SABER_-_Pre_Proposal_Conference_-_Meeting_Minutes.pdf

PDF 722 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER) DMAFB Federal contract opportunity
Solicitation number
FA4877-13-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

SABER - Pre Proposal Conference - Meeting Minutes

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineer Requirements (SABER) DMAFB, newest first.
File Type Posted
SABER_Seed_Project_-_SOW_-_FBNV_13-4000_-_Revision_1.pdf PDF
Sketch_SK-2_-_Q101.pdf PDF
SABER_-_Pre_Proposal_Conference_-_Record_of_Meeting.pdf PDF
SABER_-_Pre_Proposal_Conference_-_Powerpoint_Presentation.pdf PDF
Sketch_SK-1_-_Q99 _Q100.pdf PDF
SABER_-_Statement_of_Work_-_Revision_2.pdf PDF
FA4877-13-R-0001-0003___Incorporate_PreProposal_Conference_Meeting_Minutes.pdf PDF
SABER_Seed_Project_-_Bldg_3203_Asbestos_Registry.pdf PDF
Additional_As-Build_Drawings_-_SABER_Seed_Project.zip ZIP file
FA4877-13-R-0001-0002__Extend_Proposal_Due_Date_-_27_Sep_13.pdf PDF
ACAD_As-Built_drawing_-_bldg_3203.dwg DWG drawing
SABER_Seed_Project_-_As-Built_Drawings_-_2_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_6_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_5_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_3_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_4_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_1_of_6.PDF PDF
FA4877-13-R-0001-0001__Administrative_Corrections_Amendment.pdf PDF
SABER_-_Statement_of_Work_-_Revision_1.pdf PDF
GDN_AZ130002_-_AZ2_-_Residential.pdf PDF
SABER_Seed_Project_-_Sports_Bar_Equipment_List_Docs_-_Equip_1.pdf PDF
SABER_Seed_Project_-_SOW_-_FBNV_13-4000.pdf PDF
SABER_Seed_Project_-_Sports_Bar_Equipment_List_Docs_-_Equip_2.pdf PDF
Attachment_3_-_SABER_Price_Evaluation_Worksheet_-_Blank_Template.xlsx XLSX spreadsheet
FA4877-13-R-0001__DMAFB_SABER_Solicitation.pdf PDF
SOW_Appendix_A_-_Design_Compatibility_Guidelines_-_DCG_-_Apr12.pdf PDF
SOW_Appendix_C_-_355_CES_EMO_Civ_Contractor_Environmental_Guide.pdf PDF
Attachment_II_-_Past_Performance_Questionaire.docx DOCX document
SABER_Site_Visit_Instructions_-_28_Aug_13_at_0900_-_Swan_Gate.pdf PDF
SOW_Appendix_B_-_Installation_Development_and_Design_(ID2)_Handbook.pdf PDF
SABER_Seed_Project_-_Conceptual_Floor_Plan.pdf PDF
SABER_Seed_Project_-_AF_Form_66.xlsx XLSX spreadsheet
Arizona_Transaction_Privilege_Tax_Ruling_-_TPR_99-1.pdf PDF
SOW_Appendix_E_-_Title_Block_D_Sheet.dwg DWG drawing
GDN_AZ130019_-_AZ19_-_Heavy.pdf PDF
Event_EAL_-_Company_name.xls XLS spreadsheet
SOW_Appendix_D_-_Cover_Sheet.dwg DWG drawing
SABER_-_Statement_Of_Work.pdf PDF
GDN_AZ130006_-_AZ06_-_Heavy_Dams.pdf PDF
GDN_AZ130008_-_AZ8_-_Highway.pdf PDF
GDN_AZ130033_-_AZ33_-_Building.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

355TH CONTRACTING SQUADRON (ACC)

DAVIS-MONTHAN AIR FORCE BASE ARIZONA

19 September 2013

MEMORANDUM FOR ALL PROSPECTIVE OFFERORS

FROM: 355 CONS/MSCAC

SUBJECT: Pre-Proposal Conference Meeting Minutes; FA4877-13-R-0001, (SABER) Simplified

Acquisition of Base Engineer Requirements; Davis-Monthan Air Force Base, Tucson, Arizona.

1. A Pre-Proposal Conference/Site Visit was held at Davis-Monthan Air Force Base on 28 August

2013 at 09:00 AM, Local AZ Time. See attached “Record of Meeting” sign in sheet for listing of those who attended.

2. SSgt David A. Maida opened the meeting with a Power Point Presentation; copies of the briefed sides are attached to these meeting minutes, See Attachment 2 for more details. The briefing contained an overview, purpose, introduction of key personnel, solicitation requirements, technical requirements, additional information, a pre-briefing of the Seed project and finished with a transfer to the physical site (DM Bowling Center).

3. The following is a summary of the briefing, to include the rules of engagement for the site visit:

a. The Contracting Officer is the only person who has the authority to, or can, obligate the

Government. Any comments, thoughts, proposals, or answers to questions, are to be considered brainstorming until they are published as an amendment to the solicitation.

b. A review of the solicitation requirements, and a highlighted review of Sections L & M from the actual solicitation (FA4877-13-R-0001) was conducted. After the review of the solicitation requirements, the technical requirements were briefly addressed. At this time, it was clearly stated that no questions (Technical or otherwise related to the solicitation) would be answered during the site visit. (see paragraph c. below for details pertaining to questions/answer)

c. To maintain a fair opportunity for all participants in this solicitation, the rules of engagement for the site visit were:

i. No questions were answered during the site visit; all questions were to be written down throughout the site visit, and submitted, in writing via email, or at the end of site visit. The exact format for questions are outlined on slide 11 and 12 of the power point briefing slides. All questions to be submitted no later than, 4:30 PM, Friday, 30 August 2013.

ii. No sidebar/ private conversation with CE or the users will be authorized.

iii. Please remain with the group. Do not wander off; especially in controlled areas!

iv. Industry comments are welcome but any changes to the solicitation will be published only on FBO via an amendment.

v. All questions shall be addressed to the Contract Administrator, SSgt David Maida.

Resulting answer and/or comments, will be (and have been) recorded and available for all interested parties via the Federal Business Opportunities website (FBO). As such, these questions are listed within this memorandum, and have been incorporated, by addendum to the Solicitation (FA4877-13-R-0001)

d. A pre-briefing of the Seed Project was conducted. The Project Manager /Lead Architect gave the briefing. This was conducted as the best way to ensure each personnel in attendance could hear and understand the briefing. The noise levels at the actual site often make it hard, if not impossible to address a large group. This information is located on slides 14 through 17 of the attached power point presentation.

3. As stipulated in the rules of engagement for the Pre-Proposal Conference, question was not to be asked, or answered at the time of the Conference. Instead, all questions were to be written down and submitted directly (email preferred) to the Contract Administrator, before close of business (1630 hours) 4:30 PM, Friday, 30 August 2013. All questions received prior to the stipulated deadline are listed below. Answers have been provided for by the respective technical expert and/or Contracting Officer; answers are in red.

PRE-PROPOSAL CONFERENCE; SOLICITATION QUESTIONS

FA4877-13-R-0001

Simplified Acquisition of Base Engineer Requirements (SABER)

GENERAL (SOLICITATION) QUESTIONS

1. The RFP indicates that the offeror is to provide projects valued in price from $2,000 to

$750,000. Can an offer provide projects greater than $750,000 to demonstrate relevancy in the maintenance, repair, alteration or new construction of real property; showing capabilities to perform multi-trade construction or must they be in the range stated above?

Answer: “Relevant projects are defined as projects valued in the price range of $2,000 through

$750,000, in which the offeror’s performance was that of the prime contractor, to include …”

(Section M, Paragraph K.3.)

2. Do the design drawings and supporting documents, and the line item estimate count towards the page count in Volume 1?

Answer: No, See Solicitation Amendment 0001; ‘35% Design Submission does not count towards the maximum sheet page count.’

3. Where do the Bid Schedule and Total Evaluated Price worksheet get inserted in Volume 3; at the beginning of section B before the seed project line item pricing; please advise.

Answer: Volume III is to have 3 Sections, see Section L – L. (Volume III) Priced Proposals

Details, paragraph 2. for details and instructions.

4. RFP section L.2.b. section C states ‘It is assumed that an average of 40 projects are awarded per year, with an estimated aggregate total of $9M per year; the estimated average per year is between $4M and $6M….”. These two statements are in contradiction to each other, Please

Clarify.

Answer: Referenced statement changed; see Solicitation Amendment 0001

5. Are all factors listed in Section L.4. and L.5.a.-m. considered ‘design fee’ for purpose of Task

Order proposals?

Answer: Section L.4. provides a definition of “Design” and stipulates that by law design costs shall not exceed 6% of the construction cost. Section L.5. provides a list of “Non-Design” costs. The Design fee is considered “earnest money from the requesting User and for the

Contractor to bring the delivery order from design inception to final negotiated proposal amount.” (SABER SOW 8.5.)

6. Is this SABER a new requirement, or the replacement of and expiring SABER? If this is a replacement, please provide the previous contracts maximum amount, actual volume, and number of task orders performed.

Answer: This is a replacement of an expired SABER contract; however, should be treated as new requirement. The previous contract awarded on average forty projects per year with an average annual total award amount of $8M to $9M.

7. Per RFP Pg. 65 of 73 - Section L – K. Past Performance 1.f: Is there a minimum % of how complete the project has to be?

Answer: There is not set minimum percentage; ‘Uncompleted projects with work-in-progress may be included …’ Section L - K. 3

8. Per RFP Pg. 66 of 73 – Section L – K. Past Performance 4.: If the project already has a

CCASS, can that be turned in with the proposal in lieu of sending out a PPQ?

Answer: Not required; The Government will use data independently obtained from other

Government (i.e. PPIRS, FAPIIS) and commercial sources; this includes CCASS information.

Offerors need not submit this information with their proposals.

9. Per RFP Pg. 1 of 73 – Box 13.A. – Can you please clarify the Proposal due time? We would have to ship on Thur. Sept 5 th to get it there by Friday to make the due date? Is that correct?

Answer: It is the offerors responsibility to ensure proposals are received by the contracting office at the place and specified time stipulated within the solicitation, inclusive of all amendments. (See Block 13, SF 1442)

10. Per RFP Pg. 71 of 73 – 6. Teaming arrangements. Will the past performance of both partners in a Prime/Sub Team be evaluated equally?

Answer: IAW FAR 9.604 – Limitations; the Government can only determine the responsibility of the prime contractor. IAW FAR 9.104-4 -- Subcontractor Responsibility.

(a) Generally, prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

11. We see there is no company identification allowed beyond the cover letter. Does this include the binder covers?

Answer: No other page (within Volume I) shall contain information that would identify the company (or logo) of which has submitted its proposal. This includes binder cover pages and/or binder side pages/inserts of Volume I. (See Section L – D. Preparation instructions, 2.

Construction of Volumes) Company identification is allowed and would be inherently required for Volumes II – Past Performance and III – Price Proposal Details.

12. Can we have colored text in the volumes?

Answer: Text shall be single spaced and printed black on white paper (black and white requirements does not apply to graphics, photos, etc.) (See Section L – D. Preparation instructions, 2. Construction of Volumes)

13. The solicitation asks for pricing in both volumes 1 & 3; in volume 1 do you want just the lump sum?

Answer: See Section L. J. b. “*Important to note. The offeror is expected to provide the itemized price proposal for the seed project, in both their technical details (Volume I), and their price details (Volume III). … “

14. Based on the AZ transaction Privilege Tax Ruling (TR 99-1) we received with the solicitation, we are exempt from city tax but must still pay state tax. Is this correct? Also, we need to include the state tax in our coefficient, correct?

Answer: Any applicable taxes should be included in the Contractor's coefficient calculation.

This solicitation and any resulting contract(s) and/or task order(s) are subject to the Arizona

Transaction Privilege Tax Ruling; TPR 99-1. Ensure your offer is in compliance with this ruling and applicable laws & statues.

15. Solicitation Page 65, Item ‘b.’ in italics states, “*Important to note. The offeror is expected to provide the itemized price proposal for the seed project, in both their Technical details

(Volume I), and their price details (Volume III). Does the price proposal in the Technical

Details – Volume 1 count toward the page count?

Answer: No - The itemized price proposal is part of the 35% design submission. See

Solicitation Amendment 0001; ‘35% Design Submission does not count towards the maximum sheet page count.’

16. Solicitation Page 65, Item ‘b.’ calls for the 35% Design Submission in the Technical Approach.

Are the Design Sheets to be 11 x 17? If different, please specify size.

Answer: Design sheets requested/required for the solicitation may utilize 11” x 17” as appropriate (See Revised Section L – d. 2. Construction of Volumes)

17. Solicitation Page 67, Paragraph 3 states, “Contractors shall submit a price proposal (consisting of a coefficient, design fee, and seed project pricing).” Is the design fee to be stated as a percentage?

Answer: The design fee is to be stated as a dollar amount.

18. Will the Government publish the site visit attendance list?

Answer: Yes.

19. Would the Government consider increasing the page limit for past performance from 8 pages to 12 pages, as we are allowed to submit up to 10 projects?

Answer: No - The Government does not desire lengthy proposals; information submitted shall be clear, consolidated and concise.

20. RFP/Solicitation; Pages 66/67; Section L, 2.b.section c; The RFP is assuming that 40 projects are to be awarded each year with an average of 4-6 million historically. Are all the task orders received during fiscal year end? If not, when will the task orders be issued?

Answer: Referenced statement changed; see Solicitation Amendment 0001 – Task orders are issued as Government requirements arise, there is no way to anticipate when future task order will be issued, awarded or otherwise advertised.

21. RFP/Solicitation; Pages 66/67; Section L, 2.b.section c; what considerations are made if the estimated amount of dollars is not awarded?

Answer. None; IAW 52.216-19 and SABER SOW, the minimum order amount under this solicitation/contract is (not less than) $2,000.00. The Government is not obligated to furnish additional dollars beyond the contract stated minimum. (Note: Referenced statement changed;

see Solicitation Amendment 0001) (See IDC constraints for additional information)

22. RFP/Solicitation; Pages 66/67; Section L, 2.b.section c; Why is the pricing based on 9 million, however historically, the magnitude is 4-6 million?

Answer: Referenced statement changed; see Solicitation Amendment 0001

23. Is the SABER contract to design for the MACC? Will projects be competed between both contracts?

Answer: No.

24. Amendment number 0001, page 7 of 9, b.5. states to include in Volume I five factors including #5. “Technical Approach Seed Project (35% design submission)”. The definition of a

35% design as stated in SOW SABER page 3 of 26, is quite extensive. It is doubtful that we can supply all of the required information into Volume I and stay within the 12 page limit. The itemized pricelist alone could be 12 pages.

Question; would you consider raising the page limit for Vol I, exempting some of the factors from the page limit (i.e. #5) or reducing the requirement for a 35% design?

Answer: Referenced statement changed; see Solicitation Amendment 0001 - 35% Design

Submission does not count towards the maximum sheet page count.’

25. Page 62 of 73, 4. b. of the RFP states: “Any legally organized offeror may submit a proposal…”

Question: Does this mean that the offeror must be a General Contractor (B-1 license) licensed by the Arizona Registrar of Contractors as is necessary in order to do this type of work legally in the State of Arizona (Arizona Revised Statutes)?

Answer: Please refer to the local SBA servicing office in Phoenix on the requirements of meeting the criteria as defined for the solicitation under the 8(a) program. The Arizona Small

Business Administration certifies the business entity within the state of Arizona as required by the Code of Federal Regulations. The only requirement stipulated by the Government is the business entity must be certified in the state of Arizona as an 8(a) business entity at the time of submission of proposals.

26. Page 65 of 73, K, 1, (Past Performance Volume II) of the RFP states: “the offeror shall provide, as a minimum, a list of their past performance data….”

a. Is this list a “minimum” or is it a requirement in addition to the up to ten past performance examples?

Answer: The offeror is to provide a list of their past performance data; data can be from government and/or private industry contracts performed within the past five (5) years; however, that list should not exceed ten (10) projects.

b. Should this list be submitted within our proposal or submitted to you before our proposal?

Answer: This list is to be submitted within Volume II.

c. If it is to be submitted within our proposal is it included in Volume II, 8-page limit?

Answer: Yes, this list is part of the stipulated page limit. (Past Performance

Questionnaires do not count towards the page limit, as they are submitted by your references, directly to the Contracting Squadron)

27. Page 65 of 73, K.1. Volume II has an 8-page limit but yet we are allowed to submit data on up to ten past performance examples.

Question: Are the past performance examples (up to ten) to be included in the 8-page limit?

Answer: Yes, Volume II has an 8-page limit. The Government does not desire lengthy proposals, elaborate listing and/or extensive comments. All information submitted is to be clear, consolidated and concise.

28. SABER SOW 8.5 – Is the design fee the same as the cost of design (to include stamped drawings, development, all engineering, field surveying, SABER SOW 5.3) that is included in the Contractor’s coefficient?

Answer: No, these are distinct and separate items. The design costs which are to be included in the Contractor’s coefficient as noted in SABER SOW paragraph 5.3 represents full compensation to the contractor for their cost of completing the required 35% design upon delivery order award. The design fee is intended as earnest money to compensate the

Contractor for their proposal efforts. The design fee does not represent any design cost, as those are to be compensated through the Contractor’s coefficient. See SABER SOW paragraph 8.5 for more details.

29. Page 66 of 73, L. 1. of the RFP states: “1. The Offeror shall provide a price proposal

(consisting of a coefficient, design fee, and seed project pricing)…. “

Page 67 of 73, 4 of the RFP states: “4. Definition Of Design Costs: Design costs are limited by law to not exceed 6% of the construction cost. “Design” means defining the construction requirement (including the functional relationships and technical systems to be used such as architectural, environmental, structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings.”

a. Is our price proposal to be submitted as if it were a real SABER Task Order and NOT include a design fee that will not exceed 6% of the cost?

Answer: The Seed Project Price should be inclusive of all cost elements required to complete the project, IAW all stipulated Terms and conditions of both the SABER SOW and Seed Project SOW and all supporting documents contained therein.

b. Or are we to apply a coefficient to our seed project cost proposal and the coefficient should cover the design fees?

Answer: A coefficient is applied to the seed project cost proposal and is to be included within the total seed project price; the coefficient is not applied to the design fee. Please see answer to question #28.

c. Or may we include up to 6% design fee in our seed project cost proposal unlike if it were a real (future) SABER Task Order?

Answer: Please see answer to question #28.

30. Page 69 of 73, 4. (5) of the RFP states: “(5) [show] the capability of providing and utilizing the

RSMeans (Computerized Pricing Guide – CPG) cost estimating database to develop and provide a 35% Design Submission.”

Question: Is our PMP to include an actual completed computerized cost proposal line-item cost break-down or are we just to explain to you that we have the “capability” to provide you them in the future if we are awarded the SABER?

Answer: Proposals are to include actual completed computerized itemized priced proposals/ line-item cost break-downs. This requirement is part of the Technical Approach - 35% Design

Submission.

31. Please confirm that the seed project evaluation will require bids to fall between the floor

$250K and the ceiling $500K stated in the RFP for acceptance as a viable bid for this proposal.

Answer: IAW FAR 36.204 Disclosure of the Magnitude of Construction Projects, the aforementioned magnitude has been disclosed. (See Solicitation, Section M – E. Price, Paragraph 6. for additional information.)

32. Doc: Proposal Preparation Instructions; Pages: 7/9 Amendment 0001, Section#: K.4 Question:

Clarification from attachment #2. Within attachment #2 it only states to mail the completed questionnaire. Do the references have the options to fax, email or mail the completed forms?

Answer: References have the option to fax, email or mail the completed Past Performance

Questionnaire(s) DIRECTLY to the Contracting Squadron. (Solicitation, Section L – K.

Volume II (Past Performance Details, Paragraph 4.)

33. P 12 of 73; Note 3 – Hauling costs can be a significant element of the coefficient. This note states that there is a “primary hauling route” for the project. What is that route? The note also states that the primary route can be unilaterally changed. Since different routes could be many miles longer than the most efficient route (especially with gate closures), is there any limit on how far out of the way the Air Force may require contractors to go to haul things onto and off the project? Is there any limit on the number of times such changes will be made?

Answer: The primary haul route onto Davis-Monthan AFB is through the Swan Gate at Golf

Links Road then direct to the project site. The alternate entry would be through the Craycroft

Gate at Golf Links Road. Whereas there is no limit to the number of times a change of route may be required, this is a very rare occurrence.

34. P 12 of 73; Note 4 – This requires manufacturer’s warranties to be supplied but states that the minimum warranty is one year. If a manufacturer warranty is less than one year, such as 90 days on an appliance, will the contractor have to supply their own warranty for the difference? If so, what form must that warranty take? Is this a cost element for the coefficient or can it be an NPP item?

Answer: The contractor will have to supply their own warranty for the difference. The format of the warranty shall be as proposed by the contractor and as approved by the

Contracting Officer. This is not a cost element for the coefficient. Any additional cost would be negotiated as applicable to the specific delivery order.

35. P 13 of 73; Note 6 – This note references “extremely tight performance parameters” and suggests that performance of work orders will be awarded with absolute minimum performance periods. Please explain what the “extremely tight performance parameters” will be, and provide information that will allow bidders to estimate how much to include in their coefficients for accelerated schedules and liquidated damages.

Answer: Note 6 is in reference to an offerors Representations and Certifications. The referenced “SAM” site is a relevantly new system, and our solicitation has specific parameters (such as bonding capabilities and 8(a) certifications) that must be met in order to be considered for award. Note 6 does not address or pertain to coefficients, accelerated schedules and/or liquidated damages. Note 6 is requesting that offerors reps and certs be completed within this solicitation, as to ensure independent verification of the aforementioned requirements/parameters.

36. P 13 of 73; Note 11 – One of the expenses that must be included in the coefficient is the cost of establishing a job trailer, and the cost of moving the same. How many trailer moves need to be included in the coefficient?

Answer: The awarded contractor can expect to be provided a location to establish an office trailer on the installation. The contractor can also expect that this location will not be changed throughout the life of the contract, to include option years. However, this is not a guarantee that the location will not be changed. Should the Government require the location to be moved during the course of the contract, it will be done at the contractor’s expense.

The cost of an office trailer is considered to be a Division 1 expense, allowed in the coefficient per paragraph 5.3 of the SABER SOW. The location and utilities (except telephone and internet service) are provided by the Government at no cost and should not be included in the coefficient.

37. P 20 of 73; ¶¶ c & d – AFI 31-209 is no longer on the Air Force Publications site. Where can it be found?

Answer: Referenced AFI Removed. See Solicitation Amendment 0003.

38. AFI 31-501 states, “Access will not be approved for individuals who are employees of government contractors unless they meet all ethical requirements and provisions and are on appointment as an unpaid consultant with the Air Force.” How much cost and time need to be accounted for to get each employee appointed as an unpaid consultant to the Air Force?

Answer: Statement taken out of context. (Statement not applicable) This is an excerpt from

AFI 31-501, Paragraph 3.16.4 Granting Access to Retired General Officers or Civilian

Equivalents and Former Presidential Appointees.

39. AFI 31-501 requires each contractor employee to have a National Agency Check (NAC).

How much cost and time need to be accounted for to get a NAC for each employee?

Answer: Statement taken out of context. (Statement not applicable) This is an excerpt from

AFI 31-501, Paragraph 3.24.1 Processing Requests for Access to Restricted Areas, Sensitive

Information or Equipment Not Involving Access to Classified Information. SABER

Contractors (or any Sub-Contractors herein) are not required to have a NAC, nor will this contract require contractors to have access to any such information requiring such.

40. P 25 of 73; ¶ D – What will be the minimum hours of work specified in any delivery order?

What percentage of delivery orders will have the maximum hours of work specified in this paragraph? What percentage of delivery orders will have the minimum described in answer to the above?

Answer: This question/statement has been taken out of context. The information provided in

Section H – Paragraph D. Hours of Work, is provided to as general information as to the working hours of the base; work hours (as in when access to the base will be permitted) would be stipulated within the individual Delivery Order/Task Order (DO/TO). Example: A project requires work on the flight line, or to a building that would require power outages; the

Government would request this work be completed during ‘non-working’ hours and/or the weekends, as such the contractors would be allowed overtime. There are no minimum or maximum hours of work stipulated within the SABER SOW, Seed Project, or any such documents or future DOs/TOs awarded or performed under this solicitation and/or resulting

SABER contract.

41. P 36 of 73; ¶ 52.219-17(c) – This paragraph requires that NO subcontracts be issued unless each is approved in writing by both the SBA and the contracting officer. May the SBA approval come from the assigned offeror’s 8(a) specialist, or is there some particular SBA office or person whose approval must be obtained? What will be the criteria for approval or disapproval by the SBA? What will be the criteria for approval or disapproval by the Air

Force? What will be the time required for approval or disapproval by the SBA? What will be the time required for approval or disapproval by the Air Force?

Answer: Please refer to your Small Business Administration servicing office.

42. Ref: Price Evaluation Worksheet (Solicitation Attachment #3)

Question: The seed project does not include a Design Fee Box, do we add this to the coefficient or an indirect cost to the applied amount?

Answer: Please see answer to question #28. Note – Do not alter the formatting of the provided price Evaluation worksheet, this is locked document. Inputting data other than what was requested and required, or altering the provided worksheet, could render an offeror unacceptable.

43. Ref: Solicitation, Sections L – D. Preparation Instructions.

Question: Should the itemized price proposal for the seed project, submitted within

Technical details (Volume I) include the proposed coefficient?

Answer: No; the itemized price details contained within the (35% Design) Technical details

(Volume I) shall NOT include the contractors proposed coefficient, only the pricing information contained within the RSMeans/CPG.

SEED PROJECT (FBNV 13-4000) QUESTIONS

44. (Seed Project, FBNV 13-4000) Please provide all existing facility 3203 as built drawings in

.pdf and .dwg (CAD) formats ASAP.

Answer: As Built files have been provided; see uploaded “Document Packages/Links” on

FBO.gov posting.

45. (Seed Project, FBNV 13-4000) What is the height of the deck?

Answer: By deck height it is assumed the question is referring to the exterior covered patio deck. The finished floor of the new exterior covered patio deck should be flush with the existing/final interior sports bar finished floor elevation. (As required by ABA accessibility standards).

46. (Seed Project, FBNV 13-4000) What is the height of the ceilings?

Answer: The height of the interior ceilings should be provided at the highest possible level given existing above ceiling constraints. The exterior covered patio should be no less than 9’-

0” in height. As indicated in the SOW it is intended that this exterior covered patio structure should match the character of the existing covered patio on the North side of the Bowling

Center.

47. (Seed Project, FBNV 13-4000) What walls from existing floor plan demo?

Answer: Refer to existing as-built drawings provided and compare with conceptual floor plan provided in the Supporting Documentation. The primary wall that gets affected is the existing wall separating the proposed Sports Bar areas. This bearing wall opening gets wider.

48. (Seed Project, FBNV 13-4000) What type/location of flooring demo?

Answer: Refer to existing as-built drawings provided. In the areas of construction it can be anticipate that VCT/Carpet/and ceramic tile will need to be demoed in the Sports Bar area, adjacent bathroom corridor, and existing remaining store room in the corner of the proposed

Sports bar area (see conceptual plan).

49. (Seed Project, FBNV 13-4000) Is ceramic tile to go in throughout project, or are there other finishes in different areas? (item 21 says “per interior finish coordination”…please clarify)

Answer: The tile indicated is to be throughout the sports bar/bar servicing areas. Note 21 indicates porcelain tile.

50. (Seed Project, FBNV 13-4000) What is the scale of the sketch?

Answer: The sketch is at ¼”=1’-0”; however be reminded that the drawing is conceptual and is not a representation of a final construction document.

51. (Seed Project, FBNV 13-4000) Please clarify new electrical equipment including an upgrade to the “service main”. What does that entail? Are they talking about upgrades to the existing SES, or will it require a new main feed entirely from the power supplier and a new SES?

Answer: No upgrade to the SES is intended in the SOW. However; upgrade/replacement of existing panel(s) necessary to sustain the new sports bar addition is required.

52. (Seed Project, FBNV 13-4000) Where is the electrical room located?

Answer: The main electrical room is located from the exterior through the mechanical service yard on the west side of the building.

53. (Seed Project, FBNV 13-4000) Where is the SES located compared to the bar area?

Answer: The (SES) assume that is service entrance switch is located in the electrical room accessed from the mechanical service yard on the west side of the building.

54. (Seed Project, FBNV 13-4000) Where is current bar located and where do we have to re‐route services (plumbing/sewer) to new bar?

Answer: Refer to existing as-built drawings provided for existing bar location. (Current bar is in the back in the pro shop). See the conceptual floor plan for new bar location (about 20’ from existing Bar location).

55. (Seed Project, FBNV 13-4000) Is new exterior covered patio raised, or at ground level?

Answer: Raised. See response to question ‘#45. What is the height of the deck?’

56. (Seed Project, FBNV 13-4000) What materials are to be used for the construction of said patio?

Answer: As noted in the SOW the exterior covered patio is meant to match the character and material of the existing covered patio on the north side of the Bowling Center. Metal post and beam with metal roof. Color per base standard (Brownstone-desert tan).

57. (Seed Project, FBNV 13-4000) Where are the existing water supply lines located?

Answer: Refer to existing as-built drawings; see uploaded “Document Packages/Links”.

58. (Seed Project, FBNV 13-4000) Where are the existing fire sprinklers locations?

Answer: Refer to existing as-built drawings provided; Existing/final sprinkler locations to be modified based on sports bar layout.

59. (Seed Project, FBNV 13-4000) There is an existing fire alarm system that they are requiring us to program. Who is the manufacturer of the current system?

Answer: The current FACP is a Simplex 4002 panel (8 Zones Currently). The transmitter is a

Monaco BT-27.

60. (Seed Project, FBNV 13-4000) For HVAC, they say to modify/adjust the existing system for the new layout. Please provide a layout of the existing HVAC equipment including duct work.

Answer: Refer to existing as-built drawings; see uploaded “Document Packages/Links”.

61. (Seed Project, FBNV 13-4000) Are there existing elevations of the bar that the government prefers

62. (Seed Project, FBNV 13-4000) Is there work for the restrooms?

63. (Seed Project, FBNV 13-4000) The existing stairs leading to the bowling alley on the south side of the building are in very poor condition and do not meet code. It is not stated to replace these stairs; would the Government want this to be added?

Answer: Repair the concrete stairs as necessary to meet code; must provide temporary access/egress at the South entrance during this work as required by the Fire Inspector.

64. (Seed Project, FBNV 13-4000) Item 36 page 4 of 8 - The bar area is being called out for stainless steel inlays. Is there a concept drawing on the bar?

65. (Seed Project, FBNV 13-4000) Item 37 page 5 of 8 - This refers to an inlay of stainless steel but does not provide dimensions. Is there a concept drawing of this paneling?

66. Seed Project SOW attachments – can you please provide as-built(s) that show the current build out condition of the project area? The as-built(s) provided on 27 AUG 2013 and 28 AUG 2013 do not show current interior layout.

Answer: As Built files have been provided; see all uploaded “Document Packages/Links”

67. Seed Project SOW attachments – Please provide as-builts that show structural details and wall type sections.

68. Seed Project SOW attachments – Please provide as-builts that show existing civil conditions;

i.e. parking lot area to be converted for new patio, entrance ramp, etc.

69. Seed Project – will the government be removing the lockers from the construction area, or are they the responsibility of the contractor to demo?

Answer: The Customer/Government will be moving the lockers from the construction area.

70. (Seed Project, FBNV 13-4000) Reference: Page 2, Item 9, removing wall segments

Question: Will existing painted storefront be removed and in filled?

71. (Seed Project, FBNV 13-4000) Reference: Page 3, Item 21, Tile Floor

Question: Does product require Made in USA designation?

Answer: All Construction Materials shall be incompliance with all Contract Clauses (52.225-

9, 52.225-10, 52.225-11, 52.225-13 - just to list a few) The onus is on the contractor to ensure their proposal is in compliance will all Trade Agreements, Act(s) and/or clauses (and provisions) that are applicable to or otherwise stipulated within this solicitation and the resulting SABER Contract.

72. (Seed Project, FBNV 13-4000) Reference: Page 3, Item 25, Concrete ramp

Question: Existing stairs next to ramp are cracked and uneven. Do stairs need to be demoed and replaced?

Answer: Repair the concrete stairs as necessary to meet code. Must provide temporary access/egress at the South entrance during this work as required by the Fire Inspector.

73. (Seed Project, FBNV 13-4000) Reference: Page 4, Item 36, Bar Equipment

Question: Will all equipment be available during construction to verify dimensions?

Answer: No; the equipment delivery schedule cannot be committed to be available during construction. The (awarded) SABER Contractor will communicate with the equipment manufacturer in coordinating the Bar design.

74. (Seed Project, FBNV 13-4000) Reference: Page 5, item 37, wainscot

Question: What wood species is requested for interior woodwork?

Answer: The wood species for the wainscot should be a durable hardwood and appropriate for interior bar conditions.

75. (Seed Project, FBNV 13-4000) Reference: Page 6, Item 43, Signage

Question: Where will existing exterior signage be relocated?

Answer: Exterior “D-M Bowling Center” signage displaced by the exterior covered patio will be relocated to the south wall to the east (facing the parking lot).

76. (Seed Project, FBNV 13-4000) Reference: Page 7, Item 11, Handicap access

Question: How are existing parking spaces that will be impacted by new patio extension be addressed/ relocated.

Answer: The existing parking spaces impacted by the new patio do not need to be addressed/relocated.

77. (Seed Project, FBNV 13-4000); Not addressed in SOW; has there been any testing for or is there a report for asbestos?

Answer: See provided asbestos report (Bldg 3203 Asbestos Registry).

78. (Seed Project, FBNV 13-4000); SOW; Page 5; Para. (Item) 40; Will there be a gutter on the new patio cover and will it dump in to the planter?

Answer: A gutter is required on the new patio cover. Water will be diverted into the planter.

79. (Seed Project, FBNV 13-4000); Not addressed in SOW; Will there be lighting in the new covered patio area?

Answer: Item 27 notes the exterior lighting requirements at the covered patio. There will be lighting provided at the cover patio.

80. (Seed Project, FBNV 13-4000); SOW; Page 5; Para. (Item) 40; Will there be irrigation to the new planter area/trees? Will landscape irrigation be required with timer?

Answer: All landscaping provided shall be installed in accordance with (IAW) the base

Design Compatibility Guide (DCG) (Reference: Paragraph 4.5.2 sub-paragraph 4)

81. (Seed Project, FBNV 13-4000); SOW; Page 4; Para. (Item) 28; Will the new misting system utilize treated or untreated water?

Answer: The misting system does not require treated water if using the Base domestic water supply as it is already treated

82. (Seed Project, FBNV 13-4000); Not addressed in SOW; Are there any As-Builts for

Mechanical in the Sports Bar & Bowling Alley areas. Both are required to design and provide air balancing for the proposed Sports Bar areas. Sports Bar/Pool Table area HVAC is to be provided by Bowling Alley Area mechanical system or is it to have its own new “stand-alone”

HVAC unit/system? What is the existing vent on the south (exterior) wall for?

Answer: As-built ACAD (dwg) and pdf drawings have been provided. The intent is that the

HVAC for the new Sports Bar is to be provided by the existing bowling alley mechanical system (not meant to have its own stand-alone HVAC system).

83. (Seed Project, FBNV 13-4000); SOW; Pages 4/5; Para. (Item) 36; The Equipment List Item #1

(3 Door Refrigerator) is not included in the TriMark quote/cut sheets (dated 2/14/13). The

Equipment List does not match the TriMark equipment quote.

Answer: Use the reference for the TriMark Equipment list. The 3-door refrigerator is being provided by the Government. The (awarded) SABER contactor should coordinate the Bar design/layout with the equipment provider as required.

84. (Seed Project, FBNV 13-4000) Item 15, what height are the new interior walls? Just above suspended ceiling or up to the deck?

Answer: Interior walls are to be extended at least six (6) inches above the suspended ceiling

85. (Seed Project, FBNV 13-4000) Item 10, can you please clarify the requirement to remove exterior panels from existing wall surfaces?

Answer: Correction to the wording, it should read “interior panels”, such as the brick veneer, slotted hanging panels, etc.

86. (Seed Project, FBNV 13-4000) Item 34, Provide ten (10) wall mounted TV/Cables receptacles inside the sports bar area. There are eleven (11) shown. Please clarify.

Answer: Provide 11 as indicated on conceptual drawing; see revised Seed Project SOW

87. (Seed Project, FBNV 13-4000) Item 21, Based on the existing information, it appears the

Government wants a wood look porcelain tile. What size should these be? 4x24, 6x24, 5x32, 8x32, 4x36 are just some of the sizes currently available.

Answer: The size to be confirmed by sample (see updated AF 66); preference aesthetic is 5x32

88. (Seed Project, FBNV 13-4000) Item 21, Pattern- Does the Government want the tile installed randomly or in a 3 step pattern (equal 1/3 increments)?

Answer: The pattern shall be installed to emulate wood flooring (I.e. 1/3 Increments). Wall base will be the same porcelain tile material.

89. (Seed Project, FBNV 13-4000) Item 15, Finish- Does the government want the finish to be flat/smooth, textured, hand scraped? Matte or Glossy?

Answer: As indicated in item #15 the gyp bd finish shall be a hawk and trowel texture. Use a semi-gloss paint finish.

90. (Seed Project, FBNV 13-4000) Will we be doing wall base out of the same tile material, rubber base, or something else altogether?

Answer: The wall base will be out of the same floor tile material.

91. (Seed Project, FBNV 13-4000) Does the tile product need to be made in USA?

Answer: All Construction Materials shall be incompliance with all Contract Clauses (52.225-

9, 52.225-10, 52.225-11, 52.225-13 - just to list a few) The onus is on the contractor to ensure their proposal is in compliance will all Trade Agreements, Act(s) and/or clauses (and provisions) that are applicable to or otherwise stipulated within this solicitation and the resulting SABER Contract.

92. (Seed Project, FBNV 13-4000) Item 11 says to provide new acoustical ceiling with in laid decorative detail pattern and color for the sports bar and tin inlaid acoustical ceiling pattern over bar service area. What manufacture and product number is desired? Also what color?

Answer: The Government will not provide a suggested manufacturer/brand name. It is indicated that the in-laid decorative pattern would be similar to the existing ceiling/room color scheme.

93. (Seed Project, FBNV 13-4000) Will the AHJ require sprinkler protection at the exterior covered patio?

Answer: No - The AHJ (Fire Dept.) has indicated that sprinklers will not be required under the exterior covered patio.

94. (Seed Project, FBNV 13-4000) Will there be any modification necessary to the existing riser to meet DM Design Guide specifications?

Answer: The intent is to utilize the existing fire riser with no modifications to meet the DM

Design Guide specification.

95. (Seed Project, FBNV 13-4000) Now that there is a handicap ramp being installed will the government require handicap openers? And will they be on all four entry doors on the South side. Single and Double doors to the Sports bar and two sets of entry doors to the bowling alley?

Answer: No - Handicapped door openers are not required in the project scope of work

96. (Seed Project, FBNV 13-4000) pg. 7 of 8; paragraphs 9 and 10 ask for temporary heating and cooling to be in place for the bowling alley and snack bar (un-renovated parts of the building) in order to accomplish HVAC and electrical changes. These areas to be kept open are outside of the renovation portion of the building. It would take significant cost of rental equipment

[well beyond what is encountered on typical delivery orders] to keep these [non task related] areas operational during the alteration of the Sports Bar area. How does the government want these cost accounted for with the SABER SOW pg. 9 of 26 paragraph 4.5 excluding Division

01 costs except for some specialty testing if required per paragraph 11.4? Non-prepriced items or included in coefficient? If they are to be in the coefficient, what percentage of delivery orders will have this type of non-typical requirement?

Answer: The intent of this portion of the SOW is to account for any long term (more than 8 hours) outage that would affect the viability of the Bowling Center business during construction. These paragraphs (9 & 10) have been revised, see revised Seed Project SOW.

97. We were not able to have a full survey team available for that walk but note that it is required to fulfill the 35% deliverable requirements for the proposal. We respectfully request access to the site to perform the following survey verifications: a) Benchmarks (cited in the RFP); b)

Building and site furniture locations; c) Utility POCs; d) Curb cuts/site access (cited in the

RFP); e) Exterior lighting // Please note that no destructive measures such as potholing will be used. Please let us know if/when this site access will be available or if the site plan requirements above will be waived for the 35% deliverable.

