GDN_AZ130002_-_AZ2_-_Residential.pdf

PDF 139 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER) DMAFB Federal contract opportunity
Solicitation number
FA4877-13-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

General Decision Number AZ130002 - AZ2 - Residential

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineer Requirements (SABER) DMAFB, newest first.
File Type Posted
SABER_Seed_Project_-_SOW_-_FBNV_13-4000_-_Revision_1.pdf PDF
SABER_-_Pre_Proposal_Conference_-_Powerpoint_Presentation.pdf PDF
Sketch_SK-1_-_Q99 _Q100.pdf PDF
Sketch_SK-2_-_Q101.pdf PDF
SABER_-_Pre_Proposal_Conference_-_Record_of_Meeting.pdf PDF
SABER_-_Statement_of_Work_-_Revision_2.pdf PDF
FA4877-13-R-0001-0003___Incorporate_PreProposal_Conference_Meeting_Minutes.pdf PDF
SABER_Seed_Project_-_Bldg_3203_Asbestos_Registry.pdf PDF
SABER_-_Pre_Proposal_Conference_-_Meeting_Minutes.pdf PDF
Additional_As-Build_Drawings_-_SABER_Seed_Project.zip ZIP file
FA4877-13-R-0001-0002__Extend_Proposal_Due_Date_-_27_Sep_13.pdf PDF
ACAD_As-Built_drawing_-_bldg_3203.dwg DWG drawing
SABER_Seed_Project_-_As-Built_Drawings_-_5_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_2_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_6_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_3_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_4_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_1_of_6.PDF PDF
FA4877-13-R-0001-0001__Administrative_Corrections_Amendment.pdf PDF
SABER_-_Statement_of_Work_-_Revision_1.pdf PDF
SABER_Seed_Project_-_Sports_Bar_Equipment_List_Docs_-_Equip_1.pdf PDF
SABER_Seed_Project_-_SOW_-_FBNV_13-4000.pdf PDF
SOW_Appendix_A_-_Design_Compatibility_Guidelines_-_DCG_-_Apr12.pdf PDF
SOW_Appendix_C_-_355_CES_EMO_Civ_Contractor_Environmental_Guide.pdf PDF
Attachment_II_-_Past_Performance_Questionaire.docx DOCX document
SABER_Site_Visit_Instructions_-_28_Aug_13_at_0900_-_Swan_Gate.pdf PDF
SABER_Seed_Project_-_Sports_Bar_Equipment_List_Docs_-_Equip_2.pdf PDF
Attachment_3_-_SABER_Price_Evaluation_Worksheet_-_Blank_Template.xlsx XLSX spreadsheet
FA4877-13-R-0001__DMAFB_SABER_Solicitation.pdf PDF
SOW_Appendix_B_-_Installation_Development_and_Design_(ID2)_Handbook.pdf PDF
SABER_Seed_Project_-_Conceptual_Floor_Plan.pdf PDF
SABER_Seed_Project_-_AF_Form_66.xlsx XLSX spreadsheet
Arizona_Transaction_Privilege_Tax_Ruling_-_TPR_99-1.pdf PDF
SOW_Appendix_E_-_Title_Block_D_Sheet.dwg DWG drawing
GDN_AZ130019_-_AZ19_-_Heavy.pdf PDF
Event_EAL_-_Company_name.xls XLS spreadsheet
SOW_Appendix_D_-_Cover_Sheet.dwg DWG drawing
SABER_-_Statement_Of_Work.pdf PDF
GDN_AZ130006_-_AZ06_-_Heavy_Dams.pdf PDF
GDN_AZ130008_-_AZ8_-_Highway.pdf PDF
GDN_AZ130033_-_AZ33_-_Building.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: AZ130002 01/11/2013 AZ2

Superseded General Decision Number: AZ20120003

State: Arizona

Construction Type: Residential

County: Pima County in Arizona.

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories).

Modification Number Publication Date

0 01/04/2013

1 01/11/2013

BRAZ0003-007 07/01/2010

Rates Fringes

BRICKLAYER.......................$ 18.00 4.13

ELEC0518-002 01/01/2011

ELECTRICIAN......................$ 17.50 5.26+3%

ELEC0570-006 07/01/2011

ELECTRICIAN (Low Voltage

Wiring for Alarms)...............$ 17.50 5.26+3%

* IRON0075-008 01/01/2013

IRONWORKER, STRUCTURAL...........$ 26.52 20.65

SUAZ2011-002 07/28/2011

CARPENTER, Excludes Drywall

Hanging, and Form Work...........$ 24.45 0.00

CEMENT MASON/CONCRETE FINISHER...$ 17.13 0.00

DRYWALL FINISHER/TAPER...........$ 20.38 0.00

DRYWALL HANGER...................$ 17.44 0.00

FORM WORKER......................$ 14.04 0.00

GLAZIER..........................$ 16.86 0.00

LABORER: Common or General......$ 10.39 0.23

LABORER: Form-Stripping.........$ 18.00 0.35

LABORER: Grade Checker..........$ 16.83 0.45

LABORER: Mason Tender - Brick...$ 12.77 0.00

LABORER: Mason Tender -

Cement/Concrete/Stone............$ 13.94 0.00

LABORER: Pipelayer..............$ 13.00 0.00

LATHER...........................$ 13.31 0.00

OPERATOR: Backhoe...............$ 16.32 0.00

OPERATOR: Excavator.............$ 24.67 0.00

OPERATOR: Forklift..............$ 16.00 0.00

OPERATOR: Grader/Blade..........$ 17.40 0.00

OPERATOR: Loader (Front End)....$ 16.38 0.00

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 20.75 0.00

OPERATOR: Roller................$ 16.24 1.42

OPERATOR: Scraper...............$ 19.20 1.52

OPERATOR: Tractor...............$ 20.00 0.47

PAINTER: Brush, Roller and

Spray, Excludes Drywall

Finishing/Taping.................$ 13.31 0.00

PLUMBER..........................$ 21.78 0.00

ROOFER...........................$ 13.67 0.00

SHEET METAL WORKER (HVAC Duct

Installation Only)...............$ 14.33 0.00

TILE SETTER......................$ 18.79 0.00

TRUCK DRIVER: Dump Truck........$ 16.75 0.93

TRUCK DRIVER: Water Truck.......$ 14.50 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .