Attachment_3 _Past_Performance_Summary_Sheet_(PPSS)_17_Feb_16.docx
DOCX document 18 KB Posted
- Attached to
- Base Civil Engineer Services Federal contract opportunity
- Solicitation number
- FA4814-16-R-0005
About this file
Attachment 3
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3, Past Performance Summary Sheet (PPSS)
1. Contractor:
2. Applicable Solicitation Subfactor (environmental, O&M, etc.,):
3. PPSS # ():
4. Past Performance Requirement:
5. Past Performance Location:
6. Start Date:
7. Completion Date:
8. Client Organization:
9. Facility Owner Organization:
a. Facility Owner Point of Contact:
b. Facility Owner Phone Number:
c. Facility Owner email Address:
10. Acted as Prime Contractor? (Yes/No)
11. Past Performance Description (scope, manpower, equipment, management)
Attachment 3, Past Performance Summary Sheet (PPSS) (SAMPLE)
1. Contractor: Gemini LLC
2. Applicable Solicitation Subfactor (environmental, O&M, etc.,): Subfactor 2 O&M
3. PPSS # (F high voltage distribution):
A. Past Performance Requirement: 2 years of experience within the last 5 years of operations, maintenance, and minor repair of a high voltage electrical distribution system rate at over 5 megawatts. This will include a substation, overhead distribution, underground distribution, switching, transformers, and lighting.
4. Past Performance Location: Keflavik Naval Air station
5. Start Date: Sept 2011
6. Completion Date: Aug 2014
7. Client Organization: 57 FIS
a. Point of Contact: Lt CMDR John Doe
b. Facility Owner Phone Number: 01-327-988-0897
c. Facility Owner email Address: Doe.john.5@us.navy.mil
8. Acted as Prime Contractor? (Yes/No): Yes
9. Past Perfromance Description (scope, manpower, equipment, management):
Through a NAVFAC $1.8M annual contract we provided all operations, maintenance, and repair for a 7.5 megawatt diesel power plant and 13.8KV power distribution system. Components included: substation, switch gear, 34 transformers, over 4 miles of overhead distribution, 1.2 miles of underground distribution, and street lights covering 2.3 miles of roadway. Our 13 man contract team included generator operators and electricians qualified for both high and low voltage system maintenance and repairs. We employed two high reach trucks and provided all vehicles, equipment, materials and parts to keep the system operational, provide new services and disconnect old services no longer needed. System achieved a 99.99% reliability rate with only one major outage in the duration of our 3 year contract.