in acoustical ceilings shall be centered in lay-in acoustical unit.

B. Screw Jointed: Cut pipe accurately to measurements established at building. Work into place without springing or forcing. Proper provision shall be made for expansion and contraction of piping. Pipe and fittings shall be free from burrs and fins. All pipe shall be threaded and reamed.

Apply lubricant to male threads only. Full cut thread and no more than three threads shall remain exposed on the pipe after threading.

C. Protection: Protect materials, fittings and fixtures properly and effectively. Pipe openings shall be closed so as to prevent obstructions and damage.

D. Drainage: Wherever piping is trapped, an auxiliary draw-off shall be provided. All piping to drain back to riser main drain except where auxiliary drains are provided.

E. Welding: On-site welding of sprinkler piping will not be permitted.

F. Groove Joining: Pipe joined with mechanical grooved couplings shall be joined by a listed combination of couplings, gaskets and grooves. Grooves cut or rolled on pipe shall be dimensionally compatible with the coupling.

G. In general, install sprinkler piping at maximum height throughout the building. Offset piping as required to clear mechanical ductwork, piping, building structure, etc.

H. The mechanical systems installation (equipment, ductwork, piping, etc.) shall have priority over space within the building.

I. Sprinkler heads located 7 feet or less above finished floor elevation shall be provided with approved guards.

J. Labeling: All new sprinkler pipe 2" and larger shall be provided with plastic labels of standard manufacturer to identify piping as FIRE PROT WATER. Labels shall have red letters minimum 1” high, ¼” brush stroke, on white background. Labels shall be affixed at maximum intervals of 20’ to all fire protection system piping larger than 2” diameter. Arrow with direction flow.

3.3 INSTALLATION - GENERAL

A. Installation Requirements:

The installation shall be in accordance with the applicable provisions of NFPA 13.

B. Protection of Piping Against Earthquake Damage: Seismically protect the system piping against damage from earthquakes. This requirement is not subject to determination under NFPA 13. Install the seismic protection of the system piping in accordance with UFC 3-310-04, NFPA 13 and Annex A. Include the required features identified therein that are applicable to the specific piping system.

3.4 FIELD QUALITY CONTROL

A. Inspection By Fire Protection Specialists:

Prior to ceiling installation and concurrent with the Final Acceptance Test Report, certification by the Fire Protection Specialist that the sprinkler system is installed in accordance with the contract requirements, including signed approval of the Preliminary and Final Acceptance Test Reports. The Fire Protection Specialist shall: 1) inspect the sprinkler system periodically during the installation to assure that the sprinkler system is being provided and installed in accordance with the contract requirements, 2) witness the preliminary and final tests, and sign the test results, 3) after completion of the system inspections and a successful…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .