FA486110RA200_NELLIS_MACC_Atch24.2 Demonstration Project Bid Schedule.docx
DOCX document 16 KB Posted
- Attached to
- NELLIS MACC Federal contract opportunity
- Solicitation number
- FA4861_10_R_A200
About this file
Attachment 24.2
View the file
Other files for this federal contract opportunity
Show all 50
NELLIS MACC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4861-09-R-A006
BID SCHEDULE
PROJECT RKMF 09-0121, BLDG 620 SCIF
BID AMOUNT:
0001 Furnish all labor, supervision, equipment, tools, materials and incidental works and professional design as necessary to perform all work to complete Design for Project: RKMF 09-0121, RENOVATE BASEMENT, BLDG 620 SCIF at Nellis AFB, Nevada, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the terms, and condition specified herein.
Design performance period: A total of 135 calendar days from NTP, including time for government review, as follows:
| 35%: 30 calendar days |
| Review of 35%: 15 calendar days |
| 35% - 65%: 30 calendar days |
| Review of 65%: 15 calendar days |
| 65% to 95%: 30 calendar days |
| Review of 95%: 15 calendar days |
DESIGN LUMP SUM $______________
0002 Furnish all plant, labor, equipment, materials and supervision necessary to perform all work to complete Construction for Project: RKMF 09-0121, RENOVATE BASEMENT, BLDG 620 SCIF at Nellis AFB,NV, as ordered by the Contracting Officer. All work is to be performed in strict accordance with the specifications, terms, and condition specified herein.
Construction Performance Period: 180 calendar days from NTP
CONSTRUCTION LUMP SUM $______________
TOTAL (DESIGN & CONSTRUCTION) LUMP SUM $______________
Attachment #10