Attachment 2 - Past Performance Questionaire

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineer Requirements (SABER) DMAFB, newest first.
File Type Posted
SABER_Seed_Project_-_SOW_-_FBNV_13-4000_-_Revision_1.pdf PDF
SABER_-_Pre_Proposal_Conference_-_Powerpoint_Presentation.pdf PDF
Sketch_SK-1_-_Q99 _Q100.pdf PDF
Sketch_SK-2_-_Q101.pdf PDF
SABER_-_Pre_Proposal_Conference_-_Record_of_Meeting.pdf PDF
SABER_-_Statement_of_Work_-_Revision_2.pdf PDF
FA4877-13-R-0001-0003___Incorporate_PreProposal_Conference_Meeting_Minutes.pdf PDF
SABER_Seed_Project_-_Bldg_3203_Asbestos_Registry.pdf PDF
SABER_-_Pre_Proposal_Conference_-_Meeting_Minutes.pdf PDF
Additional_As-Build_Drawings_-_SABER_Seed_Project.zip ZIP file
FA4877-13-R-0001-0002__Extend_Proposal_Due_Date_-_27_Sep_13.pdf PDF
ACAD_As-Built_drawing_-_bldg_3203.dwg DWG drawing
SABER_Seed_Project_-_As-Built_Drawings_-_5_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_2_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_6_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_3_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_4_of_6.PDF PDF
SABER_Seed_Project_-_As-Built_Drawings_-_1_of_6.PDF PDF
FA4877-13-R-0001-0001__Administrative_Corrections_Amendment.pdf PDF
SABER_-_Statement_of_Work_-_Revision_1.pdf PDF
GDN_AZ130002_-_AZ2_-_Residential.pdf PDF
SABER_Seed_Project_-_Sports_Bar_Equipment_List_Docs_-_Equip_1.pdf PDF
SABER_Seed_Project_-_SOW_-_FBNV_13-4000.pdf PDF
SOW_Appendix_A_-_Design_Compatibility_Guidelines_-_DCG_-_Apr12.pdf PDF
SOW_Appendix_C_-_355_CES_EMO_Civ_Contractor_Environmental_Guide.pdf PDF
SABER_Site_Visit_Instructions_-_28_Aug_13_at_0900_-_Swan_Gate.pdf PDF
SABER_Seed_Project_-_Sports_Bar_Equipment_List_Docs_-_Equip_2.pdf PDF
Attachment_3_-_SABER_Price_Evaluation_Worksheet_-_Blank_Template.xlsx XLSX spreadsheet
FA4877-13-R-0001__DMAFB_SABER_Solicitation.pdf PDF
SOW_Appendix_B_-_Installation_Development_and_Design_(ID2)_Handbook.pdf PDF
SABER_Seed_Project_-_Conceptual_Floor_Plan.pdf PDF
SABER_Seed_Project_-_AF_Form_66.xlsx XLSX spreadsheet
Arizona_Transaction_Privilege_Tax_Ruling_-_TPR_99-1.pdf PDF
SOW_Appendix_E_-_Title_Block_D_Sheet.dwg DWG drawing
GDN_AZ130019_-_AZ19_-_Heavy.pdf PDF
Event_EAL_-_Company_name.xls XLS spreadsheet
SOW_Appendix_D_-_Cover_Sheet.dwg DWG drawing
SABER_-_Statement_Of_Work.pdf PDF
GDN_AZ130006_-_AZ06_-_Heavy_Dams.pdf PDF
GDN_AZ130008_-_AZ8_-_Highway.pdf PDF
GDN_AZ130033_-_AZ33_-_Building.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PERFORMANCE QUESTIONNAIRE

The below-named contractor is being considered for award of a contract for Solicitation: FA4877-13-R-0001, Simplified Acquisition of Base Engineer Requirements (SABER) Contract. The scope of work includes efforts involving repair, sustainment, renovation and/or construction of facilities on Davis-Monthan AFB, AZ 85707.

A primary consideration in our selection process is the contractor’s history of performance of similar efforts. Please make every effort to be thorough in your answers/comments. Return the completed questionnaire to the following address:

355 CONS/MSCAC

Attn: SSgt David A. Maida 3180 S. Craycroft Road Davis-Monthan AFB, AZ 85707-3522

Please refer any questions to: SSgt David Maida at (520) 228-4185 or you may email him at the following address: david.maida@dm.af.mil

A. GENERAL INFORMATION

Contractor’s Name:_____________________________________________________________ Address:______________________________________________________________________ Telephone Number: ______________________ Point of Contact: _______________________

B. RESPONDENT INFORMATION

Name: __________________________________ Title: _____________________________

Organization & Address: ________________________________________________________ Telephone: ___________________ Fax: ________________ Email: ____________________

C. CONTRACT INFORMATION

Contract Number/Title: __________________________________________________________ Period of Performance: _________________ Dollar Amount of Contract: _________________ Services Performed: ______________________________________________________________________________

D. PERFORMANCE INFORMATION

Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:

CODE PERFORMANCE RATING

A ACCEPTABLE - During the entire period, the contractor met the requirements of the contract and consistently performed at an acceptable level. Performance was accomplished with some problems, and the contractor took effective corrective action for those problems that did occur.

