Amendment Atch 2_Consolidated Q-A2.pdf

PDF 159 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4830-23-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains consolidated questions and answers regarding Solicitation Number FA4830-23-R-0001 from the Department of the Air Force Air Combat Command for the Simplified Acquisition of Base Engineering Requirements (SABER) indefinite delivery/indefinite quantity contract. The solicitation seeks a single contractor to provide construction services for minor new construction and repair projects at Air Force installations using a Gordian Construction Task Catalog pricing methodology. Questions addressed pricing terms including a $250 fee for task order proposals, use of a single coefficient applied to the CTC pricing, and application of annual CTC price adjustments. The document also clarified design requirements, personnel qualifications, and details of a seed project at Building 326 to include furniture inventories. The proposal due date was extended 21 days per a request and the document did not specify award timing.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
2. Summary of Changes_Atch 1_Amend02.pdf PDF
1. SF30_Amend02_FA483023R0001.pdf PDF
Consolidated Q-A3.pdf PDF
Atch 3_SABER Pre-Prop Conf Slides.pdf PDF
SABER Pre-Proposal Conference Minutes.pdf PDF
RFP Atch 3a - B326 Floor Plan 1.pdf PDF
RFP Atch 4 - Wage Determination.pdf PDF
Atch 1_Pre-Prop_Site Visit Attend Sheet.pdf PDF
RFP Atch 7 - PPQ.docx DOCX document
RFP Atch 9 - Q - A Form.docx DOCX document
RFP Atch 10 - Client Authorization Ltr.docx DOCX document
Atch 2_Consolidated Q-A1 (Site Visit).pdf PDF
RFP Atch 3 - Seed Project SOW QSEU 20-0171.pdf PDF
RFP Atch 5 - Base Pass Template.pdf PDF
RFP Atch 6 - AF Form 66.xlsx XLSX spreadsheet
RFP Atch 11 - Subcontractor Consent Ltr.docx DOCX document
RFP Atch 12 - SABER Ordering Guide.pdf PDF
RFP FA483023R0001.doc.pdf PDF
RFP Atch 1 - SABER Specifications.pdf PDF
RFP Atch 2 - MAFB A-E Design Guide.pdf PDF
RFP Atch 3b - B326 Floor Plan 2.pdf PDF
RFP Atch 8 - PPPI.docx DOCX document
RFP Atch 1_(Rev1) SABER Specifications.pdf PDF
RFP Atch 12_(Rev1) SABER Ordering Guide.pdf PDF
SF30_FA483023R00010001.pdf PDF
Amendment Atch 1_Summary of Changes.pdf PDF
RFP Atch 3_(Rev1) Seed Project SOW QSEU 20-0171.pdf PDF
RFP Atch 3c_Bldg 326 Furniture Inventory.pdf PDF
Site Visit Pre-Registration Form.docx DOCX document
RFP Atch 1 - SABER Specifications.pdf PDF
Pre-Proposal_Site Visit Invite.pdf PDF
RFP FA483023R0001.doc.pdf PDF
RFP Atch 5 - Base Pass Template.pdf PDF
RFP Atch 9 - Q - A Form.docx DOCX document
RFP Atch 11 - Subcontractor Consent Ltr.docx DOCX document
RFP Atch 3 - Seed Project SOW QSEU 20-0171.pdf PDF
RFP Atch 4 - Wage Determination.pdf PDF
RFP Atch 6 - AF Form 66.xlsx XLSX spreadsheet
RFP Atch 8 - PPPI.docx DOCX document
RFP Atch 12 - SABER Ordering Guide.pdf PDF
RFP Atch 2 - MAFB A-E Design Guide.pdf PDF
RFP Atch 3a - B326 Floor Plan 1.pdf PDF
RFP Atch 7 - PPQ.docx DOCX document
RFP Atch 10 - Client Authorization Ltr.docx DOCX document
RFP Atch 3b - B326 Floor Plan 2.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4830-23-R-0001

Consolidated Q&A 2

K – Contracting C – Cost/Pricing T- Technical P – Past Perf.

Solicitation Reference

Question/Comment

Government Response (Govt Use Only)

Resulted in change in

RFP? (Y/N)

(Govt Use

Only)

Change Reference

(Govt Use Only)

T-001 Seed Project SOW - SECTION 01 04 00 Unit Price Book and Software Requirements (pg. 35)

Since the contract is going to change to a Gordian-provided Construction Task Catalog (CTC), is SECTION 01 04 00 of Attachment 1 going to be revised to reflect the different methodology used in a Gordian CTC? Specifically, since proposers are to provide a single coefficient, to be applied to two different price books with different line items, will the Government allow the selected contractor to revise their coefficients once the new CTC is incorporated into the contract? If not, then please provide detail as to how proposers are to reconcile the different line items to a single coefficient.

All revised documents, to include Section 01 04 00 of RFP Attachment 1 will be provided with Amendment 0001. Offerors will be provided with an additional time to prepare for the proposal due to changes made in Amendment 0001.

The coefficient will not need to be adjusted since the offerors now will use only one price book listed in the Construction Task Catalog (CTC), utilizing the eGordian software. Specific instructions regarding to obtain temporary access (free of charge) to the Moody SABER CTC are provided in Section L and throughout the RFP revised attachments.

Y

Amendment 0001:

Section L-4.3.1.1(c) & L-6.3 for the CTC access, RFP Atchs 1, 2, 4 for the changed language in blue font.

T-002

RFP FA483023R0001 –

SECTION B – Supplies or Services & Prices or Costs (pg. 4)

When are the Line Item Estimating fees (Section B and Attachment 1, Paragraph II.3) paid? Unclear if each TO proposal receives $250 for the effort in producing the estimate and supporting documentation, or is this a fee paid if the Government requires a TO proposal but doesn’t subsequently award the TO for execution?

