Atch_17_Spec_Section_32_13_73_19_Compression_Seals.doc

DOC document 37 KB Posted

Attached to
Paving IDIQ Federal contract opportunity
Solicitation number
FA4861-16-R-A300
Issued by
Department of the Air Force Air Combat Command

About this file

Atch 17 Spec Section 32 13 73_19 Compression Seals

View the file

Other files for this federal contract opportunity

Other files attached to Paving IDIQ, newest first.
File Type Posted
FA4861-16-R-A300_-_Paving_IDIQ_RFIs_Answers.pdf PDF
Atch_56_AFI_31-501_Prsnl_Security_Pgm_Mgmt.pdf PDF
Atch_01_Paving_SOW_22Aug16.pdf PDF
FA4861-16-R-A300_Amendment_03.pdf PDF
16RA300_Amendment_02.pdf PDF
16RA300_Amendment_01.pdf PDF
16RA300_Mtg_Minutes.pdf PDF
Atch_13_Spec_Section_32_12_16_HMA_Roads.doc DOC document
Atch_53_Past_Performance_Questionnaire.pdf PDF
Atch_15_Spec_Section_32_13_11_PCC_Airfield.doc DOC document
Atch_51_PAVING_IDIQ_Line_Item_Pricing_Schedule.xlsx XLSX spreadsheet
Atch_16_Spec_Section_32_13_73_16_Poured_Joint_Sealant.doc DOC document
Atch_14_Spec_Section_32_12_36_Rubberized_Seal_Coat.doc DOC document
Atch_41_APPENDIX_20_Nuclear_Gauge_Forms_1_ _2.pdf PDF
Atch_38_APX_17_Spec_Section_271000_Telecom.pdf PDF
Atch_48_APPENDIX_27_VEA_Primary_ _Sec_Trench_Req.pdf PDF
Atch_33_APPENDIX_12_Crack_Rpr_Detail.pdf PDF
Atch_52_Past_Performance_Information_Sheet.pdf PDF
Atch_10_Spec_Section_32_11_26_ABC_for_Roads.doc DOC document
Atch_07_Spec_Section_32_01_29_Spall_Repair.doc DOC document
Atch_12_Spec_Section_32_12_15_HMA_Airfield.doc DOC document
Atch_31_APPENDIX_10_Full_Depth_Rpr_Details.pdf PDF
Atch_29_APPENDIX_8__Bollard_Detail.pdf PDF
Atch_35_APPENDIX_14_Compression_Seal_Detail.pdf PDF
Atch_54_Subcontractor_or_Teaming_Partner_Consent_Form.pdf PDF
Atch_36_APPENDIX_15_ADA_Warning_Panel_Detail.pdf PDF
Atch_25_APPENDIX_4_A_Curb_Detail.pdf PDF
Atch_28_APPENDIX_7_Valley_Gutter_Detail.pdf PDF
FA4861-16-R-A300_Solicitation.pdf PDF
Atch_30_APPENDIX_9_Partial_Depth_Rpr_Details.pdf PDF
Atch_24_APPENDIX_3_Wing_Wall_Inlet_Detail.pdf PDF
Atch_02_Spec_Section_02_41_13__Demolition.doc DOC document
Atch_42_APPENDIX_21_NAFB_Form_0-74 _Range_Pass.pdf PDF
Atch_26_APPENDIX_5_L_Curb_and_Gutter_Detail.pdf PDF
Atch_01_Paving_SOW_7Feb16.pdf PDF
Atch_05_Spec_Section_32_01_17_Crack_Sealing.doc DOC document
Atch_32_APPENDIX_11_Rpr_of_Concrete_Pavements.pdf PDF
Atch_46_APPENDIX_25_VEA_Connection_Charge_Agreement.docx DOCX document
Atch_23_APPENDIX_2_Mooring_Detail.pdf PDF
Atch_27_APPENDIX_6_Sidewalk_Detail.pdf PDF
Atch_40_APPENDIX_19_Schedule_of_Values_Template.pdf PDF
Atch_08_Spec_Section_32_11_16_Subbase.doc DOC document
Atch_21_Spec_Section_34_73_13_Mooring_and_Grounding.doc DOC document
Atch_18_Spec_Section_32_16_23_PCC_Sidewalks.doc DOC document
Atch_04_Spec_Section_32_01_16_Milling.doc DOC document
Atch_49_WD_NV160001_20160311.pdf PDF
Atch_55_Sample_Client_Authorization_Letter.pdf PDF
Atch_34_APPENDIX_13_Field_Molded_Joint_Seal_Detail.pdf PDF
Atch_11_Spec_Section_32_12_13_Tack_ _Prime_Coat.doc DOC document
Atch_50_WD_NV160034_20160108.pdf PDF
Show all 50

