Atch_40_APPENDIX_19_Schedule_of_Values_Template.pdf
PDF 114 KB Posted
- Attached to
- Paving IDIQ Federal contract opportunity
- Solicitation number
- FA4861-16-R-A300
About this file
Atch 40 APPENDIX 19 Schedule of Values Template
View the file
Other files for this federal contract opportunity
Show all 50
Paving IDIQ has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 01 - GENERAL REQUIREMENTS
LINE NO. DESCRIPTION VALUE PERCENTAGE
1.1 Project Management $38,098.73 0.98%
1.2 Supervision $37,709.97 0.97%
1.3 Project Trailer $1,555.05 0.04%
1.4 Dumpsler $777.53 0.02%
1.5 Temporary Fence $777.53 0.02%
1.6 Bond $54,038.00 1.39%
Division 01 Total $132,956.81 3.42%
DIVISION 02 - EXISTING CONDITIONS
LINE NO. DESCRIPTION VALUE PERCENTAGE
2.1 Demolition Interior (Electrical) $11,662.88 0.30%
2.2 Demolition Interior (Mechanical) $17,494.32 0.45%
2.3 Demolition (Plumbing) $4,665.15 0.12%
2.4 Demolition (Flooring) $4,665.15 0.12%
2.5 Demolition (Openings) $11,662.88 0.30%
2.6 Demolition (Concrete) $11,662.88 0.30%
2.7 Demolition (Ceilings) $11,662.88 0.30%
2.8 Demolition (Walls) $17,105.55 0.44%
2.9 Demolition (Fire Suppression) $11,662.88 0.30%
2.10 Demolition (Fire Alarm System) $5,442.68 0.14%
2.11 Demolition (Communications) $7,775.25 0.20%
Division 02 Total $115,462.50 2.97%
DIVISION 03 - CONCRETE
LINE NO. DESCRIPTION VALUE PERCENTAGE
3.1 Concrete Pad (Generator) $48,595.32 1.25%
3.2 Concrete Ceiling {Vault) $5,442.68 0.14%
3.3 Concrete Pad (Mechanical Yard} $34,599.87 0.89%
3.4 Concrete Pad (HVAC Units) $6,608.96 0.17%
3.5 Concrete Reinforcements $27,602.14 0.71%
3.6 Expansion Joints, Contraction Joinls $20,993.18 0.54%
Division 03 Total $143,842.15 3.70%
DIVISION 04 - MASONRY
LINE NO. DESCRIPTION VALUE PERCENTAGE
4.1 Mechanical Yard Masonrv Wall $40,431.31 1.04%
4.2 Generator Pad Masonry Wall $20,215.65 0.52%
SCHEDULE OF VALUES
Contract No: FA4861-XX Project No & Title: RKMF/LKTC XX-XXXX Construct Warehouse
1239914680C Typewritten Text ATTACHMENT 48 - Schedule of Values Template
4.3 Infill (Front Entry Area) $6,608.96 0.17%
4.4 Masonry Patch Work (Roll-up Door) $6,608.96 0.17%
4.5 Infill (Mechanical Louver Area $6,220.20 0.16%
4.6 Vault $13,217.93 0.34%
Division 04 Total $93,303.01 2.40%
DIVISION 05 - METALS
LINE NO. DESCRIPTION VALUE PERCENTAGE
5.1 Metal Stud Framing (Interior) $8,552.78 0.22%
5.2 0.00%
5.3 0.00%
Division 05 Total $8,552.78 0.22%
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
LINE NO. DESCRIPTION VALUE PERCENTAGE
6.1 Casework (Women's Restroom) $2,721.34 0.07%
6.2 Casework (Men's Restroom) $2,721.34 0.07%
6.3 Casework (Break Room) 0.00%
Division 06 Total $5,442.68 0.14%
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
LINE NO. DESCRIPTION VALUE PERCENTAGE
7.1 Mineral Fiber Blanket lnsulation (Interior) $40,042.54 1.03%
7.2 0.00%
7.3 0.00%
Division 07 Total $40,042.54 1.03%
DIVISION 08 - OPENINGS
LINE NO. DESCRIPTION VALUE PERCENTAGE
8.1 Steel Doors and Frames $186,606.03 4.80%
8.2 Rolling Service Doors $10,885.35 0.28%
8.3 Windows $4,276.39 0.11%
Division 08 Total $201,767.77 5.19%
DIVISION 09 - FINISHES
LINE NO. DESCRIPTION VALUE PERCENTAGE
9.1 Gypsum Board $148,507.30 3.82%
9.2 Paints and Coatings $65,312.11 1.68%
9.3 Epoxv Flooring $9,719.06 0.25%
9.4 Acoustlcal Ceiling $35,766.16 0.92%
9.5 Resilient Flooring & Ceramic Tile $20,604.42 0.53%
9.6 Rigid Access Flooring $146,174.73 3.76%
Division 09 Total $426,083.78 10.96%
DIVISION 10 - SPECIALTIES
10.1 Toilet Accessories $4,665.15 0.12%
