Multiple Award Construction Contract (MACC) IDIQ

Award Notice Posted

Solicitation number
FA4887-13-R-0005
Agency
Awarded
to Herman Construction Group, Inc.
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
FA4887-14-D-0002 Federal IDV award
PSC
Not on record
Place of performance
Luke Air Force Base Luke AFB, Arizona 85309, United States

Notice details come from SAM.gov. Updated .

Notice text

10 versions

Update #10 · Latest ·

The four Awardees are:
1. FA4887-14-D-0002 - Herman Construction Group - DUNS - 078803766
2. FA4887-14-D-0003 - Rore, Inc - DUNS -142359582
3. FA4887-14-D-0004 - M & M - DUNS - 078893168
4. FA4887-14-D-0005 - Premier Engineering Corporation - DUNS - 932854417

Update #9 ·

As a quick update to the current status of evaluations and to clear any confusion over the timeline, evaluations are ongoing and are likely not to be completed prior to the end of the current fiscal year. This is due to a number of factors, not the least of which is manning. The Source Selection Team is diligently working nonetheless and is optimistic about an early FY '14 award.

Update #8 ·

NOTICE: ALL CONTRACTORS  WHO PLAN ON HAND DELIVERING THEIR PROPOSALS THIS COMING MONDAY, 5 AUGUST, SHOULD ARRIVE AT THE SOUTH GATE VISITOR CENTER BETWEEN THE HOURS OF 2:00PM AND 4:00PM. MR. JAMES SOWDEN AND LT BRENNAN LAWSON WILL BE THERE TO ACCEPT YOUR SEALED PROPOSALS. YOU WILL NOT REQUIRE BASE ACCESS.

Update #7 ·

Amendment 0007: Note that, IAW Amendment 0007, Attachment 39 (Demonstration Project Rack Solution) is hereby removed. This solution is NOT to be utilized in the creation of proposals for this effort, as it contains multiple irreconilable discrepancies.

Update #6 ·

PREPROPOSAL CONFERENCE/SITE VISIT NOTICE:
All vendors which submitted a Luke AFB acces package in accordance with the RFP were approved. Access to Luke AFB will ONLY be granted at the South Gate for July 8, 2013. Please proceed dirctly to the gate. There is no need to obtain a pass from the Visitor Center. The gate gaurd will have a list with your name. Please provide a Drivers Licence to verify identification. 

Update #5 ·

The maximum page limitation for Volume III, Past Performance, is hereby changed from 10 to 24. Additionally, previous work under IDIQ's, MATOC's, or MACC's will be deemed RELEVANT past performance. These changes are reflected in Amendment 0002 to the RFP.

Update #4 ·

Attachment 20, Past Performance Questionaire, has been modified and can be found under Amendments to this solicitation. The due date for Past Performance Questionaires has been changed to SUNDAY, 21 JULY 2013 at 8:00 PM.

Update #3 ·

This is a notice of proposed contract action as required by FAR 5.2.

The 56th Contracting Squadron, Luke Air Force Base, AZ intends to issue a Request for Proposal (RFP) for the acquisition of a MACC IDIQ at Luke AFB, AZ.


The requirement will be for repair, maintenance, alteration, and replacement, to include design-build, on real property facilities located at Luke AFB, AZ; Gila Bend AF Auxiliary Field, AZ (includes Barry M. Goldwater Range) and Fort Tuthill Recreation Area, Flagstaff, AZ. The North American Industry Classification System (NAICS) number for this effort is 236220 (Commercial and Institutional Building Construction) and the Small Business Size Standard is $33.5M. It is anticipated that a Firm-Fixed Price (FFP) Indefinite Delivery-Indefinite Quantity (IDIQ) contract will be awarded as a result of this notice.


The Government anticipates the period of performance of the contract will be (one) 1 base year and (four) 4 one year option periods.  This Solicitation will result in multiple awards (3 to 5) of a firm fixed indefinite delivery indefinite quantity (IDIQ) contract.  This acquisition is a total 8(a) set aside for Arizona 8(a) firms or 8(a) firms with a bona fide office in Arizona.  In addition to the fore mentioned, the government seeks to award to an offeror who gives the Air Force the greatest confidence that it will meet the requirements affordably. At the time of solicitation, all responsible sources may submit a proposal, which shall be considered by the agency.


The magnitude of this contract is between $25,000,000.00 and $100,000,000.00 as cited in FAR 36.204, Disclosure of the Magnitude of Construction Projects.


The anticipated solicitation and all subsequent notices and amendments will be issued via FedBizOpps on the Internet at http://www.fbo.gov. No paper copies of the solicitation, specifications, plans or bidders mailing list will be issued from this office. The government will not reimburse any interested parties for monies spent to provide a response to the subsequent solicitation notice. The anticipated award date is 1 Sep 2013.


Any questions in regards to this notice must be submitted in writing or via email to, Lt Brennan Lwason, brennan.lawson.1@us.af.mil , 623-856-2769 or James Sowden, james.sowden@us.af.mil , 623-856-2786. Please reference Solicitation Number FA4887-13-R-0005 in your requests.

Update #2 ·

This is a notice of proposed contract action as required by FAR 5.2. This is NOT a solicitation, and proposals are NOT being accepted at this time.

The 56th Contracting Squadron, Luke Air Force Base, AZ intends to issue a Request for Proposal (RFP) for the acquisition of a MACC IDIQ at Luke AFB, AZ.


The requirement will be for repair, maintenance, alteration, and replacement, to include design-build, on real property facilities located at Luke AFB, AZ; Gila Bend AF Auxiliary Field, AZ (includes Barry M. Goldwater Range) and Fort Tuthill Recreation Area, Flagstaff, AZ. The North American Industry Classification System (NAICS) number for this effort is 236220 (Commercial and Institutional Building Construction) and the Small Business Size Standard is $33.5M. It is anticipated that a Firm-Fixed Price (FFP) Indefinite Delivery-Indefinite Quantity (IDIQ) contract will be awarded as a result of this notice.


The Government anticipates the period of performance of the contract will be (one) 1 base year and (four) 4 one year option periods.  This Solicitation will result in multiple awards (3 to 5) of a firm fixed indefinite delivery indefinite quantity (IDIQ) contract.  This acquisition is a total 8(a) set aside for Arizona 8(a) firms or 8(a) firms with a bona fide office in Arizona.  In addition to the fore mentioned, the government seeks to award to an offeror who gives the Air Force the greatest confidence that it will meet the requirements affordably. At the time of solicitation, all responsible sources may submit a proposal, which shall be considered by the agency.


The magnitude of this contract is between $25,000,000.00 and $100,000,000.00 as cited in FAR 36.204, Disclosure of the Magnitude of Construction Projects.


The anticipated solicitation and all subsequent notices and amendments will be issued via FedBizOpps on the Internet at http://www.fbo.gov. No paper copies of the solicitation, specifications, plans or bidders mailing list will be issued from this office. There will be no pre-announcement of when the solicitation for this requirement will be available. The government will not reimburse any interested parties for monies spent to provide a response to the subsequent solicitation notice. The anticipated issuance of the solicitation will be on or about 1 May 2013 with a closing date 40 days after issuance of the solicitation. The anticipated award date is 1 Sep 2013.


Any questions in regards to this notice must be submitted in writing or via email to, Lt Brennan Lwason, brennan.lawson.1@us.af.mil , 623-856-2769 or James Sowden, james.sowden@us.af.mil , 623-856-2786. Please reference Solicitation Number FA4887-13-R-0005 in your requests.

Update #1 ·

This is a notice of proposed contract action as required by FAR 5.2. This is NOT a solicitation, and proposals are NOT being accepted at this time.

The 56th Contracting Squadron, Luke Air Force Base, AZ intends to issue a Request for Proposal (RFP) for the acquisition of a MACC IDIQ at Luke AFB, AZ.


The requirement will be for repair, maintenance, alteration, and replacement, to include design-build, on real property facilities located at Luke AFB, AZ; Gila Bend AF Auxiliary Field, AZ (includes Barry M. Goldwater Range) and Fort Tuthill Recreation Area, Flagstaff, AZ. The North American Industry Classification System (NAICS) number for this effort is 236220 (Commercial and Institutional Building Construction) and the Small Business Size Standard is $33.5M. It is anticipated that a Firm-Fixed Price (FFP) Indefinite Delivery-Indefinite Quantity (IDIQ) contract will be awarded as a result of this notice.


