About this file

RFIs 1-3 w/ Government Responses

View the file

Other files for this federal contract opportunity

Other files attached to NELLIS MACC, newest first.
File Type Posted
SYNOPSIS OF AWARD.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 64 _ 26 AUG.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 55 to 63_25 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 35 to 54_20 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 18 to 34_19 AUG 10.docx DOCX document
FA486110RA200_Amendment 02.pdf PDF
FA4861-10-R-A200_Amendment 0001.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
FA486110RA200_NELLIS_MACC_RFI 6 to 17_11 AUG 10.docx DOCX document
JAFAN 6-9 23Mar04.pdf PDF
SITE VISIT AGENDA.docx DOCX document
Route Map 3.pdf PDF
FA486110RA200_NELLIS_MACC_RFI 4 to 5_06 AUG 10.docx DOCX document
Facility Construction Requirements —
FA486110RA200_NELLIS_MACC_Atch01 _ NV080001 _20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch08 ACC Architectural and Interior Design Standards.pdf PDF
FA486110RA200_NELLIS_MACC_Atch16 AF Form 3064 Progress Schedule.pdf PDF
FA486110RA200_NELLIS_MACC_Atch13 AFI 33-118 Radio Communications.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.2 _ PastPeformanceInformationSheet _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch10 USACE Safety and Health Req.pdf PDF
FA486110RA200_NELLIS_MACC_Atch21 DD 1354.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.4 _ ClientAuthorizationLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch03 _ NV080022 _ 20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch05 _MACC_Section_01010_ Rev 07-08-2010.doc DOC document
FA486110RA200_NELLIS_MACC_Atch17 AF Form 3065 Progress Report.xls XLS spreadsheet
FA486110RA200_NELLIS_MACC_Atch04 _ NV100049 _ 20100423.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch06 NAFB Design Compatibility Guidelines.pdf PDF
FA486110RA200_NELLIS_MACC_Atch18 AF Form 103 CE Work Clearance Request.pdf PDF
FA486110RA200_NELLIS_MACC_Atch24.5 Demonstration Proj. Asbestos Results.pdf PDF
FA486110RA200_NELLIS_MACC_Atch02 _ NV080004 _ 20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch09 Engineering Technical Letter —
FA486110RA200_NELLIS_MACC_Atch20 FAA 7460-1.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.3 _ ConsentLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch23.6 _ PerformanceQuestionnaireLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch12 NAFB 31-204 Vehicle Traffic Supervision.pdf PDF
FA486110RA200_NELLIS_MACC_Atch25 Financial Information Request.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch24.1 Demonstration Project SOW.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch19 NAFB 0-74 Range Pass.pdf PDF
FA486110RA200_NELLIS_MACC_RFP_30 JUL 10.pdf PDF
FA486110RA200_NELLIS_MACC_Atch24.4 Demo Project Form 66.pdf PDF
FA486110RA200_NELLIS_MACC_Atch07 Nellis Communication Standards.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.5 _ Past Performance Questionnaire _ 15 Feb 10.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch15 Schedule of Material Submittals.doc DOC document
FA486110RA200_NELLIS_MACC_Atch24.2 Demonstration Project Bid Schedule.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch11 DOD Unified Facilities Criteria.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch24.3 Demonstration Project Drawings.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.1 _ TeamingList _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch22 Construction Cost Breakdown.xls.xlsx XLSX spreadsheet
Demonstration Project SOW.pdf PDF
MACC_Section_01010.pdf PDF
Show all 50

NELLIS MACC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4861-10-R-A200; Nellis Multiple Award Construction Contract; Requests for Information

RFI 1

Please clarify the following: On page 68 of 85 notates that volume 1 is the price proposal and volume 2 is the technical proposal. Page 71 shows factor 2 as the price proposal.

Answer: All references to proposal VOLUMES are consistent (1-Price, 2-Technical, 3-Past Performance). All references to evaluation FACTORS are consistent as well (1-Technical, 2-Price, 3-Past Performance). Evaluation Factors and proposal volumes are not the same thing and are not required to be consistent with one another.

RFI 2

Does a bonafide 8(a) Procurement limited to qualified/eligible 8(a) firms in the Small Business Administration Region 8 and 9 Sector have to completed by the time of the Bid submittal or by the time of the Award of the contracts?

Answer: 8(a) status to include whether you have a bona fide place of business in the correct region must be completed by the proposal due date.

RFI 3

In the MACC Solicitation as well as in the SOW, Bldg 620 SCIF, Renovate Basement document, reference is made to the 2009 57 Wing Advanced Program Office Construction Requirements. I cannot find that specific document anywhere.

Answer: Document has been added to this notice as a supplemental attachment.

File details come from the government source that posted it. Updated .