Attachment_5c _Rev_1.pdf
PDF 4 MB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4809-14-R-0001
About this file
Attachment 5c - Seed Project Drawings (Rev. 1)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3300.zip | ZIP file | |
| VKAG_14-1201_-_Standard.zip | ZIP file | |
| Pictures.zip | ZIP file | |
| Additional_As-Builts.zip | ZIP file | |
| QR_2_15_July_2015.pdf | ||
| Amendment_0005.pdf | ||
| Attachment_5a_Rev_1.pdf | ||
| SABER_SOW_Section_C_Rev_1_15_Jul_15.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Site_Visit_Minutes.pdf | ||
| QR_1_5_June_2015.docx | DOCX document | |
| Attach_3.pdf | ||
| SABER_SOW_Section_C_FINAL.docx | DOCX document | |
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| SABER_SOW_Section_C_FINAL.docx | DOCX document | |
| Attach_12.pdf | ||
| Attach_7.pdf | ||
| Attach_2.pdf | ||
| Attach_11.pdf | ||
| Attach_8.pdf | ||
| Attach_9.pdf | ||
| Attach_3.pdf | ||
| Attach_1.pdf | ||
| Attach_6.pdf | ||
| Attach_5.pdf | ||
| RFP.pdf | ||
| Attach_4.xlsx | XLSX spreadsheet |
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
10 9
B
C
D
8 7 6
E
F
G
H
S I G
N A
T U
R E
S
C O
N T
R A
C T
M
G M
T
C E
O U
S I N
G
A
G E
N C
Y
45 3
U N
I T
E D
S
A
T E
S
A
I R
F
O R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
B
S
E
N
O R
H
R
O L I N
A
2 1
P R
O J E
T
L E
PROJECT NUMBER
SHEET
DRAWN BY
DRAWING NUMBER
SCALE
DATE
T H
D R
A W
I N
G
S
H E
N
M
E
A
F I R
E
C
H I E
F
C E
V
I R
O N
M E
N T
A L
C O
M M
U N
I C
A T
I O
N S
B
V
I R
O N
M E
N T
A L
S A
F E
T Y
B
C
C H
I E
F
T
E C
H N
I C
L
U P
P O
E
M E
N T
P R
O J E
G
I N
E E
R C
H I E
F
D
E S
I G
N
E
L E
M E
N T
D
T H
C
I L
I T
Y
C
O N
T A
I N
S
A
C M
L
P
T
E R
I A
A
T
W
I L
L
A S
B E
S T
N
T A
I N
I N
G
M
A T
E R
I A
C M
A N
D
L
E A
D
B
A S
I N
T
L
B P
S
T A
T E
M E
N T
T H
C
I L
I T
Y
C
O N
T A
I N
S
N
O
A
C M
L
T
E R
I A
L S
T H
C
I L
I T
Y
C
O N
T A
I N
S
A
C M
L
T
E R
I A
A
T
W
I L
L
T H
C
I L
I T
Y
C
O N
T A
I N
S
A
C M
L
T
E R
I A
A
T
W
I L
L
T H
C
I L
I T
Y
C
O N
T A
I N
S
A
C M
L
T
E R
I A
A
T
W
I L
L
M
O V
Y
M
L
M
O V
N
T R
A C
T O
R
F
T
A
O
J E
C T
R E
M O
V E
D
B
Y
T
R
C E
M
O V
U
D
N
T R
A C
T
A P
P R
O V
I E
F
E
N G
I N
E E
R
F O
R C
E
P
R O
T E
C T
I O
N
A N
T I T
E R
R O
R I S
M
A P
P R
O V
E
F
R E
V D
E S
C R
I P
T I O
N
G
H
T
R
U
O
F
F
T
U
B
D A
T E
A P
P R
V D
H
T
S
R
I
E
VKAG 14-1201
REPAIR RESTROOM AND ADMIN OFFICES,
