Attachment_5c _Rev_1.pdf

PDF 4 MB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4809-14-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 5c - Seed Project Drawings (Rev. 1)

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
3300.zip ZIP file
VKAG_14-1201_-_Standard.zip ZIP file
Pictures.zip ZIP file
Additional_As-Builts.zip ZIP file
QR_2_15_July_2015.pdf PDF
Amendment_0005.pdf PDF
Attachment_5a_Rev_1.pdf PDF
SABER_SOW_Section_C_Rev_1_15_Jul_15.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Site_Visit_Minutes.pdf PDF
QR_1_5_June_2015.docx DOCX document
Attach_3.pdf PDF
SABER_SOW_Section_C_FINAL.docx DOCX document
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
SABER_SOW_Section_C_FINAL.docx DOCX document
Attach_12.pdf PDF
Attach_7.pdf PDF
Attach_2.pdf PDF
Attach_11.pdf PDF
Attach_8.pdf PDF
Attach_9.pdf PDF
Attach_3.pdf PDF
Attach_1.pdf PDF
Attach_6.pdf PDF
Attach_5.pdf PDF
RFP.pdf PDF
Attach_4.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

10 9

B

C

D

8 7 6

E

F

G

H

S I G

N A

T U

R E

S

C O

N T

R A

C T

M

G M

T

C E

O U

S I N

G

A

G E

N C

Y

45 3

U N

I T

E D

S

A

T E

S

A

I R

F

O R

C

V

I L

E

N G

I N

E E

R

S

Q U

A D

R O

N

S E

Y M

O U

R

J O

H N

S O

N

A

R

B

S

E

N

O R

H

R

O L I N

A

2 1

P R

O J E

T

L E

PROJECT NUMBER

SHEET

DRAWN BY

DRAWING NUMBER

SCALE

DATE

T H

D R

A W

I N

G

S

H E

N

M

E

A

F I R

E

C

H I E

F

C E

V

I R

O N

M E

N T

A L

C O

M M

U N

I C

A T

I O

N S

B

V

I R

O N

M E

N T

A L

S A

F E

T Y

B

C

C H

I E

F

T

E C

H N

I C

L

U P

P O

E

M E

N T

P R

O J E

G

I N

E E

R C

H I E

F

D

E S

I G

N

E

L E

M E

N T

D

T H

C

I L

I T

Y

C

O N

T A

I N

S

A

C M

L

P

T

E R

I A

A

T

W

I L

L

A S

B E

S T

N

T A

I N

I N

G

M

A T

E R

I A

C M

A N

D

L

E A

D

B

A S

I N

T

L

B P

S

T A

T E

M E

N T

T H

C

I L

I T

Y

C

O N

T A

I N

S

N

O

A

C M

L

T

E R

I A

L S

T H

C

I L

I T

Y

C

O N

T A

I N

S

A

C M

L

T

E R

I A

A

T

W

I L

L

T H

C

I L

I T

Y

C

O N

T A

I N

S

A

C M

L

T

E R

I A

A

T

W

I L

L

T H

C

I L

I T

Y

C

O N

T A

I N

S

A

C M

L

T

E R

I A

A

T

W

I L

L

M

O V

Y

M

L

M

O V

N

T R

A C

T O

R

F

T

A

O

J E

C T

R E

M O

V E

D

B

Y

T

R

C E

M

O V

U

D

N

T R

A C

T

A P

P R

O V

I E

F

E

N G

I N

E E

R

F O

R C

E

P

R O

T E

C T

I O

N

A N

T I T

E R

R O

R I S

M

A P

P R

O V

E

F

R E

V D

E S

C R

I P

T I O

N

G

H

T

R

U

O

F

F

T

U

B

D A

T E

A P

P R

V D

H

T

S

R

I

E

VKAG 14-1201

REPAIR RESTROOM AND ADMIN OFFICES,

BLDG 3300

VKAG 14-1201

R E

P A

S

T R

O O

M

A

M

F

I C

E S

B L D

G

L O

C A

T I O

N

P

L A

N

A

A

W I N

G

I N

D E

X

G-1

CENME

16 JAN 15

1" = 800'

LOCATION PLAN

SCALE: 1"=800'

FINAL DETERMINATION REVEALS NO PRIME OR UNIQUE

FARMLAND ON THE BASE

NOTE

BASE CONTRACTING

BASE CIVIL ENGINEER

GATE 2 (BACK GATE)

