DEPARTMENT OF THE AIR FORCE

HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY

JUN 27 2002

FROM: AFCESA/CES

139 Barnes Drive, Suite 1 Tyndall AFB, FL 32403-5319

SUBJECT: Engineering Technical Letter (ETL) 02-12: Communications and

Information System Criteria for Air Force Facilities

1. Purpose. This ETL integrates communications and real property planning, programming, and construction. It supersedes draft ETL 01-17. It is a joint effort of Headquarters Air Force Civil Engineer Support Agency (HQ AFCESA) and Headquarters Air Force Communications Agency (HQ AFCA) with HQ AFCA coordination. It supports Air Force initiatives such as Gigabit Ethernet, network consolidation, and the Air Force Portal by establishing the following requirements:

• New facilities and facility alterations acquired with military construction (MILCON) appropriations will have common-user communications and information system infrastructure, including connectivity.

• Communications and information infrastructure and connectivity will be integrated into facility planning, programming, design, and construction to ensure the system is complete and ready for customer occupancy.

• Systems will comply with the requirements of Air Force Instruction (AFI) 33-133, Joint Technical Architecture (Joint Technical Architecture – Air Force [JTA-AF]) and basic standards to ensure compatibility, flexibility, and long-term customer support.

1.1. Intent:

• Minimize user occupancy delays and provide immediate network services on the facility occupancy date.

• Prevent facility defacement that would occur if communications and information infrastructure were not integrated into the facility design and acquisition process.

• Provide flexibility and standardization, thereby reducing the need and cost of future modifications that would result from changes in facility occupancy or user reorganization.

• Alleviate funding disconnects that result from fragmenting appropriations sources for MILCON and communications equipment infrastructure funding.

1.1.1. Scope. In each MILCON appropriations-funded project, military family housing (MFH) MILCON-funded project, or MILCON level Base Realignment And Closure (BRAC) project, include all common-user telephone and local area networks (LAN) (both Non-secure Internet Protocol Router Network [NIPRNET] and Secure Internet Protocol Router Network [SIPRNET]) infrastructure requirements to accommodate connecting operational and administrative end-user equipment. This includes, but is not limited to, the following:

• Customer jacks (telephone, fax, LAN, pay phone, community access [cable] television [CATV])

• All wiring, cabling, fiber optic cables (FOC), conduits, ducts, manholes, and pathways from the customer’s jacks to the point where the new facility will receive network services (dial tone and Internet protocol access)

• Connectivity for facility energy monitoring and control systems (EMCS) and fire alarm systems

• Entry control, intrusion detection, antiterrorism/force protection, and alarm system wiring infrastructure and components such as card readers and magnetic locks (monitors, cameras, and scanners are excluded)

• Termination devices (cross-connects, patch panels, distribution frames, network protectors)

• Communications equipment rooms (CER), closets, and other pathways

• Provisions only (e.g., floor space, electrical/mechanical utilities, ducts, and other real property improvements and fixtures) for special-purpose equipment, such as secure switches, radio transmitters, and audio-visual equipment

• Access floor systems

• Communications and information infrastructure requirements other than equipment when validated in advance and supported by the major command (MAJCOM) for inclusion into the military construction program (MCP) project’s programming documentation

• Permanently installed standby power (real property installed equipment [RPIE]) generators when justified

• Associated MILCON planning and design

1.1.2. Excluded. The following items will not be funded with MILCON appropriations.

They will continue to be funded from appropriate 3400 (Operation & Maintenance, Air Force) or 3080 (Air Force Procurement [Equipment]) funds, as required by AFI 65-601, Budget Guidance and Procedures, Volume 1.

• End instruments (telephones, secure telephone units [STU], secure terminal equipment [STE], computers, printers, video projectors, scanners, fax machines, copiers) and installation

• Terminations of building wiring infrastructure at equipment or onto existing base networks

• Special-purpose equipment (e.g., secure switches, radio transmitters, and audio-visual equipment) and installation

• Prewired work stations or furniture systems and installation

• Switching equipment (telephone switches, additional telephone central office line cards, and LAN switches) and installation

• Optical carrier equipment and installation

• CATV amplifiers and splitters which will be government-owned

• Network servers, routers, and hubs and installation

• Encryption equipment for classified systems and installation

• Power conditioning equipment such as uninterruptible power supplies (UPS) and installation

• Associated system engineering for items identified in this paragraph

1.2. Communications and information wiring infrastructure bought with construction appropriations in MILCON projects as part of the facility design and construction process will not be classified as real property or RPIE for accountability, ownership responsibility, operations and maintenance (O&M), upgrade, or replacement financing purposes.

1.3. Since communications and information infrastructure will be acquired with MILCON appropriations that are line-item-appropriated by Congress, no other appropriation will be used to augment their initial acquisition and installation. Furthermore, they are subject to the prohibition on alterations within one year from the date of beneficial occupancy in accordance with paragraph 3.4.2 of AFI 32-1032, Planning and Programming Appropriated Funded Maintenance, Repair, and Construction Projects.

2. Summary of Revisions. This ETL supersedes ETL 87-9, Prewiring. It updates requirements and standards consistent with current technology, incorporates decisions significantly expanding the scope of the superseded ETL, incorporates changes in funding and management policies, and reflects present organizational alignments.

Note: This ETL substantially revises ETL 87-9 and should be completely reviewed.

3. Application. Requirements of this ETL are mandatory for all MAJCOMS and their installations.

3.1. MCP. Compliance with this ETL is mandatory for all new construction, renovation, modernization, or rehabilitation work financed through Military Construction Appropriation Acts beginning in fiscal year (FY) 2004 on Air Force installations both inside and outside the United States of America. Technical requirements also apply for any “official service” authorized and provided in non-appropriated fund (NAF) facilities.

3.2. O&M-Funded Projects. The technical requirements of this ETL apply to O&M-funded facility projects; however, only those elements of a project that are real property subject to construction statutory funding limits (see AFI 32-1032) will be financed with funds appropriated for minor construction, repair, minor renovation, or maintenance.

