FA486110RA200_NELLIS_MACC_Atch26 Bonding Information Request.docx

DOCX document 29 KB Posted

Attached to
NELLIS MACC Federal contract opportunity
Solicitation number
FA4861_10_R_A200
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 26

View the file

Other files for this federal contract opportunity

Other files attached to NELLIS MACC, newest first.
File Type Posted
SYNOPSIS OF AWARD.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 64 _ 26 AUG.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 55 to 63_25 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 35 to 54_20 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 18 to 34_19 AUG 10.docx DOCX document
FA486110RA200_Amendment 02.pdf PDF
FA4861-10-R-A200_Amendment 0001.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
JAFAN 6-9 23Mar04.pdf PDF
FA486110RA200_NELLIS_MACC_RFI 6 to 17_11 AUG 10.docx DOCX document
Route Map 3.pdf PDF
SITE VISIT AGENDA.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI 4 to 5_06 AUG 10.docx DOCX document
FA486110RA200_NELLIS_MACC_RFI1_03 AUG 10.docx DOCX document
Facility Construction Requirements —
FA486110RA200_NELLIS_MACC_Atch23.6 _ PerformanceQuestionnaireLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch12 NAFB 31-204 Vehicle Traffic Supervision.pdf PDF
FA486110RA200_NELLIS_MACC_Atch25 Financial Information Request.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch24.1 Demonstration Project SOW.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch19 NAFB 0-74 Range Pass.pdf PDF
FA486110RA200_NELLIS_MACC_Atch01 _ NV080001 _20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch08 ACC Architectural and Interior Design Standards.pdf PDF
FA486110RA200_NELLIS_MACC_Atch16 AF Form 3064 Progress Schedule.pdf PDF
FA486110RA200_NELLIS_MACC_Atch13 AFI 33-118 Radio Communications.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.2 _ PastPeformanceInformationSheet _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch10 USACE Safety and Health Req.pdf PDF
FA486110RA200_NELLIS_MACC_Atch21 DD 1354.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.4 _ ClientAuthorizationLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch03 _ NV080022 _ 20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch05 _MACC_Section_01010_ Rev 07-08-2010.doc DOC document
FA486110RA200_NELLIS_MACC_Atch17 AF Form 3065 Progress Report.xls XLS spreadsheet
FA486110RA200_NELLIS_MACC_Atch04 _ NV100049 _ 20100423.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch06 NAFB Design Compatibility Guidelines.pdf PDF
FA486110RA200_NELLIS_MACC_Atch18 AF Form 103 CE Work Clearance Request.pdf PDF
FA486110RA200_NELLIS_MACC_Atch24.5 Demonstration Proj. Asbestos Results.pdf PDF
FA486110RA200_NELLIS_MACC_Atch02 _ NV080004 _ 20100709.rtf RTF text file
FA486110RA200_NELLIS_MACC_Atch09 Engineering Technical Letter —
FA486110RA200_NELLIS_MACC_Atch20 FAA 7460-1.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.3 _ ConsentLetter _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_RFP_30 JUL 10.pdf PDF
FA486110RA200_NELLIS_MACC_Atch24.4 Demo Project Form 66.pdf PDF
FA486110RA200_NELLIS_MACC_Atch07 Nellis Communication Standards.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.5 _ Past Performance Questionnaire _ 15 Feb 10.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch15 Schedule of Material Submittals.doc DOC document
FA486110RA200_NELLIS_MACC_Atch24.2 Demonstration Project Bid Schedule.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch11 DOD Unified Facilities Criteria.docx DOCX document
FA486110RA200_NELLIS_MACC_Atch24.3 Demonstration Project Drawings.pdf PDF
FA486110RA200_NELLIS_MACC_Atch23.1 _ TeamingList _ 15 Feb 10.doc DOC document
FA486110RA200_NELLIS_MACC_Atch22 Construction Cost Breakdown.xls.xlsx XLSX spreadsheet
Demonstration Project SOW.pdf PDF
Show all 50

NELLIS MACC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM FOR WHOM IT MAY CONCERN

FROM: 99 CONS/LGCA

5865 Swaab Blvd, Bldg 588 Nellis AFB NV 89191-7063

SUBJECT: Bonding Information Request and Release Authorization

REFERENCES:(a)Solicitation FA4861-10-R-A200
(b)Multiple Award Construction Contract (MACC)
1.Our office is evaluating
(NAME OF FIRM)

of

(FIRM’S ADDRESS, INCLUDING CITY, STATE, AND ZIP CODE)

for possible award of referenced contract. In order to proceed, we must verify the contractor’s bonding capability. The firm has provided your name as their surety and granted you release, as indicated below, to provide it to the government.

2. Please complete the attached questionnaire and return it by fax (702-652-2531) or email to me (jacquelyn.buky@nellis.af.mil) at your earliest convenience, but not later than seven (7) calendar days after receipt of this request.

3. All information provided will be FOR OFFICIAL USE ONLY and will not be publicly released. If you need any other information or have any questions, please call me at 702-652-2531. Thank you very much for your assistance.

JACQUELYN E. BUKY
Contracting Officer

Attachment Bonding Information Sheet

1st Ind, (Name of Offeror’s Firm) (Date)

TO:

(Name of Surety) (Phone # w/Area Code)

|_| I hereby authorize the surety to release my information as requested.

SIGNATURE:

BY:

(Print name/title of authorized representative)

DEPARTMENT OF THE AIR FORCE

99TH CONTRACTING SQUADRON (ACC)

NELLIS AIR FORCE BASE, NEVADA

Global Power For America

RESPONSIBILITY QUESTIONNAIRE - BONDING

FA4861-10-R-A200

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)

1. Name of Contractor to whom the following information is applicable:

2. Name of Surety:

3. Address of Surety:

4. How long has the firm provided bonding for the offeror?

5. How would you rate the relationship with the offeror?

|_| Excellent |_| Satisfactory |_|Unsatisfactory |_| Other

6. What is the offeror’s bonding limit?

Single Project $

Aggregate $

7. Has the surety ever taken over to complete a project awarded to the offeror?

|_| NO |_| YES (Include an explanation on separate sheet if yes)

8. Where there ever any complaints of non-payment by the offeror’s subcontractors/suppliers?

|_| NO |_| YES (Include an explanation on separate sheet if yes)

9. Where there ever payments made by the surety to the offeror’s subcontractors/suppliers?

|_| NO |_| YES (Include an explanation on separate sheet if yes)

10. COMMENTS:

I certify that the above information is correct and current as of

(DATE)

SIGNATURE:

BY:

(Print name/title of authorized representative)

DATE:

image1.png

File details come from the government source that posted it. Updated .