BLDG 3300
VKAG 14-1201
R E
P A
S
T R
O O
M
A
M
F
I C
E S
B L D
G
L O
C A
T I O
N
P
L A
N
A
A
W I N
G
I N
D E
X
G-1
CENME
16 JAN 15
1" = 800'
LOCATION PLAN
SCALE: 1"=800'
FINAL DETERMINATION REVEALS NO PRIME OR UNIQUE
FARMLAND ON THE BASE
NOTE
BASE CONTRACTING
BASE CIVIL ENGINEER
GATE 2 (BACK GATE)
CONTRACTOR'S
STORAGE AREA
GATE 1 (MAIN GATE)
VISITOR'S CENTER
MAG. VAR
. 9°-22'W
JUN 11
N
PROJECT LOCATION
DRAWING INDEX
DWG NO SHT NO DESCRIPTION
G-1 1 LOCATION PLAN AND DRAWING INDEX
A-1 2 FLOOR PLAN
M-1 3 MECHANICAL PLAN
M-2 4 MECHANICAL PLAN - CONSTRUCTION MANAGEMENT
HAUL ROUTE
5 5
5 5 5
15 15
PHASE 2
5 15
A-1
8 19
12 13
14 9
14 9
12 14
12 14
B01
B02
B04
B05
C06
D01
D02
D05
D06
D07
D08
D09
D11
D12
D14
D17
D18
D22
D25
D27
D28
D29
D30
D31
D33
D35
D37
D34
D38
D39
D40
D56
D54A
D54
D57
D50
D47
D48
D46
D49
D44
D42
D45
D41
D51
B03
8'
8'
1/8"=1'-0"
4' 16'
1245 3
H
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
T
L E
D R
A W
I N
G
S
H E
M
E
SCALE
DATE
T H
U N
I T
A
T E
S
A
R
C
V
G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
S
E
N
O R
R
O L
I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A
P R
O J E
A
S E
C O
N T
R A o v:\PROJECTS\FY-14\vkag 14-1201\VKAG 14-1201 A-1.dwg
T A
K
D
J U
N
G
E N
E R
T
V
I S
I O
N
R E
P A
S
T R
O O
M
A
M
F
I C
E S
B L
G
F L
O O
R
P
L A
N
16 JAN 15
AS-SHOWN
CENME
VKAG 14-1201
C O
N C
E P
T
FLOOR PLAN - FIRST FLOOR
SCALE: 1/8" = 1'-0"
A-1
KEY NOTES:
1. COMPLETELY RENOVATE RESTROOM TO INCLUDE REPLACING ALL FLOOR AND WALL TILE,
REFINISHING/PAINTING WALLS & CEILINGS, REPLACING ALL FIXTURES/PARTITIONS/ VANITIES,
2. REPLACE CARPET AND BASE COVE.
3. PROVIDE NEW VANITY, SOLID SURFACE COUNTER, MIRROR, VANITY LIGHTING
4. SAND, PREP, AND REFINISH STAIRS, TREADS, RISERS, AND HANDRAILS.
5. REMOVE ALL EXISTING CARPET AND VCT/MASTIC
BENEATH (SEE ACM ASSESSMENT REPORT). PROVIDE NEW
CARPET. CONTRACTOR RESPONSIBLE FOR RELOCATING
ALL FURNITURE AS REQUIRED TO PERFORM WORK.
6. REMOVE ALL EXISTING CARPET AND VCT/MASTIC BENEATH (SEE ACM ASSESSMENT REPORT). PROVIDE NEW
PORCELAIN FLOOR TILE TO EXTENTS HATCHED.
7. REMOVE ALL EXISTING CEILING/TEXTUR, AND PROVIDE SUSPENDED CEILING. PROVIDE NEW VCT.
CONTRACTOR RESPONSIBLE FOR RELOCATING ALL FURNITURE AS REQUIRED TO PERFORM WORK.
8. REMOVE EXISTING CEILING./TEXTURE, AND PROVIDE SUSPENDED CEILING. PROVIDE NEW RECESSED MOUNTED
LIGHT FIXTURES.
