Atch_14_Spec_Section_32_12_36_Rubberized_Seal_Coat.doc

DOC document 37 KB Posted

Attached to
Paving IDIQ Federal contract opportunity
Solicitation number
FA4861-16-R-A300
Issued by
Department of the Air Force Air Combat Command

About this file

Atch 14 Spec Section 32 12 36 Rubberized Seal Coat

View the file

Other files for this federal contract opportunity

Other files attached to Paving IDIQ, newest first.
File Type Posted
FA4861-16-R-A300_-_Paving_IDIQ_RFIs_Answers.pdf PDF
Atch_56_AFI_31-501_Prsnl_Security_Pgm_Mgmt.pdf PDF
FA4861-16-R-A300_Amendment_03.pdf PDF
16RA300_Amendment_02.pdf PDF
16RA300_Amendment_01.pdf PDF
16RA300_Mtg_Minutes.pdf PDF
Atch_07_Spec_Section_32_01_29_Spall_Repair.doc DOC document
Atch_12_Spec_Section_32_12_15_HMA_Airfield.doc DOC document
Atch_31_APPENDIX_10_Full_Depth_Rpr_Details.pdf PDF
Atch_29_APPENDIX_8__Bollard_Detail.pdf PDF
Atch_35_APPENDIX_14_Compression_Seal_Detail.pdf PDF
Atch_54_Subcontractor_or_Teaming_Partner_Consent_Form.pdf PDF
Atch_36_APPENDIX_15_ADA_Warning_Panel_Detail.pdf PDF
Atch_25_APPENDIX_4_A_Curb_Detail.pdf PDF
Atch_28_APPENDIX_7_Valley_Gutter_Detail.pdf PDF
FA4861-16-R-A300_Solicitation.pdf PDF
Atch_30_APPENDIX_9_Partial_Depth_Rpr_Details.pdf PDF
Atch_24_APPENDIX_3_Wing_Wall_Inlet_Detail.pdf PDF
Atch_02_Spec_Section_02_41_13__Demolition.doc DOC document
Atch_42_APPENDIX_21_NAFB_Form_0-74 _Range_Pass.pdf PDF
Atch_26_APPENDIX_5_L_Curb_and_Gutter_Detail.pdf PDF
Atch_34_APPENDIX_13_Field_Molded_Joint_Seal_Detail.pdf PDF
Atch_17_Spec_Section_32_13_73_19_Compression_Seals.doc DOC document
Atch_11_Spec_Section_32_12_13_Tack_ _Prime_Coat.doc DOC document
Atch_50_WD_NV160034_20160108.pdf PDF
Atch_44_APPENDIX_23_Nat'l_Manual_on_Traffic_Control_Dev.pdf PDF
Atch_39_APPENDIX_18_AF_Form_103.pdf PDF
Atch_20_Spec_Section_32_17_26_Tactile_Warning_Panels.doc DOC document
Atch_22_APPENDIX_1_Duct_Details.pdf PDF
Atch_37_APX_16_Nellis-Creech_ID2_Handbook_2011.pdf PDF
Atch_45_APPENDIX_24_DOD_Supplement_to_MUTCD.pdf PDF
Atch_47_APPENDIX_26_VEA_Trenching_ _Backfill_Req.pdf PDF
Atch_43_APPENDIX_22_Env_Permit-ATP_Guidance.doc DOC document
Atch_03_Spec_Section_31_00_00_Earthwork.doc DOC document
Atch_13_Spec_Section_32_12_16_HMA_Roads.doc DOC document
Atch_53_Past_Performance_Questionnaire.pdf PDF
Atch_15_Spec_Section_32_13_11_PCC_Airfield.doc DOC document
Atch_51_PAVING_IDIQ_Line_Item_Pricing_Schedule.xlsx XLSX spreadsheet
Atch_16_Spec_Section_32_13_73_16_Poured_Joint_Sealant.doc DOC document
Atch_41_APPENDIX_20_Nuclear_Gauge_Forms_1_ _2.pdf PDF
Atch_38_APX_17_Spec_Section_271000_Telecom.pdf PDF
Atch_48_APPENDIX_27_VEA_Primary_ _Sec_Trench_Req.pdf PDF
Atch_33_APPENDIX_12_Crack_Rpr_Detail.pdf PDF
Atch_52_Past_Performance_Information_Sheet.pdf PDF
Atch_10_Spec_Section_32_11_26_ABC_for_Roads.doc DOC document
Atch_01_Paving_SOW_7Feb16.pdf PDF
Atch_05_Spec_Section_32_01_17_Crack_Sealing.doc DOC document
Atch_32_APPENDIX_11_Rpr_of_Concrete_Pavements.pdf PDF
Atch_46_APPENDIX_25_VEA_Connection_Charge_Agreement.docx DOCX document
Atch_23_APPENDIX_2_Mooring_Detail.pdf PDF
Show all 50

