Meeting Minutes -- Attachment 2. MACC Pre-Proposal Conference - Power Point Presentation

View the file

Other files for this federal contract opportunity

Other files attached to DMAFB Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Appendix D - —
Project Package 1 - Section 01011 - Design Requirements - Revised.pdf PDF
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 3 - As-Built Drawings - Facility 145.zip ZIP file
Project Package 3 - As-Built Drawings - Facility 81.zip ZIP file
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings - Facility 4101.zip ZIP file
Project Package 2 - Electrical-Comm Site Plan.pdf PDF
Project Package 1 - Project Drawings - Revised.pdf PDF
Project Package 1 - As-Built Drawings - Facility 4455.zip ZIP file
Project Package 3 - Building 81 Communications Removal and Replacement.pdf PDF
Project Package 3 - Project Drawings —
Project Package 3 - Section 01011 - Design Requirements —
Project Package 1 - Section 01011 - Design Requirements —
Appendix D - Davis-Monthan AFB CIP Data Contour Data.zip ZIP file
Appendix E - DoD Minimum Antiterrorism Standards for Buildings - UFC 4-010-01.pdf PDF
1 - MACC Pre Proposal Conference - Record of Meeting - Sign In Sheet.pdf PDF
Arizona Transaction Privilege Tax Ruling - TPR 99-1.pdf PDF
ID2 - Davis Monthan - Jan11.pdf PDF
Project Package 4 - Wage Determination - Construction Type —
Project Package 2 - Section 01010 - Summary of Work —
Project Package 1 - Section 01011 - Design Requirements —
Project Package 4 - MACC Bid Schedule Seed Project 4.xlsx XLSX spreadsheet
Appendix A- Design Compatibility guidelines —
Project Package 3 - Section 01010 - Summary of Work —
Project Package 4 - Section 01011 - Design Requirements —
Project Package 3 - MACC Bid Schedule Seed Project 3.xlsx XLSX spreadsheet
Project Package 3 - Project Drawings —
Project Package 4 - Project Drawings.pdf PDF
FA4877-12-R-0008 MACC.pdf PDF
Project Package 3 - Wage Determination - Construction Type —
Project Package 3 - Project Drawings —
Wage Determination 05-2025 —
Project Package 3 - Project Drawings —
MACC Statement of Work.pdf PDF
Project Package 1 - MACC Bid Schedule Seed Project 1.xlsx XLSX spreadsheet
Project Package 1 - Wage Determination - Construction Type —
Project Package 3 - Project Drawings —
Project Package 1 - Airman Leadership School Design Guide.pdf PDF
Project Package 3 - Project Drawings —
Project Package 1 - Project Drawings.pdf PDF
Past Performance Questionnaire MACC.doc DOC document
Project Package 4 - Section 01010 - Summary of Work —
Project Package 3 - Project Drawings —
Project Package 2 - Wage Determination - Construction Type —
Appendix C- 355 CES EMO Civ Contractor Environmental Guide.pdf PDF
Project Package 1 - Section 01010 - Summary of Work —
Show all 50

DMAFB Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WELCOME

PRIME CONTRACTORS

PLEASE SIT TO THE LEFT

SUB CONTRACTORS

PLEASE SIT TO THE RIGHT

PLEASE SIGN-IN AT FRONT OF STAGE

THEN TAKE YOUR SEATS

FA4877-12-R-0008

Multiple Award Construction Solicitation/Contract (MACC) Pre-Proposal Conference

17 MAY 2012

PURPOSE
KEY PERSONNEL
SOLICITATION REQUIREMENTS
TECHNICAL REQUIREMENTS
ADDITIONAL INFO
PRE-BRIEF (SEED PROJECTS -- 1, 2, 3, 4)
TRANSFER TO PHYSICAL SITES

OVERVIEW

PURPOSE

To allow an opportunity for an onsite look at the requirement.
Allow for industry to comment on the requirement.
Allow the Government an opportunity to amend the solicitation as a result of the industry input. (if necessary)

KEY PERSONNEL

Contracting Officer
Authorized to make changes
Primary: Ms. Joanne Squire(520) 228-3131
Alternate: Mr. David Harrison(520) 228-4673
Contract Administrator
Not authorized to make changes
Liaison between contractor and Civil Engineering personnel
Primary: SSgt David Maida(520) 228-4185
Alternate: 1Lt Cyrus Perry(520) 228-5476

KEY PERSONNEL (cont.)

355 CES
Mr. James Barker(SSA)
Mr. Colby Moeller(Seed Project 1)
Mr. Todd Kirkpatrick(Seed Project 2, 4)
Mr. Tony Dipietro(Seed Project 3)

***Not Authorized to make changes***

***All correspondence will go through 355 CONS personnel and will be routed to CES

***Provide Government technical expertise***

KEY PERSONNEL (cont.)

SAFETY228-5342
IAW Air Force Occupational Safety, Fire Prevention and Health (AFOSH) Program
FIRE DEPARTMENT228-4757
IAW DMAFB Fire Protection Program
SECURITY FORCES228-3200
30 mph speed limit on base, 15 mph on flightline & housing
Mandatory seatbelt use
(While Driving on base) -> NO CELL PHONES unless hands free!
ENVIRONMENTAL QUALITY228-5372
Federal, State, and Local requirements must be met
Must comply with DM’s Contractors Environmental Guide

OVERSEE COMPLIANCE WITH ANY BASE, STATE, OR FEDERAL REGULATIONS

SOLICITATION REQUIREMENTS

MACC Concept
Multiple Award Opportunity for 8(a) contractor’s to propose on 4 Seed project’s.
Four AWARDEES are anticipated!!!
Offeror’s “must” propose all packages

to be considered for individual awards

Lowest Price Technically Acceptable
Seed projects are “Contract Authority”

meaning may or may not be funded!!!