Elements of a project that are not real property, such as communications wiring, and termination devices, will be funded as an expense (Element of Expense Code [EEIC] 592, 6XX, as appropriate) in accordance with AFI 65-601, Budget Guidance and Procedures, Volume 1.

3.2.1. The MAJCOMs will program communications infrastructure requirements including real property elements of work, such as walls, conduit, trenching, backfilling, and manholes, associated with non-MILCON sustainment, restoration, and modernization construction projects in the appropriate MAJCOM Engineering and Installation (E&I) account or the Combat Information Transport System (CITS) account (see AFI 65-601V1, paragraph 8.21).

3.2.2. The implementing command will program all real property elements of work, such as walls, conduit, trenching, backfilling, manholes (so-called “allied support construction”) for non-MILCON projects supporting major communications and information infrastructure programs in the major program’s Program Element (PE) in accordance with AFI 65-601V1, paragraph 8.21 and Figure 7.1, item 6b. This includes contracted architectural and engineering services for these projects in accordance with AFI 65-601V1, paragraph 7.6.10.2.

3.3. Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) and other mission equipment, cabling, antennas, and other appurtenances that are part of a mission system, such as satellite communications earth stations, (usually centrally managed by an implementing command system program office) will continue to be managed and funded as acquisition programs in accordance with DOD 5000-2-R, Mandatory Procedures for Major Defense Acquisition Programs (MDAPS) and Major Automated Information System (MAIS) Acquisition Programs. The system program office will coordinate supporting construction requirements with the MAJCOM sponsoring the MILCON project so those construction requirements are included. Where supporting construction is non-MILCON, the system program office will coordinate requirements with the host command and fund them in accordance with paragraph 3.2.2.

3.4. Upgrades. Do not use this ETL to justify upgrading existing facilities. The decision to upgrade facility communications and information systems will be based on mission need or economics and approved by the wing commander or higher authority, in accordance with MAJCOM policy.

3.5. Authority: AFI 32-1021, Planning and Programming of Facility Construction Projects, and AFI 32-1023, Design and Construction Standards and Execution of Facility Construction Projects.

3.6. Effective Date: Immediately.

3.7. Ultimate Recipients:

• MAJCOM and base communications systems officers (BCSO)

• MAJCOM and base systems telecommunications engineering managers

(STEM) at 38 Engineering Installation Group (EIG), Tinker Air Force Base, Oklahoma

• MAJCOM and base civil engineers (BCE)

• Design and construction agents

3.8. Coordination:

• The Air Force Civil Engineer (HQ USAF/ILE)

• Director of C4ISR Infrastructure (HQ USAF/XIC)

• MAJCOM Civil Engineers (CE) and MAJCOM Directors of Communication and

Information (SC)

• 38 EIG

3.9. Waivers. Coordinate requests for waiver of technical requirements on a case-by-case basis through the BCSO, BCE, STEM, and MAJCOM/SC before submitting to the MAJCOM/CE. Notify requestor and all coordinating parties of approval or disapproval.

Commands will not issue blanket waivers unless required to meet specific host country technical requirements. Requirements affecting financing, budget, or the ability to meet the intent of delivering a complete and usable communications and information system upon completion of facility construction will not be waived.

4. Referenced Publications. The latest editions of the following publications apply:

4.1. Public Law (PL):

• PL 106-52, Military Construction Appropriations Act 2000, 17 August 1999

4.2. Department of Defense (DOD):

• DOD 5000-2-R, Mandatory Procedures for Major Defense Acquisition Programs (MDAPS) and Major Automated Information System (MAIS) Acquisition Programs

• DOD 7000.14-R, DOD Financial Management Regulation

4.3. Air Force:

• AFI 21-404, Developing and Maintaining Communications and Information Systems Installation Records

• AFI 32-1021, Planning and Programming of Facility Construction Projects

• AFI 32-1023, Design and Construction Standards and Execution of Facility

Construction Projects

• AFI 32-1032, Planning and Programming Appropriated Funded Maintenance, Repair, and Construction Projects

• AFI 33-104, Base Level Planning and Implementation

• AFI 33-111, Telephone Systems Management

• AFI 33-115, Network Management, Volume 1

• AFI 33-133, Joint Technical Architecture - Air Force

• AFI 65-601, Budget Guidance and Procedures, Volume 1

• The USAF Project Manager’s Guide for Design and Construction (available at http://www.afcee.brooks.af.mil/dc/products/pmguide/pmguide.asp)

• Air Force Housing Design Guides (a list is available at http://www.afcee.brooks.af.mil/dc/dcd/arch/designdb/dsgn_guidelist.xls)

• Air Force Visiting Quarters Design Guide (available at https://www-r.afsv.af.mil/ld/documents/vqdesgd18aug2.doc)

• JTA-AF (available at https://www.afca.scott.af.mil/jta-af):

− JTA-AF, Building Wiring Architecture http://www.afcee.brooks.af.mil/dc/products/pmguide/pmguide.asp http://www.afcee.brooks.af.mil/dc/dcd/arch/designdb/dsgn_guidelist.xls https://www-r.afsv.af.mil/ld/documents/vqdesgd18aug2.doc https://www.afca.scott.af.mil/jta-af

− JTA-AF, Voice Switching Systems Architecture − JTA-AF, Information Technology Infrastructure Architecture − JTA-AF, Local Area Network Architecture

4.4. American National Standards Institute/Telecommunications Industry Association/Electronics Industries Alliance (ANSI/TIA/EIA):

• TIA/EIA-568-B, Commercial Building Telecommunications Cabling Standard − TIA/EIA-568-B.1, Part 1: General Requirements − TIA/EIA-568-B.2, Part 2: Balanced Twisted-Pair Cabling Components − TIA/EIA-568-B.3, Part 3: Optical Fiber Cabling Components Standard

• TIA/EIA-569-A, Commercial Building Standards for Telecommunications Pathways and Spaces