Paving IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAVING IDIQ

Solicitation: FA4861-16-R-A300

PAVING IDIQ

Solicitation: FA4861-16-R-A300

SECTION 32 13 73.19

PREFORMED ELASTOMERIC JOINT SEALS FOR CONCRETE PAVEMENTS

1. PART 1 - GENERAL

1.1. APPLICABLE PUBLICATIONS: The American Society for Testing and Materials (ASTM) publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

D 2628 Preformed Polychloroprene Elastomeric

Joint Seals for Concrete Pavements

D 2835 Lubricant for Installation of Preformed

Compression Seals in Concrete Pavements

1.2. EQUIPMENT: Machines, tools, and equipment used in the performance of the work required by this section shall be maintained in satisfactory condition.

1.2.1. Joint Cleaning Equipment:

1.2.1.1. Sandblasting equipment shall include an air compressor, hose, venturi-type nozzles of sufficient capacity to furnish air at a rate of not less than 150 cfm and to maintain a line pressure of not less than 90 psi at the nozzle while in use. The compressor shall be equipped with traps that maintain the compressed air free of oil and water.

1.2.1.2. Concrete Saw: A self-propelled power saw shall be provided for cutting joints to the specified widths and depths and for removing filler embedded in the joints or adhered to the joint faces.

1.2.2. Sealing Equipment: Machines to install preformed seal shall be capable of installing the preformed seal to the prescribed depths within specified tolerances without cutting, nicking, twisting, or otherwise damaging the seal; shall not stretch the preformed seal more than 5 percent during installation; and shall be either of the types described below.

1.2.2.1. Self-propelled gasoline engine powered machine which shall include a reservoir for lubricant, device for conveying lubricant in the proper quantities to the sides of the preformed seal, reel capable of holding one full spool of preformed seal, power-driven apparatus for feeding the joint seal through a compression device and inserting the seal in the joint, and guide to maintain the proper course along joint being sealed.

1.2.2.2. Two-axle, four-wheel hand-powered machine which shall include means for compressing and inserting the preformed seal into the joint and a reel capable of holding one full spool of preformed seal. Auxiliary equipment shall be provided to coat both sides of the joint with lubricant just ahead of installation of the preformed seal.

1.3. SAMPLING AND TESTING: Each lot of preformed joint seal and lubricant shall be tested for conformance with the referenced applicable material specification. A lot of preformed seal shall consist of one day's production or 20,000 feet for each cross section, whichever is less. A lot of lubricant shall consist of one day's production. The Contracting Officer shall be notified in writing of the proposed sources of joint seals and lubricants. Preformed joint seals and lubricants shall be tested for conformance with the referenced applicable material specification at the Contractor's expense. Certified copies of the test reports verifying that the material meets all specifications shall be submitted prior to the date the seals will be required at the job site. No material shall be used at the project site prior to receipt by the Contractor of written notice that the material is acceptable to the Government, based on the results of the lab report. If the sample fails to meet specification requirements, the material represented by the sample shall not be used, and new material will be tested. During the execution of the project, sufficient quantities of materials may be sampled and tested by the Government for quality assurance purposes.

1.4. TRIAL APPLICATION: Prior to installing the preformed seal, a test section at least 200-feet long shall be placed using the approved materials, equipment, and requirements. Following the sealing of the test section, and before any other joints are sealed, the test installation shall be inspected to determine that the seal and installation meet the specified requirements. If the test section meets the specified requirements, the test section may be incorporated into the permanent work and paid for at the contract unit prices per linear foot for sealing items scheduled; however, if the seal installation does not conform to the specification requirements, the test section shall be removed, necessary adjustments shall be made, and another test section placed.

1.5. SUBMITTALS: Prior to the use of materials, certified copies of the test reports of all tests required shall be submitted and approved.

1.6. DELIVERY AND STORAGE: Materials delivered to the site shall be inspected for damage, unloaded and stored with a minimum of handling. Materials shall be handled in such a manner as to ensure no damage to the joint seal or lubricant materials. Storage facilities shall maintain materials at temperatures and conditions recommended by the manufacturer.

2. PART 2 - PRODUCTS

2.1. PREFORMED ELASTOMERIC JOINT SEAL shall be a vulcanized elastomeric compound using polychloroprene as the only base polymer and shall conform to ASTM D 2628. The size, shape, and dimensional tolerances of the joint seal shall be as shown on the drawings.