9. REPLACE CEILING AND GRID AND LIGHTS.
10. TOUCH UP AND REPLACE LOOSE VENEER.
11. REPLACE ENTIRE KITCHENETTE. PROVIDE NEW CABINETS, SOLID SURFACE COUNTER, AND FIXTURES.
12. REMOVE ALL WALL COVERING, PROVIDE LEVEL 4 FINISH AND PAINT.
13. REMOVE WAINSCOT.
14. REF M-2. REPLACE EXISTING HVAC SYSTEM WITH NEW VFR SYSTEM.
15. REF M-2. REPLACE EXISTING HEAT PUMPS WITH NEW ONES OF EQUAL SIZE.
16. PROVIDE NEW BOOK SHELVES TO MATCH EXISTING.
17. PROVIDE BOOK SHELVES.
18. REMOVE EXISTING WALL COVERING, PROVIDE LEVEL 4 FINISH AND PAINT.
19. REPLACE ENTIRE EXHAUST SYSTEM.
20. REWIRE LIGHTS AND PROVIDE SEPARATE SWITCHING FOR IN-BOARD/OUT-BOARD LAMPS,
PHASE1 PHASE 2
KEY PLAN
FLOOR PLAN - SECOND FLOOR (ENGINEERING)
SCALE: 1/8" = 1'-0"
A-1
N
MAG. VAR. 9°-22'W
JUN '11
1245 3
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R
O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
T
L E
D R
A W
I N
G
S
H E
M
E
SCALE
DATE
T H
U N
I T
A
T E
S
A
R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
S
E
N
O R
R
O L I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A v:\PROJECTS\FY-14\vkag 14-1201\VKAG 14-1201 M-1.dwg
P R
O J E
A
S E
C O
N T
R A
T A
D
P A
S
T R
O O
M
A
M
F
I C
E S
B L D
G
M E
C H
A N
I C
A L
P
L A
N
16 JAN 15
AS SHOWN
CENME
VKAG 14-1201
C O
N C
E P
T
C O
N T
R A
C T
T A
S K
MECHANICAL PLAN - FIRST FLOOR
SCALE: 1/4" = 1'-0"
M-1 KEY PLAN
N
MAG. VAR. 9°-22'W
JUN '11
4'
4' 12'
1/4"=1'-0"
VAULT
VAULT
COPY
ROOM
DRAFTING
BCE
SEC.
COMMANDER'S
CONFERENCE
ROOM
CEP.
CONF.
ROOM
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PHASE 1: REPLACE ENTIRE HVAC
SYSTEMWITH VRF SYSTEM, THIS AREA
EXTEND SEPARATE TERMINAL UNIT INTO
MEN'S ROOM PROVIDE OUTSIDE AIR
DUCTING FOR ENTIRE SYSTEM.
UP
UP
UP
UP
PROPOSED
NEW WALL
RESOURCES
FLIGHT
UP
ASSET
MANAGEMENT
ASSET
MANAGEMENT
PAINT
SHOP
PLANNING
ASBESTOS SHOP
STORAGE
STORAGE
OFFICE
ELECTRICAL
MAINTENANCE
ELECTRICAL
EQUIPMENT
ROOM
UTILITY
MAINTENANCE
LOCKERS
BATH
TOOLS
OFFICE
BREAK
ROOM
OFFICE
CARPENTER
SHOP
OFFICE
OFFICE
OFFICE CPU
TOOL
ROOM
NCOIC OFFICE
LOCK
SHOP
METAL
SHOP
PAVEMENTS &
GROUNDS
TOOL
ROOM
TOOL
ROOM
BREAK
ROOM
MATERIAL
CONTROL
STORAGE
MATERIAL
CONTROL
STORAGE
COCESS
UCC
CUSTOMER
SERVICE
CHIEF OF
OPERATIONS
OPS CUSTOMER
SERVICE
DEPUTY CHIEF
OF OPS
RESOURCES
FLIGHT
CEM
FRONT
VAULT
EXT.
VAULT
COPY
ROOM
DRAFTING
BCE
BCE
SEC.
