Atch_11_Spec_Section_32_12_13_Tack_ _Prime_Coat.doc

DOC document 37 KB Posted

Attached to
Paving IDIQ Federal contract opportunity
Solicitation number
FA4861-16-R-A300
Issued by
Department of the Air Force Air Combat Command

About this file

Atch 11 Spec Section 32 12 13 Tack Prime Coat

View the file

Other files for this federal contract opportunity

Other files attached to Paving IDIQ, newest first.
File Type Posted
FA4861-16-R-A300_-_Paving_IDIQ_RFIs_Answers.pdf PDF
Atch_56_AFI_31-501_Prsnl_Security_Pgm_Mgmt.pdf PDF
Atch_01_Paving_SOW_22Aug16.pdf PDF
FA4861-16-R-A300_Amendment_03.pdf PDF
16RA300_Amendment_02.pdf PDF
16RA300_Amendment_01.pdf PDF
16RA300_Mtg_Minutes.pdf PDF
Atch_07_Spec_Section_32_01_29_Spall_Repair.doc DOC document
Atch_12_Spec_Section_32_12_15_HMA_Airfield.doc DOC document
Atch_31_APPENDIX_10_Full_Depth_Rpr_Details.pdf PDF
Atch_29_APPENDIX_8__Bollard_Detail.pdf PDF
Atch_35_APPENDIX_14_Compression_Seal_Detail.pdf PDF
Atch_54_Subcontractor_or_Teaming_Partner_Consent_Form.pdf PDF
Atch_36_APPENDIX_15_ADA_Warning_Panel_Detail.pdf PDF
Atch_25_APPENDIX_4_A_Curb_Detail.pdf PDF
Atch_28_APPENDIX_7_Valley_Gutter_Detail.pdf PDF
FA4861-16-R-A300_Solicitation.pdf PDF
Atch_30_APPENDIX_9_Partial_Depth_Rpr_Details.pdf PDF
Atch_24_APPENDIX_3_Wing_Wall_Inlet_Detail.pdf PDF
Atch_02_Spec_Section_02_41_13__Demolition.doc DOC document
Atch_42_APPENDIX_21_NAFB_Form_0-74 _Range_Pass.pdf PDF
Atch_26_APPENDIX_5_L_Curb_and_Gutter_Detail.pdf PDF
Atch_01_Paving_SOW_7Feb16.pdf PDF
Atch_05_Spec_Section_32_01_17_Crack_Sealing.doc DOC document
Atch_32_APPENDIX_11_Rpr_of_Concrete_Pavements.pdf PDF
Atch_46_APPENDIX_25_VEA_Connection_Charge_Agreement.docx DOCX document
Atch_23_APPENDIX_2_Mooring_Detail.pdf PDF
Atch_27_APPENDIX_6_Sidewalk_Detail.pdf PDF
Atch_40_APPENDIX_19_Schedule_of_Values_Template.pdf PDF
Atch_08_Spec_Section_32_11_16_Subbase.doc DOC document
Atch_21_Spec_Section_34_73_13_Mooring_and_Grounding.doc DOC document
Atch_18_Spec_Section_32_16_23_PCC_Sidewalks.doc DOC document
Atch_04_Spec_Section_32_01_16_Milling.doc DOC document
Atch_49_WD_NV160001_20160311.pdf PDF
Atch_55_Sample_Client_Authorization_Letter.pdf PDF
Atch_34_APPENDIX_13_Field_Molded_Joint_Seal_Detail.pdf PDF
Atch_17_Spec_Section_32_13_73_19_Compression_Seals.doc DOC document
Atch_50_WD_NV160034_20160108.pdf PDF
Atch_44_APPENDIX_23_Nat'l_Manual_on_Traffic_Control_Dev.pdf PDF
Atch_39_APPENDIX_18_AF_Form_103.pdf PDF
Atch_20_Spec_Section_32_17_26_Tactile_Warning_Panels.doc DOC document
Atch_22_APPENDIX_1_Duct_Details.pdf PDF
Atch_37_APX_16_Nellis-Creech_ID2_Handbook_2011.pdf PDF
Atch_45_APPENDIX_24_DOD_Supplement_to_MUTCD.pdf PDF
Atch_47_APPENDIX_26_VEA_Trenching_ _Backfill_Req.pdf PDF
Atch_43_APPENDIX_22_Env_Permit-ATP_Guidance.doc DOC document
Atch_03_Spec_Section_31_00_00_Earthwork.doc DOC document
Atch_13_Spec_Section_32_12_16_HMA_Roads.doc DOC document
Atch_53_Past_Performance_Questionnaire.pdf PDF
Atch_15_Spec_Section_32_13_11_PCC_Airfield.doc DOC document
Show all 50

Paving IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTAIN/REPAIR PAVEMENTS IDIQ

IFB No.: F26600-99-R-C118

RKMF 98-0105

Contract No.:

PAVING IDIQ

Solicitation: FA4861-16-R-A300

SECTION 32 12 13

BITUMINOUS TACK AND PRIME COAT

1. PART 1 - GENERAL

1.1. APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designations only.

American Society of Testing and Materials (ASTM) Publications:

D 140-93 Sampling Bituminous Materials

D 977-91 Emulsified Asphalt

D 2995-93 Determining Application Rate of

Bituminous Distributors

1.2. PLANT, EQUIPMENT, MACHINES AND TOOLS:

1.2.1. General Requirements: All plant, equipment, machines and tools used in the work shall be subject to inspection, and shall be maintained in a satisfactory working condition at all times. The equipment shall be adequate and shall have the capability of producing the results specified.

