Atch_02_Spec_Section_02_41_13__Demolition.doc

DOC document 33 KB Posted

Attached to
Paving IDIQ Federal contract opportunity
Solicitation number
FA4861-16-R-A300
Issued by
Department of the Air Force Air Combat Command

About this file

Atch 02_Spec Section 02 41 13 Demolition

View the file

Other files for this federal contract opportunity

Other files attached to Paving IDIQ, newest first.
File Type Posted
FA4861-16-R-A300_Amendment_03.pdf PDF
FA4861-16-R-A300_-_Paving_IDIQ_RFIs_Answers.pdf PDF
Atch_56_AFI_31-501_Prsnl_Security_Pgm_Mgmt.pdf PDF
16RA300_Amendment_02.pdf PDF
16RA300_Amendment_01.pdf PDF
16RA300_Mtg_Minutes.pdf PDF
Atch_34_APPENDIX_13_Field_Molded_Joint_Seal_Detail.pdf PDF
Atch_17_Spec_Section_32_13_73_19_Compression_Seals.doc DOC document
Atch_11_Spec_Section_32_12_13_Tack_ _Prime_Coat.doc DOC document
Atch_50_WD_NV160034_20160108.pdf PDF
Atch_44_APPENDIX_23_Nat'l_Manual_on_Traffic_Control_Dev.pdf PDF
Atch_39_APPENDIX_18_AF_Form_103.pdf PDF
Atch_20_Spec_Section_32_17_26_Tactile_Warning_Panels.doc DOC document
Atch_22_APPENDIX_1_Duct_Details.pdf PDF
Atch_37_APX_16_Nellis-Creech_ID2_Handbook_2011.pdf PDF
Atch_45_APPENDIX_24_DOD_Supplement_to_MUTCD.pdf PDF
Atch_47_APPENDIX_26_VEA_Trenching_ _Backfill_Req.pdf PDF
Atch_43_APPENDIX_22_Env_Permit-ATP_Guidance.doc DOC document
Atch_03_Spec_Section_31_00_00_Earthwork.doc DOC document
Atch_07_Spec_Section_32_01_29_Spall_Repair.doc DOC document
Atch_12_Spec_Section_32_12_15_HMA_Airfield.doc DOC document
Atch_31_APPENDIX_10_Full_Depth_Rpr_Details.pdf PDF
Atch_29_APPENDIX_8__Bollard_Detail.pdf PDF
Atch_35_APPENDIX_14_Compression_Seal_Detail.pdf PDF
Atch_54_Subcontractor_or_Teaming_Partner_Consent_Form.pdf PDF
Atch_36_APPENDIX_15_ADA_Warning_Panel_Detail.pdf PDF
Atch_25_APPENDIX_4_A_Curb_Detail.pdf PDF
Atch_28_APPENDIX_7_Valley_Gutter_Detail.pdf PDF
FA4861-16-R-A300_Solicitation.pdf PDF
Atch_30_APPENDIX_9_Partial_Depth_Rpr_Details.pdf PDF
Atch_24_APPENDIX_3_Wing_Wall_Inlet_Detail.pdf PDF
Atch_42_APPENDIX_21_NAFB_Form_0-74 _Range_Pass.pdf PDF
Atch_26_APPENDIX_5_L_Curb_and_Gutter_Detail.pdf PDF
Atch_13_Spec_Section_32_12_16_HMA_Roads.doc DOC document
Atch_53_Past_Performance_Questionnaire.pdf PDF
Atch_15_Spec_Section_32_13_11_PCC_Airfield.doc DOC document
Atch_51_PAVING_IDIQ_Line_Item_Pricing_Schedule.xlsx XLSX spreadsheet
Atch_16_Spec_Section_32_13_73_16_Poured_Joint_Sealant.doc DOC document
Atch_14_Spec_Section_32_12_36_Rubberized_Seal_Coat.doc DOC document
Atch_41_APPENDIX_20_Nuclear_Gauge_Forms_1_ _2.pdf PDF
Atch_38_APX_17_Spec_Section_271000_Telecom.pdf PDF
Atch_48_APPENDIX_27_VEA_Primary_ _Sec_Trench_Req.pdf PDF
Atch_33_APPENDIX_12_Crack_Rpr_Detail.pdf PDF
Atch_52_Past_Performance_Information_Sheet.pdf PDF
Atch_10_Spec_Section_32_11_26_ABC_for_Roads.doc DOC document
Atch_01_Paving_SOW_7Feb16.pdf PDF
Atch_05_Spec_Section_32_01_17_Crack_Sealing.doc DOC document
Atch_32_APPENDIX_11_Rpr_of_Concrete_Pavements.pdf PDF
Atch_46_APPENDIX_25_VEA_Connection_Charge_Agreement.docx DOCX document
Atch_23_APPENDIX_2_Mooring_Detail.pdf PDF
Show all 50

Paving IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTAIN/REPAIR PAVEMENTS IDIQ

IFB No.: FA4861-04-R-A008

RKMF 04-0075

Contract No.:

PAVING IDIQ

Solicitation: FA4861-16-R-A300

SECTION 02 41 13

DEMOLITION

1. PART 1- GENERAL:

1.1. APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publication is referenced to the text by the basic designation only.