• TIA/EIA-570-A, Residential Telecommunications Cabling Standard

• TIA/EIA-606, Administration Standard for the Telecommunications

Infrastructure of Commercial Buildings

• TIA/EIA-607, Commercial Building Grounding and Bonding Requirements for

Telecommunications

• TIA/EIA-758, Customer-Owned Outside Plant Telecommunications Cabling

Standard

4.5. National Fire Protection Association (NFPA):

• NFPA 70, National Electrical Code

5. Additional References:

5.1. Air Force:

• AFI 32-1022, Planning and Programming Nonappropriated Fund Facility Construction Projects

• AFI 32-1065, Grounding Systems

• AFI 32-1084, Facility Requirements

• AFI 32-6002, Family Housing Planning, Programming, Design, and

Construction

• AFI 32-6003, General Officer Quarters

• AFI 33-103, Requirements Development and Processing

• AFI 34-105, Programming for Nonappropriated Fund Facility Requirements

• AFI 64-101, Cable Television Systems on Air Force Bases

5.2. NFPA:

• NFPA 101, Life Safety Code

• NFPA 780, Standard for the Installation of Lightning Protection Systems

5.3. ANSI/TIA/EIA:

• TIA/EIA 526-7 (OFSTP-7), Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant

• TIA/EIA 526-14 (OFSTP-14), Optical Power Loss Measurements of Installed Multi-mode Fiber Cable Plant

5.4. DOD:

• DOD Joint Technical Architecture (JTA) (available to .mil users at http://www-jta.itsi.disa.mil/)

6. Acronyms.

AAFES - Army & Air Force Exchange Service AFEMS - Air Force Equipment Management System AFI - Air Force Instruction AFMC - Air Force Material Command ANSI - American National Standards Institute ATM - asynchronous transfer mode AWG - American Wire Gauge BCE - base civil engineer BCSO - base communications systems officer BET - building entrance terminal BICSI - Building Industry Consulting Services International BRAC - Base Realignment And Closure C4ISR - Command, Control, Communications, Intelligence, Surveillance, and Reconnaissance CAN - campus area network CAT - category CATV - community access (cable) television CCTV - closed circuit television CER - communications equipment room CITS - Combat Information Transport System CSIR - Communications and Information System Installation Records E&I - Engineering and Installation EEIC - Element of Expense Investment Code EIA - Electronic Industries Alliance EIG - Engineering Installation Group EMCS - energy monitoring and control system ETL - Engineering Technical Letter FOC - fiber optic cable FY - fiscal year GOQ - general officer quarters GSA - General Services Administration HQ AFCESA - Headquarters Air Force Civil Engineer Support Agency HQ AFCA - Headquarters Air Force Communications Agency HQ AFSVA/SVOHL - Headquarters Air Force Services Agency, Lodging Department HQ USAF/ILE - The Air Force Civil Engineer HQ USAF/XIC - Director of C4ISR Infrastructure (formerly HQ USAF/SC) ICEA - Insulated Cable Engineers Association http://www-jta.itsi.disa.mil/

IPMS - Information Processing Management System IPT - Integrated Process Team ISDN - Integrated Services Digital Network ITN - information transfer node JTA-AF - Joint Technical Architecture - Air Force LAN - local area network MAJCOM - major command MCP - military construction program MFH - military family housing MILCON - military construction MPOP - minimum point of presence NAF - non-appropriated funds NAVFACENGCOM - Naval Facilities Engineering Command NCC - network control center NEC - National Electrical Code NFPA - National Fire Protection Association NIPRNET - Non-secure Internet Protocol Router Network O&M - operations and maintenance PA - programmed amount PABX - private automatic branch exchange PE - Program Element RD - Requirements Document RJ - registered jack RPIE - real property installed equipment RST - remote switching terminal RTA - ready to advertise RX - receive SIPRNET - Secure Internet Protocol Router Network SLC - single line (instrument) concept STE - secure terminal equipment STEM - system telecommunications engineering manager STU - secure telephone unit TC - telecommunications closet TGB - telecommunications grounding busbar TIA - Telecommunications Industry Association TMGB - telecommunications main ground busbar TX - transmit UL - Underwriters Laboratories UPS - uninterruptible power supply USACE - U.S. Army Corps of Engineers USOC - Universal Service Ordering Code UTP - unshielded twisted pair VAC - volt alternating current

7. Background.

7.1. Until the mid-1980s, the Air Force programmed, designed, and built new facilities through the MILCON process but added communications and information systems after construction completion. Installation of communications and information infrastructure after construction completion led to defacement of facilities and resulted in loss of flexibility since systems were not integrated into facility designs. Lack of synchronization between the facility and communication infrastructure delivery processes resulted in financial disconnects commonly resolved at the expense of other programs. Expensive occupancy delays were the norm.

7.2. Following the divestiture of the telecommunications industry in 1984, the Air Force adopted a policy called “prewiring.” The policy required the basic backbone infrastructure (outlets, wiring, CERs, telecommunications closets [TC]) to be integrated into the MILCON facility delivery process and financed with Appropriation 3300, Military Construction, Air Force. It did not include end instruments, telephone and network equipment, nor the connectivity needed to provide a dial tone and network access at the subscriber’s outlet at the time of facility beneficial occupancy. These items continued to be funded from Appropriation 3400, Operation & Maintenance, Air Force, or Appropriation 3080, Air Force Procurement (Equipment). The policy eliminated the potential for defacement of newly completed facilities during installation of communications infrastructure. It also provided enhanced flexibility through facility standardization. It did not, however, eliminate the potential for funding disconnects caused by fragmented funding sources nor resultant expensive occupancy delays.

7.3. In FY 2000, the President’s budget requested $560 million for Air Force conventional MCP projects. Congress added to the Military Construction Appropriation Act $254 million worth of projects that were not requested in the President’s budget;

however, they did not increase the 3400 and 3080 appropriations by the amount necessary to buy communications equipment and connectivity for the additional buildings. Consequently, the Air Force faced a large financial disconnect in making the additional facilities usable. In November 1999, HQ USAF/ILE and HQ USAF/SC co-sponsored an Integrated Process Team (IPT) to study the facility delivery process and make recommendations that would ensure new facilities were “communications-ready” at the time of occupancy. During its investigations, the IPT also found that communication equipment and connectivity support funding had not been requested for a large percentage of the facility projects that the Air Force had requested in the President’s budget, thereby exacerbating the disconnect. Furthermore, the IPT found the timing of communication requirements identification was not synchronized with the facility delivery process. Therefore, the IPT recommended that all common-user communications and information system infrastructure costs be internalized to the MILCON appropriations. In May 2000, HQ USAF/ILE and HQ USAF/SC agreed to implement the recommendation; however, the Office of the Undersecretary of Defense (Comptroller) would not make the requested changes to Department of Defense (DOD) 7000.14-R, DOD Financial Management Regulation, which would enable the Air Force to buy communications and information equipment with funds appropriated for MILCON.

HQ USAF/ILE therefore decided in January 2002 not to further pursue changing DOD financial management policy; this ETL was published only with the other IPT-recommended process improvements aimed at mitigating funding disconnects along with the technical updates.

8. Specific Requirements.

8.1. All mandatory requirements of the JTA-AF (AFI 33-133) must be met. The JTA-AF is available to .mil Internet clients on the Web at https://www.afca.scott.af.mil/jta-af.

This ETL governs where conflicts exist with non-mandatory JTA-AF or with any Telecommunications Industry Association/Electronics Industries Alliance (TIA/EIA) technical requirements.

8.2. Installation of official base telephones and LAN service in NAF facilities, certain services facilities, certain types of quarters (including lodging), and unofficial or private facilities is strictly regulated. Install official service in these facilities only as authorized by AFI 33-111, Telephone Systems Management (for telephones), and AFI 33-115, Network Management, Volume 1 (for LANs). See paragraph 8.4 for quarters and lodging facilities requirements.

8.3. Office Facilities. Commercial and industrial facilities or portions of these facilities that accommodate normal office automation tasks (word processing, spreadsheets, database applications, email client, and Internet access) will meet the following:

8.3.1. Wired LANs.

8.3.1.1. LANs will use switched Ethernet technology meeting the Ethernet and transmission media standards defined in JTA-AF, Local Area Network Architecture.

Client jacks will be Category 5 (CAT 5)-rated or better Universal Service Order Code (USOC) registered jack (RJ)-45, wired with CAT 5 or better four-pair unshielded twisted pair (UTP) cable in accordance with TIA/EIA-568-B, Commercial Building Telecommunications Cabling Standard. Use the T568A termination configuration (or T568B by exception as permitted in this ETL). Terminate all client drops on CAT 5 or better-rated patch panels in TCs. Install Ethernet switches in TCs or the CER. Connect client drops from the patch panel to the supporting switch with CAT 5 or better-rated patch cables. Connect the single building-level switch or switch/router with the point where the building connects to the base campus area network (CAN) at an information transfer node (ITN) with 12-strand FOC. In buildings with multiple switches, interconnect workgroup-level switches and the single building-level switch or switch/router with FOC. Fiber optic multiplexing equipment will be installed and configured as may be required by the base command, control, communications, computers, and intelligence (C4I) blueprint. Technical guidance on Air Force LANs and CANs is available in the JTA-AF, Information Technology Infrastructure Architecture.

Servers required to support new facilities will only be installed in the base network control center (NCC) or the ITN server consolidation location consistent with Air Force network consolidation goals.

https://www.afca.scott.af.mil/jta-af

8.3.1.2. Alternative technologies, such as asynchronous transfer mode (ATM)-based networks or wireless LANs, may be used where justified by operational requirements or economics and approved on a case-by-case basis by the MAJCOM/SC. Wireless LANs will not be used as a substitute for a wired LAN infrastructure in new facilities except in facilities such as hangers, aircraft maintenance facilities, and warehouses where mobility of client computers is essential to operational effectiveness. Include justification and approval for alternative technologies in the MCP programming documentation.

8.3.2. Telephone Systems.

8.3.2.1. Single Line (Instrument) Concept (SLC). Telephone systems will implement the SLC and be capable of providing Integrated Services Digital Network (ISDN) services. Key systems will not be installed in new facilities. Terminate all subscriber lines in the new facilities, except point-to-point circuits such as fire alarms, on the facility telephone switch (private automatic branch exchange [PABX], remote switching terminal [RST], or other phone switch). New switching systems will meet mandatory requirements defined in JTA-AF, Voice Switching Systems Architecture. In small buildings where a separate switching system is not justified, extend all switched circuits to the base dial central office switch.

8.3.2.2. SLC Exception. Multi-line telephone or key system wiring may only be installed under special exception, justified on technical or economic grounds on AF Form 3215, C4 Systems Requirements Document, and approved by the MAJCOM/SC in accordance with AFI 33-111.

8.3.3. Building Wiring Architecture. Building telecommunications (telephone and LAN) distribution systems must meet TIA/EIA-568-B, TIA/EIA-569-A, Commercial Building Standards for Telecommunications Pathways and Spaces, TIA/EIA-606, Administration Standard for the Telecommunications Infrastructure of Commercial Buildings, and TIA/EIA-607, Commercial Building Grounding and Bonding Requirements for Telecommunications. Follow the general guidelines in JTA-AF, Building Wiring Architecture, Volume 6, available to .mil clients at https://www.afca.scott.af.mil/jta-af/FixedBase/vol6/vol6.htm. Where conflicts exist, this ETL governs. Distribution systems will be integrated into the design and construction of facilities and will be concealed. No exposed wiring will be permitted.

8.3.3.1. Distance Requirements. TIA/EIA-568-B allows a distance of 3 meters (10 feet) from the client outlet to the client end instrument (computer). It allows 90 meters (295 feet) from the client outlet to the TC. The cable length allowed in the closet is 7 meters (23 feet). Therefore, the total length of a client circuit must be no greater than 100 meters (328 feet).

8.3.3.2. CER. A facility that has significant communication systems requirements and is greater than 929 square meters (10,000 square feet) in area must have a CER.

Unoccupied and/or small facilities such as guardhouses, utility control buildings, and http://www.afca.scott.af.mil/jta-af/FixedBase/vol6/vol6.htm http://www.afca.scott.af.mil/jta-af/FixedBase/vol6/vol6.htm storage bunkers will typically not require a CER. The CER serves as the entrance facility for all incoming communications ducts and service and as the location for communication and information infrastructure such as the building PABX, RST, and LAN switches.

8.3.3.2.1. Location, Sizing, and Details. The CER will be located on the first floor along an exterior wall. It must be a dedicated space not shared with other functions (e.g., building electrical or mechanical utilities). As a minimum, the CER should have 19-millimeter (0.75-inch) plywood backboards on all walls, from no greater than

0.3 meter (1 foot) above the finished floor level to no less than 2.1 meters (7 feet) above the finished floor level. Provide 0.91-meter wide by 2.03-meter long (36-inch wide by 80-inch long) double-leaf (no center support) doors fitted with a lock to control access to the CER from inside the building. Floors, walls, and ceilings must be treated to eliminate dust. Finishes must be light in color to enhance room lighting. Provide telephone outlets for desk-mounted or wall-mounted telephones as appropriate. Do not locate the CER near other building utility rooms or generators that may cause electromagnetic interference with CER equipment or where moisture, gases, dust, or other contaminants may enter. The size of the CER, including space for equipment and service entrance facilities, must not be less than set out in Table 1. For more specific design guidance refer to TIA/EIA-569-A.

Table 1. CER Sizing

Building Usable Area Square Meters (Square Feet)

CER Size Square Meters (Square Feet)

Number of 102-millimeter (4-inch)

Entrance Conduits

<1858 (<20,000) 37 (400)* 3

1858 to 9290 (20,000 to 100,000) 46 (500) 4

9290 to 18,580 (100,000 to 200,000) 84 (900) 5

Every additional 18,580 (200,000) +56 (+600) +1 Note: Not less than 2:1 ratio length to width.

* Adjustments may be made for small buildings

8.3.3.2.2. Power Requirements. Provide a minimum of two dedicated un-switched 20-amp, 120-VAC, 60-Hz (or host country standard voltage and frequency) duplex receptacle power outlets, each on a separate branch circuit for communication equipment. Increase these minimum requirements as necessary to meet equipment loads. Support the equipment with UPS units where continuous equipment operation is required or where economically justified. Provide additional 120-VAC convenience outlets for maintenance and housekeeping. Back-up all electrical loads in the CER with standby generator power when justified.

8.3.3.2.3. Environmental Requirements. Provide heating, cooling, and fresh air appropriate for the equipment housed. Maintain a positive pressure inside the room to reduce the entry of dust. Normal operating ranges should be as locally established for employee comfort (typically between 20 to 26 °C [68 to 78 °F]). There are no special relative humidity requirements. Provide a minimum of 538 lux (50 foot-candles) of illumination measured 1 meter (39 inches) above the finished floor.

8.3.3.2.4. Ground Connections. Ground connections in the CER must meet National Fire Protection Association (NFPA) 70, National Electrical Code (NEC), and TIA/EIA-607 requirements. Provide a single-point ground for all communications/electronics equipment for the building within the CER. Provide a telecommunications main ground busbar (TMGB) (minimum of 152 millimeters high by 610 millimeters long [6 inches high by 24 inches long]) installed 2.1 meters (7 feet) above the floor on a wall (preferably an outside wall) within the CER. The ground riser from the ground plate to the single main electrical service entrance ground must be a No. 1 American Wire Gauge (AWG) or larger copper conductor directly connected to the ground plate with no taps. The resistance of the ground riser must be 5 ohms or less measured from the main building ground point. All connections of wire-to-wire and/or wire-to-ground rod must be exothermic-welded. Extend No. 6 AWG or larger copper ground wires from the CER ground plate to each TC within the building and connect a telecommunications grounding busbar (TGB) in the TC. Bond each TMGB and TGB to non-current-carrying metal building parts, such as metal framing, in the CER and TC as required by the NEC.

8.3.3.2.5. Building Entrance Terminals (BET) (Telephone). Provide gas protector modules in the CER to protect the inside plant wiring and equipment from voltage surges. Where the length of the outside plant cable from the point it enters the building to the BET is greater than 15 meters (50 feet), install the outside plant cable in metal conduit and ground the conduit. Terminate twisted-pair outside plant cable on BETs at the point where it enters the building. Provide cross-connects from the BET to the inside wiring connection point.

8.3.3.3. TCs. Provide a TC for each 929 square meters (10,000 square feet) of building area on each floor. The TC supports the functions outlined in TIA/EIA-568-B and serves to house the interface between the CER and client telephone and data outlets. It houses LAN networking equipment (e.g., Ethernet switches and patch panels) for client outlets served from the TC. A TC may serve as the CER for buildings less than 929 square meters in area.

8.3.3.3.1. Location, Sizing, and Details. TCs must be dedicated spaces not shared with other functions (i.e., building electrical or mechanical utilities). TCs must be located centrally in the area they serve and sized in accordance with TIA/EIA-569-A. Generally, the TC must be sized to approximately 1.1% of the area it serves. For example, a 929-square-meter (10,000-square-foot) area must be served by a minimum of one 10-square-meter (110-square-foot) TC. Under no circumstances will a TC be smaller than 6.5 square meters (2.1 by 3 meters) (70 square feet [7 by 10 feet]). TCs on successive floors must be vertically stacked. A minimum of three 102-millimeter (4-inch) rigid steel conduits must be installed between stacked closets on successive floors in accordance with TIA/EIA-569-A. All conduit and other penetrations through fire-rated walls, ceilings, and floors must be fire-stopped in accordance with the NEC.

As a minimum, the TC should have 19-millimeter (0.75-inch) plywood backboards on all walls, from no greater than 0.3 meter (1 foot) above the finished floor level to no less than 2.1 meters (7 feet) above the finished floor level. Floors, walls, and ceilings must be treated to eliminate dust. Finishes must be light in color to enhance room lighting.

Provide a 0.91-meter wide by 2.03-meter long (36-inch wide by 80-inch long) single-leaf door hinged to open outward and fitted with a lock to control access to the room.

Provide an outlet for a wall-mounted telephone installed near the entry door. Do not locate the TC near other building utility rooms or generators that may cause electromagnetic interference with TC equipment or where moisture, gases, dust, or other contaminants may enter.

8.3.3.3.2. Power Requirements. Provide a minimum of two dedicated un-switched 20-amp, 120-VAC, 60-Hz (or host country standard voltage and frequency) duplex receptacle power outlets, each on a separate branch circuit for communication equipment. Increase these minimum requirements as necessary to meet equipment loads. Support the equipment with UPS units where continuous equipment operation is required or where economically justified. Provide additional 120-VAC convenience outlets for maintenance and housekeeping. Backup all electrical loads in the TC with standby generator power where justified.

8.3.3.3.3. Environmental Requirements. Provide heating, cooling, and fresh air appropriate for the equipment housed. Normal operating ranges should be as locally established for employee comfort (typically between 20 to 26 °C [68 to 78 °F]). There are no special relative humidity requirements. Provide a minimum of 538 lux (50 foot-candles) of illumination measured 1 meter (39 inches) above the finished floor.

8.3.3.3.4. Grounding. All TCs must be connected to a single-point ground in the CER in accordance with TIA/EIA-607 (see paragraph 8.3.3.2.4).

8.3.3.4. Equipment Racks. Equipment racks must be 0.48 meter (19 inches) wide and mounted on the floor. Locate racks near the point where outside plant cable enters the building in CERs and center of the room in TCs. If mounting requirements for oversize equipment is anticipated, 0.58-meter (23-inch) wide racks may be substituted. In narrow or crowded closets, equipment racks may be mounted adjacent to a wall but must provide a minimum of 0.91 meter (36 inches) of space both in front and behind the rack. Where added physical protection is required for terminations, data equipment, and patching, 0.48-meter (19-inch) equipment cabinets may be used. Ground all racks and cabinets.

8.3.3.5. Cable Rack. Channel-type cable rack must be used in TCs and CERs to provide distribution raceway between telephone backboards, equipment racks, riser conduits, and distribution cable trays.

8.3.3.6. Copper Cable Terminations:

8.3.3.6.1. Copper Distribution Cable Termination. All copper distribution cable (riser cable and subscriber drops) used for telephone or data circuits must be terminated in TCs and the CER on 110-type CAT 5 or better rated termination patch panels mounted in an equipment rack. Terminations must be wired to TIA/EIA-568-B termination configuration T568A (default configuration); new facilities may be wired to terminal configuration T568B (by exception) only if required to maintain system uniformity or security. Telephone and data cables must not be intermingled; provide separate patch panels for each. On small installations where multiple patch panels are not justified, group telephone cables together and separate them from data cable groupings. Label all cables, patch panels, and terminations consistent with the building or the base overall cable management numbering system as required by the BCSO.

8.3.3.6.2. Copper Telephone Patch Cables. Telephone patch cables must be 4-pair No. 24 AWG stranded UTP and have a standard 8-pin/8-position USOC RJ-45 type connector on one end and a termination compatible with the incoming telephone circuit block or panel on the other end. It is highly recommended that telephone patch cables have the same category rating as data patch cables used in the facility to simplify housekeeping and inventory, and preclude the need to differentiate between two kinds of patch cables.

8.3.3.6.3. Copper Data Patch Cables. Data patch cables must be factory-assembled 4-pair No. 24 AWG stranded CAT 5 or better UTP and have a standard 8-pin/8-position USOC RJ-45 type connector on one end and a termination compatible with the incoming data circuit block or panel on the other end.

8.3.3.7. FOC Termination.

8.3.3.7.1. All FOC used for distribution must be terminated in rack-mounted patch panels. Duplex patch cables must be used. Termination of FOC in enclosed 0.48- or 0.61-meter (19- or 24-inch) cabinets to provide greater protection is recommended.

8.3.3.7.2. Fiber optic patch cables must be factory-assembled using single coupling SC-type FOC connectors except where other connector types are required to interface with existing equipment.

8.3.3.8. Cabling and Wiring:

8.3.3.8.1. Horizontal Cable (Telephone and Data). Horizontal cables connect individual subscriber telephone and LAN outlets to their respective 110-type patch panels in the TC. Horizontal cable for both telephone and LAN (data) must be 4-pair No. 24 AWG solid copper, 100 ohm, CAT 5 or better UTP cable. Use only cable that has passed the Underwriters Laboratory (UL) network certification program and is UL-listed and -labeled. Group telephone cables separately from LAN cables.

8.3.3.8.2. Riser Cable (Telephone). Telephone riser cables provide connection between the telephone patch panel in the TCs and the telephone patch panel or main distribution frame in the CER. Telephone riser cable must be multi-pair (sized as required to support all horizontal cables terminated in the TC plus 50% spare pairs) No. 24 AWG solid copper, 100 ohm, CAT 3 UTP cable. They must meet the requirements of TIA/EIA-568-B.

8.3.3.8.3. Riser Cable (LAN). Fiber optic network riser cables provide connectivity between the LAN workgroup-level switches in the TCs and the LAN patch panel in the CER. LAN riser cable must be 12-strand, 62.5/125-micron multi-mode FOC. The cable riser must be terminated in a patch panel with duplex SC-type connectors installed in an equipment rack or cabinet.

