FA486110RA200_NELLIS_MACC_RFI 18 to 34_19 AUG 10.docx

DOCX document 18 KB Posted

Attached to
NELLIS MACC
Solicitation number
FA4861_10_R_A200
Issued by

About this file

RFIs 18 to 34

View the file

Other files

File Type Posted
SYNOPSIS OF AWARD.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 64 _ 26 AUG.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 55 to 63_25 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 35 to 54_20 AUG 10.docx DOCX document
FA486110RA200_Amendment 02.pdf PDF
FA4861-10-R-A200_Amendment 0001.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
JAFAN 6-9 23Mar04.pdf PDF
FA486110RA200_NELLIS_MACC_RFI 6 to 17_11 AUG 10.docx DOCX document
Route Map 3.pdf PDF
SITE VISIT AGENDA.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 4 to 5_06 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI1_03 AUG 10.docx DOCX document
Facility Construction Requirements —
FA486110RA200_NELLIS_MACC_Atch19 NAFB 0-74 Range Pass.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.3 _ ConsentLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch24.1 Demonstration Project SOW.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch23.6 _ PerformanceQuestionnaireLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_RFP_30 JUL 10.pdf PDF
FA486110RA200_NELLIS_MACC_Atch04 _ NV100049 _ 20100423.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch17 AF Form 3065 Progress Report.xls XLS spreadsheet
FA486110RA200_NELLIS_MACC_Atch06 NAFB Design Compatibility Guidelines.pdf PDF
FA486110RA200_NELLIS_MACC_Atch18 AF Form 103 CE Work Clearance Request.pdf PDF
FA486110RA200_NELLIS_MACC_Atch24.5 Demonstration Proj. Asbestos Results.pdf PDF
FA486110RA200_NELLIS_MACC_Atch24.4 Demo Project Form 66.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.5 _ Past Performance Questionnaire _ 15 Feb 10.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch07 Nellis Communication Standards.pdf PDF
FA486110RA200_NELLIS_MACC_Atch15 Schedule of Material Submittals.doc DOC document
FA486110RA200_NELLIS_MACC_Atch23.1 _ TeamingList _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch11 DOD Unified Facilities Criteria.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch24.3 Demonstration Project Drawings.pdf PDF
FA486110RA200_NELLIS_MACC_Atch24.2 Demonstration Project Bid Schedule.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch02 _ NV080004 _ 20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch12 NAFB 31-204 Vehicle Traffic Supervision.pdf PDF
FA486110RA200_NELLIS_MACC_Atch25 Financial Information Request.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch22 Construction Cost Breakdown.xls.xlsx XLSX spreadsheet
FA486110RA200_NELLIS_MACC_Atch09 Engineering Technical Letter —
FA486110RA200_NELLIS_MACC_Atch26 Bonding Information Request.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch14 AF Form 3000.pdf PDF
FA486110RA200_NELLIS_MACC_Atch20 FAA 7460-1.pdf PDF
FA486110RA200_NELLIS_MACC_Atch05 _MACC_Section_01010_ Rev 07-08-2010.doc DOC document
FA486110RA200_NELLIS_MACC_Atch23.4 _ ClientAuthorizationLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch08 ACC Architectural and Interior Design Standards.pdf PDF
FA486110RA200_NELLIS_MACC_Atch10 USACE Safety and Health Req.pdf PDF
FA486110RA200_NELLIS_MACC_Atch16 AF Form 3064 Progress Schedule.pdf PDF
FA486110RA200_NELLIS_MACC_Atch13 AFI 33-118 Radio Communications.pdf PDF
FA486110RA200_NELLIS_MACC_Atch21 DD 1354.pdf PDF
FA486110RA200_NELLIS_MACC_Atch03 _ NV080022 _ 20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch23.2 _ PastPeformanceInformationSheet _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch01 _ NV080001 _20100709.rtf RTF text file
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4861-10-R-A200; Nellis Multiple Award Construction Contract; Requests for Information

RFI #18

The top of Page 73 of the solicitation states that the page limitation for each PPIS is 4 pages, but paragraph 5.b. on the same page states that each PPIS shall not exceed 8 pages. Which page limitation is correct?

Answer:

Please reference answer to RFI # 7

RFI #19

Does pages 4 through page 9 of the solicitation need to be filled out and included in the proposal? If so, please clarify how to fill out the MAX NET AMOUNT, minimum and maximum quantity(s), unit price for base and option years. Or is the purpose of these pages to inform each Offeror the minimum amount and maximum amounts?

Answer:

1) Pages 4 through 9 do not need to be filled out or included in the proposal. The purpose of pages four through eight is to provide offerors with an understanding of how any subsequently awarded contract shall be structured. Prices are to be determined by individual task orders issued against such a contract. The purpose of the minimum/maximum quantities provided on pages 8 and 9 are informational. Please be advised that generally the task orders awarded to MACC contractors shall be of the estimated magnitude specified in paragraph 1.3.2.1 of the MACC Statement of Work.

RFI #20

The Price Proposal Binder requires applicable documents in Section I - Contract Clauses to be filled out and included in the proposal. We interpret Section I as clauses we need to accept if awarded the project. Please clarify which documents are in Section I is required to be filled out.

Answer:

Clauses to be filled out are, as stated in the RFP, any applicable clause with a fill-in located in Section I. These would become incorporated into the award document. If there are no applicable fill-ins in section I then none need to be included in the offeror’s proposal.

RFI #21

Page 73, paragraph c. states the PPIS is limited to 4 pages. Paragraph 5.b. states the PPIS is limited to 8 pages. Please advise which is correct.

Answer:

Please reference answer to RFI # 7

RFI #22

Para. 1.3.1.2 requires the HVAC system to be balanced prior to project completion. What is the extent of the air balance required?

i.e; entire building, area of construction only, or newly installed units only.

Answer:

Area of construction only

RFI #23

Para. 1.3.1.5 requires the contractor to prepare preliminary drawings. Please clarify "preliminary"; equivalent to 10%, 25% or 35% design?

Answer:

Equivalent to 35% design

RFI #24

Since there is no mention of demolition of existing Hvac ductwork, is the intent to leave all existing Hvac ductwork, grilles and diffusers intact and supplement the existing conditioned air with the mini split systems?

Answer:

Yes, that is correct; supplement the existing conditioned air with the mini split system.

RFI #25

Para. 1.3.2.8.12 requires a lever action handle to be installed on the new mech yard door. Is this to be a passage latch set only, or is an interchangable core lockset required?

Answer:

This is an interchangeable core lockset with key

RFI #26

Para. 1.3.2.11.1 states that no wet type sprinkler system work is required. If the construction of additional walls creates conflicts with sprinkler head spray patterns or head spacing limitations, what will be required of the contractor?

Answer:

There are no sprinkler heads in the basement, also there shall not be a wet type sprinkler system installed for this project.

RFI #27

Para. 1.3.2.13.3 requires that the Hvac systems in each room within the construction area be independently operated and controlled.

Is this referring to modification of the existing air distrubution system through the addition of Variable Air Volume control units, of is it referring to individual control of the new mini split systems only?

Answer:

This is referring to the indepent operation of individual mini split system.

RFI #28

Para. 1.3.2.13.10 requires temperature controls for each of the mini split systems. Will individual remote controls be an acceptable method of control?

Answer:

Yes, individual remote controls are an acceptable method of control for temperature.

RFI #29

Does the SIPR cable require any specific separation criteria from the rest of the communications and electrical cables, whether in conduit or in a cable tray?

Answer:

Fiber optic cabling is being utilized to support all data networks for this facility; minimum separation between all cabling is 3mm.

RFI #30

Future Network Plan; Sheet 4 of 5;

In Room 3 / Zone B, there is a "Fiber Cross Connect On Wall". Is this a new, contractor -provided data rack or patch panel, or is it an existing comm. fixture?

Answer:

The floor mounted patch panel cabinet in room #3 is no longer required as the fiber and copper cabling will be ripped out no longer requiring a rack as they will be routed back to room #8 for termination in the appropriate patch panel.

RFI #31

What strand count do you want from the above referenced Cross Connect to the Comm Room 8?

Answer:

No longer required.

RFI #32

Are these fibers the feeder connectivity for switches in room 3?

Answer:

No longer required.

RFI #33

AF Form 3052 is an attachment that will be used to fill out proposal during the life of this contract. Our question is this form required for this sample bid.

Answer:

AF Form 3052 is obsolete and no longer in use. The general format is, however, still being utilized in the format of Attachment #22, Construction Cost Breakdown. Please reference paragraph F.2.b regarding the requirement to include this attachment as part of the price proposal.

RFI #34

We like to know if we are using the correct border sheet because there are several different border sheets identified on this solicitation. Unless you indicate otherwise we will be using the Systems FAC ANSI D Border Sheet (file name: ANSI_D_nonPW.dwg) found at the following link:

https://cadbim.usace.army.mil/CAD

Answer:

Yes, that is the correct border sheet.