This statement of work outlines requirements for a dormitory renovation project at Moody Air Force Base. The project scope includes replacing weather stripping around exterior doors, installing new flooring throughout, repainting interior walls and ceilings, and temporarily removing and storing furnishings to facilitate construction work. Specific tasks involve installing new luxury vinyl plank flooring and vinyl base in dorm rooms and common areas, repainting metal doors and frames, and deep cleaning bathroom floor tiles. The contractor must adhere to all applicable construction standards and codes, follow green procurement mandates, and dispose of waste properly. The solicitation number for this opportunity is FA4830-23-R-0001 under the Simplified Acquisition of Base Engineering Requirements program of the Department of the Air Force Air Combat Command.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
1. SF30_Amend02_FA483023R0001.pdf PDF
2. Summary of Changes_Atch 1_Amend02.pdf PDF
Consolidated Q-A3.pdf PDF
Atch 1_Pre-Prop_Site Visit Attend Sheet.pdf PDF
RFP Atch 7 - PPQ.docx DOCX document
RFP Atch 9 - Q - A Form.docx DOCX document
RFP Atch 10 - Client Authorization Ltr.docx DOCX document
Atch 3_SABER Pre-Prop Conf Slides.pdf PDF
SABER Pre-Proposal Conference Minutes.pdf PDF
RFP Atch 3a - B326 Floor Plan 1.pdf PDF
RFP Atch 4 - Wage Determination.pdf PDF
RFP FA483023R0001.doc.pdf PDF
RFP Atch 1 - SABER Specifications.pdf PDF
RFP Atch 2 - MAFB A-E Design Guide.pdf PDF
RFP Atch 3b - B326 Floor Plan 2.pdf PDF
RFP Atch 8 - PPPI.docx DOCX document
Atch 2_Consolidated Q-A1 (Site Visit).pdf PDF
RFP Atch 5 - Base Pass Template.pdf PDF
RFP Atch 6 - AF Form 66.xlsx XLSX spreadsheet
RFP Atch 11 - Subcontractor Consent Ltr.docx DOCX document
RFP Atch 12 - SABER Ordering Guide.pdf PDF
RFP Atch 12_(Rev1) SABER Ordering Guide.pdf PDF
Amendment Atch 2_Consolidated Q-A2.pdf PDF
RFP Atch 1_(Rev1) SABER Specifications.pdf PDF
RFP Atch 3c_Bldg 326 Furniture Inventory.pdf PDF
SF30_FA483023R00010001.pdf PDF
Amendment Atch 1_Summary of Changes.pdf PDF
RFP Atch 3_(Rev1) Seed Project SOW QSEU 20-0171.pdf PDF
Pre-Proposal_Site Visit Invite.pdf PDF
RFP FA483023R0001.doc.pdf PDF
RFP Atch 5 - Base Pass Template.pdf PDF
RFP Atch 9 - Q - A Form.docx DOCX document
RFP Atch 11 - Subcontractor Consent Ltr.docx DOCX document
Site Visit Pre-Registration Form.docx DOCX document
RFP Atch 1 - SABER Specifications.pdf PDF
RFP Atch 2 - MAFB A-E Design Guide.pdf PDF
RFP Atch 3a - B326 Floor Plan 1.pdf PDF
RFP Atch 7 - PPQ.docx DOCX document
RFP Atch 10 - Client Authorization Ltr.docx DOCX document
RFP Atch 3b - B326 Floor Plan 2.pdf PDF
RFP Atch 3 - Seed Project SOW QSEU 20-0171.pdf PDF
RFP Atch 4 - Wage Determination.pdf PDF
RFP Atch 6 - AF Form 66.xlsx XLSX spreadsheet
RFP Atch 8 - PPPI.docx DOCX document
RFP Atch 12 - SABER Ordering Guide.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Project Number: QSEU 20-0171

Project Title: RPR, Dorm Weather Stripping, Flooring, and Paint B326

1. GENERAL REQUIREMENTS

The required work includes the principal features listed below. The outline of principal features does not limit the responsibility of the Contractor to furnish all plant, labor, equipment, materials and transportation to result in a complete, usable facility.

1.1. Conduct all work in accordance with the contract specifications, all applicable codes, and the construction drawings and details. The Contractor shall comply with the Moody AFB Design Guide, UFC 1-200-01 DOD Building Code, with change 1 and all applicable UFCs.

1.2. The Contractor shall follow all Green Procurement mandates and submittal requirements. The government requires the use of recycled and recovered materials, bio-based products, energy and water saving products, and environmentally preferable products.

1.3. Dispose of all waste generated by this project according to all applicable regulations.

1.4. Work area(s) will be clean and all lights turned off at the end of each workday.

1.5. PPE must be worn at all times by personal on site, including hard hats, steel-toed work shoes, gloves, or as required for the task being performed. All site personnel will wear identification badges and all vehicles/equipment must be properly marked with contractor’s identification.