CONTRACTOR'S

STORAGE AREA

GATE 1 (MAIN GATE)

VISITOR'S CENTER

MAG. VAR

. 9°-22'W

JUN 11

N

PROJECT LOCATION

DRAWING INDEX

DWG NO SHT NO DESCRIPTION

G-1 1 LOCATION PLAN AND DRAWING INDEX

A-1 2 FLOOR PLAN

M-1 3 MECHANICAL PLAN

M-2 4 MECHANICAL PLAN - CONSTRUCTION MANAGEMENT

HAUL ROUTE

5 5

5 5 5

15 15

PHASE 2

5 15

A-1

8 19

12 13

14 9

14 9

12 14

12 14

B01

B02

B04

B05

C06

D01

D02

D05

D06

D07

D08

D09

D11

D12

D14

D17

D18

D22

D25

D27

D28

D29

D30

D31

D33

D35

D37

D34

D38

D39

D40

D56

D54A

D54

D57

D50

D47

D48

D46

D49

D44

D42

D45

D41

D51

B03

8'

8'

1/8"=1'-0"

4' 16'

1245 3

H

T

R

F

U

B

T

A P

P R

V D

D A

T E

I

T

S

R O

F

U

G

D E

S C

R I P

T I O

N R

E V

F

E

H

D

C

B

P R

O J E

T

L E

D R

A W

I N

G

S

H E

M

E

SCALE

DATE

T H

U N

I T

A

T E

S

A

R

C

V

G

I N

E E

R

S

Q U

A D

R O

N

S E

Y M

O U

R

J O

H N

S O

N

A

R

S

E

N

O R

R

O L

I N

A

SHEET

DRAWN BY

OF

PROJECT NUMBER

245 3

DRAWING NUMBER

A

678910

G

F

E

H

D

C

B

678910

A

P R

O J E

A

S E

C O

N T

R A o v:\PROJECTS\FY-14\vkag 14-1201\VKAG 14-1201 A-1.dwg

T A

K

D

J U

N

G

E N

E R

T

V

I S

I O

N

R E

P A

S

T R

O O

M

A

M

F

I C

E S

B L

G

F L

O O

R

P

L A

N

16 JAN 15

AS-SHOWN

CENME

VKAG 14-1201

C O

N C

E P

T

FLOOR PLAN - FIRST FLOOR

SCALE: 1/8" = 1'-0"

A-1

KEY NOTES:

1. COMPLETELY RENOVATE RESTROOM TO INCLUDE REPLACING ALL FLOOR AND WALL TILE,

REFINISHING/PAINTING WALLS & CEILINGS, REPLACING ALL FIXTURES/PARTITIONS/ VANITIES,

2. REPLACE CARPET AND BASE COVE.

3. PROVIDE NEW VANITY, SOLID SURFACE COUNTER, MIRROR, VANITY LIGHTING

4. SAND, PREP, AND REFINISH STAIRS, TREADS, RISERS, AND HANDRAILS.

5. REMOVE ALL EXISTING CARPET AND VCT/MASTIC

BENEATH (SEE ACM ASSESSMENT REPORT). PROVIDE NEW

CARPET. CONTRACTOR RESPONSIBLE FOR RELOCATING

ALL FURNITURE AS REQUIRED TO PERFORM WORK.

6. REMOVE ALL EXISTING CARPET AND VCT/MASTIC BENEATH (SEE ACM ASSESSMENT REPORT). PROVIDE NEW

PORCELAIN FLOOR TILE TO EXTENTS HATCHED.

7. REMOVE ALL EXISTING CEILING/TEXTUR, AND PROVIDE SUSPENDED CEILING. PROVIDE NEW VCT.

CONTRACTOR RESPONSIBLE FOR RELOCATING ALL FURNITURE AS REQUIRED TO PERFORM WORK.

8. REMOVE EXISTING CEILING./TEXTURE, AND PROVIDE SUSPENDED CEILING. PROVIDE NEW RECESSED MOUNTED

LIGHT FIXTURES.

9. REPLACE CEILING AND GRID AND LIGHTS.

10. TOUCH UP AND REPLACE LOOSE VENEER.

11. REPLACE ENTIRE KITCHENETTE. PROVIDE NEW CABINETS, SOLID SURFACE COUNTER, AND FIXTURES.

12. REMOVE ALL WALL COVERING, PROVIDE LEVEL 4 FINISH AND PAINT.

13. REMOVE WAINSCOT.

14. REF M-2. REPLACE EXISTING HVAC SYSTEM WITH NEW VFR SYSTEM.

15. REF M-2. REPLACE EXISTING HEAT PUMPS WITH NEW ONES OF EQUAL SIZE.

16. PROVIDE NEW BOOK SHELVES TO MATCH EXISTING.

17. PROVIDE BOOK SHELVES.

18. REMOVE EXISTING WALL COVERING, PROVIDE LEVEL 4 FINISH AND PAINT.

19. REPLACE ENTIRE EXHAUST SYSTEM.

20. REWIRE LIGHTS AND PROVIDE SEPARATE SWITCHING FOR IN-BOARD/OUT-BOARD LAMPS,

PHASE1 PHASE 2

KEY PLAN

FLOOR PLAN - SECOND FLOOR (ENGINEERING)

SCALE: 1/8" = 1'-0"

A-1

N

MAG. VAR. 9°-22'W

JUN '11

1245 3

T

R

F

U

B

T

A P

P R

V D

D A

T E

I

T

S

R

O

F

U

G

D E

S C

R I P

T I O

N R

E V

F

E

H

D

C

B

P R

O J E

T

L E

D R

A W

I N

G

S

H E

M

E

SCALE

DATE

T H

U N

I T

A

T E

S

A

R

C

V

I L

E

N G

I N

E E

R

S

Q U

A D

R O

N

S E

Y M

O U

R

J O

H N

S O

N

A

R

S

E

N

O R

R

O L I N

A

SHEET

DRAWN BY

OF

PROJECT NUMBER

245 3

DRAWING NUMBER

A

678910

G

F

E

H

D

C

B

678910

A v:\PROJECTS\FY-14\vkag 14-1201\VKAG 14-1201 M-1.dwg

P R

O J E

A

S E

C O

N T

R A

T A

D

P A

S

T R

O O

M

A

M

F

I C

E S

B L D

G

M E

C H

A N

I C

A L

P

L A

N

16 JAN 15

AS SHOWN

CENME

VKAG 14-1201

C O

N C

E P

T

C O

N T

R A

C T

T A

S K

MECHANICAL PLAN - FIRST FLOOR

SCALE: 1/4" = 1'-0"

M-1 KEY PLAN

N

MAG. VAR. 9°-22'W

JUN '11

4'

4' 12'

1/4"=1'-0"

VAULT

VAULT

COPY

ROOM

DRAFTING

BCE

SEC.

COMMANDER'S

CONFERENCE

ROOM

CEP.

CONF.

ROOM

OFFICEOFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PHASE 1: REPLACE ENTIRE HVAC

SYSTEMWITH VRF SYSTEM, THIS AREA

EXTEND SEPARATE TERMINAL UNIT INTO

MEN'S ROOM PROVIDE OUTSIDE AIR

DUCTING FOR ENTIRE SYSTEM.

UP

UP

UP

UP

PROPOSED

NEW WALL

RESOURCES

FLIGHT

UP

ASSET

MANAGEMENT

ASSET

MANAGEMENT

PAINT

SHOP

PLANNING

ASBESTOS SHOP

STORAGE

STORAGE

OFFICE

ELECTRICAL

MAINTENANCE

ELECTRICAL

EQUIPMENT

ROOM

UTILITY

MAINTENANCE

LOCKERS

BATH

TOOLS

OFFICE

BREAK

ROOM

OFFICE

CARPENTER

SHOP

OFFICE

OFFICE

OFFICE CPU

TOOL

ROOM

NCOIC OFFICE

LOCK

SHOP

METAL

SHOP

PAVEMENTS &

GROUNDS

TOOL

ROOM

TOOL

ROOM

BREAK

ROOM

MATERIAL

CONTROL

STORAGE

MATERIAL

CONTROL

STORAGE

COCESS

UCC

CUSTOMER

SERVICE

CHIEF OF

OPERATIONS

OPS CUSTOMER

SERVICE

DEPUTY CHIEF

OF OPS

RESOURCES

FLIGHT

CEM

FRONT

VAULT

EXT.

VAULT

COPY

ROOM

DRAFTING

BCE

BCE

SEC.

COMMANDER'S

CONFERENCE

ROOM

DEPUTY

BCE

WOMEN'S

RESTROOM

CE CONFERENCE

RM

MEN'S

RESTROOM

ENGINEERING

LOBBY

FIRST

SERGEANT

MECHANICAL

ROOM

EMCS

EQUIPMENT

WIMS

OFFICE

ALARM

LIBRARY

LOGISTICS

CE

SUPERINTENDENT

VENT

ENVIRONMENTAL

CEP.

CONF.

ROOM

OFFICEOFFICE

OFFICE

OFFICE

OFFICE

C L O

S E

T

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

1245 3

T

R

F

U

B

T

A P

P R

V D

D A

T E

I

T

S

R

O

F

U

G

D E

S C

R I P

T I O

N R

E V

F

E

H

D

C

B

P R

O J E

T

L E

D R

A W

I N

G

S

H E

M

E

SCALE

DATE

T H

U N

I T

A

T E

S

A

R

C

V

I L

E

N G

I N

E E

R

S

Q U

A D

R O

N

S E

Y M

O U

R

J O

H N

S O

N

A

R

S

E

N

O R

R

O L I N

A

SHEET

DRAWN BY

OF

PROJECT NUMBER

245 3

DRAWING NUMBER

A

678910

G

F

E

H

D

C

B

678910

A v:\PROJECTS\FY-14\vkag 14-1201\M-2.dwg

P R

O J E

A

S E

C O

N T

R A

T A

D

P A

S

T R

O O

M

A

M

F

I C

E S

B L D

G

M E

C H

A N

I C

A L

P

L A

N

C

O N

S T

R U

C T

I O

N

M

A N

A G

E M

E N

T

16 JAN 15

AS SHOWN

CENME

VKAG 14-1201

C O

N C

E P

T

C O

N T

R A

C T

T A

S K

8'

8'

1/8"=1'-0"

4' 16'

PHASE 2- BID OPTION 1

1. DEMOLISH PACKAGE HEAT PUMP ON ROOF.

2. DEMOLISH PACKAGE HEAT PUMP ON ROOF.

3. DEMOLISH ALL DUCTWORK AND HANGERS.

4. DESIGN AND INSTALL NEW VARIABLE REFRIGERANT FLOW

(VRF) HVAC SYSTEM TO INCLUDE CONDITIONED OUTSIDE AIR

TO EACH INDOOR BLOWER.

5. INSTALL NEW PACKAGE HEAT PUMP. TIE TO EXISTING

DUCTWORK. REUSE EXISTING ELECTRICAL SERVICE IF SIZED

CORRECTLY. PROVIDE NEW T-STAT (PROGRAMMABLE).

N

MAG. VAR. 9°-22'W

JUN '11

KEY PLAN

B01

B02

B04

B05

C04

C05

C06

C07

C08

D01

D02

D05

D06

D07

D08

D09

D11

D12

D14

D17

D18

D22

D25

D27

D28

D29

D30

D31

D33

D35

D37

D34

D38

D39

D40

D56

D54A

D54

D57

D50

D47

D48

D46

D49

D44

D42

D45

D41

D51

B03

4 3

NIC

UNIT ON ROOF DIRECTLY ABOVE

1 5

1 5

PACKAGE HEAT PUMP ON ROOF

PACKAGE HEAT PUMP ON ROOF

B01

B02

B04

B06

B05

B07

B21A

B21

B23

B22

B38

B39

B40

B41

B36

B35

B42

B43

B32

B33

B31

B30

B29

B28B26

B25

B24

B27

B12 B19

B14

B17

B16

B15

B18

B13

B11

B11A

B10

B09

C04

C05

C06

C07

C08

C09

C10

C12

C14

C15 C16

C18

C20

C21

C22

C23

C24

C31

C25

C26

C27

C30

C28

C32

D01

D02

D05

D06

D07

D08

D09

D11

D12

D14

D17

D18

D22

D25

D27

D28

D29

D30

D31

D33

D35

D37

D34

D38

D39

D40

D56

D54A

D54

D57

D50D47

D48

D46

D49

D44

D42

D45

D41

D51

A02

A04

A05

A06

A16

A17

A18

A19

A20

A28

A27

A26

A25

A24

A21

A11

A12

A10

A09

A13

A14

A08

A07

A22

A23

A29

A30

A15

B

A

B07A

B03

A26-1

File details come from the government source that posted it. Updated .