2. Summary of Changes_Atch 1_Amend02.pdf

PDF 119 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4830-23-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

This document is an amendment to an RFP for the Simplified Acquisition of Base Engineering Requirements at Moody Air Force Base. The amendment makes several changes to the RFP, including modifying the scope of work from requiring a preliminary design across all disciplines to requiring a preliminary work plan demonstrating coordination among trades. It also changes the evaluation criteria to assess offerors' capability to execute the seed project in accordance with the revised work plan requirements. The amendment additionally clarifies that offerors shall not include eGordian fees in their proposed coefficients.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
1. SF30_Amend02_FA483023R0001.pdf PDF
Consolidated Q-A3.pdf PDF
Atch 2_Consolidated Q-A1 (Site Visit).pdf PDF
RFP Atch 3 - Seed Project SOW QSEU 20-0171.pdf PDF
RFP Atch 5 - Base Pass Template.pdf PDF
RFP Atch 6 - AF Form 66.xlsx XLSX spreadsheet
RFP Atch 11 - Subcontractor Consent Ltr.docx DOCX document
RFP Atch 12 - SABER Ordering Guide.pdf PDF
Atch 3_SABER Pre-Prop Conf Slides.pdf PDF
SABER Pre-Proposal Conference Minutes.pdf PDF
RFP Atch 3a - B326 Floor Plan 1.pdf PDF
RFP Atch 4 - Wage Determination.pdf PDF
Atch 1_Pre-Prop_Site Visit Attend Sheet.pdf PDF
RFP Atch 7 - PPQ.docx DOCX document
RFP Atch 9 - Q - A Form.docx DOCX document
RFP Atch 10 - Client Authorization Ltr.docx DOCX document
RFP FA483023R0001.doc.pdf PDF
RFP Atch 1 - SABER Specifications.pdf PDF
RFP Atch 2 - MAFB A-E Design Guide.pdf PDF
RFP Atch 3b - B326 Floor Plan 2.pdf PDF
RFP Atch 8 - PPPI.docx DOCX document
SF30_FA483023R00010001.pdf PDF
Amendment Atch 1_Summary of Changes.pdf PDF
RFP Atch 3_(Rev1) Seed Project SOW QSEU 20-0171.pdf PDF
Amendment Atch 2_Consolidated Q-A2.pdf PDF
RFP Atch 1_(Rev1) SABER Specifications.pdf PDF
RFP Atch 12_(Rev1) SABER Ordering Guide.pdf PDF
RFP Atch 3c_Bldg 326 Furniture Inventory.pdf PDF
RFP Atch 3 - Seed Project SOW QSEU 20-0171.pdf PDF
RFP Atch 4 - Wage Determination.pdf PDF
RFP Atch 6 - AF Form 66.xlsx XLSX spreadsheet
RFP Atch 8 - PPPI.docx DOCX document
RFP Atch 12 - SABER Ordering Guide.pdf PDF
Site Visit Pre-Registration Form.docx DOCX document
RFP Atch 1 - SABER Specifications.pdf PDF
Pre-Proposal_Site Visit Invite.pdf PDF
RFP FA483023R0001.doc.pdf PDF
RFP Atch 5 - Base Pass Template.pdf PDF
RFP Atch 9 - Q - A Form.docx DOCX document
RFP Atch 11 - Subcontractor Consent Ltr.docx DOCX document
RFP Atch 2 - MAFB A-E Design Guide.pdf PDF
RFP Atch 3a - B326 Floor Plan 1.pdf PDF
RFP Atch 7 - PPQ.docx DOCX document
RFP Atch 10 - Client Authorization Ltr.docx DOCX document
RFP Atch 3b - B326 Floor Plan 2.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002

FA4830-23-R-0001

Attachment 1

SUMMARY OF CHANGES

RFP No. FA4830-23-R-0001-A0002, Moody AFB SABER

RFP Reference Changed From Changed To

NOTE:

Red color font indicates deletion from the original RFP language.

Blue color font indicates addition or modification to the original RFP language.

Section L-4.3.1.1 L-4.3.1.1 Provide a preliminary design across all disciplines in accordance with (IAW) the Seed Project SOW (Attachment 3 and all the sub-attachments). The following essential elements are the minimum requirements for the concept design:

(a) Scope of Work:

i. Provide a written narrative summarizing, explaining, and documenting the preliminary design to address, in detail, the offeror’s technical approach, at a minimum, to the following components: mechanical, electrical, structural, fire protection, life safety, and energy. The narrative shall also clearly illustrate compliance with local, state, and federal building and construction codes and Life Safety Codes.

ii. Provide the drawings describing a preliminary design, including basic layout and planning of work, and at a minimum, the following components: mechanical, electrical, structural, fire protection, life safety, and energy.

iii. Provide design calculations to substantiate appropriate equipment or material selection/sizing, component assembly, and proposed labor and sizing of utilities and structural elements (e.g. mechanical, electrical, structural, L-4.3.1.1 Provide a preliminary work plan in accordance with the Seed Project SOW (Attachment 3 and all the sub-attachments) to demonstrate coordination efforts among the different trades/subcontractors, the sequencing of construction, and the implementation of roles and responsibilities of the key personnel.

(a) Scope of Work – Provide a written narrative summarizing, explaining, and documenting the processes anticipated to successfully fulfil the requirements of the seed project from task order award to final acceptance.

Identify the different trades and subcontractors and demonstrate how each will coordinate work to show a fluid sequence and minimize down-time or delay. The narrative should clearly define the roles and responsibilities of all key personnel and show how each will implement their responsibilities.

Amendment 0002

FA4830-23-R-0001

Attachment 1 fire protection, life safety, and energy) in compliance with the Seed Project SOW (Attachment 3).

Section M-3.1.1 M-3.1.1 The standard is met when the proposed preliminary design across all disciplines demonstrates the offeror’s technical capability for successfully executing and completing the seed project IAW the Sow and the proposal provides:

(a)(i) Effectively and sufficiently detailed narrative summarizing, explaining, and documenting the preliminary design to address the offeror’s technical approach.

(a)(ii) Effective and accurate concept design drawings describing a preliminary design, including basic layout, and planning of work that depicts all components IAW Moody AFB Seed Project SOW.

(a)(iii) Complete and accurate calculation to substantiate appropriate equipment or material selection/sizing, component assembly, and of utilities and structural elements (e.g., mechanical, electrical, structural, fire protection, life safety, and energy) in compliance with SOW paragraph 9.

M-3.1.1 The standard is met when the proposed work plan demonstrates the offeror’s technical understanding and capability for successfully executing and completing the seed project IAW the Seed Project SOW and the proposal provides:

(a) Efficiently, logically, and sufficiently detailed narrative summarizing, explaining, and documenting the preliminary work plan processes to address offeror’s technical approach.

Section L-6.3.2, Coefficient Rates

Added: The offerors shall not include the eGordian fee into the proposed coefficient. Only the selected SABER awardee will include the eGordian fee as a separate line-item in each task order cost proposal.

File details come from the government source that posted it. Updated .