Attachment_12_-_Hazardous_Material_Questionaire.doc

DOC document 33 KB Posted

Attached to
Multiple Award Construction Contract (MACC) IDIQ Federal contract opportunity
Solicitation number
FA4887-13-R-0005
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 12 - Hazardous Material Questionaire

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) IDIQ, newest first.
File Type Posted
Attachment_42_-_RFI_Responses_5.docx DOCX document
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Attachment_41_-_RFI_Responses_4.docx DOCX document
Amendment_0006.pdf PDF
Attachment_40_-_RFI_Responses_3.docx DOCX document
Attachment_38_-_RFI_Responses_2.docx DOCX document
Attachment_39_-_Demonstration_Project_Rack_Solution.pdf PDF
Attachment_36_-_RFI_Responses.docx DOCX document
Attachment_35_-_Bldg_1130_Hazmat_Report.pdf PDF
Amendment_0004.pdf PDF
Attachment_34_-_Preproposal_sign-in_sheet.pdf PDF
Amendment_0001.pdf PDF
MACC_Amendment_0002.pdf PDF
Attachment_20_-_Past_Performance_Questionnaire.doc DOC document
Attachment_28p.pdf PDF
Attachment_28l.pdf PDF
Attachment_4_-_Luke_AFB_Landscape_Design_and_Maintenance_Standards.pdf PDF
Attachment_3_-_Luke_AFB_Master_Specifications.rtf RTF text file
Attachment_28i.pdf PDF
Attachment_7_-_Engineering_Technical_Letter_(ETL_02-12).pdf PDF
Attachment_25_-_Client_Authorization_Letter.doc DOC document
Attachment_28c.pdf PDF
Attachment_17_-_USACE_Safety_and_Health_Requirements.pdf PDF
Attachment_9_-_AF_Form_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_1_-_Wage_Determination.docx DOCX document
Attachment_29_-_USAF_Unaccompanied_Housing_Design_Guide.pdf PDF
Attachment_33_-_Base_Access_Instructions.pdf PDF
Attachment_14_-_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Attachment_28h.pdf PDF
Attachment_32_-_L_and_M_Matrix_(Mandatory_Compliance_Items).xlsx XLSX spreadsheet
Attachment_22_-_Teaming_List.doc DOC document
Attachment_15_-_AF_Form_103_Base_Civil_Engineer_Work_Clearance_Req.pdf PDF
Attachment_28a.pdf PDF
Attachment_28g.pdf PDF
Attachment_24_-_Past_Performance_Information_Sheet.doc DOC document
Attachment_16_-_DD_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Attachment_30_-_MACC_Prodedural_Specifications.docx DOCX document
Attachment_21_-_Past_Performance_Questionnaire_Cover_Letter.doc DOC document
Attachment_28k.pdf PDF
Attachment_28n.pdf PDF
Attachment_28d.pdf PDF
Attachment_20_-_Past_Performance_Questionnaire.doc DOC document
Attachment_27_-_Bonding_Information_Request.docx DOCX document
Attachment_28j.pdf PDF
Attachment_18_-_DoD_Unified_Facilities_Criteria_(link).docx DOCX document
Attachment_5_-_Architectural_Design_Compatibility_Guide.PDF PDF
Attachment_28e.pdf PDF
Attachment_11_-_AF_Form_3000_Material_Approval_Submittal.pdf PDF
Attachment_19_-_AFI_33-118_Radio_Communications.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 12

28 Mar 13

Contractor's Hazardous Material Questionnaire 1.

Contractor’s Company Name:

Name of Contractor:

Phone Number:

Fax Number:

Address:

2. Contract Number:

3. Date, time and location of pre-performance conference meeting:

4. Project:

5. Quality Assurance Evaluator (QAE)/ Contracting Officer (CO)

________________________Phone#___________

6. Projected contract period:

Start Date: ________ End Date: _________

7. Will contractor be using any hazardous material (HAZMAT) during this contract?

a) If the answer is NO to the above question, sign and date below.

Contractor’s Name (print) Contractor’s Signature Date

b) If the answer is YES to the above question, sign and date below and complete item 8. Provide QAE/CO a chemical inventory and copies of all Material Safety Data Sheets (MSDS) 5 days prior to contract start date. Provide QAE/CO a monthly HAZMAT usage report (see Contractor’s Environmental Reporting Entry Form, Attachment 1) during the contract period no later than 5 days after the end-of-each month.

Contractor’s Name (print) Contractor’s Signature Date

8. Will the contractor be generating a potential waste or hazardous waste during the contract period? (Yes/No) If YES, contact the base Hazardous Waste Manager at (623) 856-6501 and/or the Pollution Prevention Chief at (623) 856-4166 for proper reporting and disposal procedures.

The point-of-contact for the HAZMO Office is Mr. Oscar Mabry, (623) 856-4748, Fax: (623) 856-4747, e-mail: oscar.mabry@us.af.mil

File details come from the government source that posted it. Updated .