Clarifications and Corrections to Site Visit Meeting Minutes.pdf

PDF 195 KB Posted

Attached to
DMAFB Multiple Award Construction Contract (MACC)
Solicitation number
FA4877-12-R-0008
Issued by

About this file

Clarifications and Corrections to Site Visit Meeting Minutes

View the file

Other files

File Type Posted
FA4877-12-R-0008-0002 MACC Amendment 2.pdf PDF
Appendix D - —
Appendix D - —
Project Package 1 - Section 01011 - Design Requirements - Revised.pdf PDF
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 3 - As-Built Drawings - Facility 81.zip ZIP file
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 3 - As-Built Drawings - Facility 145.zip ZIP file
Project Package 1 - Project Drawings - Revised.pdf PDF
Project Package 1 - As-Built Drawings - Facility 4101.zip ZIP file
Project Package 2 - Electrical-Comm Site Plan.pdf PDF
Project Package 1 - As-Built Drawings - Facility 4455.zip ZIP file
Project Package 3 - Building 81 Communications Removal and Replacement.pdf PDF
Project Package 1 - Bldgs 4101 and 4455 Various Asb Reports.xlsx XLSX spreadsheet
Project Package 3 - Project Drawings —
Project Package 1 - Section 01011 - Design Requirements —
Project Package 3 - Section 01011 - Design Requirements —
MACC Statement of Work - Revised.pdf PDF
3 - MACC Pre-Proposal Conference - Site Map.pdf PDF
Pre-Proposal Conference Site Visit Meeting Minutes - MACC.pdf PDF
1 - MACC Pre Proposal Conference - Record of Meeting - Sign In Sheet.pdf PDF
2 - MACC Pre-Proposal Conference - Power Point Presentation.ppt PPT presentation
Appendix D - Davis-Monthan AFB CIP Data Contour Data.zip ZIP file
Appendix E - DoD Minimum Antiterrorism Standards for Buildings - UFC 4-010-01.pdf PDF
FA4877-12-R-0008-0001 MACC Amendment 1.pdf PDF
Arizona Transaction Privilege Tax Ruling - TPR 99-1.pdf PDF
MACC Site Visit Clarifications and Instructions - 17 May 12 at 0900 - Swan Gate.pdf PDF
Special Event EAL - Your Companys Name.xls XLS spreadsheet
ID2 - Davis Monthan - Jan11.pdf PDF
Project Package 3 - Project Drawings —
Project Package 3 - Project Drawings —
Project Package 2 - Section 01011 - Design Requirements —
Project Package 2 - Section 01010 - Summary of Work —
Project Package 2 - Section 01010 - Summary of Work —
Project Package 4 - Wage Determination - Construction Type —
Project Package 1 - Section 01011 - Design Requirements —
Project Package 3 - Project Drawings —
Project Package 3 - Section 01011 - Design Requirements —
Project Package 4 - Project Drawings.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

355TH CONTRACTING SQUADRON (ACC)

DAVIS-MONTHAN AIR FORCE BASE ARIZONA

01 June 2012

MEMORANDUM FOR ALL PROSPECTIVE OFFERORS

FROM: 355 CONS/MSCAA

SUBJECT: Clarifications and Corrections to Pre-Proposal Conference Site Visit Meeting Minutes;

Solicitation FA4877-12-R-0008; Multiple Award Construction Contract (MACC); Davis-Monthan Air

Force Base, Tucson, Arizona.

1. Pre-Proposal Conference Site Visit Meeting Minutes were posted with Amendument 1. Upon review of these question, by both the Government and Indusry, there have been request(s) for clarifcations. This memorandum shall serve to clarify and/or correct the meeting minutes and accompanying documents; clarification(s) listed below:

A. Question 77) REFERENCE: Project A (FBNV 11-0043 A; QUESTION: Item 1.1- iii.3.

What is the required number of showers, lockers, toilets, urinals, and sinks required in the new bathrooms? ANSWER -- Two urinals, two commodes, and a shower in each bathroom, two sinks in each bathroom for a total of 4 urinals, 4 toilets, 4 sinks and two showers.

Clarification: The number of lockers was not provided -- ADD: The total number of personnel are 46. Each needs a locker. However no more than 50 lockers should be considered.

B. Question 118) REFERENCE: N/A; QUESTION: Are we required to submit an AF66 with each seed project at the time of proposal submissions?; ANSWER: Yes, refer to solicitation documents. Clarification: NO, AF66 do NOT need to be submitted with your propsal submissions. The solicitation documents for the seed projects state - they are completed with the design build process, and are to be submitted at, or anytime after, the 65% design build. (The answer provided with the original meeting minutes was inputted incorrectly)

C. Question 151) Correction to Answer: Change Answer from: “See previous answer

(QUESTION #138) concerning Volume III…” TO: “See previous answer (Question #137)”

D. Question 156) Correction to Answer: Change Answer from: “See answer to question 165 for more details” TO: “See answer to question 164 for more details”.

E. File read issues: Clarification --The .gdb files are part of Appendix D – They are GIS database files; programs such as „AutoCAD‟ and/or „ARC GIS‟ can be used to read these files. The .PCX files are pixel files; a program such as Adobe Pro, or Adobe Photoshop should read these files. Once opened, if desired, they can be converted into a .pdf; however, the government will not convert files, nor will software be provided. It is each firm‟s responsibility to have the required software.

2. Clarifications concerning this memorandum shall be directed to the Contract Administrator, SSgt David A. Maida; 520.228.4185; david.maida@dm.af.mil.

//SIGNED//

DAVID A. MAIDA, SSgt, USAF

Contract Administrator