COMMANDER'S
CONFERENCE
ROOM
DEPUTY
BCE
WOMEN'S
RESTROOM
CE CONFERENCE
RM
MEN'S
RESTROOM
ENGINEERING
LOBBY
FIRST
SERGEANT
MECHANICAL
ROOM
EMCS
EQUIPMENT
WIMS
OFFICE
ALARM
LIBRARY
LOGISTICS
CE
SUPERINTENDENT
VENT
ENVIRONMENTAL
CEP.
CONF.
ROOM
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
C L O
S E
T
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
1245 3
T
R
F
U
B
T
A P
P R
V D
D A
T E
I
T
S
R
O
F
U
G
D E
S C
R I P
T I O
N R
E V
F
E
H
D
C
B
P R
O J E
T
L E
D R
A W
I N
G
S
H E
M
E
SCALE
DATE
T H
U N
I T
A
T E
S
A
R
C
V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S E
Y M
O U
R
J O
H N
S O
N
A
R
S
E
N
O R
R
O L I N
A
SHEET
DRAWN BY
OF
PROJECT NUMBER
245 3
DRAWING NUMBER
A
678910
G
F
E
H
D
C
B
678910
A v:\PROJECTS\FY-14\vkag 14-1201\M-2.dwg
P R
O J E
A
S E
C O
N T
R A
T A
D
P A
S
T R
O O
M
A
M
F
I C
E S
B L D
G
M E
C H
A N
I C
A L
P
L A
N
C
O N
S T
R U
C T
I O
N
M
A N
A G
E M
E N
T
16 JAN 15
AS SHOWN
CENME
VKAG 14-1201
C O
N C
E P
T
C O
N T
R A
C T
T A
S K
8'
8'
1/8"=1'-0"
4' 16'
PHASE 2- BID OPTION 1
1. DEMOLISH PACKAGE HEAT PUMP ON ROOF.
2. DEMOLISH PACKAGE HEAT PUMP ON ROOF.
3. DEMOLISH ALL DUCTWORK AND HANGERS.
4. DESIGN AND INSTALL NEW VARIABLE REFRIGERANT FLOW
(VRF) HVAC SYSTEM TO INCLUDE CONDITIONED OUTSIDE AIR
TO EACH INDOOR BLOWER.
5. INSTALL NEW PACKAGE HEAT PUMP. TIE TO EXISTING
DUCTWORK. REUSE EXISTING ELECTRICAL SERVICE IF SIZED
CORRECTLY. PROVIDE NEW T-STAT (PROGRAMMABLE).
N
MAG. VAR. 9°-22'W
JUN '11
KEY PLAN
B01
B02
B04
B05
C04
C05
C06
C07
C08
D01
D02
D05
D06
D07
D08
D09
D11
D12
D14
D17
D18
D22
D25
D27
D28
D29
D30
D31
D33
D35
D37
D34
D38
D39
D40
D56
D54A
D54
D57
D50
D47
D48
D46
D49
D44
D42
D45
D41
D51
B03
4 3
NIC
UNIT ON ROOF DIRECTLY ABOVE
1 5
1 5
PACKAGE HEAT PUMP ON ROOF
PACKAGE HEAT PUMP ON ROOF
B01
B02
B04
B06
B05
B07
B21A
B21
B23
B22
B38
B39
B40
B41
B36
B35
B42
B43
B32
B33
B31
B30
B29
B28B26
B25
B24
B27
B12 B19
B14
B17
B16
B15
B18
B13
B11
B11A
B10
B09
C04
C05
C06
C07
C08
C09
C10
C12
C14
C15 C16
C18
C20
C21
C22
C23
C24
C31
C25
C26
C27
C30
C28
C32
D01
D02
D05
D06
D07
D08
D09
D11
D12
D14
D17
D18
D22
D25
D27
D28
D29
D30
D31
D33
D35
D37
D34
D38
D39
D40
D56
D54A
D54
D57
D50D47
D48
D46
D49
D44
D42
D45
D41
D51
A02
A04
A05
A06
A16
A17
A18
A19
A20
A28
A27
A26
A25
A24
A21
A11
A12
A10
A09
A13
A14
A08
A07
A22
A23
A29
A30
A15
B
A
B07A
B03
A26-1
File details come from the government source that posted it. Updated .