Attachment_14_-_Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 124 KB Posted

Attached to
Multiple Award Construction Contract (MACC) IDIQ
Solicitation number
FA4887-13-R-0005
Issued by

About this file

Attachment 14 - Construction Cost Estimate Breakdown

View the file

Other files

File Type Posted
Attachment_42_-_RFI_Responses_5.docx DOCX document
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Attachment_41_-_RFI_Responses_4.docx DOCX document
Amendment_0006.pdf PDF
Attachment_40_-_RFI_Responses_3.docx DOCX document
Attachment_37_-_Revised_SOO_Demonstration_Project.DOCX DOCX document
Amendment_0005.pdf PDF
Attachment_39_-_Demonstration_Project_Rack_Solution.pdf PDF
Attachment_38_-_RFI_Responses_2.docx DOCX document
Attachment_36_-_RFI_Responses.docx DOCX document
Amendment_0004.pdf PDF
Attachment_35_-_Bldg_1130_Hazmat_Report.pdf PDF
Attachment_34_-_Preproposal_sign-in_sheet.pdf PDF
Amendment_0003.pdf PDF
Amendment_0001.pdf PDF
MACC_Amendment_0002.pdf PDF
Attachment_20_-_Past_Performance_Questionnaire.doc DOC document
Attachment_12_-_Hazardous_Material_Questionaire.doc DOC document
Attachment_28b.pdf PDF
Attachment_10_-_AF_Form_3065_Progress_Report.pdf PDF
Attachment_28m.pdf PDF
Attachment_26_-_Financial_Information_Request.docx DOCX document
Attachment_18_-_DoD_Unified_Facilities_Criteria_(link).docx DOCX document
Attachment_28j.pdf PDF
Attachment_27_-_Bonding_Information_Request.docx DOCX document
Attachment_1_-_Wage_Determination.docx DOCX document
Attachment_29_-_USAF_Unaccompanied_Housing_Design_Guide.pdf PDF
Attachment_9_-_AF_Form_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_28p.pdf PDF
Attachment_5_-_Architectural_Design_Compatibility_Guide.PDF PDF
Attachment_28e.pdf PDF
Attachment_11_-_AF_Form_3000_Material_Approval_Submittal.pdf PDF
Attachment_33_-_Base_Access_Instructions.pdf PDF
Attachment_28q.pdf PDF
Attachment_19_-_AFI_33-118_Radio_Communications.pdf PDF
Attachment_6_-_Luke_AFB_Design_and_Construction_Standards.doc DOC document
Attachment_28o.pdf PDF
FA4887-13-R-0005_Luke_AFB_MACC.doc DOC document
Attachment_28l.pdf PDF
Attachment_4_-_Luke_AFB_Landscape_Design_and_Maintenance_Standards.pdf PDF
Attachment_7_-_Engineering_Technical_Letter_(ETL_02-12).pdf PDF
Attachment_28i.pdf PDF
Attachment_3_-_Luke_AFB_Master_Specifications.rtf RTF text file
Attachment_28h.pdf PDF
Attachment_25_-_Client_Authorization_Letter.doc DOC document
Attachment_22_-_Teaming_List.doc DOC document
Attachment_32_-_L_and_M_Matrix_(Mandatory_Compliance_Items).xlsx XLSX spreadsheet
Attachment_15_-_AF_Form_103_Base_Civil_Engineer_Work_Clearance_Req.pdf PDF
Attachment_28g.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 3052 FRONT

CONSTRUCTION COST ESTIMATE BREAKDOWNOMB No. 0704-0193
Expires
CONTRACTORADDRESS
CONTRACT FOR (Work to be preformed)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTS
LINEUNITOTHER
NO.ITEMOFMANHOURAVERAGEDIRECTLINE
MEASUREQUANTITYUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
AF FORM 3052 Jan 88PREVIOUS EDITION IS OBSOLETE

Attachment 14

AF 3052 CONT SHT 1

CONSTRUCTION COST ESTIMATE BREAKDOWN CONTINUATION SHEETOMB No. 0704-0193
Expires
CONTRACTORADDRESS
CONTRACT FOR (Work to be preformed)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTS
LINEUNITOTHER
NO.ITEMOFMANHOURAVERAGEDIRECTLINE
MEASUREQUANTITYUNITTOTALMANDAYSRATETOTALCOSTSTOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

AF 3052 BACK SHT

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, linear feet - LF, board feet - BF, each - EA, pound - LB).

Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issed. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
TOTAL MATERIAL COSTS$- 0

TOTAL LABOR COSTS $ - 0

TOTAL OTHER DIRECT COSTS $ - 0

TOTAL DIRECT COSTS $ - 0

OVERHEAD ___ % $ - 0

SUBTOTAL $ - 0

PROFIT ___ % $ - 0

TOTAL PRICE$- 0
DATE ______________________________FIRM NAME ________________________________________
TITLE ______________________________BY _________________________________________________
(Signature)
_________________________________________________________________________________________________________________________
INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of

a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)

AF 3052 BACK - SAMPLE

INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of
all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, linear
feet - LF, board feet- BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issed. Otherwise, the
contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7
the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant
dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows:
TOTAL MATERIAL COSTS$
TOTAL LABOR COSTS$
TOTAL OTHER DIRECT COSTS$
TOTAL DIRECT COSTS$
OVERHEAD%$
SUBTOTAL$
PROFIT%$
TOTAL PRICE$
DATE ______________________________FIRM NAME _______________________________________________
TITLE ______________________________BY ________________________________________________________
(Signature)
____________________________________________________________________________________________________________
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any
additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made
available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying
the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation
of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any
negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)

File details come from the government source that posted it. Updated .