10.2 Interior Signage $3,498.86 0.09%
10.3 0.00%
Division 10 Total $8,164.01 0.21%
DIVISION 13 - SPECIAL CONSTRUCTION
LINE NO. DESCRIPTION VALUE PERCENTAGE
13.1 Steel Deck Vault $17,105.55 0.44%
13.2 Steel I-beam (Openings) $27,990.90 0.72%
13.3 Steel louvers (Mech Yard) $8,552.78 0.22%
13.4 Steel Gale (Generator) $2,332.58 0.06%
Division 13 Total $55,981.81 1.44%
DIVISION 21 - FIRE SUPPRESSION
LINE NO. DESCRIPTION VALUE PERCENTAGE
21.1 Riser $39,265.02 1.01%
21.2 Wet Pipe Fire Sprinkler Piping $27,602.14 0.71%
21.3 Testing $8,552.78 0.22%
Division 21 Total $75,419.94 1.94%
DIVISION 22 - PLUMBING
LINE NO. DESCRIPTION VALUE PERCENTAGE
22.1 Plumbing (Fixtures) $80,085.09 2.06%
22.2 Plumbing Piping& Materials $38,098.73 0.98%
22.3 0.00%
Division 22 Total $118,183.82 3.04%
DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING
LINE NO. DESCRIPTION VALUE PERCENTAGE
23.1 HVAC Air Handlers $204,489.11 5.26%
23.2 Acoustics Duct Silencers $20,993.18 0.54%
23.3 Exhaust & Supply Fans $10,885.35 0.28%
23.4 Boiler & Computer Room Units (CRAC) $257,749.58 6.63%
23.5 Variable Air Volume 0JAV) Boxes $15,161.74 0.39%
23.6 Fire Smoke Dampers & Louvers $10,885.35 0.28%
23.7 Testing, Adjusting & Balancing of HVAC Sys $34,211.11 0.88%
23.8 Thermal lnsulation for Mechanical Sys $10,885.35 0.28%
23.9 Duct Insulation $53,649.23 1.38%
23.10 Duct Work & Duct Work Accessories $123,626.50 3.18%
23.11 Diffusers, Registers & Grills $45,485.22 1.17%
23.12 HVAC Controls $214,985.70 5.53%
Division 23 Total $1,003,007.42 25.80%
DIVISION 26 - ELECTRICAL
26.1 Electrical Conduit, Fillings, Boxes $138,788.24 3.57%
26.2 Electrical Wire & Cable $291,571.93 7.50%
26.3 Interior Distribution Systems $198,268.91 5.10%
26.4 Low Voltage SwitchQear $192,826.23 4.96%
26.5 Switchboards & Panel Boards $46,651.51 1.20%
26.6 Interior lighting $65,312.11 1.68%
26.7 Electrical Exterior Underground $77,363.75 1.99%
Division 26 Total $1,010,782.68 26.00%
DIVISION 27 - COMMUNICATIONS
LINE NO. DESCRIPTION VALUE PERCENTAGE
27.1 Comm Piping, Fittings and Boxes $96,801.88 2.49%
27.2 Communications Wire $145,008.44 3.73%
27.3 Communications Cable Tray $47,817.80 1.23%
27.4 Testing $32,656.06 0.84%
Division 27 Total $322,284.18 8.29%
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
LINE NO. DESCRIPTION VALUE PERCENTAGE
28.1 Fire Alarm System Conduit & Fittings $43,930.17 1.13%
28.2 Fire Alarm Panel and Power Boosters $6,608.96 0.17%
28.3 Fire Alarm Programming & Testing $1,555.05 0.04%
28.4 MNS Conduit and Fittings $22,159.47 0.57%
28.5 MNS Panels $12,440.40 0.32%
28.6 MNS Programming & Testing $1,166.29 0.03%
Division 28 Total $87,860.34 2.26%
DIVISION 31 - EARTHWORK
LINE NO. DESCRIPTION VALUE PERCENTAGE
31.1 Landscaping (Demo) $9,719.06 0.25%
31.2 Landscaping (Replace) $9,719.06 0.25%
31.3 Soi! Compaction Test $4,665.15 0.12%
Division 31 Total $24,103.27 0.62%
DIVISION 32 - EXTERIOR IMPROVEMENTS
LINE NO. DESCRIPTION VALUE PERCENTAGE
32.1 Bollards $2,332.58 0.06%
32.2 Concrete Sidewalks $1,555.05 0.04%
32.3 Fog Seal (Parking Lot) $3,887.63 0.10%
32.4 Curb Stops (Parking Lot) $1,555.05 0.04%
32.5 Restnping (Parking Lot) $1,166.29 0.03%
Division 32 Total $10,496.60 0.27%
DIVISION 33 - UTILITIES
33.1 Natural Gas $3,887.63 0.10%
33.2 0.00%
33.3 0.00%
Division 33 Total $3,887.63 0.10%
CLOSE-OUT DOCUMENTS
LINE NO. DESCRIPTION VALUE PERCENTAGE
A As-Built Drawings 0.00% B Warranties C O&M Manuals 0.00% D 0.00%
Close-out Total $0.00 0.00%
BID TOTAL $3,887,625.72 100.00%