1.6. It is the Contractor’s responsibility to verify site conditions, measurements, quantities, and materials needed to complete this project including revisions to the Scope of Work to the extent possible prior to submitting a proposal.

1.7. See SABER Division Specifications for submittal schedule and submittals required.

1.8. High-Visibility Standards: This project will be a high-visibility project. It will receive additional scrutiny from Senior Leaders. Quality of the finished project is very important. Adherence to the schedule is critical.

2. SITE RESTRICTIONS

2.1. Building will be unoccupied during the course of construction.

3. PROJECT SCOPE

3.1. Work shall entail removing, cleaning and reinstalling furniture and appliances; installing new weather stripping around exterior doors; painting doors; flooring replacement; and interior paint in Dorm

Building 326.

4. PROJECT REQUIREMENTS

4.1. DORM ROOMS

4.1.1. Weather Stripping: Replace weather stripping around door frame, underneath the exterior doors of the dorm rooms and replace door sweeps. Weather stripping to be equal to or better than existing.

4.1.2. Flooring: Existing carpet tiles, vinyl composition, and ceramic tile to be removed (includes surface scraping) and replaced with a new 7x48 20 mil Luxury Vinyl Plank Pratcraft (LVT) 1439 V Crossover or

FA4830-23-R-0001

Attachment 3

Project Title: RPR, Dorm Weather Stripping, Flooring, and Paint B326 equal. Color to be 00580 Wenge or equal. Vinyl cove base to removed, repair, prep wall to receive new

4” vinyl cove base. Color to be Johnsonite 40 Black B or equal. Bathroom floor tile is to be deep cleaned.

4.1.3. Walls: Repair/patch, prep, prime and paint the interior living, kitchen, closet and bathroom walls.

Color to be SW7066 ‘Gray Matters’ eggshell by Sherwin-Williams or equal.

4.1.4. Ceiling: Remove all existing texture, patch, prep, prime and paint the ceilings in the interior living, kitchen, closet and bathroom. Color to be Bright White by Sherwin-Williams or equal.

4.1.5. Doors: Prep to include caulking, prime and paint exterior metal door, interior metal door, exterior

HM frame and interior HM frame ‘Moody Bronze’ or equal. Do not paint bifold closet doors.

4.1.6. Furniture & Appliances: All furniture and appliances to be removed by contractor and stored during construction activities. Contractor will ensure all furniture and appliances are cleaned and mold free prior to being stored and after returning to original location. Furniture and appliances to be stored in an environmentally controlled condition. Contractor to return furniture and appliances to original location upon completion.

4.2. DAY ROOM

4.2.1. Weather Stripping: Replace weather stripping around door frame, underneath the exterior doors of the dorm rooms and replace door sweeps. Weather stripping to be equal to or better than existing.

4.2.2. Flooring: Existing carpet tiles, vinyl composition and ceramic tile to be removed (includes surface scraping) and replaced with a new 7x48 20 mil Luxury Vinyl Plank Pratcraft (LVT) 1439 V Crossover or equal. Color to be 00580 Wenge or equal. Vinyl cove base to removed, repair, prep wall to receive new

4” vinyl cove base. Color to be Johnsonite 40 Black B or equal. Bathroom floor tile is to be deep cleaned.

4.2.3. Walls: Repair/patch, prep, prime and paint the interior living, kitchen, closet and bathroom walls.

Color to be SW7066 ‘Gray Matters’ eggshell by Sherwin-Williams or equal.

4.2.4. Ceiling: Remove all existing texture, patch, prep, prime and paint the ceilings in the interior living, kitchen, closet, and bathroom. Color to be Bright White by Sherwin-Williams or equal.

4.2.5. Doors: Prep to include caulking, prime and paint exterior metal door, interior metal door, exterior HM frame and interior HM frame ‘Moody Bronze’ or equal. Do not paint bifold closet doors.

4.2.6. Furniture & Appliances: All furniture and appliances to be removed by contractor and stored during construction activities. Contractor will ensure all furniture and appliances are cleaned and mold free prior to being stored and after returning to original location. Furniture and appliances to be stored in an environmentally controlled condition. Contractor to return furniture and appliances to original location upon completion.

4.3. LAUNDRY ROOM

4.3.1. Walls: Repair/patch, prep, prime and paint the interior walls. Color to be SW7066 ‘Gray Matters’ eggshell by Sherwin-Williams or equal.

FA4830-23-R-0001

Project Title: RPR, Dorm Weather Stripping, Flooring, and Paint B326

4.3.2. Ceiling: Remove peeling paint, prep, prime and paint the ceilings. Color to be Bright White by

Sherwin-Williams or equal.

4.3.3. Furniture & Appliances: All furniture and appliances to be removed by contractor and stored during construction activities. Contractor will ensure all furniture and appliances are cleaned and mold free prior to being stored and after returning to original location. Furniture and appliances to be stored in an environmentally controlled condition. Contractor to return furniture and appliances to original location upon completion.