2.2. LUBRICANT for elastomeric joint seal shall be a one-component compound conforming to ASTM D 2835.

3. PART 3 - EXECUTION

3.1. PREPARATION OF JOINTS: Immediately before installation of the preformed joint seal, the joints shall be thoroughly cleaned to remove all laitance, curing compound, filler, and protrusions of hardened concrete from the sides and upper edges of the joint space to be sealed. Any irregularity in the joint face which would prevent uniform contact between the joint seal and the joint face shall be corrected prior to installation of the joint seal.

3.1.1. Sawing: Joints shall be sawn to clear and open joints to full specified width and depth. If the joint has opened 1/16 inch or more as measured at the slab edge at the time of final sawing, the sawed width shall be increased so that the net width will meet the prescribed tolerances. All loosened material shall be blown from the joint by compressed air.

3.1.2. Sandblast Cleaning: After sawing and air pressure cleaning, the exposed concrete joint faces and the pavement surfaces extending 1/2 inch from the edges of joint shall be sandblasted using a multipass technique until the surfaces are free of dust, dirt, curing compound, filler, and any other material that might prevent ready insertion or uniform contact of the seal and bonding of the lubricant to the concrete. After sandblast cleaning and immediately prior to filling, the joints shall be blown out with compressed air and left completely free of sand, water, dust, and other debris. Sandblasting followed by air pressure cleaning of joints shall be limited to only that length of joint that can be sealed during the same workday.

3.2. INSTALLATION OF JOINT SEAL:

3.2.1. Time of Installation: Joints shall be sealed immediately following the concrete-curing period or as soon thereafter as weather conditions permit. The concrete inside the joint shall be surface dry, and atmospheric and pavement temperatures shall be above 40 degrees F. at the time of installation of the joint seal. Open joints that cannot be sealed under conditions specified herein shall be provided with an approved temporary seal to prevent infiltration of foreign material. When rain interrupts sealing operations, joints shall be air pressure cleaned and allowed to dry prior to installing the lubricant and joint seal.

3.2.2. Sequence of Installation: Longitudinal joints shall be sealed first, followed by transverse contraction joints, and then all other joints.

3.2.3. Sealing of Joints:

3.2.3.1. The joint seal shall be installed using equipment specified in paragraph 1.2, EQUIPMENT. The sides of the joint seal or the sides of the joint shall be covered with a coating of lubricant and the seal installed in such a manner as to conform to requirements specified above. Butt joints and seal at intersections shall be coated with liberal applications of lubricant. Lubricant spilled on the pavement shall be removed immediately to prevent setting on the pavement. The in-place joint seal shall be in an upright position and free from twisting, distortion, or stretching that exceeds one percent. The joint seal shall be placed at a uniform depth within the tolerances specified below in paragraph 3.2.3.2. Joint seals which fail to meet specified requirements shall be removed and replaced in a satisfactory manner.

3.2.3.2. Preformed joint seal shall be installed to a depth of 3/16 inch, plus or minus 1/16 inch, below the pavement surface except when the joint is beveled or has a radius at the surface or unless otherwise directed. For beveled joints or joints with a radius at the surface, the joint seal shall be installed at a depth of 1/8 inch plus or minus 1/8 inch below the bottom edge of the bevel or radius. No part of the preformed joint seal shall be allowed to project above the surface of the pavement. The seal shall be installed in the longest practicable lengths in longitudinal joints and shall be cut at the joint intersections for continuous installation of the seal in the transverse joints. The lubricant in the longitudinal joints shall be allowed to set prior to cutting at the joint intersection. For all transverse joints, the minimum length of the joint seal shall be the pavement slab width.

3.3. FIELD TESTS AND INSPECTIONS:

3.3.1. Tests: Conformance to stretching limitations shall be determined by the Contractor at such times as directed by the Contracting Officer. Marks shall be made on the joint seal at least 20 feet apart prior to installation. After installation, the distance between the marks shall be measured on the pavement. If stretching exceeds one percent, the seal shall be removed and replaced. If the seal is compressed to less than the distance marked, resulting in excessive undulation, adjustments shall be made to allow for proper installation. Also, measurements shall be made by the Contractor as directed to determine conformance with depth of installation requirements. Preformed joint seals not in conformance to the specification requirements shall be corrected. Final acceptance of joints seals will be made by the Contracting Officer. Joint seals may be rejected at any time by the Contracting Officer prior to final acceptance of the project.

3.3.2. Inspections: Inspections shall be made by the Contractor to verify that the joints are in conformance to the requirements described above, that the walls of the joints or sides of the preformed seal are uniformly coated, and that the seal is installed in conformance with the specification requirements. Upon completion of the project, all unused materials will be removed from the site and the pavement left in a clean condition.

END OF SECTION

Elastomeric Joint Seals

Page 32 13 73.19-1 (7 Feb 2016)

Elastomeric Joint Seals

Page 32 13 73.19-2 (7 Feb 2016)