1.2.2. Bituminous Distributor: The distributor shall have pneumatic tires of such size and number to prevent rutting, shoving or otherwise damaging the base surface or other layers in the pavement structure. The distributor shall be designed and equipped to spray the bituminous material in a uniform coverage at the specified temperature, at readily determined and controlled rates with an allowable variation from the specified rate of not more than plus or minus 5 percent, and at variable widths. Distributor equipment shall include a separate power unit for the bitumen pump, full-circulation spray bars, tachometer, pressure gauges, volume-measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand hose attachment suitable for applying bituminous material manually to areas inaccessible to the distributor. The distributor shall be equipped to circulate and agitate the bituminous material during the heating process.

1.2.3. Power Brooms and Power Blowers: Power brooms and power blowers shall be suitable for cleaning the surfaces to which the tack coat is to be applied.

1.3. WEATHER LIMITATIONS: Tack coat shall be applied only when the surface to receive the tack coat is dry. Tack coat shall be applied only when the atmospheric temperature in the shade is 50 degrees F or above and when the temperature has not been below 35 degrees F for the 12 hours prior to application.

1.4. SAMPLING AND TESTING:

1.4.1. General Requirements: Sampling and testing shall be performed by a testing laboratory.

1.4.2. Sampling: The samples of bituminous material, unless otherwise specified, shall be in accordance with ASTM D 140.

1.4.3. Initial Sampling and Testing:

1.4.3.1. Bituminous Materials: Certified copies of the manufacturer's test reports indicating compliance with applicable specified requirements shall be submitted to the Contracting Officer.

1.4.3.2. Calibration Test: The Contractor shall furnish all equipment, materials, and labor necessary to calibrate the bituminous distributor. Calibration shall be made with the approved job material and prior to applying the tack or prime coat material to the prepared surface. Calibration of the bituminous distributor shall be in accordance with ASTM D 2995.

1.4.3.3. Trial Applications: As a preliminary to providing the complete tack or prime coat, three lengths of at least 100 feet for the full width of the distributor bar shall be tacked to evaluate the amount of tack that can be satisfactorily applied. Unless otherwise authorized, the trial application rate of bituminous materials shall be applied in the amount of 0.05 gallons per square yard. Other trial applications shall be made using various amounts of material as may be deemed necessary.

2. PART 2 - PRODUCTS

2.1. BITUMINOUS MATERIAL: Emulsified asphalt shall conform to ASTM D 977, grade SS-1 or SS-1h.

3. PART 3 - EXECUTION

3.1. PREPARATION OF SURFACE: Immediately before applying the tack coat all loose material, dirt, clay, or other objectionable material shall be removed from the surface to be treated. The area to be tacked shall also be dry and clean.

3.2. APPLICATION RATE: Bituminous material for the tack coat shall be applied in quantities of not less than 0.05 gallon nor more than 0.15 gallon per square yard of pavement surface. Bituminous material for the prime coat shall be applied in quantities of not less than 0.15 gallon nor more than 0.40 gallon per square yard of pavement surface.

3.3. APPLICATION TEMPERATURE: Asphalt application temperature shall provide an application viscosity between 10 and 60 seconds, Saybolt Furol, or between 20 and 120 centistokes, kinematic.

3.4. APPLICATION: Following preparation and subsequent inspection of the surface, the tack or prime coat shall be applied at the specified rate with uniform distribution over the surface to be treated. All areas and spots missed by the distributor shall be properly treated with the hand spray. Following application of the tack material and prior to application of the succeeding layer of pavement, the tack shall be allowed to cure and obtain evaporation of any volatiles or moisture. Until the succeeding layer of pavement is placed, the tacked area shall be maintained by protecting the surface against damage and by repairing and retacking deficient areas at no additional cost to the Government. If required, clean dry sand shall be spread to effectively blot up any excess bituminous material. No smoking, fires, or flames other than the heaters that are a part of the equipment shall be permitted within 25 feet of heating, distributing, and transferring operations of bituminous material other than bituminous emulsions.

3.5. CURING PERIOD: Following application of the bituminous material and prior to application of the succeeding layer of pavement, the bituminous coat shall be allowed to cure and to obtain evaporation of any volatiles or moisture.

3.6. FIELD QUALITY CONTROL: Samples of the bituminous material shall be tested for compliance with the applicable specified requirements. A sample shall be obtained and tested by the contractor for every 200 gallons of bituminous material used.

END OF SECTION

Page 32 12 13-1 (22 Mar 99)

Bituminous Tack & Prime Coat

Page 32 12 13-3 (7 Feb 2016)