UA UNACCEPTABLE – During the entire period, the contractor did not meet the requirements of the contract and performance was at an unacceptable level. There were a number of serious problems that required extensive oversight and involvement, and corrective actions were either ineffective or non-existent.

N/A NOT APPLICABLE

Please use the above ratings to describe the contractor’s performance in the following areas:

1. HISTORY COMPLETING EFFORTS INVOLVING DESIGN, CARPENTRY, ROAD REPAIR, ROOFING, EXCAVATION, INTERIOR AND EXTERIOR ELECTRICAL, HEATING, VENTILATION, AIR CONDITIONING, PLUMBING, SHEET METAL, PAINTING, DEMOLITION, CONCRETE MASONRY, AND WELDING.

(PRICE RANGE OF $2,000.00 THROUGH $750,000.00)

a. Contractor had professional and qualified management team
A UA N/A
b. Contractor provided submittals timely
A UA N/A
c. Contractor was able to complete project within budget
A UA N/A
d. Contractor successfully completed construction as designed
A UA N/A

e. Were Contractor change order/equitable adjustment requests reasonable

A UA N/A

f. Contractor’s overall quality of service
A UA N/A

COMMENTS/REMARKS:_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

2. MANAGEMENT EFFECTIVENESS

a. Contractor provided experienced managers and supervisors with technical and administrative abilities to meet contract requirements.
A UA N/A
b. Contractor maintained appropriate staffing levels (number/ qualifications)
A UA N/A
c. Contractor effectively managed materials requirements (i.e., maintained adequate stock levels)
A UA N/A
d. Contractor effectively oversaw/managed subcontractors
A UA N/A
e. Contractor’s overall management effectiveness
A UA N/A

COMMENTS/REMARKS:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

3. QUALITY OF SERVICE AND WORKMANSHIP

a. Contractor maintained acceptable standards of workmanship
A UA N/A
b. Contractor provided acceptable-quality materials
A UA N/A
c. Contractor’s overall quality of service
A UA N/A

COMMENTS/REMARKS:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

4. TIMELINESS/ADHERENCE TO SCHEDULES

a. Contractor completed scheduled tasks within stated time frames
A UA N/A
b. Contractor was proactive in keeping you informed of schedule changes if they were going to occur
A UA N/A
c. Contractor responded to emergency requirements in a timely manner
A UA N/A
d. Overall contractor timeliness
A UA N/A

COMMENTS/REMARKS:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

5. QUALITY CONTROL

a. Contractor provided an adequate quality control plan
A UA N/A
b. Contractor adhered to its quality control plan
A UA N/A
c. Contractor’s quality control resulted in little/no work on your part to achieve acceptable service (i.e.-few failed inspections)
A UA N/A
d. Contractor documented its quality control checks/corrective actions
A UA N/A
e. Contractor’s overall quality control
A UA N/A

COMMENTS/REMARKS:___________________________________________________________________________________________________________________________________________________________________________________________________________________

6. CUSTOMER SATISFACTION

a. Contractor maintained a professional working relationship
A UA N/A
b. Contractor was reasonable and cooperative in resolving customer complaints
A UA N/A
c. Contractor was flexible in responding to customer requirements
A UA N/A
d. Overall customer satisfaction
A UA N/A

COMMENTS/REMARKS:___________________________________________________________________________________________________________________________________________________________________________________________________________________

7. COMPLIANCE WITH ENVIRONMENTAL/LABOR/SAFETY REQUIREMENTS

a. Environmental requirements
A UA N/A
b. Labor laws
A UA N/A
c. Workplace safety
A UA N/A
d. Overall compliance
A UA N/A

COMMENTS/REMARKS:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

8. OVERALL PAST PERFORMANCE RATING: ______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

9. If a Government contract, did the contractor receive any Contract Discrepancy Reports, Letters of Concern, or Cure Notices? __________ If yes, please describe:

10. If given the opportunity, would you award another contract to this contractor? Please explain response below.

FA4877-13-R-0001