Attachment 7 - Incentive Option Plan - 23Oct20.pdf

PDF 1 MB Posted

Attached to
SABER Construction Services IDIQ
Solicitation number
FA488721R0003
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA488721R00030005 SF 30.pdf PDF
Attachment 31 - RFI Log - 3 Feb 2021.xlsx XLSX spreadsheet
Solicitation Amendment FA488721R00030004 SF 30.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 29Jan21.pdf PDF
Attachment 31 - RFI Log - 29Jan2021.xlsx XLSX spreadsheet
Solicitation Amendment FA488721R00030003 SF 30.pdf PDF
Attachment 31 - RFI Log - 25Jan2021.xlsx XLSX spreadsheet
Attachment 1 - SABER SOW - 21 January 2021.pdf PDF
Attachment 32 - As-Built Elevation Drawings - 6Mar86.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 21Jan21.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 21Jan21.pdf PDF
Solicitation Amendment FA488721R00030002 SF 30.pdf PDF
Attachment 29 - NAF Standard Clauses Revised 22 January 2021.pdf PDF
Attachment 9 - Present Past Performance Questionnaire (PPPQ) Cover Letter Revised 25Jan21.pdf PDF
Attachment 33 - Asbestos LBP Reports - 19Feb03.pdf PDF
Attachment 28 - Resume Template - 21Jan21.docx DOCX document
Attachment 3 - Wage Determination AZ20210030 - Coconio County 1Jan21.pdf PDF
Attachment 31 - RFI Log - 13Jan21.xlsx XLSX spreadsheet
Attachment 5 - Section L Instructions to Offerors - 11Jan21.pdf PDF
Attachment 8 - Solicitation Cross Reference Matrix - 11 Jan 2021.docx DOCX document
Pre-Proposal Conference Attendees 6Jan21.pdf PDF
Attachment 2 - Wage Determination AZ20210031 - Maricopa County - 1Jan21.pdf PDF
Attachment 6 - Section M Evaluation Criteria - 11Jan21.pdf PDF
Solicitation Amendment FA488721R00030001 SF 30.pdf PDF
Attachment 28 - Resume Template - 11Jan21.docx DOCX document
Attachment 29 - NAF Standard Clauses.pdf PDF
Attachment 2 - Wage Determination AZ20200031 - Maricopa County 4Dec20.pdf PDF
Attachment 15 - Luke AFB Disc Submittal Guidelines.pdf PDF
Attachment 16 - LUKE Design and Construction Standards cm.pdf PDF
Attachment 12 - Teaming Partner Consent Letter - 23Oct20.doc DOC document
Attachment 6 - Section M Evaluation Criteria - 4Dec20.pdf PDF
Attachment 24 - Seed project RTA - 942 South - 1Jun17.pdf PDF
Attachment 11 - Present Past Performance Questionnaire (PPPQ) 23Oct20.docx DOCX document
Attachment 13 - Luke Master Specifications - 9Sep2020.pdf PDF
Attachment 23 - Seed Project RTA - 942 North - 1Jun17.pdf PDF
Attachment 4 - Price Evaluation Worksheet - 23Oct20.xlsx XLSX spreadsheet
Attachment 19 - Luke Specification for Fire Protection and Life Safety.pdf PDF
Attachment 22 - Basic Project Design Requirements - 23Oct20.pdf PDF
Attachment 9 - Present Past Performance Questionnaire (PPPQ) Cover Letter.pdf PDF
Attachment 1 - SABER SOW - 28Aug20.pdf PDF
Attachment 5 - Section L Instructions to Offerors - 4Dec20.pdf PDF
Attachment 25 - SOW Seed Project - Upgrade F16 Simulator Area 18Aug20.pdf PDF
Solicitation - FA488721R0003.pdf PDF
Attachment 20 - Mass Notification Systems - 23Oct20.pdf PDF
Attachment 26 - AF Form 3064 Progress Schedule - 23Oct20.xlsx XLSX spreadsheet
Attachment 8 - Solicitation Cross Reference Matrix - 28Oct20.docx DOCX document
Attachment 30 - NAF Construction Clauses Definitions.pdf PDF
Attachment 17 - AETC First 400 Feet Standard Guidance.pdf PDF
Attachment 10 - Present Past Performance Information (PPPI) 23Oct20.docx DOCX document
Attachment 14 - AFI 33-118 Electromagnetic Spectrum Management.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LUKE AIR FORCE BASE

SIMPLIFIED ACQUISITION of BASE ENGINEERING REQUIREMENTS

INCENTIVE OPTION PLAN

1.0 DEFINITIONS

“Incentive Option Period (IOP),” refers to a period of performance established under this competitively awarded contract in which the awardee may be awarded an option contract in the future based on a contingency. In this case, the contingency is defined as the awardee receiving exclusively “Satisfactory” or higher Contractor Performance

Assessment Reporting System (CPARS) documented ratings in all evaluated areas of contract performance considered at the effective Determination Point (DP).

“Determination Point (DP),” refers to the scheduled point in time when the ACO makes a unilateral decision as to whether the Service Provider (SP) has become eligible or ineligible for an opportunity to perform a future IOP. An affirmative determination does not automatically entitle the SP to perform during a particular IOP, but rather affords the SP an opportunity to perform during a particular IOP contingent upon the ACO determining the requirements of

FAR Part 17.202 – Use of Options are met and exercising the IOP IAW FAR 52.217-9, Option to Extend the Term of the Contract.

“Eligible,” refers to the ACO’s affirmative decision that the SP has met the required criteria, (i.e., received exclusively “Satisfactory” or higher CPARS ratings) which in turn, supports the ACO’s decision to exercise either

Option 1 - First IOP (Ordering Year 6) and Option 2 - Second IOP (Ordering Year 7).

2.0 INTRODUCTION

2.1. This Incentive Option Plan describes the process that will be applied by the ACO to determine whether the SP is eligible or ineligible for the IOPs. The figure in Para 4.1. below depicts the DPs when the ACO may determine the

SP is eligible or ineligible to be awarded either future IOP.

2.2. The objective of this incentive approach is to motivate consistent, “Satisfactory” or better performance in all

CPARS rated areas from the outset of SP performance. For this reason, the first IOP DP relates directly to initial performance quality (the first ordering year). Subsequent IOP DPs consider performance occurring after the first ordering year.

3.0 PARAMETERS

3.1. The SP becomes eligible or ineligible for IOPs based on CPARS performance ratings for the basic contract and all projects completed within the periods specified in the figure in Para 4.1. below. A single CPARS rating below “Satisfactory” in any rated area (i.e. Quality, Schedule, Cost Control, Management, Small Business Utilization, and Regulatory Compliance) guarantees ineligibility for at least one IOP. Exclusively “Satisfactory” or higher CPARS ratings in all rated areas guarantee continued IOP eligibility.

3.2. All IOPs will be executed in accordance with FAR 52.217-9, Option to Extend the Term of the Contract, as the unilateral right of the Government. As such, it should be understood that becoming “eligible” for IOPs does not guarantee future performance of IOP 1 and IOP2. In addition to maintaining eligibility through acceptable CPARS ratings, the IOPs remain contingent upon the requirements of FAR Part 17.207 – Exercise of Options criteria being met.

3.3. Within approximately 45 days of CPARS finalization, at the applicable DP described in Section 4.1. below, the

ACO will determine whether the SP is eligible or ineligible for a particular IOP. The ACO will notify the contractor as soon as practicable upon making the determination.

Attachment 7 - FA488721R0003 Incentive Option Plan

23 October 2020

Point #2 SP becomes eligible or ineligible for the

1st IOP if it became ineligible for the

2nd IOP at DP #1

Point #3 SP becomes eligible or ineligible for the

2nd IOP if it became eligible for the 1st

IOP at DP #1

4.0 IMPLEMENTATION

4.1. This section illustrates the IOP eligibility process. There are up to three possible DPs, and each is described below. Each DP makes reference to a “first IOP” and/or a “second IOP”. The first IOP refers to the 1st

Option

Period (6th Year), and the Second IOP refers to the 2nd Option Period (7th Year), as depicted in the figure below.

Apr

Apr

Apr

Apr

Apr

Apr

Apr

Apr

Ordering Yr Ordering Yr Ordering Yr Ordering Yr Ordering Yr

One Two Three Four Five

Determination

Point #1 SP becomes eligible for the 1st

IOP or ineligible for the 2nd IOP

1st IOP

4.2.Determination Point #1:

4.2.1. Eligible. The SP has achieved CPARS ratings of “Satisfactory” or better in all evaluated performance areas during the first ordering year period of performance. The SP becomes eligible for the first IOP. The exercise of this option period may or may not, depending on the circumstances, be exercised by the contracting officer in accordance with FAR 52.217-9. If the SP becomes eligible for the first IOP at this determination point, the SP establishes an opportunity to become eligible for the second IOP at DP #3.

4.2.2. Ineligible. The SP did not achieve annual CPARS ratings of “Satisfactory” or better in all evaluated performance areas during the first ordering year period of performance. The SP becomes ineligible to receive the second IOP; however, the SP retains the opportunity to become eligible for the first IOP at DP #2.

4.3.Determination Point #2: This DP is implemented only if eligibility for the second IOP was lost at DP #1.

4.3.1. Eligible. The SP achieved annual CPARS ratings of “Satisfactory” or better in all evaluated performance areas for ordering years two and three. The SP becomes eligible for the first IOP. The exercise of this option period may or may not, depending on the circumstances, be exercised by the contracting officer in accordance with FAR

52.217-9.

4.3.2. Ineligible. The SP did not achieve annual CPARS ratings of “Satisfactory” or better in all evaluated performance areas for ordering years two and three. The SP becomes ineligible for the first IOP.

4.4. Determination Point #3: This DP is implemented only if the SP became eligible for the first IOP at DP #1.

1st Option Period

2nd Option Period

Attachment 7 Incentive Option Plan FA488721R0003 23 October 2020

2nd IOP

4.4.1. Eligible. The SP achieved annual CPARS ratings of “Satisfactory” or better in all evaluated performance areas for ordering years two, three, and four. The SP becomes eligible for the second IOP. The exercise of this option period may or may not, depending on the circumstances, be exercised by the contracting officer in accordance with FAR 52.217-9.

4.4.2. Ineligible. The SP does not achieve annual CPARS ratings of “Satisfactory” or better in all evaluated performance areas for ordering years two, three, and four. The SP becomes ineligible for the second IOP.

Attachment 7 Incentive Option Plan FA488720R0004 23 October 2020