Each proposal should include the LIE fee of $250. If the TO is awarded, then the LIE cost is already included in the proposal. If the proposal is not accepted and a TO not awarded, then the LIE fee of $250 will be paid for producing the estimate.

N N/A

T-003

RFP FA483023R0001 -

L-6.3.2 Coefficient Rate

(pg. 69)

Since the contract period is for 4 years, are the wage decisions incorporated in the solicitation binding for the entire 4-year period (i.e., no changes during the 4-year period)?

The proposed coefficient is not subject to economic price adjustments and will remain unchanged for the entire 4-yr ordering period. To incorporate fair inflation rate adjustments to the unchanging coefficient rate, the CTC will be republished annually during the contract to be applied to the proposed construction price to finalize all SABER task order prices.

Y Amendment 0001:

Section L-6.3.2(a)

T-004 N/A

Can a list of projects issued under the current SABER contract be provided (to include):

a. Job description

b. Location of project

c. Work Order contracted amount ($)

d. Work Order issue date

The task orders issued under the previous SABER is not relevant to this solicitation. Please reference section L & M of RFP FA483023R0001 for what is required for future TOs, including the SABER seed project.

N N/A

T-005 N/A Will a "Degreed" Key Personnel holding an M.S. in Construction Management suffice in lieu of an Architecture or Civil Engineering Degree?

Yes. N N/A

T-006 N/A Will the government provide the current coefficient(s) of the incumbent SABER contractor?

The incumbent contractor’s pricing (coefficient) is protected information. Therefore, the government is unable to release that information for doing so is illegal as well as unethical.

N N/A

T-007 N/A Will a bid sheet be provided for the seed project?

No, the price proposal/cost estimate will be from the CTC and in a Masterformat. When using eGordian CTC, the offeror must use the CTC format; therefore, providing a bid sheet is unnecessary.

N N/A

T-008

Seed Project SOW (Attachment 3) and RFP

FA483023R0001 - L-

4.3.1 Coefficient Rate (pg.

69)

Upon review of the Seed Project SOW (Attachment 3), it does not appear that any mechanical, electrical, structural, fire protection, life safety, or energy design is required for this project, however, the RFP calls for preliminary calculations, equipment selections, and layouts for all trades listed to be provided as part of the proposal package. Please confirm that there is no design scope for mechanical, electrical, structural, fire protection, life safety, or energy as part of this project. If these trades are to be included in this project, please define the requirements for each trade.

The government confirms that there is no design scope for mechanical, electrical, structural, fire protection, life safety, or energy as part of this project.

N N/A

K-001 N/A Will meeting minutes, including responses to questions and contractor sign-in sheet, for pre-proposal conference be

The meeting minutes, responses to the site visit questions & answers, and contractor sign in sheet were posted to SAM.gov. N N/A

FA4830-23-R-0001

Consolidated Q&A 2 provided? on 13 July.

T-009 Seed Project SOW (Attachment 3)

When was Building 326 constructed? Will an environmental report be necessary, as there is peeling paint and vinyl floor tile and mastic to be removed?

The building was constructed in 1972, but the interior has been remodeled multiple times. No environmental report is necessary. N N/A

T-010 Seed Project SOW (Attachment 3)

Is it possible to provide a list of the appliances and furniture in a typical unit in Building 326?

The information is available and the list of furniture/appliances was added to the RFP. Please see the RFP Attachment 3c -B326 Furniture Inventory.

Y Amendment 0001:

Attachment 3c

T-011 Seed Project SOW (Attachment 3)

In the sections Dorms 4.1.2 Flooring, and Day Room 4.2.2.

Flooring, it states to remove ceramic tile and to surface scrape the floor, but also it says bathroom floor tile is to be deep cleaned. Can the government confirm if ALL flooring is to be removed from these dorms, or if the bathroom is staying.

Bathroom ceramic tile remains in place and will be deep cleaned.

This is updated and reflected in the SOW and Amendment 0001 Y

Amendment 0001:

Atch 3, Seed SOW, para. 4.2.2

T-012 SABER Specs (Attachment 1)

Can the government confirm if the QC manager, SSHO, and superintendent can all be one person?

QC Manager and Superintendent cannot be the same person, dual “hat”-ting among other positions is authorized. Y

Amendment 0001, RFP Atch 1, SABER Specs, Section 01 31 01, para 1.1.1.5

T-013 Seed Project SOW (Attachment 3)

Can the government confirm that the day room will be cleared of all furniture and recreational equipment prior to construction as discussed at the site visit?

Furniture and recreational equipment will remain in the dayroom, it can be moved within and covered up during construction. If there is an issue with items remaining in the dayroom the government will remove them.

N N/A

K-002 SF 1442 Once all RFIs have been answered we are requesting an extension of the proposal due date by 21 calendar days.

With the release of Amendment 0001, the proposal due date will be extended by 21 days. Y Amendment 0001:

SF30, Block 10

K-003 N/A We are requesting the contract be awarded 30 days after proposals are submitted, as vendors will only hold their prices for short periods of time.

The RFP requires a minimum bid guarantee of 180 days;

therefore, the offeror should ask the vendors to provide prices that will be valid for at least 180 days. Awarding an IDIQ contract within 30 days from the proposal due date is not mathematically feasible, considering the government must conduct a formal source selection that requires a numerous documentations and multiple level of clearance/legal reviews.

Also, the CTC is only updated annually, so the proposals the offeror provides must be technically valid for a year. If for some reason, there is an economic anomaly with a material/labor cost increase within the minimum bid guarantee of 180 days, then the issue will be addressed prior to issuing the task order for the specific project.

N N/A