8.3.3.8.4. Outside Plant Cable. Telephone outside plant cable provides connection between the telephone main distribution frame or 110-type patch panel in the CER and the point where the facility connects to the base telephone network (typically the dial central office or an RST in another building). Data outside plant cable provides connection between the intra-building LAN main Ethernet switch/router and the point where the facility connects to the base CAN (typically the NCC or an ITN). Outside plant cable connectivity typically consists of both single-mode FOC (for data) and multi-pair metallic cables (for telephones) as specified in the base C4I systems blueprint;

however, some buildings may require single-mode FOC connectivity for both functions.

Outside plant single-mode FOC and metallic cable must meet the requirements specified in TIA/EIA-758, Customer-Owned Outside Plant Telecommunications Cabling Standard.

8.3.3.8.4.1. Metallic outside plant cable must be multi-pair sized as required to support the building circuit requirements (telephone lines, trunks, alarm and sensor circuits, and point-to-point communications circuits) coordinated with the base C4I systems blueprint plus a minimum of 10% spare capacity (50% is recommended). Capacity greater than 10% may be provided where approved by the MAJCOM.

8.3.3.8.4.2. Single-mode FOC must be used to provide data connectivity from the intra-building LAN switch/router or RST to the base CAN (typically at an ITN) or the base dial central office. Except where higher fiber strand count is specified in the base C4I systems blueprint, FOC must be single-mode, 12-strand cable.

8.3.3.9. Standard Telecommunications Outlet. The standard outlet must consist of two 8-pin/8-position CAT 5 or better modular USOC RJ-45 jacks mounted in a single faceplate (one jack for telephone and one for data use) in a factory-made assembly with (or collocated with) two duplex 120-VAC, 60-Hz (or host country standard voltage and frequency as applicable) power receptacles. Telephone and data jacks must be non-keyed unless the user requires keyed connectors to maintain system uniformity, security, or other user-specified reasons. The power outlet circuits must be based on a loading assumption that each location of two duplex receptacles will power one personal computer with a monitor along with typical office appurtenances such as task lights; also assume that there will be no diversification of this load.

8.3.3.9.1. Standard outlets may contain blank faceplates or provisions for the future installation of FOC if approved by the MAJCOM. Outlets at select locations may also have a type “F” jack if required for CATV or closed circuit television (CCTV) as approved by the MAJCOM.

8.3.3.9.2. All administrative facilities (610 Category Code) and administrative spaces in other types of facilities must be equipped with one standard telecommunications outlet for each 4.5 square meters (48 square feet) of net office space. Outlet densities and locations for all special-purpose spaces and non-administrative facilities must be determined by the user and the BCSO and must follow the guidelines in TIA/EIA-569-A.

8.3.3.10. Pay Phone Outlet. Pay phone outlets must consist of one 8-pin/8-position CAT 3 or better modular USOC RJ-45 non-keyed jack in a single gang outlet faceplate.

Locate pay phone outlets in common-use areas where required by the BCSO or Army & Air Force Exchange Service (AAFES) (the present pay phone service provider).

8.3.3.11. Furniture Systems Support Wiring. Although furniture systems are designed for quick reconfiguration of office space, experience has shown that furniture prewired with power and telecommunications connections cannot be reconfigured easily.

Telephone and data wiring systems in areas with pre-wired workstations, furniture systems, or modular walls must have sufficient flexibility and connectivity to enable rearrangement without modifications to the permanent communications and data wiring in the facility. Suitable connectors must be provided; permanent splices/connections are prohibited.

8.4. Quarters and Lodging Facility Guest Rooms. This section applies to all quarters including MFH (junior enlisted housing, senior enlisted housing, company grade officer housing, field grade officer housing, and general officer quarters [GOQ]) and dormitories (unaccompanied enlisted personnel housing and unaccompanied officer personnel housing). It also applies to guest rooms and suites in billeting facilities (visiting officer quarters, visiting airmen quarters, and distinguished visitor quarters) and temporary lodging facilities.

8.4.1. Quarters are private domiciles, not alternate duty locations. Telecommunications service (dial tones and Internet access) in quarters is a private business matter between the housing occupant and the private telecommunications service provider. Lodging facility guest rooms are private occupancies. Telecommunications service in guest rooms is a private business matter between the occupant and the base Services Squadron who contracts with telecommunications service providers.

Telecommunication services, including dial tone, Internet access, and CATV service, must not be funded in these facilities with appropriated money nor will they be connected to base official telecommunications networks except as follows:

8.4.1.1. Senior officers who are commanders having legal command and control authority (MAJCOM, numbered Air Force, and wing commanders) may be authorized command and control circuits in their personal quarters under certain conditions (see AFI 33-111, Attachment 2). In such conditions, wiring may consist of a circuit for a STU and a circuit for access to the base CAN. These installations must meet the technical requirements of this ETL. These requirements are in addition to private telecommunications service circuits.

8.4.1.2. USAF Academy cadet dormitory quarters must be wired with one circuit for each student in each room to allow access to the student LAN.

8.4.1.3. Permanently installed jacks, wiring, raceways/pathways, and connectivity to base networks in new construction for the exceptions in paragraphs 8.4.1.1 and 8.4.1.2 (MFH units, GOQs, student dormitories) will be funded with MILCON appropriations for the new construction. In existing quarters, installation, repair, and maintenance of permanent wiring and jacks must be funded only with funds appropriated for housing (Public Law [PL] 106-52, Military Construction Appropriations Act, 2000, Section 128) and are subject to the statutory funding limits applicable to housing.

8.4.2. Following the divestiture of the telecommunications industry in 1984, the Air Force has owned the inside wiring in quarters and lodging facility guest rooms from the subscriber’s jack to the demarcation point where the wiring connects to the telecommunication service provider’s network (usually at the outside wall of the quarters). At bases that have acquiesced with the service provider to a base minimum point of presence (MPOP), the government owns the wiring from the subscriber outlet to the MPOP (the central demarcation point is usually at the base dial central office). The cost of customer jacks, all permanent wiring, and raceways/pathways up to the service provider’s network interface needed for private telecommunications services in quarters and lodging facility guest rooms will be included in the MILCON program funding for new facilities. On O&M-funded projects, these requirements must be funded only with housing funds (PL 106-52, Section 128) and are subject to the statutory funding limits on housing.

8.4.3. All jacks and wiring in housing and lodging guest rooms must comply with TIA/EIA-570-A, Residential Telecommunications Cabling Standard, except for the circuits described in paragraph 8.4.1.

8.4.3.1. Premises Wiring.

8.4.3.1.1. All wiring must be concealed.

8.4.3.1.2. Telephone wiring inside quarters and lodging facility guest rooms must be 4-pair No. 24 AWG solid copper, CAT 3 or better UTP cable.

8.4.3.1.3. CATV wiring must be 75-ohm coaxial cable terminated with type “F” connectors and jacks.

8.4.3.2. Outlets. Telephone and CATV outlets must be wall-mounted. See Air Force housing design guides (published by HQ USAF and MAJCOMs) and the Air Force Visiting Quarters Design Guide (published by Headquarters Air Force Services Agency, Lodging Department [HQ AFSVA/SVOHL]) for additional information on quarters and lodging facility guest rooms. Locate outlets or provide additional outlets to enable maximum furniture placement flexibility.

8.4.3.2.1. Quarters. Telephone outlets must consist of 4-pin/4-position non-keyed CAT 3 or better modular USOC RJ-11 jacks. CATV outlets must be “F”-type jacks.

Locate jacks in the kitchen, living room, family room, and all bedrooms adjacent to a 120-VAC, 60-Hz (or host country standard voltage and frequency as applicable) duplex electrical receptacle.

8.4.3.2.2. Lodging Facility Guest Rooms. Telephone outlets must consist of 4-pin/4-position non-keyed modular USOC RJ-11 jacks. Locate one of the jacks in each room at the location of the guest’s desk adjacent to a 120-VAC, 60-Hz (or host country standard voltage and frequency as applicable) duplex electrical receptacle, both wall-mounted above the top of the desk so guests can conveniently access them with laptop computers. MAJCOMs may, at their discretion, require the outlet at the guest’s desk location to consist of two RJ-11 jacks, one labeled “TELEPHONE” and one labeled “DATA,” mounted on a single faceplate with each jack wired separately to the billeting telephone and Internet protocol switching equipment. CATV outlets must be “F”-type jacks.

8.5. Telecommunications System Management Records. Telecommunications system labeling, management records, and drawings must comply with TIA/EIA-606. Existing base standard numbering practices may be used as long as they incorporate the following requirements: all outlets, patch panel positions, and cables must be labeled as to their function with a unique identifier code; and as-built drawings and management records must show the location of all…

This is the start of the file's text. The full file is on GovTribe.

Other files for this federal contract opportunity

Other files attached to NELLIS MACC, newest first.
File Type Posted
SYNOPSIS OF AWARD.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 64 _ 26 AUG.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 55 to 63_25 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 35 to 54_20 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 18 to 34_19 AUG 10.docx DOCX document
FA486110RA200_Amendment 02.pdf PDF
FA4861-10-R-A200_Amendment 0001.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
JAFAN 6-9 23Mar04.pdf PDF
Route Map 3.pdf PDF
SITE VISIT AGENDA.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 4 to 5_06 AUG 10.docx DOCX document
Facility Construction Requirements —
FA486110RA200_NELLIS_MACC_RFI1_03 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch17 AF Form 3065 Progress Report.xls XLS spreadsheet
FA486110RA200_NELLIS_MACC_Atch04 _ NV100049 _ 20100423.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch06 NAFB Design Compatibility Guidelines.pdf PDF
FA486110RA200_NELLIS_MACC_Atch18 AF Form 103 CE Work Clearance Request.pdf PDF
FA486110RA200_NELLIS_MACC_Atch24.5 Demonstration Proj. Asbestos Results.pdf PDF
FA486110RA200_NELLIS_MACC_Atch02 _ NV080004 _ 20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch20 FAA 7460-1.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.3 _ ConsentLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch23.6 _ PerformanceQuestionnaireLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch12 NAFB 31-204 Vehicle Traffic Supervision.pdf PDF
FA486110RA200_NELLIS_MACC_Atch25 Financial Information Request.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch24.1 Demonstration Project SOW.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch19 NAFB 0-74 Range Pass.pdf PDF
FA486110RA200_NELLIS_MACC_RFP_30 JUL 10.pdf PDF
FA486110RA200_NELLIS_MACC_Atch24.4 Demo Project Form 66.pdf PDF
FA486110RA200_NELLIS_MACC_Atch07 Nellis Communication Standards.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.5 _ Past Performance Questionnaire _ 15 Feb 10.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch15 Schedule of Material Submittals.doc DOC document
FA486110RA200_NELLIS_MACC_Atch24.2 Demonstration Project Bid Schedule.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch11 DOD Unified Facilities Criteria.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch24.3 Demonstration Project Drawings.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.1 _ TeamingList _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch22 Construction Cost Breakdown.xls.xlsx XLSX spreadsheet
FA486110RA200_NELLIS_MACC_Atch26 Bonding Information Request.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch14 AF Form 3000.pdf PDF
FA486110RA200_NELLIS_MACC_Atch01 _ NV080001 _20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch08 ACC Architectural and Interior Design Standards.pdf PDF
FA486110RA200_NELLIS_MACC_Atch16 AF Form 3064 Progress Schedule.pdf PDF
FA486110RA200_NELLIS_MACC_Atch13 AFI 33-118 Radio Communications.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.2 _ PastPeformanceInformationSheet _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch10 USACE Safety and Health Req.pdf PDF
FA486110RA200_NELLIS_MACC_Atch21 DD 1354.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.4 _ ClientAuthorizationLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch03 _ NV080022 _ 20100709.rtf RTF text file
Demonstration Project SOW.pdf PDF
MACC_Section_01010.pdf PDF
Show all 50

NELLIS MACC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .