About this file

RPES Q A

View the file

Other files for this federal contract opportunity

Other files attached to Base Civil Engineer Services, newest first.
File Type Posted
Q A.pdf PDF
SF_30.pdf PDF
Appendix_4_3_V2.xls XLS spreadsheet
Appendix_4.7_V2.xlsx XLSX spreadsheet
Appendix_4.4_(Part_2)_V2.doc DOC document
Attachment_6_V3.pdf PDF
Attachment_4_V2_21_Mar.xlsx XLSX spreadsheet
SF_30.pdf PDF
HVAC_Inventory_-_8_Mar_16.xlsx XLSX spreadsheet
FY15_Work_Order_hours.xlsx XLSX spreadsheet
Asbuilt_shore_exclusion_zone.pdf PDF
Funded_Electrical_Projects.xlsx XLSX spreadsheet
PWS_Questions_FBO.pdf PDF
Electrical_overhead_inventory.xlsx XLSX spreadsheet
HVAC_IWIMS_Inventory_Mar_2016.xlsx XLSX spreadsheet
ppi_tool.accdb —
Sign_in_sheet_and_map.pdf PDF
Site_Visit_Briefing_Slides_V3.ppt PPT presentation
PAPerspectivesBrief_Updated_II.pptx PPTX presentation
SF_30.pdf PDF
Attachment_6_1_March_16.pdf PDF
IAP_IAMAW_CBA_1_Oct_2015.pdf PDF
Akima_IAMAW_CBA_1_Oct_2015.pdf PDF
Appendix_4.2_g-07-01.pdf PDF
Appendix_4.3.xls XLS spreadsheet
Appendix_4.6.pdf PDF
Attachment_4_Performance_Survey_Form_17_Feb_16.xlsx XLSX spreadsheet
Appendix_4.4.xlsx XLSX spreadsheet
Appendix_4.2_G-01-01_Color.pdf PDF
Attachment_3 _Past_Performance_Summary_Sheet_(PPSS)_17_Feb_16.docx DOCX document
Appendix_4.2_G-02-01_Color.pdf PDF
Appendix_4.2_g-05-01.pdf PDF
Attachment_2_PPI_Tool_Instructions_17_Feb_16.docx DOCX document
Appendix_4.2_C-01-01.pdf PDF
Appendix_4.2_C-05-01.pdf PDF
Appendix_4.4.xlsx XLSX spreadsheet
FA4814-16-R-0005.pdf PDF
Appendix_4.4_(Part_2).pdf PDF
Attachment_6_17_Feb_16.docx DOCX document
Attachment_1_17_Feb_16.docx DOCX document
Appendix_4.2_g-03-01.pdf PDF
Appendix_4.7.xlsx XLSX spreadsheet
Appendix_4.2_g-04-01_color.pdf PDF
Attachment_5_GFP_17_Feb_16.xlsx XLSX spreadsheet
Appendix_4.2_G-10-01.pdf PDF
Appendix_4.1.pdf PDF
Appendix_4.5.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q: Please clarify the intent of the RPES portion of the solicitation

A: To ascertain whether the offeror has met the requirements of the PWS, the government must determine the offeror fully understands them, has a complete plan to address them, and the offeror’s proposal cost provides all the necessary resources necessary to execute it. Some areas that should be considered in preparing the RPES:

1. Do you have the sufficient numbers of personnel and are they qualified to perform the task(s)? i.e.

The PWS requires the offeror be able to produce $25M/year of design across all disciplines. 100% design project plans and specifications are signed and sealed by a Professional Engineer (PE) and Registered Architect (RA). The RPES must show the offeror will provide a sufficient overall number of engineers/architects and registered Professional Engineers (PE) and Registered Architect (RA) in each key discipline to perform that task.

2. Subcontracted Capability should be quantified and describe scope/magnitude of the subcontracted portion in each RPES and in the overall proposal. i.e. If the offeror intends to use a local firm to replace marine pilings each year, the offeror should show it in item 12 on the RPES as a subcontract, and indicate the scope and magnitude of that subcontract. Another example is if the contractor plans to supplement manpower or services via contract. i.e. If the contractor plans to supplement the offeror’s HVAC in‐house capability during the peak cooling season via subcontract. The offer should list that in item 12 with a brief description of scope/magnitude for that subcontract. This description should demonstrate the offeror understands the requirement and the scope/magnitude of any subcontracts needed to execute the requirement.

3. Government Furnished Material (GFM). The offeror should differentiate between government furnished materials (vehicles, equipment, materials, and IT hardware/software) and a breakdown of what the offeror will provide to execute each RPES. This description should demonstrate the offeror understands the requirement and the scope/magnitude of any subcontracts needed to execute the requirement.

4. Government Funded Subcontracts. The offeror should differentiate between government funded subcontracts and those that the offeror will provide as part of the firm fixed price to execute each RPES.

This description should demonstrate the offeror understands the requirement and the scope/magnitude of any subcontracts needed to execute the requirement.

File details come from the government source that posted it. Updated .