CAN I WORK

ON

SATURDAY?

SOLICITATION REQUIREMENTS (cont.)

If Seed projects are not funded the contract minimum would be met through “Doing business w/DM seminar.

Four MACC AWARDEE’s would be paid $2K for the initial meeting to meet the contract minimum Evaluation criteria still based on Seed projects, Technical, Past Performance, and Price to make awardee determination

Solicitation will use Lowest Price Technical Acceptable (LPTA) procedures Technical-Acceptable/Unacceptable Defined in Section L Criteria for meeting sub-factor in Section M Past Performance-Acceptable/Unacceptable Defined in Section L Criteria for meeting sub-factor in Section M Price-Acceptable/Unacceptable Must be realistic/reasonable in relationship to the IGE & other proposals submitted.

Contractors shall use the applicable MACC Bid Schedules included with each Project Package All Four Project Packages are considered design/build

(REVIEW OF SOLICITATION, SECTIONS L & M)

SOLICITATION REQUIREMENTS

(REVIEW OF SOLICITATION, SECTIONS L & M)

Section L (Instructions, Conditions & Notices to Bidders)

8(A) Competitive Set-Aside
BONA-FIDE ARIZONA OFFICE!
13 C.F.R. § 124.507 & 8(a) Compliance Guide
SBA Determination Prior to submitting its offer for the procurement !!!
Bonding Requirements –
Single Project Magnitude - $5 Mil
Aggregate Bonding - $10 Mil

Section M (Evaluation Factors for Award)

[pg 65; A. 1] Award made to the Acceptable offer with a (1) Technically Acceptable proposal; (2) Acceptable Past Performance; and (3) The lowest evaluated cost or Price….

ACCEPTABLE / UNACCEPTABLE

MUST propose on all four (4) project packages to be considered for award!

If you win A.. No longer get B, C, etc.

TECHNICAL REQUIREMENTS

NO QUESTIONS WILL BE ANSWERED DURING THE SITE VISIT!
PLEASE WRITE YOUR QUESTIONS DOWN AS WE PROCEED THROUGHOUT THE DAY.
ALL QUESTIONS SHALL BE SUBMITTED IN WRITING - VIA EMAIL or AT THE END OF THE SITE VISIT.

------------ [ IN WRITING! ] --------------

HOW TO FORMAT QUESTIONS
INCLUDE THE FOLLOWING FOR EACH QUESTION
Seed Project Number
“Seed Project # 1 ALS” --- “Why does …… “
Page / Document / Section - Reference Number (As applicable)
“MACC Statement of Work; Pg 13; 8. b. – GPS Data” – “How to …….. “

Submit via Email to: DAVID.MAIDA@DM.AF.MIL

TECHNICAL REQUIREMENTS

Address ?’s to Contract Administrator
Questions Due – COB FRI. 18 May 12
ALL questions, comments, and answers will be recorded and made available on FedBizOps.
24 MAY 12
No SIDEBAR conversations!!!!!!!!!
Stay in a group. Do not wander off.

ADDITIONAL INFORMATION

IF any changes/updates to the RFP are required – The amendment will be posted with the Questions/Answers & Site Visit Meeting Minutes --- Via FOB by 24 MAY 12

ADDITIONAL INFORMATION

Past Performance information is due by COB of the solicitation closing date.
Offerors without PP information see RFP.
Proposals due 6 JUNE 2012 @ 2:00 pm local time

Seed Project 1

ALS

DEMO

Seed Project 1 - ALS

CES Project Manager: Colby Moeller
Renovate portion of Building 4455 for Airman Leadership School (ALS)
Renovate HVAC,

exst. chiller to remain Minimal work in Bathrooms

Replace finishes in red highlighted area
Existing tile to remain in hallway this area only
Walls around seminar rooms to be rated minimum STC 45
Asbestos report for Building 4455 and 4101 now available (not complete)
Demo 4101 entirely, including all utilities back to nearest point of connection.

Seed Project 2 Maintenance Shop

Relocate

Seed Project 2 – Maintenance Shop

Project Manager -- Todd Kirkpatrick PE
Relocate Existing Maintenance Bay – Provide Fire Suppression
Construct Office/Conference Space for Two Groups Dirt Boys and Power Pro
Demo Existing Facility – Bldg 5122

Seed Project 3 Parts Warehouse

Demo / Relocate

Seed Project 3 Parts Warehouse

Demo building 145 – Move mezzanine
Demo overhead power lines – establish power to building 81
Demo Herky Road – Re-grade area
New addition to building 81
New covered storage area
New fenced storage area

Seed Project 4 Parking Area (Curbing)

Seed Project 4 Parking Area (Curbing)

Project Manager -- Todd Kirkpatrick PE
Demolish Existing 10th Street Configuration Including Milling, Repaving, and Restriping
Install New Curbing
Reconfigure Comanche/10th St. Intersection with Pavement Markings and Traffic Dots

BUS SEATING ASSIGNMENTS

BUS 1 & 2: (44 Pax) ALL CONTRACTORS

BUS 3: (28 Pax) – GOV’T PERSONNEL

BUS TO Seed Project Sites…

NO PICTURES OF THE FLIGHT LINE!

Best in ACC

UNKNOWN-0

UNKNOWN-1

UNKNOWN-2