U.S. Department of the Army Corps of Engineers (CE) Manual EM 385-1-1 Safety and Health Requirements Manual (1992)

1.2. AVAILABILITY OF WORK AREAS: The Contractor will coordinate with the Contracting Officer before initiating any work and will notify him of proposed location of work and time of operations. Demolition work immediately adjacent to active runways and taxiways shall be scheduled with Nellis AFB personnel.

1.3. SUBMITTALS: None required.

1.4. GENERAL REQUIREMENTS: The work includes demolition or removal of all construction indicated or specified. All materials resulting from demolition work, except as indicated or specified otherwise, shall become the property of the Contractor and shall be removed from the limits of Government property. Rubbish and debris shall be removed from Government property daily unless otherwise directed. Materials that cannot be removed daily shall be stored in areas specified by the Contracting Officer. In the interest of occupational safety and health, the work shall be performed in accordance with EM 385‑1‑1, Section 23, Demolition, and other applicable Sections. In the interest of conservation, salvage shall be pursued to the maximum extent possible; salvaged items and materials shall be disposed of as specified.

1.5. DUST CONTROL: The amount of dust resulting from demolition shall be controlled to avoid creation of a nuisance in the surrounding area. Use of water will be permitted.

1.6. PROTECTION OF EXISTING PROPERTY: Before beginning any cutting or demolition work, the Contractor shall carefully survey the existing property and examine the drawings and specifications to determine the extent of the work. The Contractor shall take all necessary precautions to insure against damage to existing property to remain in place, and any damage to such property shall be repaired or replaced as approved by the contracting Officer at no additional cost to the Government. The Contractor shall carefully coordinate the work of this section with all other work. Contractor shall take all necessary precautions to prevent spalling and chipping of pavement to remain in place. No equipment shall be operated within 5 feet of the concrete to remain in place except for hand held impact equipment and only after sawcutting is accomplished.

1.7. BURNING: The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.8. USE OF EXPLOSIVES: Use of explosives will not be permitted.

1.9. UTILITIES:

1.9.1. Disconnection of Utility Services: Utilities shall be disconnected only when and where necessary. Where such disconnection will interrupt the utility services to an area not included in the contract, arrangements for such interruption shall be made with the Contracting Officer at least 5 working days in advance of the interruption.

1.9.2. Protection: Contractor shall preserve in operating condition, unless otherwise noted, active utilities traversing project site. Contractor shall repair damage to such utilities caused by work under this contract to the satisfaction of the Contracting Officer.

1.10. DISPOSITION OF MATERIAL: Title to all materials to be demolished, is vested in the Contractor upon receipt of Notice to Proceed and such materials are designated as scrap. The Government will not be responsible for the condition, loss or damage to such property after Notice to Proceed. At his option the Contractor may retain these items in useable form and take possession of them for his own benefit providing that there is no subsequent cost or incovenience to the Government. Stockpiled broken concrete, asphaltic concrete, and excess excavation materials shall be removed from Government Property before completion of the project unless otherwise noted. Scrap shall not be sold on site.

1.11. CLEAN-UP:

1.11.1. Debris Control: Debris shall be removed and transported in a manner as to prevent spillage on streets or adjacent areas.

1.11.2. Regulations: Local regulations regarding hauling and disposal apply.

1.11.3. Airfield Work: The Contractor will be required to maintain cleanliness of adjacent open and operational airfield pavements at all times during progression of work by use of a sweeper in order to eliminate foreign object damage (FOD). The Contractor will be required to move all materials and machinery to a safe distance as determined by the Contracting Officer from an active runway or taxiway at the close of each day's work.

2. PART 2 - PRODUCTS (Not Applicable)

3. PART 3 - EXECUTION (Not Applicable)

END OF SECTION

Page 02 41 13-1 (29 Feb 04)

Demolition

Page 02 41 13-3 (7 Feb 2016)

File details come from the government source that posted it. Updated .