2 - MACC Pre-Proposal Conference - Power Point Presentation.ppt
PPT presentation 10 MB Posted
- Attached to
- DMAFB Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA4877-12-R-0008
About this file
Meeting Minutes -- Attachment 2. MACC Pre-Proposal Conference - Power Point Presentation
View the file
Other files for this federal contract opportunity
Show all 50
DMAFB Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WELCOME
PRIME CONTRACTORS
PLEASE SIT TO THE LEFT
SUB CONTRACTORS
PLEASE SIT TO THE RIGHT
PLEASE SIGN-IN AT FRONT OF STAGE
THEN TAKE YOUR SEATS
FA4877-12-R-0008
Multiple Award Construction Solicitation/Contract (MACC) Pre-Proposal Conference
17 MAY 2012
| PURPOSE |
| KEY PERSONNEL |
| SOLICITATION REQUIREMENTS |
| TECHNICAL REQUIREMENTS |
| ADDITIONAL INFO |
| PRE-BRIEF (SEED PROJECTS -- 1, 2, 3, 4) |
| TRANSFER TO PHYSICAL SITES |
OVERVIEW
PURPOSE
| To allow an opportunity for an onsite look at the requirement. |
| Allow for industry to comment on the requirement. |
| Allow the Government an opportunity to amend the solicitation as a result of the industry input. (if necessary) |
KEY PERSONNEL
| Contracting Officer | |
| Authorized to make changes | |
| Primary: Ms. Joanne Squire | (520) 228-3131 |
| Alternate: Mr. David Harrison | (520) 228-4673 |
| Contract Administrator | |
| Not authorized to make changes | |
| Liaison between contractor and Civil Engineering personnel | |
| Primary: SSgt David Maida | (520) 228-4185 |
| Alternate: 1Lt Cyrus Perry | (520) 228-5476 |
KEY PERSONNEL (cont.)
| 355 CES | ||
| Mr. James Barker | (SSA) | |
| Mr. Colby Moeller | (Seed Project 1) | |
| Mr. Todd Kirkpatrick | (Seed Project 2, 4) | |
| Mr. Tony Dipietro | (Seed Project 3) |
***Not Authorized to make changes***
***All correspondence will go through 355 CONS personnel and will be routed to CES
***Provide Government technical expertise***
KEY PERSONNEL (cont.)
| SAFETY | 228-5342 | ||
| IAW Air Force Occupational Safety, Fire Prevention and Health (AFOSH) Program | |||
| FIRE DEPARTMENT | 228-4757 | ||
| IAW DMAFB Fire Protection Program | |||
| SECURITY FORCES | 228-3200 | ||
| 30 mph speed limit on base, 15 mph on flightline & housing | |||
| Mandatory seatbelt use | |||
| (While Driving on base) -> NO CELL PHONES unless hands free! | |||
| ENVIRONMENTAL QUALITY | 228-5372 | ||
| Federal, State, and Local requirements must be met | |||
| Must comply with DM’s Contractors Environmental Guide |
OVERSEE COMPLIANCE WITH ANY BASE, STATE, OR FEDERAL REGULATIONS
SOLICITATION REQUIREMENTS
| MACC Concept |
| Multiple Award Opportunity for 8(a) contractor’s to propose on 4 Seed project’s. |
| Four AWARDEES are anticipated!!! |
| Offeror’s “must” propose all packages |
to be considered for individual awards
| Lowest Price Technically Acceptable |
| Seed projects are “Contract Authority” |
meaning may or may not be funded!!!
CAN I WORK
ON
SATURDAY?
SOLICITATION REQUIREMENTS (cont.)
If Seed projects are not funded the contract minimum would be met through “Doing business w/DM seminar.
Four MACC AWARDEE’s would be paid $2K for the initial meeting to meet the contract minimum Evaluation criteria still based on Seed projects, Technical, Past Performance, and Price to make awardee determination
Solicitation will use Lowest Price Technical Acceptable (LPTA) procedures Technical-Acceptable/Unacceptable Defined in Section L Criteria for meeting sub-factor in Section M Past Performance-Acceptable/Unacceptable Defined in Section L Criteria for meeting sub-factor in Section M Price-Acceptable/Unacceptable Must be realistic/reasonable in relationship to the IGE & other proposals submitted.
Contractors shall use the applicable MACC Bid Schedules included with each Project Package All Four Project Packages are considered design/build
(REVIEW OF SOLICITATION, SECTIONS L & M)
SOLICITATION REQUIREMENTS
(REVIEW OF SOLICITATION, SECTIONS L & M)
Section L (Instructions, Conditions & Notices to Bidders)
| 8(A) Competitive Set-Aside |
| BONA-FIDE ARIZONA OFFICE! |
| 13 C.F.R. § 124.507 & 8(a) Compliance Guide |
| SBA Determination Prior to submitting its offer for the procurement !!! |
| Bonding Requirements – |
| Single Project Magnitude - $5 Mil |
| Aggregate Bonding - $10 Mil |
Section M (Evaluation Factors for Award)
[pg 65; A. 1] Award made to the Acceptable offer with a (1) Technically Acceptable proposal; (2) Acceptable Past Performance; and (3) The lowest evaluated cost or Price….
ACCEPTABLE / UNACCEPTABLE
MUST propose on all four (4) project packages to be considered for award!
If you win A.. No longer get B, C, etc.
TECHNICAL REQUIREMENTS
| NO QUESTIONS WILL BE ANSWERED DURING THE SITE VISIT! |
| PLEASE WRITE YOUR QUESTIONS DOWN AS WE PROCEED THROUGHOUT THE DAY. |
| ALL QUESTIONS SHALL BE SUBMITTED IN WRITING - VIA EMAIL or AT THE END OF THE SITE VISIT. |
------------ [ IN WRITING! ] --------------
| HOW TO FORMAT QUESTIONS |
| INCLUDE THE FOLLOWING FOR EACH QUESTION |
| Seed Project Number |
| “Seed Project # 1 ALS” --- “Why does …… “ |
| Page / Document / Section - Reference Number (As applicable) |
| “MACC Statement of Work; Pg 13; 8. b. – GPS Data” – “How to …….. “ |
Submit via Email to: DAVID.MAIDA@DM.AF.MIL
TECHNICAL REQUIREMENTS
| Address ?’s to Contract Administrator |
| Questions Due – COB FRI. 18 May 12 |
| ALL questions, comments, and answers will be recorded and made available on FedBizOps. |
| 24 MAY 12 |
| No SIDEBAR conversations!!!!!!!!! |
| Stay in a group. Do not wander off. |
ADDITIONAL INFORMATION
IF any changes/updates to the RFP are required – The amendment will be posted with the Questions/Answers & Site Visit Meeting Minutes --- Via FOB by 24 MAY 12
ADDITIONAL INFORMATION
| Past Performance information is due by COB of the solicitation closing date. |
| Offerors without PP information see RFP. |
| Proposals due 6 JUNE 2012 @ 2:00 pm local time |
Seed Project 1
ALS
DEMO
Seed Project 1 - ALS
| CES Project Manager: Colby Moeller |
| Renovate portion of Building 4455 for Airman Leadership School (ALS) |
| Renovate HVAC, |
exst. chiller to remain Minimal work in Bathrooms
| Replace finishes in red highlighted area |
| Existing tile to remain in hallway this area only |
| Walls around seminar rooms to be rated minimum STC 45 |
| Asbestos report for Building 4455 and 4101 now available (not complete) |
| Demo 4101 entirely, including all utilities back to nearest point of connection. |
Seed Project 2 Maintenance Shop
Relocate
Seed Project 2 – Maintenance Shop
| Project Manager -- Todd Kirkpatrick PE |
| Relocate Existing Maintenance Bay – Provide Fire Suppression |
| Construct Office/Conference Space for Two Groups Dirt Boys and Power Pro |
| Demo Existing Facility – Bldg 5122 |
Seed Project 3 Parts Warehouse
Demo / Relocate
Seed Project 3 Parts Warehouse
| Demo building 145 – Move mezzanine |
| Demo overhead power lines – establish power to building 81 |
| Demo Herky Road – Re-grade area |
| New addition to building 81 |
| New covered storage area |
| New fenced storage area |
Seed Project 4 Parking Area (Curbing)
Seed Project 4 Parking Area (Curbing)
| Project Manager -- Todd Kirkpatrick PE |
| Demolish Existing 10th Street Configuration Including Milling, Repaving, and Restriping |
| Install New Curbing |
| Reconfigure Comanche/10th St. Intersection with Pavement Markings and Traffic Dots |
BUS SEATING ASSIGNMENTS
BUS 1 & 2: (44 Pax) ALL CONTRACTORS
BUS 3: (28 Pax) – GOV’T PERSONNEL
BUS TO Seed Project Sites…
NO PICTURES OF THE FLIGHT LINE!
Best in ACC
UNKNOWN-0
UNKNOWN-1
UNKNOWN-2