Paving IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTAIN/REPAIR PAVEMENTS IDIQ

IFB No.: F26600-99-R-C118

RKMF 98-0105

Contract No.:

PAVING IDIQ

Solicitation: FA4861-16-R-A300

SECTION 32 12 16

RUBBERIZED ASPHALT EMULSION SEALANT

1. PART 1- GENERAL

1.1. APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

Federal Specifications (Fed. Spec.):

TT-C-555B Accelerated Weathering

(2 Year Exposure)

TT-C-551B Resistance to Wind Driven Rain

(98 MPH)

American Society for Testing and Materials (ASTM) Publications:

ASTM D 217 Cone Penetration at 77 Deg. F

ASTM 3910 Wet track Abrasion Test

American Association of State Highway and Transportation Officials

(AASHTO) Publications:

T-45-56% Non-volatile Soluble in Trichloroethylene by Wt

1.2. TEST REQUIREMENTS: Product information on the proposed sealant to be used shall be submitted to the Contracting Officer for approval prior to use on the jobsite.

1.3. EQUIPMENT: Machines, tools and equipment used in the performance of the work required by this section shall be approved before the work is started and shall be maintained in satisfactory condition at all times.

1.4. DELIVERY AND STORAGE: Materials delivered to the jobsite shall be inspected for defects, unloaded, and stored with a minimum of handling to avoid damage. Storage facilities shall be provided at the jobsite to protect materials from weather and to maintain them at the temperatures as recommended by the manufacturer.

1.5. ENVIRONMENTAL CONDITIONS: The ambient air temperature and the pavement temperature shall be a minimum of 50 degree F and rising at the time of application of the materials. Sealant shall not be applied if moisture is present.

2. PRODUCT:

2.1. DESCRIPTION: The sealant shall have the following physical properties:

a. Color Deep Black

b. Solids Content 49% Minimum by Weight

c. Weight 9 lbs. per Gallon

d. Fiber Non-Asbestos

e. Flammability Non-Flammable

f. Acrylic Copolymer 3-5%

2.2. CONFORMITY: Sealant shall conform to ASTM-D-217, ASSHTO T 45-56%, ASTM 3910, Fed. Spec. TT-C-555B, and TT-C-551B.

3. EXECUTION:

3.1. PREPARATION OF ASPHALT SURFACE: Immediately before the installation of the sealant, the cracks shall be thoroughly cleaned and sealed as described in SECTION 02975 “Sealing of Cracks in Bituminous Pavement. The surface shall be free of all dirt, sand, oil or grease, and/or any foreign material(s) that will prevent the bonding of the sealant to the asphalt surface. The pavement surface and any small (hairline) cracks shall be completely dry of any moisture before the sealant is applied. Comply with manufacturer’s instructions on application.

3.2. APPLICATION RATE: The application rate for a single application shall be 2.5 gallons per 100 sq. ft. If more than one application is required then the previous application shall be fully cured before the next application is applied.

END OF SECTION

Page 32 12 16-1 (22 Mar 99)

Rubberized Asphalt Emulsion Sealant

Page 32 12 16-1 (7 Feb 2016)

File details come from the government source that posted it. Updated .