Answer: It is anticipated that the 35% proposal deliverable does not require this detailed information. Once awarded the Contractor will be given further access to provide this specific information.

98. (Seed Project, FBNV 13-4000) Is the SABER contractor to install the GFE and supply and install the BAR?

The RFP Seed Project SOW states:

Item 36: Provide/install bar in configuration that will accept the equipment list provided (See Supporting

Documents-Bar Equipment List). The bar height at the counter or ledge shall be approx. 42”, and the drink ledge surface shall be 12”-14” deep. The lower drink preparation counter height shall be 32”-36” coordinate height and depth with bar equipment list. The Counter tops for each bar surface and splash shall be wood with stainless steel surface inlaid and rivet seams to depict avionic metal work. The bar exposed side panels/millwork shall be raised wood with recessed stainless steel inlaid and rivet seams to depict avionic metal work. The bar shall have a foot rest on the high bar seating side. Provide shop drawings for the bar and coordinate final design layout with the Bar Equipment List. The bar servicing area must contain the following equipment items furnished by the Government and installed by the contractor;

Yet the Government provided List of Government Furnish Equipment (GFE) shows that the supplier is providing installation of the GFE and BAR:

15 1 ea. INSTALLATION // GILL MARKETING Model No. INSTALL

Equipment and Furniture Installation to consist of:

* Install new bar and set new backbar equipment

* Plumb and run electrical for back bar equipment

* Assemble and install new furniture, tables and chairs

1 ea BAR // Wasserstrom Model No. BAR

U-Shaped Bar. Bar design and size to be per plan. Bar to have Laminate on Front, FRP on Back, stainless steel footrest, bar top to be quartz with drop edge of 3", lights under front bar top, to have FRP with electrical receptacles as required for operation of back bar equipment. 40"Bar Height, U-Shaped, Bar Die Wall, Quartz

Speed Rail

Answer: The bar equipment is to be provided by the Government contracted supplier (Tri

Mark). The Bar is to be provided/designed by the SABER contractor as indicated in the statement of work. Ignore u-shaped bar reference in the TriMark quote as it was used for estimating purposes only. The Bar is part of the SABER scope of work

99. (Seed Project, FBNV 13-4000) Pg: 2/ 8, Item 15, Reference Sketch attached SK-1 (RFI 2)

Question: “Corridor wall” is the intend to take this to STEEL STUD to underside of decking or leave below the tile ceiling as the north dining wall tops out below ceiling 8” that divides the play area from the dinning (RFI 1)

Answer: The design intent is to fully enclose the corridor going to the bathroom with full height walls (floor to ceiling wall).

100. (Seed Project, FBNV 13-4000) Pg: 3/ 8, Item 25, Reference Sketch attached SK-1 (RFI 3)

Question: “Modify Planter” is the intended height to match existing FF of new patio or met the parking level + one slump block HT?

Answer: The design intent is to match the existing finished floor of new patio/existing access level going into Bowling Center.

101. (Seed Project, FBNV 13-4000) Pg: 3/ 8, Item 22, Reference Sketch attached SK-2 (RFI 4)

Question: “provide new Floor Sinks” what is the status of the previous waste plumbing at sink clouded? Still in service or abandoned and/or beyond use?

Answer: The existing sink referenced is still in service

SABER SOW QUESTIONS

102. Per SABER SOW, staffing paragraphs 7.2.2. and 7.2.3 make references to positions listed in paragraph 6.2, but paragraph 6.2 is about NPP items?? Please advise.

Answer: Statement changed; see Solicitation Amendment 0001

103. Per SABER SOW, staffing paragraph 7.2.4 references requirements in paragraphs 8.9. and

8.12. There is no paragraph 8.12., please advise.

Answer: Statement changed; see Solicitation Amendment 0001

104. Per SABER SOW, paragraph 8.9.6. states that complete edited specifications should be included with task order proposal submittals. Is this required for the seed project, or can specifications be submitted in outline form and be submitted in full text upon award of the task order?

Answer: Specification sections applicable to the seed project may be submitted in outline format and then submitted in full text upon award of the task order.

105. Per SABER SOW, paragraph 8.9. a 35% design package is required with each awarded delivery order unless otherwise stated by the contracting officer. Two questions on this:

a. What is the design level effort required for task order proposal submission.

Answer: Unless a specific level of design effort is called for in a delivery order RFQ, the contractor shall submit documentation as necessary to substantiate line item quantities and provide the Government with the necessary paperwork to evaluate the complete proposal package. See paragraph 8.4.

b. How will the contractor be compensated if the contracting officer requires more than a

35% design effort for a task order before construction since the yearly per project design fee is based on this 35% effort?

Answer: The Government does not intend to require more than a 35% level of design effort under this SABER contract.

106. Per SABER SOW, paragraph 11.7.1. and sub paragraphs 11.7.1.1. and 11.7.1.2.: if the contractor is to always assume these materials to be asbestos-containing, should the abatement of these materials be included in each applicable delivery order, or just the testing? If just testing, should we assume that payment for the abatement of any discovered hazardous materials would be handled by a task order modification? Or include the abatement in the task order proposal and have a deductive task order modification if no hazardous materials are found? Please advise.

Answer: Under each applicable delivery order, the contractor should include the abatement in the task order proposal. If no hazardous materials are found to exist as a result of testing, a deductive task order modification will be accomplished.

107. Per SABER SOW 4.2.2. – Does the government have laptops for the e4Clicks software training, or will the cost of rental laptops be part of the contractor’s coefficient?

Answer: The contractor will include the cost of rental laptops as part of their coefficient.

108. Per SABER SOW 4.2.3. – list of hard copy book to be provided to the government includes

‘R.S. Means Systems Book’, no book by this title is available on R.S. Means website.

Question: Please clarify.

Answer: Book title has been deleted from the requirement; see SABER SOW Revision 2.

109. Per SABER SOW 11.7. Environmental Testing –…