Attachment 4 - Price Evaluation Worksheet - 23Oct20.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
SABER Construction Services IDIQ
Solicitation number
FA488721R0003
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA488721R00030005 SF 30.pdf PDF
Attachment 31 - RFI Log - 3 Feb 2021.xlsx XLSX spreadsheet
Solicitation Amendment FA488721R00030004 SF 30.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 29Jan21.pdf PDF
Attachment 31 - RFI Log - 29Jan2021.xlsx XLSX spreadsheet
Solicitation Amendment FA488721R00030003 SF 30.pdf PDF
Attachment 31 - RFI Log - 25Jan2021.xlsx XLSX spreadsheet
Attachment 1 - SABER SOW - 21 January 2021.pdf PDF
Attachment 32 - As-Built Elevation Drawings - 6Mar86.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 21Jan21.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 21Jan21.pdf PDF
Solicitation Amendment FA488721R00030002 SF 30.pdf PDF
Attachment 29 - NAF Standard Clauses Revised 22 January 2021.pdf PDF
Attachment 9 - Present Past Performance Questionnaire (PPPQ) Cover Letter Revised 25Jan21.pdf PDF
Attachment 33 - Asbestos LBP Reports - 19Feb03.pdf PDF
Attachment 28 - Resume Template - 21Jan21.docx DOCX document
Attachment 3 - Wage Determination AZ20210030 - Coconio County 1Jan21.pdf PDF
Attachment 31 - RFI Log - 13Jan21.xlsx XLSX spreadsheet
Attachment 5 - Section L Instructions to Offerors - 11Jan21.pdf PDF
Attachment 8 - Solicitation Cross Reference Matrix - 11 Jan 2021.docx DOCX document
Pre-Proposal Conference Attendees 6Jan21.pdf PDF
Attachment 2 - Wage Determination AZ20210031 - Maricopa County - 1Jan21.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 11Jan21.pdf PDF
Solicitation Amendment FA488721R00030001 SF 30.pdf PDF
Attachment 28 - Resume Template - 11Jan21.docx DOCX document
Attachment 29 - NAF Standard Clauses.pdf PDF
Attachment 2 - Wage Determination AZ20200031 - Maricopa County 4Dec20.pdf PDF
Attachment 15 - Luke AFB Disc Submittal Guidelines.pdf PDF
Attachment 16 - LUKE Design and Construction Standards cm.pdf PDF
Attachment 12 - Teaming Partner Consent Letter - 23Oct20.doc DOC document
Attachment 7 - Incentive Option Plan - 23Oct20.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 4Dec20.pdf PDF
Attachment 24 - Seed project RTA - 942 South - 1Jun17.pdf PDF
Attachment 11 - Present Past Performance Questionnaire (PPPQ) 23Oct20.docx DOCX document
Attachment 13 - Luke Master Specifications - 9Sep2020.pdf PDF
Attachment 23 - Seed Project RTA - 942 North - 1Jun17.pdf PDF
Attachment 19 - Luke Specification for Fire Protection and Life Safety.pdf PDF
Attachment 22 - Basic Project Design Requirements - 23Oct20.pdf PDF
Attachment 9 - Present Past Performance Questionnaire (PPPQ) Cover Letter.pdf PDF
Attachment 1 - SABER SOW - 28Aug20.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 4Dec20.pdf PDF
Attachment 25 - SOW Seed Project - Upgrade F16 Simulator Area 18Aug20.pdf PDF
Solicitation - FA488721R0003.pdf PDF
Attachment 20 - Mass Notification Systems - 23Oct20.pdf PDF
Attachment 26 - AF Form 3064 Progress Schedule - 23Oct20.xlsx XLSX spreadsheet
Attachment 8 - Solicitation Cross Reference Matrix - 28Oct20.docx DOCX document
Attachment 30 - NAF Construction Clauses Definitions.pdf PDF
Attachment 17 - AETC First 400 Feet Standard Guidance.pdf PDF
Attachment 10 - Present Past Performance Information (PPPI) 23Oct20.docx DOCX document
Attachment 14 - AFI 33-118 Electromagnetic Spectrum Management.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAB 1 - Weighted Coefficients

FA488721R0003 Attachment 4
PRICE EVALUATION WORKSHEET
Simplified Acquisition of Base Engineer Requirements (SABER) Contract
Luke AFB and 161st ANG
CLINItem DescriptionWeight Based on Historical DataProposed CoefficientWeighted Value Result
0001AA- Base Ordering Period 1001AA- Option Year 1 2001AA- Option Year 2Luke/161st ANG - Standard Hours79%0.000
0001AB- Base Ordering Period 1001AB- Option Year 1 2001AB- Option Year 2Luke/161st ANG - Non-Standard Hours8%0.000
SUBTOTAL WEIGHTED COEFFICIENT RATE87%0.000
Gila Bend Auxiliary Field
CLINItem DescriptionWeight Based on Historical DataProposed CoefficientWeighted Value Result
0002AA- Base Ordering Period 1002AA- Option Year 1 2002AA- Option Year 2Gila Bend Auxiliary Field - Standard Hours6%0.000
0002AB- Base Ordering Period 1002AB- Option Year 1 2002AB- Option Year 2Gila Bend Auxiliary Field - Non-Standard Hours1%0.000
SUBTOTAL WEIGHTED COEFFICIENT RATE7%0.000
Ft Tuthill Receration Center, Flagstaff AZ
CLINItem DescriptionWeight Based on Historical DataProposed CoefficientWeighted Value Result
0003AA- Base Ordering Period 1003AA- Option Year 1 2003AA- Option Year 2Ft Tuthill - Standard Hours5%0.000
0003AB- Base Ordering Period 1003AB- Option Year 1 2003AB- Option Year 2Ft Tuthill - Non-Standard Hours1%0.000
SUBTOTAL WEIGHTED COEFFICIENT RATE6%0.000
100%
NOTE: Fill-in highlighted boxes only; data to correspond with offerors proposed prices as inserted within the bid schedule. The coefficient shall be no further out than to the thousandths (0.000). Transfer subtotal weighted coefficient rate to the Total Evaluated Price Tab.

Tab 2 - Total Evaluated Price

FA488721R0003 Attachment 4
PRICE EVALUATION WORKSHEET
Simplified Acquisition of Base Engineer Requirements (SABER) Contract
Equation: (For Evaluation Purposes Only!)
Luke AFB Price = $37,000,000 x Luke AFB Weighted Coefficient
Gila Bend & Goldwater Range Price = $37,000,000 x Gila Bend & Goldwater Range Weighted Coefficient
JBAB Price = $37,000,000 x JBAB Weighted Coefficient
Luke & 161st ANG + Gila Bend & Goldwater Range + Ft Tuthill Price = Total Evaluated Price
Instructions to Offerors: The weighted coefficient rates will be evaluated. Fill-in highlighted boxes only; data to correspond with offerors proposed prices as inserted within the bid schedule. The coefficient shall be no further out than to the thousandths (0.000).
Estimate Aggregate Total Over All Periods and OptionsSubtotal Weighted Coefficient RatesEvaluated Total(s)
Luke + 161st ANG$37,000,000.00X0.000=$0.00
Gila Bend + Goldwater Range$37,000,000.00X0.000=$0.00
Ft Tuthill - Flagstaff AZ$37,000,000.00X0.000=$0.00
Total Evaluated Price:$0.00
*Estimate Aggregate per location is for evaluation purposes only & is non-binding.

Tab 3 - Coefficient Development

FA488721R0003 Attachment 4
PRICE EVALUATION WORKSHEET
Simplified Acquisition of Base Engineer Requirements (SABER) Contract
Basis for Development of the CoefficientPercentage of Coefficient for Luke AFB & 161st ANGPercentage of Coefficient for Gila BendPercentage of Coefficient for Ft. Tuthill

The coefficient shall cover all items including all general conditions, profit, overhead, bonds, taxes, insurance, administrative/technical support and labor burden for the prime Contractor’s office staff and workforce. Bond costs shall be included in the coefficient and bonds will be required for each Task Order IAW FAR 28.

General Conditions
Profit
Overhead
Bonds
Taxes
Insurance
Administrative/Technical Support
Labor Burden - Prime Contractor
Total Coefficient

NOTE: Offerors shall identify cost elements that compose the total coefficient for each area of work. The above elements are included as a reference, but can be edited as necessary based on each offeror's coefficient pricing.