The Government anticipates the period of performance of the contract will be (one) 1 base year and (four) 4 one year option periods.  This Solicitation will result in multiple awards (3 to 5) of a firm fixed indefinite delivery indefinite quantity (IDIQ) contract.  This acquisition is a total 8(a) set aside for Arizona 8(a) firms or 8(a) firms with a bona fide office in Arizona.  In addition to the fore mentioned, the government seeks to award to an offeror who gives the Air Force the greatest confidence that it will meet the requirements affordably. At the time of solicitation, all responsible sources may submit a proposal, which shall be considered by the agency.


The magnitude of this contract is between $25,000,000.00 and $100,000,000.00 as cited in FAR 36.204, Disclosure of the Magnitude of Construction Projects.


The anticipated solicitation and all subsequent notices and amendments will be issued via FedBizOpps on the Internet at http://www.fbo.gov. No paper copies of the solicitation, specifications, plans or bidders mailing list will be issued from this office. There will be no pre-announcement of when the solicitation for this requirement will be available. The government will not reimburse any interested parties for monies spent to provide a response to the subsequent solicitation notice. The anticipated issuance of the solicitation will be on or about 1 May 2013 with a closing date 40 days after issuance of the solicitation. The anticipated award date is 1 Sep 2013.


Any questions in regards to this notice must be submitted in writing or via email to, Lt Brennan Lwason, brennan.lawson@us.af.mil , 623-856-2769 or Eric Hinsch, eric.hinsch@us.af.mil , 623-856-9665. Please reference Solicitation Number FA4887-13-R-0005 in your requests.

Files

File Type Posted
Attachment_42_-_RFI_Responses_5.docx DOCX document
Amendment_0008.pdf PDF
Attachment_41_-_RFI_Responses_4.docx DOCX document
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Attachment_40_-_RFI_Responses_3.docx DOCX document
Attachment_37_-_Revised_SOO_Demonstration_Project.DOCX DOCX document
Attachment_38_-_RFI_Responses_2.docx DOCX document
Amendment_0005.pdf PDF
Attachment_39_-_Demonstration_Project_Rack_Solution.pdf PDF
Amendment_0004.pdf PDF
Attachment_36_-_RFI_Responses.docx DOCX document
Attachment_35_-_Bldg_1130_Hazmat_Report.pdf PDF
Amendment_0003.pdf PDF
Attachment_34_-_Preproposal_sign-in_sheet.pdf PDF
Amendment_0001.pdf PDF
MACC_Amendment_0002.pdf PDF
Attachment_20_-_Past_Performance_Questionnaire.doc DOC document
Attachment_28p.pdf PDF
Attachment_9_-_AF_Form_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_16_-_DD_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Attachment_28l.pdf PDF
Attachment_1_-_Wage_Determination.docx DOCX document
Attachment_30_-_MACC_Prodedural_Specifications.docx DOCX document
Attachment_4_-_Luke_AFB_Landscape_Design_and_Maintenance_Standards.pdf PDF
Attachment_29_-_USAF_Unaccompanied_Housing_Design_Guide.pdf PDF
Attachment_21_-_Past_Performance_Questionnaire_Cover_Letter.doc DOC document
Attachment_3_-_Luke_AFB_Master_Specifications.rtf RTF text file
Attachment_33_-_Base_Access_Instructions.pdf PDF
Attachment_28k.pdf PDF
Attachment_28i.pdf PDF
Attachment_14_-_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Attachment_28n.pdf PDF
Attachment_7_-_Engineering_Technical_Letter_(ETL_02-12).pdf PDF
Attachment_28h.pdf PDF
Attachment_28d.pdf PDF
Attachment_25_-_Client_Authorization_Letter.doc DOC document
Attachment_32_-_L_and_M_Matrix_(Mandatory_Compliance_Items).xlsx XLSX spreadsheet
Attachment_20_-_Past_Performance_Questionnaire.doc DOC document
Attachment_28c.pdf PDF
Attachment_22_-_Teaming_List.doc DOC document
Attachment_27_-_Bonding_Information_Request.docx DOCX document
Attachment_17_-_USACE_Safety_and_Health_Requirements.pdf PDF
Attachment_28j.pdf PDF
Attachment_15_-_AF_Form_103_Base_Civil_Engineer_Work_Clearance_Req.pdf PDF
Attachment_18_-_DoD_Unified_Facilities_Criteria_(link).docx DOCX document
Attachment_28a.pdf PDF
Attachment_5_-_Architectural_Design_Compatibility_Guide.PDF PDF
Attachment_28g.pdf PDF
Attachment_28e.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
Luke AFB MACC Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity